Atch A - SOW Atch 7 - Minneapolis VA BIM Management Plan Worksheet - Form (3 pages).pdf

PDF 127 KB Posted

Attached to
C1DZ--618-20-111, Renovate Bldg 223 for Pandemic Storage *DESIGN-BUILD*
Solicitation number
36C26321R0043
Issued by

About this file

This document is a Building Information Modeling (BIM) management plan worksheet for the Minneapolis VA project to renovate Building 223 for pandemic storage. The worksheet collects contact information for key BIM team members from the architectural, mechanical, electrical, structural, interior design, civil and other disciplines. It requires the team to use Autodesk Revit 2015 software natively and to conduct clash detection at the 95% and 100% design stages. Uses of BIM mandated by the VA include lighting analysis, mechanical systems analysis, walking distances, sightlines and photorealistic imagery. The worksheet also requires the team to describe how design files will be shared between disciplines and secured, as well as confirmation that the team will follow the VA's Revit model return procedure.

View the file

Other files

File Type Posted
36C26321R0043 0001.docx DOCX document
RFP 36C26321R0043 Questions and Responses (1 page).pdf PDF
36C26321R0043_1.docx DOCX document
Atch C - PPQ (3 pages).pdf PDF
Atch A - Scope of Work (SOW) FINAL 2.8.2021 (14 pages).pdf PDF
Atch A - SOW Atch 12a - SHPO Request for Project Review (2 pages).pdf PDF
Atch A - SOW Atch 12b - SHPO Scope of Work Form (4 pages).pdf PDF
Atch A - SOW Atch 9 - Mpls VA Design Standards (10 pages).pdf PDF
Atch F - Wage Determination SCA 2015-4945 12.21.2021 (12 pages).pdf PDF
Atch E - Wage Determination Davis Bacon MN20210107 01.01.2021 (7 pages).pdf PDF
Atch B - Contractor Safety and EMR (2 pages).pdf PDF
Atch A - SOW Atch 2 - Bldg 222 Build Out Package (54 pages).pdf PDF
Atch A - SOW Atch 8 - Minneapolis VA Revit Model Standards V1 (15 pages) (1).pdf PDF
Atch A - SOW Atch 5a - Convert Building 220-223 Concept Plans (9 pages) (1).pdf PDF
Atch A - SOW Atch 10 - Minneapolis Specific Standards (zip file).zip ZIP file
Atch A - SOW Atch 3 - Building 222 Roads and Grounds (23 pages).pdf PDF
Atch A - SOW Atch 3 - Building 222 Roads and Grounds (23 pages) (1).pdf PDF
Atch A - SOW Atch 4 - Bldg 223 Final LEAD Report (22 pages).pdf PDF
Atch A - SOW Atch 11 - Mpls Detail Drawings (zip file).zip ZIP file
Atch A - SOW Atch 6 - VA Barrier Free Design Standard (7 pages).pdf PDF
Atch D - VA6500.6 Appendix C 2 3a-5h-6a-7a-7d-9, Appendix D (7 pages).pdf PDF
Atch A - SOW Atch 1 - Fort Snelling West District Report (40 pages).pdf PDF
Atch A - SOW Atch 5b - Convert Building 220-223 Pictures (1 page).pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Minneapolis VA BIM Management Plan Worksheet

Date: _______________________

Project Information:

List project name and number provided by VA.

Project Name: __________________________

Project Number: __________________________

Designate BIM Team Members:

The individuals listed here are expected to remain engaged for the entirety of the project.

Design Team BIM Manager

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Discipline Lead BIM Coordinators

Architectural

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Mechanical

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Electrical

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Structural

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Interior Design

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Civil

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Other

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Software Checking this box indicates the design team with use the approved software and version.

This project will be developed natively using Autodesk Revit 2015.

Clash Detection List the project milestones in which Clash Detection reports will be provided (95% & 100% required).

95% 100%

BIM Uses List ways in which your firm will leverage the BIM for advanced scheduling, analysis, design, etc.

Required by VA Yes Lighting analysis

Mechanical Systems Analysis (e.g. heating and cooling loads) Walking Distances Sightlines Photorealistic imagery Other: ________________________

File Sharing How and when will files be shared between disciplines.

• How will files be shared: ______________________________ (n/a for multi-discipline firm) Data Security: Files will only be accessible to relevant design team.

• How often will files be shared: _____________________________

Return Model Procedure Checking this box indicates that you are familiar with the Return Model Procedure outlined in the Minneapolis VA Revit Model Standards document.

Returned Revit model(s) will be properly processed, or cleaned, according to the Minneapolis VA BIM Standards.

Date:
Project Name:
Project Number:
How will files be shared:
How often will files be shared:
DT BIM Mgr Name:
DT BIM Mgr Title:
DT BIM Mgr Firm:
DT BIM Mgr Phone:
DT BIM Mgr Email:
Arch Name:
Arch Title:
Arch Firm:
Arch Phone:
Arch Email:
Mech Name:
Elec Name:
Mech Title:
Mech Firm:
Mech Phone:
Mech Email:
Struct Name:
Struct Title:
Struct Firm:
Struct Phone:
Struct Email:
ID Title:
ID Firm:
ID Phone:
ID Email:
ID Name:
Civ Name:
Civ Title:
Civ Firm:
Civ Phone:
Civ Email:
Other Name:
Other Title:
Other Firm:
Other Phone:
Other Email:
Clash Other:
Bim Use Other:
Software: Off
Clash 95: Off
Clash 100: Off
Clash Other Check: Off
Light Check VA: Off
Light Check Yes: Off
Mech Check VA: Off
Mech Check Yes: Off
Walk Check VA: Off
Walk Check Yes: Off
Sightline VA: Off
Sightline Yes: Off
Photo VA: Off
Photo Yes: Off
Other Check VA: Off
Other Check Yes: Off
Return Model: Off
Security: Off