Atch 2 AF 66 Submittal Register.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- AMENDMENT 02: Replace Site Lighting Electrical Conduits at 5 LFs Federal contract opportunity
- Solicitation number
- FA461326R0001
About this file
This is a Schedule of Material Submittals form (AF Form 66) that establishes the submittal requirements and timeline for the "Replace Site Lighting Electrical Conduits at 5 LFs" project (GHLN 26-6277, Solicitation FA461326R0001). The form outlines 11 required submittals with specific deadlines and documentation types, including Environmental Assessment Letter (EAL) documentation, AF Form 103 dig permit, all required permits (NPDES, right-of-way, or other), Safety Data Sheets, hazardous materials documentation, storage plan if required, project schedule, as-built drawings, PVC coated conduit, Leviton 1221-21 Single-Pole 20A 277Volt Ivory AC switches, and pad gravel. Most submittals are due upon award or within 10-15 days after Notice to Proceed, with as-built drawings due 30 days prior to project closeout and equipment submittals required prior to installation.
The form requires contractors to submit certification of compliance, shop drawings, samples, color selections, manufacturer's recommendations, warranties, catalog data, operating instructions, and test reports as applicable to each line item. Each submittal must be tracked through receipt in contracting, distribution to civil engineering, approval or disapproval status, and contractor resubmittal notifications. This submittal register serves as the primary control document for managing contractor deliverables and ensuring compliance with the project specifications and Air Force contracting requirements under the simplified acquisition procedures outlined in the related FAR Part 13 solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - Conformed .pdf | ||
| Atch 7 Post Site Visit Question and Answer.pdf | ||
| Solicitation Amendment FA461326R00010002 SF 30.pdf | ||
| RFP Amendment 02.pdf | ||
| Atch 1 Statement of Work 13 Apr 2026 Rev 1.pdf | ||
| Amendment 01 SF 30.pdf | ||
| Conformed Solicitation.pdf | ||
| RFP Amendment 01.pdf | ||
| Solicitation - FA461326R0001.pdf | ||
| Atch 5 SF 24 Bid Bond Form.pdf | ||
| Atch 6 Cost Estimate Breakdown.xlsx | XLSX spreadsheet | |
| Atch 3b NIST SP 800-171 Entry Guide.pdf | ||
| Atch 3a NIST SP 800-171 Assessment.pdf | ||
| Request for Proposal_Signed.pdf | ||
| Atch 3 MFR CUI Control_Receipt.pdf | ||
| Atch 4 Combined Wage Determinations.pdf | ||
| Atch 1 Statement of Work 18 Dec 25.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| PROJECT NUMBER | PROJECT TITLE | SOLICITATION/CONTRACT NUMBER | |||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | GHLN 26-6277 | Replace Site Lighting Electrical Conduits at 5 LFs | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURE'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TESTS | REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | ||||||||||||||||||||
| 1 | EAL Documentation | X | Upon Award | ||||||||||||||||||
| 2 | AF Form 103 - Dig Permit | X | 10 Days After NTP | ||||||||||||||||||
| 3 | All Permits (Local, State, and Federal) NPDES, ROW, or Other | X | Upon Award | ||||||||||||||||||
| 4 | Safety Data Sheets | X | Upon Award | ||||||||||||||||||
| 5 | Hazardous Materials | X | Upon Award | ||||||||||||||||||
| 6 | Storage Plan (if required) | X | Upon Award | ||||||||||||||||||
| 7 | Project Schedule | X | 15 Days After Award | ||||||||||||||||||
| 8 | As-Built Drawings | X | 30 Days Prior to Close Out | ||||||||||||||||||
| 9 | PVC Coated conduit | X | Prior to Installation | ||||||||||||||||||
| 10 | Leviton 1221-21 Single-Pole 20A 277Volt Ivory Ac Switch | X | Prior to Installation | ||||||||||||||||||
| 11 | Pad Gravel | X | Prior to Installation | ||||||||||||||||||
| 12 | |||||||||||||||||||||
| 13 | |||||||||||||||||||||
| 14 | |||||||||||||||||||||
| 15 | |||||||||||||||||||||
| AF Form 66, OCT 89 | PREVIOUS EDITION WILL BE USED | See Specifications for Frequency |