This document contains a performance questionnaire for a contractor submitting an offer for a United States Department of Veterans Affairs contract requirement. The performance questionnaire requests information on the contractor's past performance on a referenced project to renovate Building 223 for pandemic storage. The contractor is asked to provide details on the project such as the contract period of performance, number, dollar value, role on the project, and description of work. Previous customers of the contractor are asked to rate the contractor's performance on a scale of 1 to 5 in areas such as management, quality control, timeliness, responsiveness to issues, and overall performance. Space is provided for comments on any ratings of 1 or 2. The customer is also asked whether a cure or show cause notice was issued, if they would award another contract to this contractor, and if the contractor is rated in the Contractor Performance Assessment Reporting System. The completed questionnaire must be returned by March 18, 2021.

The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration for project 618-20-111 to renovate building 223 for pandemic storage as a COVID-19 response project.

View the file

Other files

File Type Posted
36C26321R0043 0001.docx DOCX document
RFP 36C26321R0043 Questions and Responses (1 page).pdf PDF
36C26321R0043_1.docx DOCX document
Atch A - Scope of Work (SOW) FINAL 2.8.2021 (14 pages).pdf PDF
Atch A - SOW Atch 12a - SHPO Request for Project Review (2 pages).pdf PDF
Atch A - SOW Atch 12b - SHPO Scope of Work Form (4 pages).pdf PDF
Atch A - SOW Atch 9 - Mpls VA Design Standards (10 pages).pdf PDF
Atch F - Wage Determination SCA 2015-4945 12.21.2021 (12 pages).pdf PDF
Atch E - Wage Determination Davis Bacon MN20210107 01.01.2021 (7 pages).pdf PDF
Atch B - Contractor Safety and EMR (2 pages).pdf PDF
Atch A - SOW Atch 2 - Bldg 222 Build Out Package (54 pages).pdf PDF
Atch A - SOW Atch 8 - Minneapolis VA Revit Model Standards V1 (15 pages) (1).pdf PDF
Atch A - SOW Atch 5a - Convert Building 220-223 Concept Plans (9 pages) (1).pdf PDF
Atch A - SOW Atch 10 - Minneapolis Specific Standards (zip file).zip ZIP file
Atch A - SOW Atch 3 - Building 222 Roads and Grounds (23 pages).pdf PDF
Atch A - SOW Atch 3 - Building 222 Roads and Grounds (23 pages) (1).pdf PDF
Atch A - SOW Atch 4 - Bldg 223 Final LEAD Report (22 pages).pdf PDF
Atch A - SOW Atch 11 - Mpls Detail Drawings (zip file).zip ZIP file
Atch A - SOW Atch 6 - VA Barrier Free Design Standard (7 pages).pdf PDF
Atch D - VA6500.6 Appendix C 2 3a-5h-6a-7a-7d-9, Appendix D (7 pages).pdf PDF
Atch A - SOW Atch 1 - Fort Snelling West District Report (40 pages).pdf PDF
Atch A - SOW Atch 5b - Convert Building 220-223 Pictures (1 page).pdf PDF
Atch A - SOW Atch 7 - Minneapolis VA BIM Management Plan Worksheet - Form (3 pages).pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE QUESTIONAIRE

36C26321R0043, Project: 618-20-111, Renovate Building 223 for Pandemic Storage

INSTRUCTIONS TO CONTRACTOR

Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit it according to the instructions, below.

INSTRUCTIONS TO REFERENCE CONTACT

The contractor named below is submitting an offer for a United States Department of Veterans Affairs contract requirement, and has sent this form to you, in your role as a past performance reference contact. Please complete this form in full (all areas shaded in light yellow, below). Once completed, please send the form to the Contracting Specialist via email at teresa.kohlbeck@va.gov.

Please return the completed form by March 18, 2021 at 10:00 am CT.

GENERAL INFORMATION [completed by Contractor]

Contractor Company Name Street Address

Contractor Point of Contact Name City

Point of Contact Phone Number State

Reference Project Title Zip Code

Contract Period of Performance (start to finish): Email

Contract Number Contract Dollar Value

Description of Work

Role of Contractor on This Project (check appropriate box) ☐ Prime Contractor ☐ Sub‐contractor ☐ Key Personnel

36C26321R0043, Project: 618-20-111, Renovate Building 223 for Pandemic Storage

RESPONDENT INFORMATION [completed by Reference Contact]

Company Name Street Address

POC Name City

Phone Number State

Fax Number Zip Code

Email

PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 5 that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 1 OR 2 in the Remarks section, below (text box will expand to whatever extent is necessary).

1 2 3 4 5

UNSATISFACTORY MARGINAL SATISFACTORY VERY GOOD EXCEPTIONAL

Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.

Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective.

Performance met contractual requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory.

Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.

Performance met all contract requirements and exceeded many to the government’s benefit. Problems, if any, were negligible and were resolved in a timely, highly effective manner.

The Contractor … 1 2 3 4 5

1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

2. Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.

3. Delegated authority to project managers and supervisors commensurate with contract requirements.

4. Home office participated in solving significant local problems. ☐ ☐ ☐ ☐ ☐

5. Followed approved quality control plan. ☐ ☐ ☐ ☐ ☐

6. Provided effective quality control and/or inspection procedures to meet contract requirements.

7. Corrected deficiencies in timely manner and pursuant to their quality control procedures.

8. Provided timely resolution of contract discrepancies ☐ ☐ ☐ ☐ ☐

9. Identified problems as they occurred. ☐ ☐ ☐ ☐ ☐

Suggested alternative approaches to problems. ☐ ☐ ☐ ☐ ☐

Displayed initiative to solve problems. ☐ ☐ ☐ ☐ ☐

36C26321R0045, Centralized Services & Social Distancing for COVID

Developed realistic progress schedules. ☐ ☐ ☐ ☐ ☐

Met established project schedules. ☐ ☐ ☐ ☐ ☐

Provided timely resolution of warranty defects. ☐ ☐ ☐ ☐ ☐

Was responsive to contract changes. ☐ ☐ ☐ ☐ ☐

Provided adequate project supervision. ☐ ☐ ☐ ☐ ☐

Obtained consent of surety for increases in bonding as work‐in‐progress increased. ☐ ☐ ☐ ☐ ☐

Paid subcontractors/suppliers in a timely manner. ☐ ☐ ☐ ☐ ☐

Provided accurate and complete line item cost proposals including all aspects of work required for each task.

Cooperated with Government personnel after award. ☐ ☐ ☐ ☐ ☐

How would you rate the contractor's overall performance? ☐ ☐ ☐ ☐ ☐

Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”

YES

NO

23 Would you award another contract to this contractor? If not, please explain in

“remarks.”

YES

NO

24 To the best of your knowledge, is the contractor rated in CPARS? ☐

YES

NO

REMARKS (Please use as much space as is needed – the box will expand as you type).

Name of Person Completing Form Signature