Att 02 Price Schedule AV Refresh.pdf

PDF 100 KB Posted

Attached to
Joint Region Marianas Audio Visual (AV) Refresh
Solicitation number
N6264926QH044
Issued by

About this file

Price Schedule Summary: JRM Building 200 Flag Conference Room AV Refresh

This document is a pricing schedule for an audiovisual (AV) equipment refresh project at JRM Building 200's Flag Conference Room. The project encompasses five contract line items (CLINs) totaling equipment, installation, integration, programming, validation, and removal services. CLIN 0001 covers project coordination, scheduling, site access coordination, field verification, and stakeholder/Contracting Officer's Representative (COR) coordination as a single job. CLIN 0002 addresses equipment, installation, and integration services and includes primary front displays (2 units of minimum 95-inch commercial-grade displays without embedded Wi-Fi or Bluetooth), display wall mounts (2 units), beamforming microphone arrays (2 ceiling-mounted units with acoustic echo cancellation), ceiling speakers (8 units), an audio amplifier, a Digital Signal Processor (DSP) with acoustic echo cancellation and noise suppression, AV switching and control support hardware, rack power distribution and uninterruptible power supply support, bulk cabling (CAT6, control, and audio), NIPRNet/SIPRNet presentation connectivity, workstation camera mounting hardware, rack hardware and cable management materials, and installation/integration services to install and test all components with existing Government-furnished equipment.

CLIN 0003 encompasses programming, configuration, and existing equipment integration for the touchscreen/control processor, DSP, SVTC codec, SVTC camera, and workstation camera, including final control programming and configuration files. CLIN 0004 requires system validation/Secure Video Teleconference (SVT) operations testing, deficiency correction, and comprehensive documentation including equipment lists, as-built signal-flow documentation, rack layouts, cable labels, configuration notes, operating instructions, quick-reference guides, user training, manufacturer warranty information, and workmanship warranty. CLIN 0005 addresses removal and Government property turnover, specifically removing the existing credenza, front-of-room displays, mounts, and obsolete AV cabling while retaining the SVTC codec, SVTC camera, workstation camera, touchscreen/control processor, and existing half-rack cabinet, with removed property turned over to the COR. The schedule contains columns for quantity, part description, unit of measure, unit price, and total price, though pricing data is not populated in this template document.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Qty Part Description Unit of

Measure Unit Price Total Price

CLIN 0001 - Project Coordination and Site Verification

Project coordination, scheduling, site access coordination, field verification, and stakeholder/COR coordination Job

CLIN 0001 SUBTOTAL

CLIN 0002 - Equipment, Installation, and Integration

Primary Front Displays

Commercial-grade front display, minimum 95-inch diagonal; no embedded Wi-Fi or Bluetooth

EA

Display Wall Mounts

Heavy-duty wall mount compatible with furnished displays and verified wall structure

EA

Beamforming Microphone Arrays

Ceiling-mounted beamforming microphone array providing full conference-table pickup and supporting DSP-based acoustic echo cancellation

EA

Ceiling Speakers

Ceiling-mounted speaker providing clear, uniform room-audio coverage

EA

Audio Amplifier

Amplifier sized for the furnished speaker system and room-audio design

EA

Digital Signal Processor (DSP)

DSP providing acoustic echo cancellation, noise suppression, automatic gain control, microphone mixing, and room audio/control-system integration

EA

AV Switching / Control Support Hardware

Switching, interface, and control-support hardware required to integrate the new AV equipment with the existing Government-furnished system, including a dedicated physical conference-table microphone mute/unmute control with clear mute-state indication

Lot

Rack Power Distribution / UPS Support

Rack power distribution and uninterruptible power support sized for the installed AV system Lot

Bulk Cabling

CAT6, control, audio, and other signal cabling required for installation and integration Lot

NIPRNet / SIPRNet Presentation Connectivity

Price Schedule - JRM Building 200 Flag Conference Room AV Refresh

Cables, adapters, wall plates, pass-throughs, and fixed connectivity required at the designated operator/workstation location Lot

Workstation Camera Mounting Hardware

Secure mounting solution and required adapters for the existing

Government-furnished workstation camera Lot

Rack Hardware / Cable Management

Rack shelves, brackets, cable management, labels, fasteners, mounting hardware, connectors, patch cables, power supplies, interface devices, and other incidental materials required for a complete installation

Lot

Installation / Integration Services

Install, terminate, label, dress, integrate, and test the displays, audio system, AV/control hardware, rack hardware, cabling, presentation connectivity, and existing Government-furnished equipment

Lot

CLIN 0002 SUBTOTAL

CLIN 0003 - Programming, Configuration, and Existing

Equipment Integration

Program and configure the existing touchscreen/control processor and DSP; integrate the existing SVTC codec, SVTC camera, and workstation camera; provide final control programming, DSP configuration, presets, and restore/configuration files

Job

CLIN 0003 SUBTOTAL

CLIN 0004 - System Validation, Documentation, and Training

Perform system validation/SOVT; correct and retest deficiencies;

provide final equipment list, as-built signal-flow documentation, rack layout, cable labels, configuration notes, operating instructions, quick-reference guide, user training, standard manufacturer warranty information, and workmanship warranty

Job

CLIN 0004 SUBTOTAL

CLIN 0005 - Removal and Government Property Turnover

Remove the existing credenza, existing front-of-room displays/mounts, and AV cabling or small AV hardware made obsolete by the refresh; retain the SVTC codec, SVTC camera, workstation camera, touchscreen/control processor, and existing half-rack cabinet; turn removed Government property over to the COR at the Government-designated on-site location

Job

CLIN 0005 SUBTOTAL

TOTAL