This is a Performance Specifications document for the Design-Build (DB) renovation and addition project of the BLM Vale District Office located at 100 Oregon Street, Vale, Oregon 97918. The project is governed by the GAOA (Government Buildings Environmental Accountability Act) and requires the Design-Build Contractor (DBC) to evaluate the provided concept package, complete geotechnical investigations, design all site and building systems, obtain necessary permits, submit design development and construction documents, provide a construction schedule, manage site security and access, construct the project, and deliver operations and maintenance manuals along with as-constructed drawings.
The specifications establish minimum acceptable standards across all building systems including substructure (reinforced concrete foundations and slabs-on-grade with radon mitigation and perimeter drainage), floor and roof construction (wood or metal framing with specific lumber grades and engineered systems), exterior walls (wood or steel framing with fiber-cement cladding), exterior windows (vinyl on rear, aluminum storefront on front), exterior doors (hollow metal and aluminum), roofing (asphalt shingles or membrane systems with 30-year warranties), interior partitions (wood or steel framing with gypsum board), interior doors (flush wood), and interior finishes including ceramic tile in bathrooms, vinyl composition tile in select areas, carpet tiles in offices and meeting spaces, and acoustical ceiling tiles throughout. The DBC must comply with nationally recognized building codes (IBC, IRC, IEBC), IECC energy requirements, OSHA safety standards, and all applicable federal design and construction policies. Key submittal requirements include design calculations, shop drawings, manufacturer specifications, concrete mix designs, welding qualifications, and test reports. All A-E services must be performed by licensed architects and engineers registered in Oregon, and all work products become property of the Government.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Specifications
Design- Build (DB)
GAOA Vale District Office Renovation & Addition
Project Number: L310
BLM Vale District Office
100 Oregon Street
Vale, Oregon 97918
UNITED STATES DEPARTMENT OF THE INTERIOR
Bureau of Land Management
National Operations Center
Architecture & Engineering Branch (OC-671)
30 SEPTEMBER 2025
GAOA Vale District Office Renovation & Addition BLM Vale District Vale, Oregon
TABLE OF CONTENTS
TABLE OF CONTENTS
INTRODUCTION
1010 Project Summary
1020 Project Program
1030 Project Criteria
A SUBSTRUCTURE
A1010 Standard Foundations
A4010 Standard Slabs-on-Grade
B SHELL
B1010 Floor and Roof Construction
B2010 Exterior Walls
B2020 Exterior Windows
B2050 Exterior Doors and Grilles
B3010 Roofing
C INTERIORS
C1010 Interior Partitions
C1030 Interior Doors
C1090 Interior Specialties
C2010 Interior Wall Finishes
C2030 Flooring
C2050 Ceiling Finishes
D SERVICES
D2010 Domestic Water Distribution
D2020 Sanitary Drainage
D3020 HVAC
D4010 Fire Suppression
D4030 Fire Protection Specialties
D5020 Electrical Service and Distribution
D5040 Lighting
Vale, Oregon
TABLE OF CONTENTS
D6010 Data Communications
D7010 Access Control and Intrusion Detection
E EQUIPMENT AND FURNISHINGS
E1060 Residential Equipment
G SITE WORK
G1010 Site Clearing
G1020 Site Elements Demolition
G1070 Site Earthwork
G2030 Pedestrian Plazas and Walkways
G2060 Site Development
G2080 Landscaping
G3010 Water Utilities
G3020 Sanitary Sewerage Utilities
G4010 Site Electric Distribution Systems
--- END OF SECTION ---
Vale, Oregon
SECTION 1010
PROJECT SUMMARY PAGE 1
1010 PROJECT SUMMARY
1010.1 SCOPE
A. In accordance with the terms and conditions of the Contract, the Design-Build Contractor (DBC) shall perform the work of this Request for Proposal (RFP) for the Bureau of Land Management
(BLM) as described below and in associated Sections and Technical Specifications.
B. The Technical Specifications set forth in this document are intended to establish the minimum acceptable standards of quality and provide guidance to the respective sections herein. The omission of any specific Project Scope elements from these Technical Specifications shall not be construed as their exclusion from the overall Scope of Work. It is the sole responsibility of the DBC to ensure that all requirements delineated in the Project Statement of Work are fully incorporated into the Contract deliverables, regardless of their presence or absence in the Technical
Specifications.
C. All Architect-Engineer (A-E) Services required in this RFP shall be performed by licensed Architects and Engineers registered in the State where the project is located.
D. The A-E remains fully responsible for determining if the standards or provisions cited in the technical specifications have been revised or updated. Any such conflicts between the specifications and the identified standard or provisions shall be brought to the attention of the
Government requesting direction.
1010.2 LOCATION
A. This project is located at 100 Oregon Street, Vale, OR 97918.
1010.3 BACKGROUND
A. Refer to Project Statement of Work for background.
1010.4 PROJECT DESCRIPTION
A. Refer to Project Statement of Work for description of Project.
1010.5 SCOPE OF WORK REQUIREMENTS
A. The work will include, but not be limited to, the following:
1. Evaluate the BLM Concept Package provided in the RFP package.
2. Review site data.
Vale, Oregon
SECTION 1010
PROJECT SUMMARY PAGE 2
3. Upon award, provide design schedule of work, with milestone submittal dates indicated.
Coordinate proposed milestone dates with BLM.
4. Submit list of required permits, if any.
5. Design site, site utilities, building and foundation system.
6. Submit DB Design Development and DB Construction Documents for review and approval, as required per milestone dates in design schedule.
7. Provide schedule of construction work. Coordinate proposed milestone dates with
Government.
8. Secure work area and provide for continued access to the facility.
9. Construct project.
10. Create and provide operations and maintenance manual.
11. Provide as-constructed drawings.
B. Compliance with the various codes and design criteria will be determined by a review of the design calculations, specifications, design drawings, construction submittals submitted during construction, and by field inspection. Compliance review is to verify that the DBC is providing systems, products, and/or materials that will satisfy the stated criteria. This review shall not relieve the DBC from responsibility for any errors or omissions nor from responsibility for complying with the requirements of this contract.
1010.6 CONTACT INFORMATION
A. Contracting Officer (CO):
1. Nathan Roush, Supervisory Contract Specialist
2. DOI Branch of National Acquisitions
3. Email: nroush@blm.gov
4. Phone: 720-346-5583
B. Contracting Officer�s Representative (COR):
1. Eric Grim, Engineer
2. BLM Oregon/Washington State Office
3. Email: ejgrim@blm.gov
Vale, Oregon
SECTION 1010
PROJECT SUMMARY PAGE 3
4. Phone: 541-471-6530
C. Technical Design Representative:
1. Jacob Laureska, Architect
2. BLM National Operations Center
3. Email: jlaureska@blm.gov
4. Phone: 720-948-5860
D. Facility Operations Supervisor / On-site Contact:
1. Ryan Bates
2. Vale District Office
3. Email: rbates@blm.gov
4. Phone: 541-473-6257
1010.7 COPYRIGHT
A. All information provided is property of the Government and no copyright symbols or statements shall be used:
1. All designs, drawings, specifications, notes and other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design, or construction project, without additional compensation to the Contractor. The
Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. (US Code) 201. With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws.
2. The Contractor for a period of three (3) years after completion of the task order agrees to furnish all retained works on the request of the Contracting Officer. Unless otherwise provided in this contract, the Contractor shall have the right to retain copies of all works beyond such period.
1010.8 REPORTS
A. Report(s) shall include the results/findings of the investigation. The report shall be provided with a cover, table of contents, executive summary, signature sheet (of evaluator, project manager, and reviewer) with professional state seal, introduction, general remarks, site investigation, analysis, recommendations, and annotated photos showing location taken and appendices (references, all calculations, evaluation checklists, summary data sheet, deficiencies, cost estimate(s), drawings, and any other data, etc.)
Vale, Oregon
SECTION 1010
PROJECT SUMMARY PAGE 4
Vale, Oregon
SECTION 1020
PROJECT PROGRAM PAGE 1
1020 PROJECT PROGRAM
1020.1 PROJECT PROGRAM
A. Refer to Project Statement of Work for Project Program.
Vale, Oregon
SECTION 1030
PROJECT CRITERIA PAGE 1
1030 PROJECT CRITERIA
1030.1 JURISDICTION, CODES AND EASEMENTS
A. Definitions:
1. Building Codes, in general, refer to sets of requirements governing the design, construction, alteration, maintenance and use of buildings. They specify the minimum requirements to adequately safeguard building occupants� health, safety, and welfare.
2. Model Building Codes refer to minimum design provisions and practices established by nationally recognized coordinating bodies made up of building professionals from all interested organizations. They are developed using consensus processes, they require the use of referenced national consensus standards and specifications, and they can be used as templates for AHJs to use when developing their local ordinances.
3. Authorities Having Jurisdiction (AHJ): AHJs adopt and enforce a comprehensive building code package by ordinance. They can adopt the model codes in their entirety or amend them as necessary depending on their laws and regulations.
4. Federal Basic Design and Construction Policies: Follow nationally recognized model building codes and other applicable nationally recognized codes that govern Federal construction to the maximum extent feasible and consider local building code requirements. (See 40 U.S.C. 3310 and 3312.)
a. 40 U.S. Code § 3312 - Compliance with nationally recognized codes
i. Application:
A) To any project for construction or alteration of a building for which amounts are first appropriated for a fiscal year beginning after September 30, 1989.
ii. Building Codes: Each building constructed or altered by the General Services
Administration or any other federal agency shall be constructed or altered, to the maximum extent feasible as determined by the Administrator or the head of the federal agency, in compliance with one of the nationally recognized model building codes and with other applicable nationally recognized codes, including electrical codes, fire and life safety codes, and plumbing codes, as the Administrator decides is appropriate. In carrying out this subsection, the Administrator or the head of the federal agency shall use the latest edition of the nationally recognized codes.
iii. Zoning Laws: Each building constructed or altered by the Administration, or any other federal agency shall be constructed or altered only after consideration of all requirements (except procedural requirements) of the following laws of a State or a political subdivision of a State, which would apply to the building if it were not a building constructed or altered by a federal agency:
Vale, Oregon
SECTION 1030
PROJECT CRITERIA PAGE 2
A) Zoning laws.
B) Laws relating to landscaping, open space, minimum distance of a building from the property line, maximum height of a building, historic preservation, esthetic qualities of a building, and other similar laws.
iv. Cooperation With State and Local Officials
A) State and local government consultation, review, and inspections: To meet the requirements of subsections (b) and (c), the Administrator or the head of the federal agency authorized to construct or alter the building shall:
a) in preparing plans for the building, consult with appropriate officials of the State or political subdivision of a State, or both, in which the building will be located.
b) on request, submit the plans in a timely manner to the officials for review by the officials for a reasonable period of time not exceeding
30 days: and
c) permit inspection by the officials during construction or alteration of the building, in accordance with the customary schedule of inspections for construction or alteration of buildings in the locality, if the officials provide to the Administrator or the head of the federal agency:
a. a copy of the schedule before construction of the building is begun; and
b. reasonable notice of their intention to conduct any inspection before conducting the inspection.
d) State and Local Government Recommendations: Appropriate officials of a State or political subdivision of a State may make recommendations to the Administrator or the head of the federal agency authorized to construct or alter a building concerning measures necessary to meet the requirements of subsections (b) and (c). The officials also may make recommendations to the
Administrator or the head of the federal agency concerning measures which should be taken in the construction or alteration of the building to consider local conditions. The Administrator or the head of the agency shall give due consideration to the recommendations.
e) Effect of Noncompliance: An action may not be brought against the
Federal Government and a fine or penalty may not be imposed against the Government for failure to meet the requirements of
Vale, Oregon
SECTION 1030
PROJECT CRITERIA PAGE 3
subsection (b), (c), or (d) or for failure to carry out any recommendation under subsection (e).
f) Limitation on Liability: The Government and its contractors shall not be required to pay any amount for any action a State or a political subdivision of a State takes to carry out this section, including reviewing plans, carrying out on-site inspections, issuing building permits, and making recommendations.
B. Authority Having Jurisdiction:
1. Authority Having Jurisdiction (AHJ) means a legal entity (Federal, State, or Local), such as a
Building Official or Fire Code Official, that has statutory authority for enforcing a code or standard or for approving equipment, materials, an installation, or a procedure.
2. The Bureau of Land Management (BLM) is the recognized AHJ on BLM property.
C. General Code Requirements:
1. The flagship ICC model building codes are the International Building Code (IBC), the
International Existing Building Code (IEBC) and the International Residential Code (IRC).
These three model codes can be considered parent codes that coordinate all other codes.
Combined with discipline-specific companion codes, including fire, plumbing, mechanical and others, a comprehensive package is formed. This package includes referenced national consensus material and engineering standards and product quality specifications, thereby incorporating the scientific understanding produced by specialized organizations. Compliance with the referenced standards within each code is necessary for compliance with the code.
2. The building design shall conform to the codes and standards listed in the �BLM Building Codes and Standards� document attached to the Performance Specifications.
3. The site design shall comply with the following (in addition to above):
a. American Association of State Highway and Transportation Officials (AASHTO) T99-
18, �Standard Method of Test for Moisture�Density Relations of Soils Using a 2.5-kg
(5.5-lb) Rammer and a 305-mm (12-in.) Drop�.
b. AASHTO T191-14, �Standard Method of Test for Density of Soil In-Place by the Sand-
Cone Method�.
c. AASHTO T310, �Standard Method of Test for In-Place Density and Moisture Content of Soil and Soil�Aggregate by Nuclear Methods (Shallow Depth)�.
d. 2009 Manual on Uniform Traffic Control Devices (MUTCD), with Revisions 1 and 2, May 2012
e. BLM National Sign Handbook https://www.blm.gov/services/national-operations-center/national-sign-program.
Vale, Oregon
SECTION 1030
PROJECT CRITERIA PAGE 4
D. Occupational Safety and Health Administration (OSHA) Requirements:
1. The contractor shall develop and implement a comprehensive safety and health plan that meets or exceeds OSHA requirements, including but not limited to:
a. Hazard communication.
b. Personal Protective Equipment (PPE).
c. Emergency response plan.
d. Fall protection.
e. Electrical safety.
f. Confined space entry.
E. Easements:
1. Coordinate utility access/alignments with appropriate authorities during preliminary design and planning efforts.
2. Once the final utility alignments are known, the Contractor shall notify the Government of the tentative easement requirements and the name and titles of the designated utility easements with associated surveys by a licensed surveyor.
3. Subject to a preliminary review by the Contracting Officer, this information will be forwarded to the BLM State Realty Office who will then contact the various utilities and upon verification, process the required easements with the individual utilities as required.
Vale, Oregon
SECTION A1010
STANDARD FOUNDATIONS PAGE 1
A1010 STANDARD FOUNDATIONS
A1010.1 SYSTEM DESCRIPTION
A. This system consists of all work below the lowest floor construction and the adjoining horizontal and vertical elements required to form a complete foundation, together with the necessary soil excavation and backfill.
A1010.2 CODE RISK CATEGORY
A. As specified in Section 1030 �Project Criteria�.
B. Climate Zone: Project is located in climate zone 5B (Malheur County, Oregon)
A1010.3 GEOTECHNICAL INVESTIGATION
A. To be completed by the DBC.
A1010.4 GENERAL REQUIREMENTS
A. Determination of the foundation system requirements shall be the responsibility of the Design Build
Contractor (DBC).
B. The foundation systems for all structures included in this contract shall be designed to conform to the codes and standards listed in Section 1030 �Project Criteria�.
A1010.5 DESIGN REQUIREMENTS
A. The DBC shall design to meet applicable loading requirements (live, dead, snow, wind, seismic, etc.) as outlined in Section 1030 �Project Criteria�.
B. Frost Depth: As required for building location.
C. Radon Mitigation: As recommended by the Geotechnical Report.
D. Concrete:
1. Minimum concrete design requirements shall be in accordance with ACI 318-14, Chapter 19
�Concrete Design and Durability Requirements�, including exposure and corrosive environment requirements.
2. Minimum compressive strength at 28 days shall be as required by design, but not less than
4000 psi.
3. Cementitious Material Content: Cementitious material may be a blend of Portland cement and fly ash. Minimum cementitious material content, 564 pounds per cubic yard.
Vale, Oregon
SECTION A1010
STANDARD FOUNDATIONS PAGE 2
a. Portland Cement: ASTM C150, Type II.
b. Fly Ash: ASTM C618-95, Class F. Fly ash not to exceed 15 percent of total cementitious material content by weight.
4. Entrained Air Content: All exterior concrete and concrete exposed to freeze/thaw shall have entrained air in accordance with ACI:
a. For Exposure Class F1, F2, F3.
b. Concrete for hard troweled slabs shall not exceed 3.0% total air.
5. Chloride Ion Content: Chlorides are not permitted.
6. Other admixtures complying with ASTM C494 or ASTM C618 may be used with approval.
7. Concrete Testing Service: The Contractor is responsible for all concrete testing, including testing identified as being the responsibility of the "Owner�. Engage a qualified independent testing agency to perform material evaluation tests and to design concrete mixtures.
E. Reinforcing steel:
1. ASTM A615 Grade 60.
2. ASTM A615 Grade 40 for field bent dowels.
3. ASTM A706 Grade 60 for field welded reinforcing.
A1010.6 SUBMITTALS DURING DESIGN
A. Refer to Project Statement of Work.
A1010.7 SUBMITTALS DURING CONSTRUCTION
A. Submit the following for review and approval in accordance with the Project Statement of Work.
B. Shop Drawings:
1. Foundation plan including:
a. Layout
b. Anchor bolt locations
c. Reinforcing fabrication marks
d. Control joints.
2. Reinforcing steel shop drawings.
Vale, Oregon
SECTION A1010
STANDARD FOUNDATIONS PAGE 3
C. Manufacturer�s Catalog Data:
1. Perimeter drainage system and soil gas venting system components.
2. Concrete sealer/hardener (if used).
3. Insulation and insulation appurtenances.
4. Vapor barrier.
D. Design Data:
1. Concrete mix design including all additives and design environmental Exposure Category and
Classes based on ACI 318.
E. Test Reports:
1. Soil compaction results.
2. Aggregate gradation.
3. Concrete cylinder test results.
Vale, Oregon
SECTION A40
STANDARD SLABS-ON-GRADE PAGE 1
A4010 STANDARD SLABS-ON-GRADE
A4010.1 SYSTEM DESCRIPTION
A. This system consists of all work associated with slab-on-grade floors.
B. Slab-on Grade Construction:
1. Slab-on-grade:
a. Exterior flatwork thickness shall be minimum 4 inches (walks etc.).
b. Interior flatwork thickness shall be minimum 5 inches.
2. Use ACI 318, Table 7.6.1.1 for minimum reinforcing for interior building slabs-on-grade and exterior Engine Bay flatwork. Maximum spacing of reinforcing shall be three times slab thickness or 18 inches, whichever is smaller.
3. Provide control joints and adequate reinforcing steel at re-entrant corners in slabs-on-grade.
4. Use of staggered or offset control joints in slabs-on-grade shall not be permitted.
5. Load transfer dowels shall be used at all thresholds and approach aprons along with expansion joint material (which also serves as a thermal break). Equipment approach aprons are recommended to also have a minimum 4� bearing lip with two layers of slip sheet.
6. Vehicle aprons: Thicken exposed edges 2X slab depth for 2X slab depth length, transitioning at a 45 degree to slab depth.
A4010.2 SYSTEM REQUIREMENTS
A. The DBC shall utilize slab-on-grade construction for the addition, considering on site soil conditions, site frost depth, site grading, recommendations of the Geotechnical Engineering Report and other pertinent conditions and constraints.
1. All wood in direct contact with concrete or concrete masonry shall be pressure treated in accordance with IBC requirements.
2. Foundations shall be constructed of reinforced concrete.
3. Structure Excavation and Backfill:
a. Soil density specification and testing are the responsibility of the DBC. The DBC shall assure that subgrade soil densities are adequate to support the structure with minimal settlement.
b. Dewatering is the responsibility of the DBC. No concrete shall be placed in excavations that contain standing water.
Vale, Oregon
SECTION A40
STANDARD SLABS-ON-GRADE PAGE 2
c. As much as possible, the DBC shall use excavated material for backfill material. This may require processing the excavated material. Imported backfill shall be kept to a minimum. The geotechnical report addresses the suitability of reuse of excavated material, including where it may be used, how it shall be processed, and applicable design values if used for support of any structural system.
d. OSHA excavation safety rules shall be adhered to. Keep heavy equipment away from trench edges and place surcharge loads at a distance at least equal to the depth of the excavation away from edges of the excavation.
A4010.3 SUBMITTALS DURING DESIGN
A. Refer to Project Statement of Work.
A4010.4 SUBMITTALS DURING CONSTRUCTION
A. Submit the following for review and approval in accordance with the Project Statement of Work.
B. Shop Drawings:
1. Foundation plan including:
a. Layout
b. Anchor bolt locations
c. Reinforcing fabrication marks
d. Control joints.
2. Reinforcing steel shop drawings.
C. Manufacturer�s Catalog Data:
1. Concrete sealer/hardener (if used).
2. Insulation and insulation appurtenances.
3. Vapor barrier.
D. Design Data:
1. Concrete mix design including all additives and design environmental Exposure Category and
Classes based on ACI 318.
E. Test Reports:
1. Soil compaction results.
Vale, Oregon
SECTION A40
STANDARD SLABS-ON-GRADE PAGE 3
2. Aggregate gradation.
3. Concrete cylinder test results.
A4010.5 SYSTEM COMPONENTS
A. Standard Foundation:
1. Continuous, reinforced concrete spread footing on undisturbed or properly compacted soil.
Footing assemblies shall include excavation, hand-shaped bottom, compacted backfill, formwork and keyways, reinforcing steel, concrete, and screed finish
2. Apply Non-Fibered Asphalt Emulsion Damp Proofing (ASTM D1227, Type III Class 1, and
ASTM D1187 Type I) for below-grade damp proofing of walls and foundations.
3. Provide perimeter drainage system for high ground water sites and as recommended by the geotechnical report. The perimeter drainage system shall be designed to remove water away from the foundation of the structure, with the drainage system terminated in the site storm sewer system or terminated above grade with a screened end and riprap in a retention basin.
Provide perforated pipe as specified below, wrapped with filter fabric and bedded in granular fill material:
a. Corrugated Polyethylene (PE) Drainage Pipe: ASTM F405-13, perforated, heavy duty, with PE snap fittings and couplings.
b. Polyvinyl Chloride (PVC) Pipe: ASTM D3034-16, Type PSM, PS 46 (SDR 35), perforated, with PVC solvent-weld fittings and couplings.
B. Slab-on-Grade Construction:
1. General: Slab-on-grade design and construction shall be in accordance with ACI 360R-10 and
ACI 318-14 Paragraph 24.4.3.2.
2. All interior slabs-on-grade shall be provided with methods for expansion control, perimeter and joint sealers, and slope to floor drains and floor sinks.
a. Column block outs shall be diamond shape with closure pour afterward.
b. Edge chamfer shall be ½�.
c. Max spacing of control joints shall be 20 ft.
d. Maximum aspect ratio shall be 1.5 to 1.
e. Minimum saw cut joint depth shall be slab thickness/5.
3. Provide aggregate base minimum 4 inch under interior slabs-on-grade, with 20 mil reinforced polyethylene vapor barrier located directly under slab.
Vale, Oregon
SECTION A40
STANDARD SLABS-ON-GRADE PAGE 4
4. Furnish anchor bolts minimum 7� embedment in top of foundation walls for anchoring the sill plate at maximum 48-inch O.C. and/or as required for shear walls.
5. Exterior slab/building interface (stoops & aprons): Use 3/4-inch expansion joint material with backer rod and sealant and load transfer dowels with dowel caps. Minimum #5 at 24 inches
O.C. or minimum of three per stoop. Terminate perimeter insulation at this location at concrete interface as required.
6. Floor Treatment: All slabs-on-grade which will not be covered with any type of flooring shall have a floor sealer/hardener applied. Floors that will be covered, especially with resilient flooring, shall not have a sealer/hardener applied.
7. Insulation: ASTM C578-18, Type IV, extruded polystyrene (XPS) rigid insulation. Provide continuous XPS perimeter insulation from top of slab to bottom of foundation/top of footing
(minimum 24 inches) on the exterior face of the foundation, with a protective fiberglass reinforced plastic (FRP) covering where insulation is exposed above grade. Minimum insulation R values shall be as required by the IECC.
8. Soil Gas Venting System: Provide a passive soil gas venting system to vent the space under the vapor barrier, with the vent terminating above the roof of the building. The passive soil gas venting system shall be designed with provision to add a fan in the future, if necessary.
Vale, Oregon
SECTION B1010
FLOOR AND ROOF CONSTRUCTION PAGE 1
B1010 FLOOR & ROOF CONSTRUCTION
B1010.1 SYSTEM DESCRIPTION
A. This system includes all work related to floor and roof construction.
B1010.2 CODE RISK CATEGORY
A. As specified in Section 1030 �Project Criteria�.
B1010.3 GENERAL REQUIREMENTS
A. Determination of the floor and roof construction framing system requirements shall be the responsibility of the Design-Build Contractor (DBC).
B. The floor and roof systems for the structure included in this contract shall be designed to conform to the codes and standards listed in Section 1030 �Project Criteria�.
B1010.4 DESIGN REQUIREMENTS
A. The DBC shall design to meet applicable loading requirements (live, dead, snow, wind, seismic, etc.) as outlined in Section 1030 �Project Criteria�.
B1010.5 CONCRETE SYSTEMS REQUIREMENTS
A. As specified in Section A �Substructure.�
B1010.6 WOOD SYSTEM REQUIREMENTS
A. Provide blocking and lateral support for floor joists in accordance with IBC Section 2308. Provide blocking between roof framing members at bearing locations and at diaphragm boundaries.
B. Interior Wood Framing Requirements:
1. Dimensional wood framing members shall be new lumber. Lumber may be Douglas fir, Douglas fir-larch, Hemlock fir, southern pine, or other structurally competent species allowed by applicable codes and standards. Framing lumber shall meet the following minimum grading requirements:
a. Joists and Rafters: Number 2 or better.
b. Beams, 4x and larger: Shall be laminated. Number 1.
c. Posts, 4x and larger: Shall be laminated.
Vale, Oregon
SECTION B1010
FLOOR AND ROOF CONSTRUCTION PAGE 2
d. Blocking: Number 3 or better.
C. Exterior (Exposed) Wood Framing:
1. Porch Beams and Posts:
a. Dimensional timber wood framing members shall be new lumber Douglas Fir #1 FOHC
(Free of Heart Center).
D. Engineered lumber may be used in lieu of dimensional lumber for roof framing system.
E. Roof Framing & Sheathing Requirements:
1. Minimum roof sheathing thickness shall be 5/8 inch. Roof sheathing panel end joints shall be staggered.
2. Diaphragm designs shall be engineered to avoid use of 3x material at diaphragm edges/joints.
3. Roof trusses shall be attached to exterior wall top plates with hurricane ties.
4. Rake overhangs shall be framed with outriggers supported by the gable end walls and connected to the roof trusses inside the gable end walls where SIPS are used.
5. All wood in direct contact with concrete or concrete masonry shall be pressure treated in accordance with IBC requirements and have two layers of 30 lb. felt beneath.
B1010.7 METAL SYSTEM REQUIREMENTS
A. All loads are supported by structural steel frame.
1. Secondary lateral loads are transferred to structural steel frame.
2. Lateral loads transferred to foundation by structural steel shall be without the aid of in-plane wall diaphragms. Tension cables shall not be used.
B. Steel design shall conform to the relevant codes listed in Section 1030 �Project Criteria�.
C. Structural Steel:
1. Structural steel framing shall be Grade 50 with associated channels, angles, plate and bar.
2. Cold-Formed Hollow Structural Sections: ASTM A500 Grade B or C.
3. Steel Pipe: ASTM A53, Type E or Type S, Grade B.
4. Bolts and Connections: Designate Type A325 or A490.
D. Open Web Steel Joists:
Vale, Oregon
SECTION B1010
FLOOR AND ROOF CONSTRUCTION PAGE 3
1. Bearing Condition: Underslung.
2. Provide holes in chord members for connecting and securing other construction to joists.
3. Camber joists according to SJI�s �Specifications�.
4. Reinforce at concentrated loads in accordance with SJI�s �Specifications�.
5. Deflection requirements in accordance with SJI�s �Specifications�.
6. Deliver, store, and handle joists as recommended in SJI�s �Specifications.�
7. Top-Chord Extensions: Extend top chord of joists complying with SJI�s �Specifications�.
8. K-Series Joists:
a. Manufacture steel joists of type indicated according to �Standard Specification of Open
Web Steel Joists, K-Series� in SJI�s �Specifications,� with steel-angle top- and bottom-chord members, underslung ends, and parallel top chord.
b. Framing shall comply with SJI�s �Specifications� and the following:
i. Max open web steel joist spacing shall be 5�-0�.
c. Steel Joist Substitutes: Manufacture according to �Standard Specifications for Open
Web Steel Joists, K-Series� in SJI�s �Specifications,� with steel-angle or steel-channel members.
E. Structural Metal Deck:
1. AISI Specifications: Comply with calculated structural characteristics of steel deck according to AISI�s �North American Specification for the Design of Cold-Formed Steel Structural
Members.�
2. Fire-Resistance Ratings: comply with ASTM E119; testing by a qualified testing agency.
Identify products with appropriate markings of applicable testing agency.
3. Ensure that the number of support attachments at diaphragm chords, struts, ties or other collector elements that are parallel to the deck flutes is adequate to develop the full capacity of the diaphragm.
4. Shall be factory hot-dipped galvanized ASTM A 525 minimum Class G-60.
5. Gage: Minimum 22 gage.
B1010.8 SUBMITTALS DURING DESIGN
A. Refer to Project Statement of Work.
Vale, Oregon
SECTION B1010
FLOOR AND ROOF CONSTRUCTION PAGE 4
B1010.9 SUBMITTALS DURING CONSTRUCTION
A. Submit the following for review and approval in accordance with the Project Statement of Work.
B. Concrete Systems:
1. As specified in Section A �Substructure.�
C. Wood Systems:
1. Shop Drawings:
a. Pre-Engineered wood trusses.
b. SIPs layout and connection details.
2. Manufacturer�s Catalog Data:
a. Engineered lumber.
b. Wood Framing / Glulams.
c. Metal framing connectors.
d. Spray foam insulation.
e. Structural insulated panels.
f. Coating / stains.
3. Certificates:
a. Framing lumber and sheathing, including species, grade, and treatment.
D. Metal Systems:
1. Welding Qualifications: Qualify field-welding procedures and personnel according to AWS
D1.1/D1.1M, "Structural Welding Code - Steel."
2. Structural Steel Framing
a. Informational Submittals:
i. Qualification Data: For manufacturer/professional engineer.
b. Shop Drawings: Show fabrication of structural-steel components.
i. Include details of cuts, connections, splices, camber, holes, and other pertinent data.
Vale, Oregon
SECTION B1010
FLOOR AND ROOF CONSTRUCTION PAGE 5
ii. Include embedment Drawings.
iii. Indicate welds by standard AWS symbols, distinguishing between shop and field welds, and show size, length, and type of each weld. Show backing bars that are to be removed and supplemental fillet welds where backing bars are to remain.
iv. Indicate type, size, and length of bolts, distinguishing between shop and field bolts.
Identify pretensioned and slip-critical, high-strength bolted connections.
v. Identify members and connections of the seismic-load-resisting system.
vi. Indicate locations and dimensions of protected zones.
vii. Identify demand-critical welds.
viii. Identify members not to be shop primed.
3. Open Web Steel Joists
a. Informational Submittals:
i. Qualification Data: For manufacturer/professional engineer.
ii. Welding certificates.
iii. Manufacturer certificates.
iv. Mill Certificates: For each type of bolt.
v. Comprehensive engineering analysis of special joists signed and sealed by the qualified professional engineer responsible for its preparation.
vi. Field quality-control reports.
b. Shop Drawings:
i. Include layout, designation, number, type, location, and spacing of joists.
ii. Include joining and anchorage details; bracing, bridging, and joist accessories;
splice and connection locations and details; and attachments to other.
construction.
4. Structural Metal Decking
a. Informational Submittals:
i. Welding certificates.
ii. Product Certificates: For each type of steel deck.
Vale, Oregon
SECTION B1010
FLOOR AND ROOF CONSTRUCTION PAGE 6
iii. Product Test Reports: For tests performed by a qualified testing agency, indicating that each of the following complies with requirements:
A) Evaluation Reports: For steel deck, from ICC-ES.
B) Field quality-control reports.
b. Shop Drawings:
i. Include layout and types of deck panels, anchorage details, reinforcing channels, pans, cut deck openings, special jointing, accessories, and attachments to other construction.
B1010.10 SYSTEM COMPONENTS
A. Concrete Floor Construction: As specified in Section A �Substructure�.
B. Roof Construction:
1. Wood Roof Construction:
a. General: Attics shall be vented with adequate access from inside the facility.
b. Pre-Engineered Wood Trusses: Roof trusses shall be designed to meet the requirements of ANSI/TPI 1-2014, �National Design Standard for Metal Plate
Connected Wood Truss Construction.�
c. Spray-Foam Insulation (for application at truss heels and incidental areas for complete encapsulation): Comply with ASTM C1029-15 and ICC-ES AC377, Appendix X requirements.
d. Metal Framing Connectors: Galvanized steel engineered wood connectors. Metal framing connectors shall be installed with appropriate fasteners in strict accordance with the manufacturer�s instructions.
e. Exposed Timber Framing: Coat with premium exterior penetrating oil finish. Apply one coat before installation and one coat after. Apply third coat prior to occupancy/completion.
C. Steel Systems Construction:
1. Erection: Set structural steel accurately in locations and to elevations indicated and in accordance with ANSI/AISC 303 and ANSI/AISC 360.
2. Open Web Steel Joists
Vale, Oregon
SECTION B1010
FLOOR AND ROOF CONSTRUCTION PAGE 7
a. Install joists and accessories plumb, square, and true to line; securely fasten to supporting construction according to SJI's "Specifications� and �Code of Standard
Practice�.
3. Structural Metal Decking:
a. Fasten deck panels to steel supporting members by arc spot (puddle) welds of the surface diameter indicated.
b. Side-Lap and Perimeter Edge Fastening: Fasten side laps and perimeter edges of panels between supports, at intervals specified.
i. Side-Laps: Mechanically clinch or button punch.
4. Metal Roof System
a. System shall comply with UL Class 90.
b. Metal Roof Panels: As specified in Section B30 Roofing.
c. Underlayment: As specified in Section B30 Roofing.
d. Cover Board:
i. Fiberglass-mat faced gypsum roof boards 1/2� thick DensDeck by Georgia Pacific or approved equal.
A) Stagger roof board end and edge joints minimum 12" over installed insulation layers.
B) Board edges and ends shall be butted tightly together; do not gap edges or ends.
C) Apply only as many roof boards as can be covered by underlayment system in the same day.
ii. Stagger the cover board and insulation joints.
iii. Install fasteners through insulation to structural metal deck below.
e. Roof Insulation:
i. ASTM C578-18 extruded polystyrene (XPS) foam panels
ii. Thickness shall be as required to achieve the required R-values.
iii. Minimum of three layers of rigid insulation. All end joints to be staggered with respect to adjoining rows. All joints to be offset from joints in layers below, including cover board.
Vale, Oregon
SECTION B1010
FLOOR AND ROOF CONSTRUCTION PAGE 8
iv. Structural Metal Decking: As listed above. Provide ventilation for structural deck corrugations at both eaves.
Vale, Oregon
SECTION B2010
EXTERIOR WALLS PAGE 1
B2010 EXTERIOR WALLS
B2010.1 SUMMARY
A. This system consists of the exterior facing of the building, including load bearing and non-load bearing exterior walls, exterior doors, and exterior windows.
B2010.2 CODE RISK CATEGORY
B. As specified in Section 1030 �Project Criteria�.
B2010.3 GENERAL REQUIREMENTS
A. Determination of the exterior wall framing system and siding requirements shall be the responsibility of the Design Build Contractor (DBC) where not explicitly stated in this section.
B. Exterior walls shall be constructed utilizing at a minimum the following options:
1. Either wood or steel construction framing.
2. Exterior substrate shall be fiber cement board system or exterior-grade plywood sheathing.
3. Exterior wall cladding shall be fiber-cement. Style shall be either board and batten, horizontal lap siding, or a combination of the two.
4. Minimum interior wall/ceiling height shall be 8 feet in occupied areas, and higher where feasible.
C. The exterior enclosure systems for all structures included in this contract shall be designed to conform with all applicable building codes and regulations.
D. Extend framing and cavity/continuous insulation to underside of roof at porches and gable ends.
E. Provide new infill wood stud framing at all existing gable ends. Re-clad gable end framing with structural wall sheathing and siding.
B2010.4 WOOD SYSTEM REQUIREMENTS
A. As specified in Section B1010.
1. Minimum wall sheathing thickness shall be 7/16-inch, Exposure 1, APA rated 32/16.
2. Plywood sheathing backing panels for telephone boards and similar: ACX plywood, 5/8-inch thickness.
Vale, Oregon
SECTION B2010
EXTERIOR WALLS PAGE 2
3. Diaphragm designs shall be engineered in order to avoid use of 3x material at diaphragm edges/joints.
4. All wood in direct contact with concrete or concrete masonry shall be pressure treated in accordance with IBC requirements and have two layers of 30 lb. felt beneath.
5. Air/Water Barrier Drainage Requirements: Systems for drainage of water between wall air/water barrier (drainage plane) and fiber cement siding shall be as follows:
a. Fiber cement siding installed over housewrap: Drainable housewrap, with spacers, corrugations, or grooves to furnish drainage pathways behind siding.
b. Fiber cement siding installed over continuous insulation (sheathing insulation) or wood sheathing with factory-applied air/water barrier: Rainscreen or furring strips furnishing a minimum 1/8-inch gap behind siding.
c. If the project is located where average annual rainfall is greater than 40 inches, a rainscreen or furring strips furnishing a minimum 1/8-inch gap behind siding shall be installed over housewrap, continuous insulation, or OSB with factory-applied air/water barrier drainage planes.
B2010.5 METAL SYSTEM REQUIREMENTS
A. As specified in Section B1010.
1. Cold Formed Metal Framing.
a. Design framing systems to provide for movement of framing members located outside the insulated building envelope without damage or overstressing, sheathing failure, connection failure, undue strain on fasteners and anchors, or other detrimental effects when subject to a maximum temperature change.
b. Design framing system to maintain clearances at openings, to allow for construction tolerances, and to accommodate live load deflection of primary building structure.
c. Design exterior non-load-bearing wall framing to accommodate horizontal deflection without regard for contribution of sheathing materials.
d. Cold-Formed Steel Framing Standards: Unless more stringent requirements are indicated, framing shall comply with AISI S100, AISI S200, and the following:
i. Wall Studs: AISI S211:
A) Max Spacing: 24 inches.
B) Depth: Minimum 5½�.
C) Gage: Minimum 20 gage.
Vale, Oregon
SECTION B2010
EXTERIOR WALLS PAGE 3
D) Minimum 18 Gage for weldable construction.
ii. Headers: AISI S212.
iii. Lateral Design: AISI S213.
B2010.6 SUBMITTALS DURING DESIGN
A. Refer to Project Statement of Work.
B2010.7 SUBMITTALS DURING CONSTRUCTION
A. Submit the following for review and approval in accordance with the Project Statement of Work.
B. Metal Systems
1. Structural Steel: As specified in Section B10.
2. Cold Formed Metal Framing
a. Include layout, spacings, sizes, thicknesses, and types of cold-formed steel framing;
fabrication; and fastening and anchorage details, including mechanical fasteners.
b. Indicate reinforcing channels, opening framing, supplemental framing, strapping, bracing, bridging, splices, accessories, connection details, and attachment to adjoining work.
C. Manufacturer�s Catalog Data:
1. Air/water barrier (housewrap).
2. Continuous insulation (sheathing insulation)
3. Exterior furring for thermal isolation.
4. Wall cavity insulation.
5. Siding and trim.
6. Exterior paint
7. Exterior siding.
8. Lock box.
D. Samples:
1. Paint color samples.
Vale, Oregon
SECTION B2010
EXTERIOR WALLS PAGE 4
2. Wall color samples.
E. Certificates:
1. Framing lumber and sheathing, including species, grade, and treatment.
B2010.8 EXTERIOR WALL COMPONENTS
A. Wood Exterior Walls:
1. General: Wall framing shall be 2x6 wood studs or equivalent (spacing not to exceed 24 inches on center), with plywood sheathing, and polyethylene fiber air/water barrier (housewrap) with taped joints � see drainage requirements for air/water barrier in �System Requirements� above.
OSB sheathing with factory-applied air/water barrier and taped joints may be used in lieu of standard sheathing and housewrap. Walls shall be insulated, covered with siding, caulked, and painted as specified below. Provide 5/8-inch gypsum board on interior wall face, screwed to studs, with all joints taped and all screw heads spotted with joint compound to a Level 4 finish suitable for light texture application.
2. Wall Insulation Systems: The following shall be acceptable for use as wall insulation:
a. Fiberglass: ASTM C665-17, Type I, (unfaced) friction fit fiberglass batt cavity insulation.
b. Rock Wool: ASTM C665-17, Type I, (unfaced) friction fit rock wool (mineral wool) batt cavity insulation.
c. Spray-Foam: ASTM C1029-15, Type II, 2 PCF, closed cell polyurethane spray-foam cavity insulation.
d. Continuous (Sheathing) Insulation: ASTM C578-18 extruded polystyrene (XPS) rigid insulation, or ASTM C1289-11 foil-faced polyisocyanurate rigid insulation. Since the continuous insulation will be installed outside of the air/water barrier, the continuous insulation joints shall not be taped.
3. Wall Insulation R Values: Minimum R values for exterior wall stud cavity and continuous insulation shall be as follows:
a. New Construction: In accordance with IECC minimum requirements.
b. Existing Exterior Walls: Provide minimum R-10 continuous thermal insulation around entire building perimeter.
4. Insulation shall be installed in a manner that will prevent condensation from forming inside the air/water barrier (house wrap).
5. Siding: ASTM C1186-08 fiber cement board lap siding and 1x fiber reinforced cement trim, factory-primed for paint. Lap siding shall be installed with a 6-inch exposure and shall be
Vale, Oregon
SECTION B2010
EXTERIOR WALLS PAGE 5
fastened in accordance with the siding manufacturer�s installation instructions. Siding end joints in the wall field shall be butted tight, with flashing installed under the joint; do not caulk field butt joints. Provide 1/8-inch gap where siding meets jamb and sill trim pieces, and caulk gaps between siding and trim. Furnish head flashing over all door and window trim, but do not caulk the gap between the flashing and the siding above.
6. Caulk: ASTM C920-18, Type S, Grade NS, Class 25, permanently flexible acrylic caulk.
7. Paint: Factory-primed siding and trim shall be painted with two coats of exterior grade latex
(100% acrylic) semi-gloss paint. Color shall be as selected by the Government.
8. Metal Framing Connectors: Galvanized steel engineered wood connectors. Metal framing connectors shall be installed with appropriate fasteners in strict accordance with the manufacturer�s instructions.
B. Steel Exterior Walls:
1. General:
a. Wall framing shall be vertical steel studs at minimum 5-1/2� deep (spacing not to exceed 24 inches on center)
b. Sheathing: Plywood, OSB, or exterior-grade Gypsum Board.
i. Cover with polyethylene fiber air/water barrier (housewrap) with taped joints � see drainage requirements for air/water barrier in �System Requirements� above. OSB sheathing with factory-applied air/water barrier and taped joints may be used in lieu of standard sheathing and housewrap. Walls shall be insulated, covered with siding, as specified below.
c. Provide 5/8-inch Type X gypsum board on interior wall face, screwed to studs, with all joints taped and all screw heads spotted with joint compound to a Level 4 finish suitable for light texture application.
d. Wall Insulation Systems: The following shall be acceptable for use as wall insulation:
i. Fiberglass: ASTM C665-17, Type I, (unfaced) friction fit fiberglass batt cavity insulation.
ii. Rock Wool: ASTM C665-17, Type I, (unfaced) friction fit rock wool (mineral wool) batt cavity insulation.
iii. Spray-Foam: ASTM C1029-15, Type II, 2 PCF, closed cell polyurethane spray-foam cavity insulation.
e. Continuous (Sheathing) Insulation: ASTM C578-18 extruded polystyrene (XPS) rigid insulation, or ASTM C1289-11 foil-faced polyisocyanurate rigid insulation. Since the
Vale, Oregon
SECTION B2010
EXTERIOR WALLS PAGE 6
continuous insulation will be installed outside of the air/water barrier, the continuous insulation joints shall not be taped.
f. Wall Insulation R Values: Minimum R values for exterior wall stud cavity and continuous insulation shall be as required by the IECC.
2. Furring System: Thermally broken cladding attachment system.
a. GreenGirt CMH (https://smartcisystems.com/products/greengirt/) or approved equal -
Composite Metal Hybrid (CMH) sub-framing system with in-fill insulation integrated with exterior wall cladding.
Vale, Oregon
SECTION B2020
EXTERIOR WINDOWS PAGE 1
B2020 EXTERIOR WINDOWS
B2020.1 SUMMARY
A. This section consists of Exterior Windows.
B2020.2 GENERAL REQUIREMENTS
A. Determination of exterior windows shall be the responsibility of the Design Build Contractor (DBC) where not explicitly stated in this section.
B. Exterior windows shall be the following types:
1. New windows on building rear: Commercial-grade vinyl to match existing size and style.
2. New windows on front addition: Extruded aluminum storefront.
C. Source Limitations: Obtain each type and variety of window from a single manufacturer, unless otherwise indicated.
D. Structural Performance: Window assemblies shall have an LC-PG35 rating as a minimum for Type
HS and Type FW windows per AAMA/WDMA/CSA 101/I.S.2/A440-11, and shall be provided with a higher performance grade rating as necessary to meet special wind requirements if wind loads at the project location are greater than 35 PSF.
E. Thermal Performance: Window assembly thermal performance shall be as required by the IECC.
F. Sound Transmission: Windows shall have a minimum STC rating of 34.
G. Security:
1. The exterior glazing shall be clear laminated glass.
2. Operable windows shall be lockable from the inside when they do not need to be open for ventilation or other operational purposes.
H. Trim: Solid surface sills, with gypsum board returns at jambs and heads.
I. Blinds: See Section C �Interiors�.
J. Window Sizes:
1. New windows on building rear: Match existing window sizes.
2. New windows on front addition: To be determined by the DBC.
Vale, Oregon
SECTION B2020
EXTERIOR WINDOWS PAGE 2
B2020.3 SUBMITTALS DURING DESIGN
A. Refer to Project Statement of Work.
B2020.4 SUBMITTALS DURING CONSTRUCTION
A. Submit the following for review and approval in accordance with the Project Statement of Work.
B. Manufacturer�s Catalog Data:
1. Exterior windows.
C. Operation and Maintenance Data:
1. Exterior windows.
D. Samples:
1. Window color samples.
Vale, Oregon
SECTION B2050
EXTERIOR DOORS & GRILLES PAGE 1
B2050 EXTERIOR DOORS & GRILLES
B2050.1 SUMMARY
A. This section consists of Exterior Doors and Hardware:
1. Hollow Metal Doors and Frames.
2. Extruded Aluminum Storefront Door Systems.
3. Commercial door hardware and electrified door hardware as shown or specified for both exterior and interior doors.
B2050.2 GENERAL REQUIREMENTS
A. Determination of exterior doors and hardware products shall be the responsibility of the Design
Build Contractor (DBC) where not explicitly stated in this section.
B. Exterior doors shall be the following types:
1. Staff entry doors, including building rear and sides: Hollow metal doors and frames with glazing in locations deemed appropriate by the Government and in accordance with BLM Physical
Security standards.
2. Public / Primary Entrance doors: Extruded aluminum storefront with sidelites.
C. Source Limitations: Obtain each type and variety of door hardware from a single manufacturer, unless otherwise indicated.
D. Provide electrified door hardware from same manufacturer as mechanical door hardware, unless otherwise indicated.
E. Coordination: Hardware and keying conference with Owner prior to final approval of doors and hardware.
F. Security:
1. Glass panels in doors:
a. Shall be no larger than 96 square inches.
b. Where larger than 96 square inches, glass panels in doors shall have a physical treatment to prevent unauthorized access or increase delay time for unauthorized access attempts. Physical treatments may include burglar-resistant fil or glazing, security bars, and/or expanded metal mesh.
Vale, Oregon
SECTION B2050
EXTERIOR DOORS & GRILLES PAGE 2
B2050.3 REFERENCES
A. ANSI/BHMA A156 � Builders Hardware…