Performance Work Statement

Analysis, Development, and Implementation of Manufacturing Technology for the Defense Industrial Base

Prepared by

Charles Taylor US Army Combat Capabilities Development Command (CCDC) Aviation and Missile Center (AvMC) Manufacturing Science and Technology (MS&T) Division

ATTN: FCDD-AME-M

Building 5400, Room S-240 5400 Fowler Road Redstone Arsenal, AL 35898

(256) 842-0274 phone

(256) 842-7656 fax charles.t.taylor75.civ@mail.mil

14 January 2020

Modification History

Revision: 0

Date: 1/10/20

Changes/Notes: Initial Version

PERFORMANCE WORK STATEMENT

Analysis, Development, and Implementation of Manufacturing Technology for the Defense Industrial Base

1.0 PURPOSE: The purpose of this Performance Work Statement (PWS) is to define the requirements for Analysis, Development, and Implementation of Manufacturing Technology for the Defense Industrial Base.

1.1 Background:

Keeping pace with the rapid progression of advanced material and process applications in modern systems requires a focused initiative for the development and deployment of advanced manufacturing techniques. The Department of Defense (DoD) is continually seeking to transform to more cost-effective, sustainable and maintainable use of high performance materials and manufacturing techniques to further improve readiness through increased system availability and performance. There is a need for technical and management capabilities that can help conserve scarce funding through savings that would otherwise be lost through inefficient machining and manufacturing operations—or lost to non-U.S. operations.

Identifying technical and management opportunities, implementing the solutions, and transferring those solutions to the Defense Industrial Base is a needed function. Additionally, advanced manufacturing systems require a new and uniquely trained labor pool that has a broader understanding of materials, processes, tooling, and machine computer control systems.

Tasks presented in this PWS include:

· Program Management

· DoD Manufacturing Project Implementation

· Industry Training and Outreach

2.0 APPLICABLE DOCUMENTS: Applicable top level documents are identified by number, version, title, date, and category in the Document Summary List (DSL), an attachment to the Contract. The document versions specified on the DSL take precedence over the generic references (without revision letters) cited in the PWS.

3.0 PERFORMANCE REQUIREMENTS: The work required by this contract shall be performed in accordance with this PWS as delineated by task orders to be issued in accordance with the terms and conditions of the basic contract.

3.1 Program Management

The contractor’s technical strategies shall focus on current proven manufacturing methods as well as state-of-the-art methods beyond that of conventional manufacturing. The contractor shall provide program and project management services for multiple DoD and Industry organizations in managing a variety of manufacturing technology projects.

The contractor shall utilize a project management process that focuses on the progression of the project through a complete project management life-cycle including defining the scope, planning, executing, monitoring and controlling, and closing.

The contractor shall prepare progress reports by task in accordance with (IAW) DI-MGMT-80227. A performance and cost report by task shall be prepared IAW DI-FNCL-80912.

3.2 DoD Manufacturing Project Implementation

Projects that benefit the DoD Industrial Base to include Industry and the Organic Industrial Base will be identified by the Government or submitted by the contractor and reviewed by the Government to determine benefit for the Warfighter and the Defense Industrial Base. Projects shall include manufacturing assessments, manufacturing process analysis and development, process demonstrations, and implementation of manufacturing solutions. The contractor shall initiate, perform and complete each project as identified in task orders. The contractor shall be able to utilize existing partnerships and establish future collaborations with industry and academia to work together on manufacturing technology solutions.

Types of potential manufacturing technology need areas shall include (where applicable), but not limited to: US Army Aviation and Missile systems as well as Manufacturing and Enabling/Disruptive Technologies for the larger DoD Industrial Base.

· Aviation – Platforms/materials/structures, power systems, engines/propulsion systems, drives/rotors, mission systems, avionics/navigation, sensors, networks, data link and communication, survivability, sustainability, autonomy, manned/unmanned teaming (MUMT), unmanned aerial vehicle (UAV), component cyber security and aviation ground support equipment/systems (AGSE).

· Missile – Target detection/acquisition/tracking sensors, missile electronics, seekers to defeat moving targets and air defense threats, guidance/control for improved precision and Global Positioning System (GPS)-denied precisions, lethality mechanisms, warheads, fuzes, payloads, radar, datalink and communication, materials and structures, power systems, aerodynamics, navigation systems, modeling and simulation, energetics, component cyber security, propulsion systems for increased range and decisive effects, missile launchers, and support equipment.

· Manufacturing and Enabling/Disruptive Technologies – Innovation enablers, additive manufacturing, high energy creation and storage systems, directed energy, advanced materials/processes, advanced manufacturing techniques, manufacturing cyber security, modeling and simulation, virtual prototyping, robotics, automation, high temperature materials, lightweight & hybrid materials, flexible electronics, reclamation/repair technologies, and open system architectures for enhanced manufacturing productivity (digital manufacturing and Industrial Internet of Things (IIoT)).

3.2.1 Manufacturing Assessments

As identified in task orders, the contractor shall assemble a team of qualified engineers and analysts familiar with manufacturing, machining, related tooling and equipment, manufacturing and repair processes as well as above the shop floor production planning and control systems, including project planning to perform assessments at Army and DoD facilities as well as commercial Original Equipment Manufacturers (OEM) and subcontractors. These assessments shall include, but are not limited to:

· Assess manufacturing technology needs by reviewing manufacturing and processing operations and interviewing shop floor and management personnel

· Define potential projects

· Identify project requirements

· Compile relevant background data, lists, photos, layouts, diagrams IAW DI-ADMN-80447A

· Develop preliminary project plans and rough-order-of-magnitude project cost estimates

· Document findings, conclusions and recommendations IAW DI-MISC-80048

3.2.2 Manufacturing Process Analysis and Development

As identified in task orders, manufacturing processes shall be analyzed in order that the process output will be realized in the most efficient manner obtainable. The contractor shall determine the necessary means for conducting this analysis, taking into consideration all the applicable rules and regulations that apply. This may include, but is not limited to, the DoD, the federal government, and/or the state government regulation and policies.

The manufacturing process shall be evaluated, analyzed, and developed on a continuing basis during project development and execution. The process evaluation shall be conducted in order to determine, among other possible items, optimal methods, lower costs, reduced lead times, and quality improvements that will enhance the product for the Warfighter.

3.2.3 Process Demonstrations

As identified in task orders, the contractor shall validate manufacturing technology solutions utilizing in-house capabilities and industry partners’ process demonstrations. Concepts shall be tested and optimized for Defense Industrial Base customer benefit to include proof-of-concepts and prototype components.

3.2.4 Implementation of Manufacturing Solutions

As identified in task orders, the contractor shall deliver manufacturing solutions to the Defense Industrial Base customer and install the solutions at the customer location. Solutions shall include minor evolutionary changes to existing processes up to full turnkey installations of new equipment. Drawings of equipment shall be provided IAW DI-SESS-81000E, DI-SESS-81001E, DI-SESS-81002F, DI-SESS-81003E, DI-SESS-81004E, and DI-SESS-81008E, as applicable. Process descriptions shall be provided IAW DI-SESS-81012E. Drawings and process descriptions shall be IAW MIL-STD-31000B. Any special packaging instructions shall be provided IAW DI-PACK-80121C. The contractor shall work closely with Defense Industrial Base customers at the customers’ facilities to ensure new solutions are fully integrated, operational, and are providing the expected results in the manufacturing processes. The contractor shall have a strategy to mitigate the difficulties associated with long lead items and diminishing sources.

3.2.5 Technology Transition of Manufacturing Solutions

Contractor participation is necessary to successfully transition new manufacturing solutions from labs, centers, and other science and technology developers (both governmental and non-governmental organizations) to customer designated programs, project offices, and systems. As identified in task orders and in order to foster a clear understanding between all parties, the contractor shall enable the technology transition of manufacturing solutions. Work shall include assistance in the preparation of transition agreements and/or plans and the implementation of the agreement/plan until the technology has been fully transitioned.

3.3 Industry Training and Outreach Comment by Taylor, Charles T CIV (US): Add hardware deliverables section, call out CDRLs too to address data deliverables at the same time

As identified in task orders, the contractor shall provide the resources, technologies and facilities to train and develop the U.S. workforce to implement the “state of the market” manufacturing techniques. For individual task orders as applicable, the contractor shall provide a Training Program Development and Management Plan IAW DI-ILSS-81070. This training shall be conducted at a customer site, supplier or the contractor training facilities.

As appropriate, the contractor shall participate in trade shows and technical conferences through the use of exhibit booths and technical presentations. Specific consideration shall be given to the Defense Manufacturing Conference due to its importance to the CCDC AvMC, Manufacturing Science and Technology Division. Contractor booths shall be staffed by contractor personnel or industry partners, providing examples of success stories and ongoing projects. Presentations at conferences are encouraged. The contractor shall provide presentations IAW DI-ADMN-81373. Presentations shall receive the appropriate reviews and clearances and shall be approved by Government technical POC.

4.0 TRAVEL: Travel will be required in the performance of this PWS and will be specified in each task order. OCONUS travel is authorized in performance of this PWS and if necessary will be specified within the PWS of the Task Order’s Scope of Work.

4.1 AT Awareness Training For Contractor Personnel Traveling Overseas

This standard language text requires US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.

5.0 SECURITY: No classified work is anticipated in performance of this contract; however, in the event that classified work is required appropriate steps will be taken to ensure proper handling of all classified information. The contractor shall not use foreign national employees to perform the efforts of this task. Applicable security classification guides will be furnished with individual Technical Instructions as required.

5.1 AT Level 1 Training

This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://jkodirect.jten.mil

5.2 Threat Awareness Reporting Program Training

For all DoD contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training presented by a Counterintelligence Special Agent. Contact the Redstone Arsenal MI Detachment at 256-313-5186 for scheduling.

5.3 For Contractors Requiring Common Access Card (CAC)

Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

5.4 Contractors That Do Not Require CAC, but Require Access to a DOD Facility or Installation

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

5.5 Security Education, Training & Awareness (SETA) Training

This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled access areas shall complete annual mandatory SETA awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The following URL is made available for your training: https://www.lms.army.mil. Upon completion of the training, you must provide certification to the Information Security Officer. Security Education, Training & Awareness covers Information Security, Personnel Security and Industrial Security Programs.

5.6 Combating Trafficking in Persons, Cyber Awareness Challenge, Personal Identification Information (PII) and Sexual Harassment Assault Response Program (Sharp) Training

This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled access areas shall complete Combating Trafficking in Persons, Cyber Awareness Challenge, Personal Identification Information (PII), and Sexual Harassment Assault Response Program (SHARP). The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel.

5.7 Clearance Level

The contractor shall be required to obtain and maintain a SECRET facility clearance and provide adequate cleared personnel at the SECRET level.

6.0 INFORMATION ASSURANCE/ANTI-TERRORISM/OPERATIONS SECURITY: Contractor employees shall in some instances, support IA/AT/OPSEC functions and shall be required to access Government networks under this contract. These instances are dependent on the Scope of Work contained within individual Task Order Performance Work Statements.

6.1 OPSEC SOP/Plan Requirements

The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. The contractor shall comply with the applicable Government OPSEC Standing Operating Procedure (SOP)/Plan required for execution of this task.

6.2 OPSEC Training

Level I OPSEC Awareness Training: Per AR 530-1, Operations Security, all contractor employees, to include subcontractor employees shall complete Level I OPSEC Awareness Training within 30 calendar days of their reporting for duty. All subcontractors shall take the Level 1 OPSEC Awareness Training located at the below website and print the certificates demonstrating completion. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR, within 10 calendar days after completion of training by all employees and subcontractor personnel. OPSEC awareness training is available at the following website: https://securityawareness.usalearning.gov/opsec/index.htm

7.0 DATA RIGHTS

At a minimum, the Contractor as a prime, must offer Government Purpose Rights.

8.0 CONTRACTING OFFICER REPRESENTATIVE (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

9.0 GOVERNMENT FURNISHED PROPERTY (GFP) AND EQUIPMENT (GFE): If GFP or GFE is required to support the efficient completion of the individual task orders, engineering and development activity it will be accounted for and tracked under that task order. In those activities that require close interface between government and contractor personnel in order to accomplish the required technical objectives, DoD Government customers may make available Government facilities.

10.0 GOVERNMENT-FURNISHED INFORMATION (GFI): If GFI is required to support the efficient completion of the individual task orders, engineering and development activity it will be accounted for and tracked under that task order. This information may take the form of databases, government technical documentation and computer programs. The contractor may require access to other contractor’s proprietary information in order to accomplish the task order technical objectives. In those instances, the contractor will be required to execute non-disclosure agreements with the proprietary source of the data.

11.0 Deliverables

11.1 Specific Deliverables: The contractor shall deliver specific items to include hardware, test assets, materials, etc. to the Government in accordance with each individual task order Performance Work Statement.

11.2 General Deliverables: The contractor shall prepare the following documentation in accordance with Government provided task order CDRLs requirements: Contract Summary Report IAW DI-ADMN-80447A (CDRL A0001), Presentation Material IAW DI-ADMN-81373 (CDRL A002), Performance and Cost Report IAW DI-FNCL-80912 (CDRL A003), Training Program Development and Management Plan IAW DI-ILSS-81070 (CDRL A004), Contractor’s Progress, Status and Management Report IAW DI-MGMT-80227 (CDRL A005), Scientific and Technical Reports Summary IAW DI-MISC-80048 (CDRL A006), Special Packaging Instructions IAW DI-PACK-80121C (CDRL A007), Product Drawings/Models and Associated Lists IAW DI-SESS-81000E (CDRL A008), Commercial Drawings/Models and Associated Lists IAW DI-SESS-81003E (CDRL A009), Special Inspection Equipment Drawings/Models and Associated Lists IAW DI-SESS-81004E (CDRL A010), Special Tooling Drawings/Models and Associated Lists IAW DI-SESS-81008E (CDRL A011), Proposed Critical Mfg Process Description IAW DI-SESS-81012E (CDRL A012), Developmental Design Drawings/Models and Associated Lists IAW DI-SESS-81002F (CDRL A013), Conceptual Design Drawings/Models IAW DI-SESS-81001E (CDRL A016), and Technical Data Packages IAW MIL-STD-3100B.

12.0 CONTRACTOR MANPOWER REPORTING: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Manufacturing Technology Development and Implementation for the Defense Industrial Base via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/

Reporting inputs will be for the labor executed during the period of performance during each government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at http://www.ecmra.mil/.

13.0 HAZARDOUS MATERIALS: The contractor shall not use any Class I Ozone Depleting Chemical/Ozone Depleting Substance (ODC/ODS) (identified at http://www.epa.gov/ozone/ods.html) in the manufacture or support of items required by this PWS unless a waiver is obtained from the Government.

14.0 PERFORMANCE OBJECTIVES/METRICS:

14.1 This performance-based service task order incorporates the following performance objectives: (1) Delivery of high quality technical performance; (2) Adherence to task order schedule, milestone, and delivery requirements; and (3) Efficient and effective control of task order costs. It is the contractor’s responsibility to employ the necessary resources to ensure accomplishment of these objectives. The Government’s assessment of the contractor’s performance in achieving these objectives shall utilize the standards, acceptable quality levels, and surveillance methods described in the Performance Requirements Summary matrix set forth in Appendix A.

14.2 The performance objectives, standards, and acceptable quality levels shall be applied on a TO basis. The COR will maintain communications with the contractor’s Program/TO Manager as needed to identify any active TO performance that is not meeting the acceptable quality levels. These communications will be conducted at least on a quarterly basis in order to provide the contractor a fair opportunity to improve its performance level.

14.3 The Contracting Officer will notify the Contractor in writing if he fails to meet the acceptable level of performance on the Performance Requirements Summary Matrix as defined in Appendix A. Acceptable levels of performance are defined under the column “Acceptable Quality Level (AQL)” for each Performance Objective.

APPENDIX A

PERFORMANCE REQUIREMENTS SUMMARY MATRIX

PERFORMANCE

OBJECTIVE

PERFORMANCE STANDARD
ACCEPTABLE QUALITY LEVEL (AQL)
METHOD OF SURVEILLANCE
High Quality Technical Performance
Task Order technical requirements as contained in Paragraph 3.0 through 3.3 of this PWS are met with little rework required and with few minor and no significant problems encountered

Performance as defined in Paragraphs 3.1, 3.2, and 3.3 meets all Task Order technical and functional requirements, and is highly responsive to changes in technical direction and/or the technical support environment

Assessments, evaluations, analyses, recommendations, and related assistance are thorough, reliable, highly relevant to TO requirements, and consist of substantial depth and breadth of subject matter as defined in Paragraph 3.2, 3.2.1, 3.2.2, 3.2.3, 3.2.4, 3.2.5

Deliverable reports contain all required data and meet all applicable CDRL requirements. Reference Paragraph 2.0 CDRL list found in DSL, an attachment to the contract.

Performance occurs with no required rework on at least 95% of deliverable items.
Routine Inspection of Deliverable Products/Services
Adherence to Schedule
Task Order milestones, periods of performance, and/or deliverable submission dates are met or exceeded
Contractor meets Task Order delivery requirements for milestones and deliverables 90% of the time (excluding Government caused delays).
Routine Inspection of Deliverable Products/Services
Control of Task Order Cost
Task Order costs are controlled in efficient and effective manner
Task Order cost at conclusion of period of performance meets or is less than contract task order amount.
Routine Inspection of Task Order Performance, Performance/Cost Reports, Payment Invoices, Etc.