Atch. 1 Grease Trap PWS.pdf

PDF 702 KB Posted

Attached to
Grease Trap Cleaning - AMENDED
Solicitation number
FA480125Q0004
Issued by

About this file

This is a Performance Work Statement (PWS) for grease trap cleaning services at Holloman Air Force Base, NM, dated July 8, 2024. The contractor shall provide all personnel, equipment, tools, materials, and supervision necessary for cleaning and inspection of grease traps at eight facilities on base, including Popeyes, BX Food Court, dining facility, community center, bowling alley, and child development center.

The PWS requires regular cleaning service every 4 months during the first 10 business days of the scheduled month, with tank sizes ranging from 1,000 to 5,000 gallons. The contractor must respond within 8 hours for unscheduled services and 4 hours for emergency services. Work includes removing all liquid, semi-solid and solid matter, cleaning walls/piping/baffles, and proper disposal at an approved off-base site within 300 miles. Services are to be performed Monday-Friday between 7:00 AM - 4:00 PM except federal holidays. The contractor must provide documentation including work ticket receipts and waste disposal manifests. Quality control requirements include maintaining a quality control plan and meeting performance thresholds of 90-100% satisfactory service.

View the file

Other files

File Type Posted
Atch. 2, Grease Trap Bid Sheet.xlsx XLSX spreadsheet
Q and A MFR.pdf PDF
Atch. 2, Grease Trap Bid Sheet.xlsx XLSX spreadsheet
AMENDED PKA Services Combo - Grease Trap.docx DOCX document
Atch. 2, Grease Trap Bid Sheet.xlsx XLSX spreadsheet
Atch. 3 FAR & DFARS Provisions and Clauses.pdf PDF
Atch. 4 DAFFARS 5352.242-9000.docx DOCX document
Atch. 2, Grease Trap Bid Sheet.xlsx XLSX spreadsheet
PKA Services Combo - Grease Trap.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sol # FA4801xxxxxxxx Contract # FA480xxxxxxx

8 July 2024 Attachment 1 Page 1 of 15

PERFORMANCE WORK STATEMENT (PWS)

GREASE TRAP CLEANING

Holloman Air Force Base, NM

8 July 2024

DRAFT

REVIEWED BY:

SAMUEL W. BUTSON, Civ, DAF Date Contracting Officer Representative (COR) 49th Civil Engineering Squadron

DALE M. WOOSLEY, Civ, DAF Date Contracting Officer Representative (COR) Supervisor 49th Civil Engineering Squadron

PATTI J. REN, Civ, DAF Date Quality Assurance Program Coordinator (QAPC) 49th Contracting Squadron

APPROVED BY:

LEONARDO E DOMINGUEZ, Capt, USAF Date Contracting Officer 49th Contracting Squadron

8 July 2024 Attachment 1 Page 2 of 15

TABLE OF CONTENTS

Paragraph Page

1.0. DESCRIPTION OF SERVICES

2.0. SERVICES SUMMARY

3.0. GOVERNMENT FURNISHED UTILITIES

4.0. GENERAL INFORMATION

5.0. APPENDICES

APPENDIX A: ESTIMATED WORK QUANTITIES

APPENDIX B: MAP OF FACILITIES

APPENDIX C: PUBLICATIONS

8 July 2024 Attachment 1 Page 3 of 15

1.0. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items/services necessary to provide cleaning and inspection of grease traps at Holloman Air Force Base (HAFB) in accordance with (IAW) this Performance Work Statement (PWS), federal, state, and local laws/regulations.

1.1. CLEANING OF GREASE TRAPS.

1.1.1. The Contractor shall perform pumping and cleaning, skimming, and disposal services to remove waste, grease, oils, and sediment from identified facilities (Appendix A). The Contractor shall clean any spillage or residue immediately. Any damage caused by the Contractor shall be resolved by the Contractor immediately.

1.1.2. The Contractor shall remove all liquid, semi-solid and solid matter from each identified grease trap.

The Contractor shall use scraping or high-pressure water to remove all sludge and other residues from the tank bottom; removing waste build-up on pit walls, inlet/outlet piping, manhole access, and baffles; clearing obstructions in the inlet/outlet pipes to ensure unrestricted flow; and evacuation of all wastewaters. Walls, piping, and baffles shall be grease free after cleaning. The Contractor shall clean the grease trap lids, top and bottom. The Contractor shall clean the surface area around the grease trap to be free of grease and food particles. Grease traps shall be considered clean when waste materials have been removed. The surface areas shall be cleaned to ten (10) feet in all directions from the center of the grease trap access. Spills, splashes, or other damages caused by the Contractor shall be cleaned and/or repaired at the Contractor's expense. Grease traps shall be cleaned whenever they are pumped. Contractor must have the ability to suction material from tanks over a distance of at least 100 feet. Contractor shall not drive on landscaping or sidewalks to accomplish this work.

1.1.3. The Contractor shall transport and dispose of all excavated or otherwise removed liquid, semi-solid, and solid waste materials IAW all applicable United States Environmental Protection Agency (EPA), federal, state, and local laws. The Contractor shall not discharge chemicals or grease into the base sanitary sewage collection system, or any municipal or regional sewage works, public or private.

Disposal will be at the closest approved off-base disposal site, not to exceed a distance of 300 miles from

HAFB.

1.1.4. Regular Service Schedule. Grease traps scheduled for cleaning, pumping, inspection, and disposal shall be cleaned during the first ten (10) business days of the scheduled month in accordance with Appendix A. Any changes to this schedule must be approved by the contracting officer’s representative

(COR).

1.1.5. Unscheduled Service and Emergency Schedule.

1.1.5.1. In addition to scheduled service, the Contracting Officer (CO) or COR may request the Contractor perform unscheduled pumping, disposal, and cleaning services on an as-needed basis. In the event that servicing is required outside the Contractor's regular schedule, the Contractor shall respond to the Government within eight (8) hours of notification to schedule the service to be performed within 24 hours of notification.

1.1.5.2. In addition to scheduled and unscheduled service, the Contractor shall be available to provide emergency services. In the event that emergency servicing is required, the Contractor shall respond to the Government within four (4) hours of notification to schedule the service to be performed within 12 hours of notification. Tasks may include, but are not limited to, necessary repairs of internal piping or cleaning of influent/effluent lines due to grease build u p .

8 July 2024 Attachment 1 Page 4 of 15

1.1.5.3. The Government shall provide an annual allowance for reimbursable costs for the basic period and each additional option period for unscheduled and emergency services. The cost of unscheduled or emergency pumping, disposal, and cleaning services will be in accordance with the price of the respective facility in the bid schedule. The cost of services that require other corrective maintenance, repair, or replacement will be covered under the reimbursable line item and will be based on the cost of such, to include labor and materials. For unscheduled and emergency services exceeding $2,500, only the CO has authority to approve repairs and improvements. For unscheduled and emergency services exceeding $2,500 where maintenance, repairs, replacements occur by subcontractor, the Contractor shall provide two, preferably three independent price quotes and/or written justification stating otherwise, to help determine price fair and reasonable.

1.1.6. Documentation. The Contractor will provide the COR with a work ticket receipt (also known as a manifest) for the grease traps cleaned. Work ticket receipt and/or manifest will include pertinent pump out information such as date, time, volume pumped, and general condition of grease trap. The COR will sign for verification the same day services are performed. The Contractor shall also provide an electronic copy of a waste receipt where the contents were disposed of within ten (10) business days of completing the scheduled services.

1.2. CONTRACTOR MANPOWER REPORTING – Enterprise Contractor Manpower Reporting Application (ECMRA).

1.2.1. The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Holloman Air Force Base, NM via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address https://www.ecmra.mil/Default.aspx.

1.2.1.1. Reporting inputs will be for the labor executed during the period of performance (PoP)for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the ECMRA help desk.

*Reporting Period: Contractor is required to input data by 31 October of each year.

1.3. CONTRACTOR LEVEL I ANTITERRORISM TRAINING

Each contract employee must accomplish Antiterrorism Awareness (AT) Training as stated in the provision/clause DFARS 252.204-7004, LEVEL 1 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS. This training provides contractor employees with the requisite knowledge necessary to remain vigilant for possible terrorist threats. Coordination for training should be done by the requiring Antiterrorism Representative (ATR) after contract award. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit ATR. Contractor employees are required to complete Level I antiterrorism awareness training within 30 days of requiring access and annually thereafter. AT certificates for each contract employee must be submitted to the COR or unit ATR. Level I AT awareness training can be taken at JKO https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam for non- common access card (CAC) holders. CAC holders must take AT Level 1 training, course name "Force Protection," via Advanced Distribution Learning Center (ADLS) at https://golearn.adls.af.mil/login.aspx.

http://www.ecmra.mil/Default.aspx http://www.ecmra.mil/Default.aspx

8 July 2024 Attachment 1 Page 5 of 15

2.0. SERVICE SUMMARY.

Performance Objective PWS Para Performance Threshold

SS – 1

Scheduled Service The contractor shall perform pumping and cleaning, skimming, and disposal services to remove waste, grease, oils, and sediment from identified facilities and quantities in Appendix A.

1.1.1., 1.1.2., 1.1.3., & 1.1.4.

Very Good: 100% of the time over each PoP

Satisfactory: 90% of the time over each PoP

Marginal: 85% of the time over each PoP

SS – 2

Unscheduled Service The contractor shall perform pumping and cleaning, skimming, and disposal services to remove waste, grease, oils, and sediment from identified facilities within 24 hours of notification.

1.1.2., 1.1.3., & 1.1.5.

Very Good: 100% of the time over each PoP

Satisfactory: 90% of the time over each PoP

Marginal: 85% of the time over each PoP

SS – 3

Complete and Submit Documentation as Required Provide COR with a work ticket receipt for the grease traps cleaned and provide an electronic copy of a waste receipt where the contents were disposed of within ten

(10) business days of completing the scheduled services

1.1.6

Very Good: 100% of the time over each PoP

Satisfactory: 90% of the time over each PoP

Marginal: 85% of the time over each PoP

3.0. GOVERNMENT FURNISHED UTILITIES. The Government will furnish electricity and water service as necessary for accomplishment of work IAW this PWS.

4.0. GENERAL INFORMATION.

4.1. QUALITY CONTROL. The Contractor shall develop and maintain a quality control program/plan (QCP) to ensure grease trap cleaning services are performed in accordance with commonly accepted commercial practices and services identified in this PWS. The program/plan shall also include how the Contractor will implement and maintain quality-accepted practices/procedures to identify, prevent, and ensure nonperformance and continual repeat of defective service does not occur. The written QCP shall be submitted to the CO for review no later than the pre-performance conference. The CO will review and either accept the QCP as written or provide feedback within ten (10) working days. If QCP is returned, Contractor shall resubmit within five (5) working days, until plan is accepted. The plan shall specifically address the items listed above as well as the Contractor's strategy to provide quality workmanship, continual process

8 July 2024 Attachment 1 Page 6 of 15 improvement and for correcting deficiencies as required.

4.2. QUALITY ASSURANCE. The COR will evaluate the Contractor's performance at the completion of scheduled, unscheduled, and emergency services. The COR(s) may also perform periodic on-site inspections, and at the Governments discretion, inspect each task at each work location to ensure conformance and acceptable performance, prior to payment.

4.3. CONTRACT REMEDIES FOR PERFORMANCE FAILURES.

4.3.1. Government Remedies. The Government shall follow FAR 52.212-4(a), Inspection/Acceptance, for Contractor's failure to perform satisfactory services or failure to correct non-conforming services.

4.3.2. Government Options. If the Contractor fails to perform required services within the specified limitations, the Government may:

• Accept the services at a later date, at no additional cost to the Government.

• Refuse to accept the service at a later date in which case the Government will bear no cost and make no payment for the missed service.

• Procure the missed service, upon such terms and conditions as the CO deems appropriate, from an alternate, responsible firm, and the Contractor agrees to be liable to the Government for any excess costs incurred and to continue performance as required thereafter.

• Terminate the contract.

4.4. HOURS OF OPERATION. The Contractor shall perform the on-site services required under this contract during the following hours: 7:00 am - 4:00 pm, Monday through Friday, except on U.S. holidays specified in section 4.4.1 of this PWS. No on-site work shall be scheduled or performed on holidays unless previously approved or directed by the COR. If the Contractor desires to work on non- scheduled workdays, he/she must submit a written request to the COR for approval.

4.4.1. Holidays. The Contractor is required to provide service, except on Federal Holidays as noted below:

Day Holiday First Day of January New Year's Day* Third Monday of January Martin Luther King, Jr. Birthday Third Monday of February President’s Day Last Monday of May Memorial Day 19 June Juneteenth Fourth of July Independence Day* First Monday of September Labor Day Second Monday of October NM Indigenous People's Day (aka Columbus Day) 11 November Veteran’s Day* Last Thursday of November Thanksgiving Day 25 December Christmas Day*

*If holiday falls on a Saturday, it will be observed on the preceding Friday. If it falls on a Sunday, it will be observed on the following Monday.

8 July 2024 Attachment 1 Page 7 of 15

4.5. SECURITY REQUIREMENTS. Unclassified – access to classified information not required.

4.5.1. Illegal Aliens: The Contractor shall not hire an illegal alien to work or perform any service on Holloman AFB (HAFB). Employees who are not U.S. citizens can only be persons possessing a current resident alien immigrant status (Green Card) or if a non-resident immigrant must possess a current Employment Authorization Document. While on HAFB, non-U.S. citizen employees must be able to produce for inspection the appropriate credential: Green Card or Employment Authorization Document. Any illegal alien found on the installation shall be immediately detained by the base security forces and barred from the installation.

4.5.2. Listing of Employees: The Contractor shall maintain a current listing of employees that require access to HAFB. The list shall include the employee's name and social security number and type of investigation if contract work involves unescorted entry to Air Force (AF) restricted areas or other sensitive areas designated by the installation commander. The list shall be provided to the Program Manager and sponsoring agency security manager. An updated listing shall be provided when an employee's status or information changes (i.e. termination, reassignment, etc.) or when a new employee is added.

4.5.3. Security Training: The Contractor ensures all employees receive initial and recurring (annual) security education training from the sponsoring agency security manager. Training must be conducted IAW DoDM 5200.01, Volume 1, DoD Information Security Program, and AFI 16-1404, Air Force Information Security Program. Contractor personnel who work in AF controlled/restricted areas must be trained IAW AFI 31-101, Integrated Defense. The sponsoring agency controlled area monitor will provide this training when required.

4.5.4. Pass and Identification Items: The Contractor shall ensure the pass and identification items required for contract performance are obtained for their employees. Employees shall only be granted access to the installation to perform functions directly related to their respective contract. All Contractor employees requiring unescorted access to HAFB shall be identified on a Visit Access Request (VAR) form. The Contractor shall submit a complete VAR through the Contracting Office to 49 SFS/S5AV no later than 7 duty/business days, and for foreign nationals, 14 duty/business days prior to requiring access to the installation. Foreign nationals should be submitted on a separate VAR.

4.5.5. Retrieving Identification Media: The Contractor shall return all identification media from employees who depart for any reason before the contract expires; i.e., terminated for cause, retirement, etc.

The Contractor will notify the Government within 24 hours when unable to retrieve identification media from contract employees.

4.5.6. Travel Restrictions: Contractors are prohibited in areas of the installation other than their appropriate place of work and the routes to and from installation entry/exit points.

4.5.7. Traffic Laws: The Contractor and its employees shall comply with base traffic regulations.

Violations may result in the loss of base driving privileges and/or debarment from the installation.

4.5.7.1. Employees shall wear a seatbelt when operating or riding in any military, contractor-owned, or privately-owned vehicle while on the installation.

4.5.7.2. Speed limits on HAFB are 30 MPH unless otherwise posted. Be aware of reduced speed limits and exercise caution when driving in base housing and school zones.

4.5.7.3. All vehicle operators on the installation shall not use cell phones unless the vehicle is safely parked

8 July 2024 Attachment 1 Page 8 of 15 or unless they are using a hands-free device. The wearing of any other portable headphones, earphones or other listening devices (except for hand-free cellular phones) while operating a motor vehicle is

PROHIBITED.

4.5.8. Weapons, Firearms, and Ammunition: Employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within military, contractor, or privately-owned vehicle while on

HAFB.

4.5.9. For Official Use Only (FOUO): The Contractor shall comply with DoDM 5200.01-V4, Enclosure 3, DoD Information Security Program: Controlled Unclassified Information (CUI), requirements. This manual sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

4.5.10. Reporting Requirements: Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information.

4.5.11. Physical Security: The Contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.

4.5.12. Controlled/Restricted Areas: The Contractor shall implement local base procedures for entry to AF controlled/restricted areas where Contractor personnel will work. An AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by the sponsoring agency security manager before a restricted area badge will be issued. Contractor employees must have a completed and favorable Tier 1 or higher investigation (or DoD-determined equivalent investigation) before receiving a restricted area badge.

Interim access can be granted in accordance with AFMAN 16-1405, Air Force Personnel Security Program Management. The sponsoring agency security manager will process personnel security investigation for trustworthiness determination through the 49 WG/IP Personnel Security Office. N/A for this requirement

4.5.12.1. Escorted Entry Procedures: Unless granted unescorted entry (see procedures below), all contractor employees will be escorted while in AF controlled/restricted areas on HAFB. When escorted, employees shall remain with their assigned escort at all times while in controlled/restricted areas. Escort responsibility rests with the sponsoring agency. An escort briefing will be provided to all escorted employees prior to entering a controlled/restricted area. Persons providing escort are responsible for providing this briefing. Escort officials assume responsibility for the safe and secure conduct of escorted employees and are required to maintain constant surveillance and control of employees at all times while in a controlled/restricted area.

4.5.12.2. Unescorted Entry Procedures: An AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by the sponsoring agency security manager before a restricted area badge will be issued. Employees must have a completed and favorable Tier 1 security investigation before receiving a restricted area badge. Interim access can be granted in accordance with AFMAN 16- 1405, Air Force Personnel Security Program Management. Unescorted entry will never be granted solely to avoid the inconvenience of escorted entry.

4.5.13. Photography: Photography in or within the close proximity of an AF controlled/ restricted area, flight line, or taxiway is strictly prohibited. Contractors that wish to take photos shall coordinate with the COR or Government Program Manager who will coordinate with the appropriate owning unit security manager for

8 July 2024 Attachment 1 Page 9 of 15 a photography clearance memorandum prior to taking photos.

4.5.14. Video/Still Imagery Devices: The use or possession of any device capable of capturing video and still images is strictly prohibited within any controlled/restricted area without written authorization from the installation commander or his/her designated representative. Individuals will be denied access to restricted/controlled areas if in possession of these devices.

4.5.15. Portable/Personal Electronic Devices (PED): The use of possession of all PEDs used for storing, processing, and/or transmitting information is strictly prohibited within all areas where classified material is discussed, briefed, stored, or processed without written authorization from the Designated Approval Authority.

4.5.16. Key Control: The Contractor shall establish and implement methods of making sure all keys and/or combinations issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The Contractor shall not duplicate any keys issued by the Government. The Government requires keys/combinations to the contractor's area of responsibilities. The Contractor shall supply a key or combination to the Fire Department in the event of an emergency. N/A for this requirement

4.5.16.1. The Contractor shall immediately report to the COR any occurrences of lost or duplicated keys, compromised lock combinations, or use by unauthorized persons.

4.5.16.2. In the event keys, other than master keys, are lost or duplicated, the contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks without cost to the Government. The Government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the contractor.

4.5.16.3 The Contractor shall prohibit the use of keys or combinations, issued by the Government, by any other persons other than the contractor's employees and the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in performance of contract work requirements in those areas.

4.6. CONTRACTOR PERSONNEL REQUIREMENTS.

4.6.1. Contract Manager. The Contractor shall provide a point of contact who shall be responsible for the performance of the work. The name of this person, and alternate(s), who shall act for the contractor when the contract manager is absent, shall be designated in writing to the COR five (5) working days prior to project start day. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract. The contract manager or alternate shall be available during normal duty hours and within two (2) hours to meet on the installation with the designated personnel to discuss problem areas. They must be able to read, write, speak, and understand English.

4.6.2. Contractor Personnel. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This shall be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contains the company and employee name in English. Contractor personnel shall use protective clothing whenever they are performing tasks that could cause harm to the employees or damage to property.

8 July 2024 Attachment 1 Page 10 of 15

4.6.3. The Contractor shall not employ persons to work on this contract if such person is identified to the Contractor by the Government as a potential threat to the health, safety, security, general wellbeing or operational mission of the installation and its population.

4.6.4. Performance of Services during crisis declared by the National Command Authority. IAW DoDI

3020.37 Continuation of Essential DoD Contractor Services During Crisis and aforementioned Air Force implementation, and unless otherwise directed by an authorized Government representative, it is determined that services as identified in this PWS are non-essential for performance during a crisis.

4.7. COMPLETION TIME. Before leaving the base, the Contractor shall be required to notify the COR when job is completed.

4.8. RETREAT. Retreat will be sounded, via the installation “giant voice” audio system, every Monday through Friday at 4:30 pm to signal the official end of the duty day and to pay respect to the U.S. Flag. All vehicle operators shall come to a complete stop until the last note of retreat. Contractor personnel outside of a vehicle or facility shall face toward the direction of the sounding of retreat or towards the base flag pole (if visible) and remain silent until the last note of retreat is played.

4.9. Records Management and Freedom of Information Action (FOIA) Requirements. (March 2020)

4.9.1. Records Management (RM). IAW AFI 33-322, Records Management and Information Governance Program – Records (section 1.3.6) the Contractor shall provide accountability and ensure all records and documents generated during the period of this contract are made available to the Government at all times. Records relating to work that contractors perform are maintained according to AFI 33-322- Records Management and Information Governance Program, Air Force Records Information Management System (AFRIMS RDS), Federal Records Management (https://www.archives.gov/records- mgmt/policy/records-mgmt-language), the Federal Acquisition Regulation, and the Defense Federal Acquisition Regulation Supplement, as applicable. When contractors create data for the government’s use, the contract must identify the background data that contractors must deliver to the government for possible reuse. Before identifying background data that contractors must deliver to the government, program and contracting officers must coordinate with stakeholders. These include records and information managers, historians and other United States Government agencies as appropriate. This is to ensure that all government needs are met, particularly when the data supports new missions or programs. When the background data includes records, the contractor must deliver enough technical documentation to allow the Air Force or other agencies to use the data.

Manage all data created for government use or legally controlled by the government according to the records management procedures in this instruction.

4.9.2. Freedom of Information Act (FOIA) and Privacy Act (PA). The contractor shall comply with DoDM 5400.07_AFMAN33-302, Freedom of Information Act (FOIA) Program (27 Apr 2018) and AFI 33-332, Air Force Privacy and Civil Liberties Program (12 May 2020). These regulations set policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding Personally Identifiable Information (PII) material. In accordance with AFI 33-332, Paragraph 1.3.4., Contractors who are required to access or handle PII on behalf of the Air Force, will follow this instruction and training requirements. As required by the Federal Acquisition Regulation, contractors must comply with clauses 52.224-1 Privacy Act Notification and 52.224-2, Privacy Act. All contractors, regardless of access to PII, will participate in annual privacy awareness training requirements.

http://www.archives.gov/records-

8 July 2024 Attachment 1 Page 11 of 15

4.9.3. Contractor Records. The Contractor shall maintain all government records IAW AFI 33-322, Records Management and Information Governance Program – Managing Records (Chapter 3), in order to support the COR who is responsible for all lifecycle record management and all duties assigned to the organization's Record Professional (RP) (Tier-1 (T-1)). [AFI 33-360, Publications and Forms Management, Table 1.1 outlines description of the authorities for T-1.]

5.0. APPENDICES.

Appendix A – Estimated Work Quantities Appendix B – Map Appendix C – Applicable Publications and Forms

8 July 2024 Attachment 1 Page 12 of 15

INTENTIONALLY LEFT BLANK

8 July 2024 Attachment 1 – Appendix A Page 13 of 15

Appendix A

Estimated Work Quantities

FACILITY # FACILITY NAME PHYSICAL ADDRESS TANK SIZE FREQUENCY

33 Popeyes 744 First Street 1,200 Gal. Every 4 Months

223 Blakes 223 Fourth Street 1,000 Gal. Every 4 Months 227 BX Food Court 551 Fourth Street 5,000 Gal. Every 4 Months 274 Dining Facility 660 Idaho Avenue 1,200 Gal. Every 4 Months 325 Community Center 722 Idaho Avenue 1,000 Gal. Every 4 Months 468 Bowling Alley 880 Idaho Avenue 1,000 Gal. Every 4 Months 531 Club 980 New Mexico Ave. 1,000 Gal. Every 4 Months 648 Child Development 215 Patterson Avenue 1,000 Gal. Every 4 Months

8 July 2024 Attachment 1 – Appendix B Page 14 of 15

Appendix B Map of facilities listed on Appendix A - represented by blue dots

8 July 2024 Attachment 1 – Appendix C Page 15 of 15

APPENDIX C

APPLICABLE PUBLICATIONS AND FORMS

PUBLICATION NO. NAME DATE APPLICABLE

PARAGRAPH

*DoDm 5200.01, Volume 1 DoD Information Security Program 4 May 2018 All

*DoDm 5200.01, Volume 4 DoD Information Security Program:

Controlled Unclassified Information (CUI) 9 May 2018 Enclosure 3

**AFI 16-1404 Air Force Information Security Program 30 October 2019 All

**AFMAN 16-1405 Air Force Personnel Security Program Management 1 August 2018 All

*DoDM 5400.7 Department of Defense Freedom of Information Act (FOIA) Program 25 January 2017 All

**AFMAN 33-302 Freedom of information Act (FOIA) 27 April 2018 All

**AFI 33-332 Air Force Privacy and Civil Liberties Program 14 February 2019 All

*Available at: https://www.esd.whs.mil/Directives/issuances/dodm/ **Available at: https://www.e-publishing.af.mil/Product-Index/ http://www.esd.whs.mil/Directives/issuances/dodm/ http://www.esd.whs.mil/Directives/issuances/dodm/ http://www.e-publishing.af.mil/Product-Index/

REVIEWED BY:
APPROVED BY:
TABLE OF CONTENTS
1.1. CLEANING OF GREASE TRAPS.
1.1.5. Unscheduled Service and Emergency Schedule.
1.2. CONTRACTOR MANPOWER REPORTING – Enterprise Contractor Manpower Reporting Application (ECMRA).
1.3. CONTRACTOR LEVEL I ANTITERRORISM TRAINING
2.0. SERVICE SUMMARY.
4.0. GENERAL INFORMATION.
4.3. CONTRACT REMEDIES FOR PERFORMANCE FAILURES.
4.5. SECURITY REQUIREMENTS. Unclassified – access to classified information not required.
4.6. CONTRACTOR PERSONNEL REQUIREMENTS.
4.9. Records Management and Freedom of Information Action (FOIA) Requirements. (March 2020)
5.0. APPENDICES.
Appendix A
Estimated Work Quantities
Appendix B
APPENDIX C