ATCH 22 - Section L Atch L-4_SOO Replacing ABE.pdf

PDF 155 KB Posted

Attached to
COMMAND & CONTROL SYSTEM - CONSOLIDATED (CCS-C) SUSTAINMENT & RESILIENCY (C-SAR)
Solicitation number
FA8823
Issued by

View the file

Other files

File Type Posted
CSAR_RFP_Ltr.pdf PDF
ATCH 28 - Section L Atch L-10 WBS Mapping.pdf PDF
ATCH 06 - Constellation Capacity Rates.docx DOCX document
ATCH 14 - Integrated Master Processes.pdf PDF
ATCH 15 - Labor Rates.pdf PDF
ATCH 01_C-SAR TO1_PWS.pdf PDF
ATCH 08 - Cybersecurity Resiliency Enhancements Rates.docx DOCX document
ATCH 18 - Section L.pdf PDF
ATCH 12 - Compliance and Reference Docs.pdf PDF
ATCH 26 - Section L Atch L-8_Consent Form.pdf PDF
CSAR RFP Ltr Atch_OCI Questionnaire.docx DOCX document
ATCH 25 - Section L Atch L-7_FACTS Sheet.docx DOCX document
ATCH 07 - Operations Resiliency Enhancements Rates.docx DOCX document
ATCH 10 - Enterprise Enhancements Rates.docx DOCX document
ATCH 20 - Section L Atch L-2_OCI Mitigation Plan Checklist.docx DOCX document
ATCH 24 - Section L Atch L-6 Sample TO Labor Est.pdf PDF
CSAR TO1.pdf PDF
ATCH 02 - DD254.pdf PDF
EXH C - WBS Resource Distribution Table.pdf PDF
ATCH 05 - Sustaining Engineering Rates.docx DOCX document
ATCH 09 - Special Studies Rates.docx DOCX document
ATCH 19 - Section L Atch L-1_BLS Wage Data.pdf PDF
ATCH 04 - Sustainment and Operations Support Rates.docx DOCX document
ATCH 01 - PWS.pdf PDF
ATCH 13 - Rights in Data.pdf PDF
EXH A - A CDRLs (FFP).pdf PDF
CSAR RFP Ltr Atch_OCI Mitigation Plan Checklist.docx DOCX document
ATCH 03_C-SAR Task Order 1 Section L Reference.pdf PDF
ATCH 04_C-SAR Task Order 1 Section M Reference.pdf PDF
EXH B - B CDRLs (Cost).pdf PDF
ATCH 11 - Transition Phases (Labor) Rates.docx DOCX document
ATCH 16 - PPP.pdf PDF
ATCH 30 - Section M.pdf PDF
ATCH 02_C-SAR Task Order 1 Mission Essential Tasks.pdf PDF
ATCH 03 - Labor Categories_Skill Mix.pdf PDF
CSAR IDIQ RFP.pdf PDF
ATCH 27 - Section L Atch L-9_Commercial Client Auth Ltr_PPQ.docx DOCX document
ATCH 23 - Section L Atch L-5_SOO Commercial Antenna Special Study.pdf PDF
EXH D - CSDR Prime.pdf PDF
ATCH 17 - Government Furnished Property.pdf PDF
ATCH 21 - Section L Atch L-3_SOO Adding a MILSATCOM Satellite.pdf PDF
ATCH 29 - Section L Atch L-11_Sample Burdened Rate Template.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8823-23-R-0001 Attachment 22 Sec L, Atch L-4 SOO for Replacing ABE

SECTION L – ATTACHMENT L-4

Statement of Objectives for Replacing Archive Browsing Extractor (ABE)

1 Introduction The CCS-C system provides United States Space Force (USSF) and United States Space Command (USSPACECOM) satellite control capabilities for the Military Satellite Communications (MILSATCOM) programs. The Government desires to replace the Archive Browsing Extractor (ABE) product to improve performance and reduce license costs.

2 Objectives

2.1 Tasks

a. Analyze requirements, conduct trade studies, and develop a preliminary design to identify a replacement that meets all ABE plotting and data processing requirements as documented in the CCS-C System Specification.

b. Provide a cost and technical assessment of the replacement effort including product selection, integration/interface development, installation approach, schedule, and total cost prior to proceeding with the replacement.

c. Procure, integrate, and test the ABE replacement in the Contractor Development Lab prior to installation and test in the CCS-C Test Facility.

d. Develop installation instructions and plans for users and that minimize operational downtime/impacts and software regressions.

e. Install the product in operational locations. Support operational checkout, and user familiarization of the product.

2.2 Services

During the performance of this SOO, the contractor shall provide the following services:

a. Provide Program Management ensuring effective management of resources to meet satellite technical objectives on schedule and within budget.

b. Integrate the new ABE product replacement with existing system components while minimizing operational impacts.

c. Provide System and Software Engineering for all subsystems/components of the CCS-C system, including enhancements or development related to integration of replacement product and new specifications as required.

d. Provide Technical Order (TO) support functions for CCS-C satellite operations.

1 Introduction
2 Objectives

File details come from the government source that posted it. Updated .