At02A_ConceptPackage.pdf
PDF 2 MB Posted
- Solicitation number
- 140L0626R0009
About this file
This is a Concept Package for a federal construction project involving the renovation and addition of the BLM Vale District Office located at 100 Oregon Street, Vale, Oregon 97918. The project encompasses the renovation of an existing 16,320 square foot single-story Bureau of Land Management district office and the construction of a new 1,051 square foot addition on the facility's front. The project will accommodate 86 total full-time equivalent personnel across multiple office suites including V000 (17 staff), V003 (14 staff), V004 (11 staff), V040 (26 staff), V050 (2 staff), V080 (1 staff), Hosted offices (4 staff), 1039/Seasonal positions (10 staff), and ESP Program (1 staff).
The design must comply with 2024 International Building Code, 2024 International Plumbing Code, 2024 International Mechanical Code, National Electrical Code (NFPA 70), and ABA Accessibility Guidelines. Key project requirements include the construction of a new ABA-compliant entry portico with architectural features compatible with BLM design requirements and Eastern Oregon vernacular, new roof overhangs, enhanced building massing at the primary entry, a new flagpole and masonry garden landscape feature, and comprehensive site improvements including new sidewalks, concrete aprons, parking lot rehabilitation, and landscape modifications. The BLM serves as the Authority Having Jurisdiction; however, the contractor must provide a courtesy set of plans to the local fire department if requested. The proposed floor plan indicates schematic-level programming with office suites, conference rooms, break rooms, restrooms, high-density file storage, server/network facilities, library, meeting rooms, print areas, public lobbies, reception areas, and custodial spaces totaling 17,371 square feet.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U N
IT
ED
S
TA
TE
S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
PR
O
JE
C
T N
O
D
ES
IG
N
O
FF
IC
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
K
ED
B
Y:
PR
O
JE
C
T
PH
AS
E:
D
AT
E:
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
O
VE
D
N O
C A
E
BL
M
N at io na l O pe ra tio ns C en te r
9/ 9/
:4
2:
A M
G-100
C O
VE
R
S H
EE
T
VA
LE
D
IS
TR
IC
T O
FF
IC
E
RE
NO
VA
TI
O
N
S
EP
TE
M
BE
R
O
R
EG
O N
S T.
, V
AL
E, O
R
EG
O N
N O
C A
E
N /A
PR
E-
D
ES
IG
N
C
O N
C
EP
T
N O
C A
E
BR
AN
C
H
SHEET INDEX
Sheet Number Sheet Name
GENERAL
G-100 COVER SHEET
G-200 TABLE OF ORGANIZATION
ARCHITECTURAL
AS-101 ARCHITECTURAL SITE PLAN
AR-101 EXISTING FLOOR PLAN
AD-101 DEMOLITION PLAN
A-101 PROPOSED FLOOR PLAN
A-102 PLAN DIAGRAMS
A-103 CONCEPT RENDERINGS
A-201 PROPOSED ELEVATIONS
VALE DISTRICT OFFICE
RENOVATIONS & ADDITION
100 OREGON STREET, VALE, OREGON 97918
BLM VALE DISTRICT
PROJECT SUMMARY:
RENOVATION OF EXISTING 16,320 SQ.FT. SINGLE-STORY BUREAU OF LAND MANAGEMENT DISTRICT OFFICE NEW 1,051 SQ.FT.
ADDITION ON THE FACILITY FRONT.
LOCATION:
BLM VALE DISTRICT OFFICE
100 OREGON STREET
VALE, OREGON 97918
APPLICABLE BUILDING CODES AND REGULATIONS:
2024 INTERNATIONAL BUILDING CODE (IBC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
2024 INTERNATIONAL MECHANICAL CODE (IMC)
NATIONAL ELECTRICAL CODE (NEC), NFPA 70
ABA ACCESSIBILITY GUIDELINES
JURISDICTION:
THE BLM IS THE AUTHORITY HAVING JURISDICTION (AHJ), HOWEVER, CONTRACTOR WILL PROVIDE A COURTESY SET TO THE
LOCAL FIRE DEPARTMENT IF REQUESTED.
SITE MAPPROJECT VICINITY MAP - VALE OREGON
PROJECT
SITE
PROJECT
SITE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
BLM CONCEPT PACKAGE
V000
OFFICE CUBICLE
WORKSPACE
POSITIONPOSITION ID
DEPUTY DISTRICT MANAGER - 120 SFV000-005 •
SUPERVISORY NATURAL RESOURCE SPEC.V000-018 •
NATURAL RESOURCE SPEC.V000-012 •
GEOGRAPHIC INFORMATION SYSTEM SPEC.V000-010 •
PLANNING & ENV. COORDINATORV000-013
SAFETY & OCCUPATIONAL HEALTH SPEC.V000-017
PLANNING & ENV. COORDINATORV000-014
PLANNING & ENV. COORDINATORV000-015
ARCHAELOGISTV000-001 •
ECOLOGIST / BOTANISTV000-007 •
WILDLIFE BIOLOGISTV000-019
GIS SPECIALISTV000-011
BIO SCIENCE TECH (WILDLIFE)V000-004 •
ARCHAELOGISTV000-002 •
17 STAFF
V003
OFFICE CUBICLE
WORKSPACE
POSITIONPOSITION ID
ADMINISTRATIVE OFFICER - 120 SFV003-001 •
CIVIL ENGINEERV003-013 •
CIVIL ENGINEERV003-014 •
ADMIN SUPPORT ASSISTANTV003-004 •
ADMIN SUPPORT ASSISTANTV000-008
BUDGET ANALYSTV003-011
BUDGET TECHNICIANV003-012
ADMIN SUPPORT ASSISTANT (HR LIAISON)V003-002
ENGINEERING TECHNICIAN (CIVIL)V003-022
ENGINEERING TECHNICIAN (CIVIL)V000-021
ADMIN SUPPORT ASSISTANTV003-003 •
CONTACT REPRESENTATIVEV003-015 •
14 STAFF
ADMIN SUPPORT ASSISTANTV003-007 •
CONTACT REPRESENTATIVEV003-016 •
V004
OFFICE CUBICLE
WORKSPACE
POSITIONPOSITION ID
SUPV WILDLAND FIREFIGHTER - 120 SFV004-001 •
SUPV WILDLAND FIREFIGHTER - 120 SFV004-035 •
WILDLAND FIREFIGHTER (FUELS MGMT)V004-063 •
WILDLAND FIREFIGHTER (FIRE MGMT PLAN.)V004-061 •
WILDLAND FIREFIGHTER (PREVENTION)V004-066
MGMT & PROGRAM ANALYSTV004-010
WILDLAND FIREFIGHTER (FUELS MGMT)V004-060
V004-062
11 STAFF
WILDLAND FIREFIGHTER (FUELS MGMT)
V004-059 WILDLAND FIREFIGHTER (FUELS MGMT)
V004-064 WILDLAND FIREFIGHTER (FUELS MGMT)
V004-067 WILDLAND FIRERIGHTER (PREVENTION)
V040
OFFICE CUBICLE
WORKSPACE
POSITIONPOSITION ID
FIELD MANAGER - 120 SFV040-001 •
RANGE TECHNICIANV040-017
RANGELAND MANAGEMENT SPECIALISTV040-020 •
SUPVY. RANGELEND MGMTV040-025 •
NATURAL RESOURCE SPECIALISTV040-008
NATURAL RESOURCE SPECIALISTV040-009
RANGELAND MANAGEMENT SPECIALISTV040-019
V040-022
26 STAFF
RANGELAND MANAGEMENT SPECIALIST
V040-021 •
RANGE TECHNICIANV040-016
RANGELAND MANAGEMENT SPECIALIST
V040-012 NATURAL RESOURCE SPECIALIST (WH&B)
OUTDOOR RECREATION PLANNERV040-014
REALTY SPECIALISTV040-024 •
ASSISTANT FIELD MANAGER - 120 SFV040-003 •
ARCHAELOGISTV040-002
GEOLOGISTV040-007
GEOLOGISTV040-028 •
V040-004
OUTDOOR RECREATION PLANNERV040-013 •
WILDLIFE BIOLOGISTV040-026
WILDLIFE BIOLOGISTV040-027 •
BOTANISTV040-005
ECOLOGIST / BOTANISTV040-006
NATURAL RESOURCE SPECIALISTV040-010
RANGE TECH (WEEDS)V040-015 •
NATURAL RESOURCE SPECIALISTV040-011 •
ASSISTANT FIELD MANAGER - 120 SF
V080
OFFICE CUBICLE
WORKSPACE
POSITIONPOSITION ID
MONUMENT MANAGERV080-001 •
1 STAFF
DISTRICT MANAGER - 150 SFV000-006 •
TRIBAL LIAISONV000-003 •
PUBLIC AFFAIRS SPECIALISTV000-016
DISTRICT HR SPECIALISTTBD
VALE DISTRICT OFFICE TABLE OF ORGANIZATION
GENERAL BLM SPACE AUTHORIZATION NOTES
1. THE NINE (9) INDIVIDUALS LISTED WITH OFFICES HAVE BEEN APPROVED
WITH BLM HQ ASSET MANAGEMENT
2. THE MAXIMUM ALLOWABLE SQUARE FOOTAGE FOR EACH OFFICE IS
LISTED NEXT TO THE POSITION TITLE
3. CUBICLES SHALL BE MAXIMUM 8'-0" x 8'-0" (64SF).
REC.
REC.
NOT INCLUDED
HOSTED
OFFICE CUBICLE
WORKSPACE
POSITIONPOSITION ID
ORWA STATE OFFICE - FOIA •
4 STAFF
ORWA STATE OFFICE - ARCHAELOGIST
DOI - IT •
NEW MEXICO - ENGINEER •
1039 / SEASONAL
OFFICE CUBICLE
WORKSPACE
POSITIONPOSITION ID
FIRE
ADMIN
MALHEUR FO, RANGE, REC, ETC. •
ESR
ESR
10 STAFF
ADMIN
FIRE
MALHEUR FO, RANGE, REC, ETC.
MALHEUR FO, RANGE, REC, ETC.
MALHEUR FO, RANGE, REC, ETC.
ESP PROGRAM
OFFICE CUBICLE
WORKSPACE
POSITIONPOSITION ID
RETIREE •
1 STAFF
TOTAL STAFF = 86 PERSONNEL
V050
OFFICE CUBICLE
WORKSPACE
POSITIONPOSITION ID
ARCHAELOGISTV050-002 •
2 STAFF
REALTY SPECIALISTV050-021 •
U N
IT
ED
S
TA
TE
S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
PR
O
JE
C
T N
O
D
ES
IG
N
O
FF
IC
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
K
ED
B
Y:
PR
O
JE
C
T
PH
AS
E:
D
AT
E:
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
O
VE
D
N O
C A
E
BL
M
N at io na l O pe ra tio ns C en te r
9/ 9/
:4
2:
A M
G-200
TA
BL
E O
F O
R G
AN
IZ
AT
IO
N
VA
LE
D
IS
TR
IC
T
O
FF
IC
E
RE
NO
VA
TI
O N
S
EP
TE
M
BE
R
O R
EG
O
N S
T.
, V
AL
E, O R
EG
O
N
N O
C A
E
N /A
PR
E-
D
ES
IG
N
C
O N
C
EP
T
N O
C A
E
BR
AN
C
H
NEW ROOF OVERHANGS TO
REPLACE DEMOLISHED OVERHANGS
MODIFY CONCRETE SIDEWALKS AS
NECESSARY TO CONNECT TO
EXISTING SITE SIDEWALKS
NEW BUILDING
ADDITION
NEW ENTRY PORTICO /
PORCH STRUCTURE
PORTIONS OF EXISTING SIDEWALK
TO BE REMOVED AND REPLACED W/
NEW ENTRY WAY
1. SITE PLAN IS BASED ON GOOGLE AERIAL IMAGERY AND
THEREFORE IS NOT TO BE SCALED. ITEMS SHOWN ARE
APPROXIMATE AND ACTUAL CONDITIONS MAY VARY.
2. PROPOSED ADDITIONS, WALKWAYS, AND OTHER SITE
FEATURES ARE FOR ILLUSTRATIVE PURPOSES ONLY. THE
ACTUAL DESIGN AND LAYOUT OF THESE ITEMS MAY VARY
O R E G O N S T R E E T
T
S
R E
E
N
EXISTING
BUILDING
NEW FLAGPOLE & MASONRY
GARDEN LANDSCAPE FEATURE
SITE PLAN NOTES
EXISTING MODULAR
OUTBUILDING TO BE
REMOVED
EXISTING EMPLOYEE
ENTRANCE ACCESS GATE
PROVIDE CRACK SEAL, SEAL COAT &
NEW PARKINGS FOR HIGHLIGHTED
PAVEMENT AREAS
NO CHANGES TO EXISTING
STAFF PARKING AREA
NEW VERTICAL CONSTRUCTION
NEW SIDEWALK / CONCRETE
AREAS OF EXISTING PAVEMENT TO BE REFINISHED
SITE PLAN LEGEND
NEW ROOF OVERHANG AND ABA
COMPLIANT SIDEWALK ACCESS
FOR NEW DOOR
NEW CONCRETE APRON AT NEW
EXT. DOOR
NEW CONCRETE APRON AT NEW
EXT. DOOR
REPLACE EXISTING CONCRETE SIDEWALK
SERVING PARKING AREA
NEW
LANDSCAPING
U N
IT
ED
S
TA
TE
S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
PR
O
JE
C
T N
O
D
ES
IG
N
O
FF
IC
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
K
ED
B
Y:
PR
O
JE
C
T
PH
AS
E:
D
AT
E:
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
O
VE
D
N O
C A
E
BL
M
N at io na l O pe ra tio ns C en te r
9/ 9/
:4
2:
A M
AS-101
AR
C
H
IT
EC
TU
R
AL
S
IT
E
PL
AN
VA
LE
D
IS
TR
IC
T
O
FF
IC
E
RE
NO
VA
TI
O N
S
EP
TE
M
BE
R
O R
EG
O
N S
T.
, V
AL
E, O R
EG
O
N
N O
C A
E
N /A
PR
E-
D
ES
IG
N
C
O N
C
EP
T
N O
E
AE
B R
AN
C
1" = 30'-0"1 ARCHITECTURAL SITE PLAN - PROPOSED
AA
BB
CC
CONFERENCE ROOM
RESTROOM
(FIXTURES NOT SHOWN)
RESTROOM
(FIXTURES NOT SHOWN)
RESTROOM
(FIXTURES NOT SHOWN)
RESTROOM
(FIXTURES NOT SHOWN)
BREAK
OFFICE OFFICE OFFICE
OFFICE OFFICE
OFFICE
OFFICE
LOBBY MAIL
MEETING
OFFICE
STORAGE STORAGE
MECH. /
ELEC. SERVER /
NETWORK
SHARED
OFFICE
SHARED
OFFICE
OFFICE FILES
OPEN OFFICE W/ CUBICLES
OPEN OFFICE W/ CUBICLES
OPEN OFFICE W/ CUBICLES
1. DRAWINGS ARE INTENDED FOR REFERENCE PURPOSES ONLY AND ARE NOT TO BE SCALED FOR ANY REASON. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS / QUANTITIES AND FOR PRODUCING A NEW, CURRENT SET OF EXISTING CONDITIONS DOCUMENTS PRIOR TO COMMENCEMENT OF
DESIGN.
2. ALL PLANS & ELEVATIONS ARE DRAWN SHOWING VERTICAL ELEMENTS (SUCH AS WALLS) PLUMB AND HORIZONTAL ELEMENTS (SUCH AS FLOORS AND CEILINGS) LEVEL. DOCUMENTS ARE DRAWN WITHOUT
INDICATING SETTLEMENT OR DETERIORATION.
3. THE DRAWINGS AS SHOWN MAY VARY FROM ACTUAL CONDITIONS.
EXISTING CONDITIONS NOTES
U N
IT
ED
S
TA
TE
S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
PR
O
JE
C
T N
O
D
ES
IG
N
O
FF
IC
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
K
ED
B
Y:
PR
O
JE
C
T
PH
AS
E:
D
AT
E:
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
O
VE
D
N O
C A
E
BL
M
N at io na l O pe ra tio ns C en te r
9/ 9/
:4
2:
A M
AR-101
EX
IS
TI
N
G F
LO
O
R P
LA
N
VA
LE
D
IS
TR
IC
T O
FF
IC
E
RE
NO
VA
TI
O
N
S
EP
TE
M
BE
R
O
R
EG
O N
S T.
, V
AL
E, O
R
EG
O N
N O
C A
E
N /A
PR
E-
D
ES
IG
N
C
O N
C
EP
T
N O
C A
E
BR
AN
C
H
1/8" = 1'-0"1 EXISTING FLOOR PLAN
0' 4' 8' 16' 32'
GRAPHIC SCALE 1/8" = 1'-0"
AA
BB
CC
REMOVE DOOR
REMOVE WINDOW REMOVE WINDOW
REMOVE
OVERHANGS
REMOVE OVERHANG
EXISTING STRUCTURAL COLUMNS TO REMAIN IN PLACE
EXISTING STRUCTURAL COLUMNS TO REMAIN IN PLACE
EXISTING STRUCTURAL COLUMNS TO REMAIN IN PLACE
DEMOLITION PLAN IS APPROXIMATE. ACTUAL DEMOLITION MAY VARY DEPENDING ON FINAL DESIGN.
IMPORTANT NOTE DEMOLITION LEGEND
ITEMS TO BE REMOVED
U N
IT
ED
S
TA
TE
S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
PR
O
JE
C
T N
O
D
ES
IG
N
O
FF
IC
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
K
ED
B
Y:
PR
O
JE
C
T
PH
AS
E:
D
AT
E:
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
O
VE
D
N O
C A
E
BL
M
N at io na l O pe ra tio ns C en te r
9/ 9/
:4
2:
A M
AD-101
D
EM
O
LI
TI
O
N P
LA
N
VA
LE
D
IS
TR
IC
T O
FF
IC
E
RE
NO
VA
TI
O
N
S
EP
TE
M
BE
R
O
R
EG
O N
S T.
, V
AL
E, O
R
EG
O N
N O
C A
E
N /A
PR
E-
D
ES
IG
N
C
O N
C
EP
T
N O
C A
E
BR
AN
C
H
1/8" = 1'-0"1 DEMOLITION PLAN
AA
BB
CC
C O
AT
S
PRINT / OFFICE SUPPLIES
REF
REF
HIGH-DENSITY
FILE
STORAGE
STORAGE
MECH. /
ELEC.
SERVER /
NETWORK
LIBRARY
IT
MEETING
ROOM
V000
OFFICE
V000
OFFICE
MEETING
ROOM
V004
OFFICE
V004
OFFICE
CUSTODIAL
BREAK
ROOM
STOR.
HUDDLE
PRINT /
FILE
V040
OFFICE
V040
OFFICE
V040
OFFICE
PUBLIC
MEETING
PUBLIC
LOBBY
V003
OFFICE
AREA
V000 OFFICE SUITE
(15 WORKSTATIONS)
V003 OFFICE SUITE
(12 WORKSTATIONS
INC. RECEPTION)
V050 OFFICE
SUITE
(2 STATIONS)
V080 OFFICE
WORKSTATION
1039/SEASONALS
OFFICE SUITE
(10 WORKSTATIONS)
V040 OFFICE SUITE
(23 WORKSTATIONS)
ESP
WORKSTATION
HOSTED OFFICE SUITE
(4 WORKSTATIONS)
V004 OFFICE SUITE
(9 WORKSTATIONS)
NEW ABA-COMPLIANT
WALK TO EXISTING
SIDEWALK
NEW ABA-COMPLIANT
WALK TO EXISTING
SIDEWALK
NEW ABA-COMPLIANT
WALK TO EXISTING
SIDEWALK
INDICATES NEW GROSS SQUARE FOOTAGE
NEW ROOF OVERHANG NEW ROOF OVERHANG
NEW ENTRY PORTICO
WELLNESS
MAILBOXES
NEW DOOR
LEO
EVIDENCE
STOR.
NEW DOOR &
CONCRETE PAD
FOLDING WALL PARTITION
FLOOR PLAN IS SCHEMATIC IN NATURE AND IS NOT INTENDED TO CAPTURE ALL NECESSARY PROGRAMMATIC ITEMS THAT THE BLM REQUIRES TO BE INCLUDED IN THE DESIGN OF THE DISTRICT OFFICE. THE DBC SHALL BE RESPONSIBLE FOR ENSURING FULL COMPLIANCE WITH APPLICABLE BUILDING CODES, AS WELL AS WORKING WITH THE BLM THROUGHOUT THE PROJECT DESIGN TO MEET ALL NECESSARY PROGRAMMATIC NEEDS.
IMPORTANT NOTE
RECEPTION
DISPLAY
AREA
PROVIDE SIDELITES & GLAZING IN
LOBBY DOORS IN COMPLIANCE W/ BLM
PHYSICAL SECURITY REQUIREMENTS
NEW ROOF OVERHANG
NEW ABA-COMPLIANT
WALK TO EXISTING
SIDEWALK
V003
OFFICE
NEW WINDOWS TO PROVIDE NATURAL LIGHT TO WORKSPACE
NEW SIDEWALK & ENTRY
COURT - REFER TO SITE
DRAWINGS
M
IN
5'
3"
COATS
NEW DOOR &
CONCRETE PAD
ABA
RESTROOM
DW
WATER
COOLERS
WATER
COOLERS
COUNTER
BU
IL
T-
IN
C
AS
EW
O
R K
BU
IL
T-
IN
C
AS
EW
O
R K
BU
IL
T-
IN
C
AS
EW
O
R K
BUILT-IN COUNTER
MOP SINK
U N
IT
ED
S
TA
TE
S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
PR
O
JE
C
T N
O
D
ES
IG
N
O
FF
IC
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
K
ED
B
Y:
PR
O
JE
C
T
PH
AS
E:
D
AT
E:
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
O
VE
D
N O
C A
E
BL
M
N at io na l O pe ra tio ns C en te r
9/ 9/
:4
2:
A M
A-101
PR
O
PO
SE
D F
LO
O
R P
LA
N
VA
LE
D
IS
TR
IC
T O
FF
IC
E
RE
NO
VA
TI
O
N
S
EP
TE
M
BE
R
O
R
EG
O N
S T.
, V
AL
E, O
R
EG
O N
N O
C A
E
N /A
PR
E-
D
ES
IG
N
C
O N
C
EP
T
N O
C A
E
BR
AN
C
H
1/8" = 1'-0"1 PROPOSED FLOOR PLAN
HIGH-DENSITY
FILE
STORAGE
STORAGE
MECH. /
ELEC.
SERVER /
NETWORK
LIBRARY
IT
MEETING
ROOM
V000
OFFICE
V000
OFFICE
MEETING
ROOM
V004
OFFICE
V004
OFFICE
CUSTODIAL
BREAK
ROOM Per BLM IM No. 2023-046:
Office facilities shall use 150 USF/p as the standard.
DOI-AAAP-0049 Office Space Utilization Standard:
Portion of DOI-owned buildings dedicated to office use covering restrooms, MEP rooms, loading docks, exit staircases, elevator shafts, MEP shafts, wall thickness, etc. shall be limited to 60 GSF / person.
Total FTE (Full-Time Equivalent) Employees:
Suite No. of Employees V000 17 V003 14 V004 11 V040 26 V050 2 V080 1
HOSTED 4
1039 / SEASONAL 10
ESP PROGRAM 1
TOTAL 86
Exempt areas are listed in the BLM Space Allowance Worksheet and include Public Reading Area/Room (lobby), High Density file Areas, Library, Restrooms for Public Use, Law Enforcement Evidence Storage Room, Server/Network Room, and the Public Meeting Room.
ALLOWABLE VS PROVIDED SQUARE FOOTAGES:
OFFICE SPACES:
Total Allowable Net Area: 12,900sf (86 employees x 150 USF/p) Total Provided Net Area: 12,870sf
TARE (restrooms, MEP, vestibules, wall thickness, etc.)
Total Allowable Gross Area: 5,160sf (86 employees x 60 GSF) Total Provided Gross Area: 1,555sf
EXEMPT SPACE:
Total Exempt Area: 2,946sf
PROJECT SPACE CALCULATIONS
TOTAL AREA: 17,371sf (Office + TARE + Exempt)
V003
OFFICE
HUDDLE
STOR.
PUBLIC
LOBBY
PUBLIC
MEETING
V040
OFFICE
V040
OFFICE
V040
OFFICE
WELLNESS
V003
OFFICE
LEO
EVIDENCE
STOR.
RECEPTION
V000
17 STAFF
V003
14 STAFF
V004
11 STAFF
V040
26 STAFF
OFFICE SUITES
V080
1 STAFF
V050
2 STAFF
1039 / SEASONAL
10 STAFF
HOSTED
4 STAFF
ESP PROGRAM
1 STAFF
U N
IT
ED
S
TA
TE
S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
PR
O
JE
C
T N
O
D
ES
IG
N
O
FF
IC
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
K
ED
B
Y:
PR
O
JE
C
T
PH
AS
E:
D
AT
E:
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
O
VE
D
N O
C A
E
BL
M
N at io na l O pe ra tio ns C en te r
9/ 9/
:4
2:
A M
A-102
PL
AN
D
IA
G R
AM
S
VA
LE
D
IS
TR
IC
T O
FF
IC
E
RE
NO
VA
TI
O
N
S
EP
TE
M
BE
R
O
R
EG
O N
S T.
, V
AL
E, O
R
EG
O N
N O
C A
E
N /A
PR
E-
D
ES
IG
N
C
O N
C
EP
T
N O
C A
E
BR
AN
C
H
3/32" = 1'-0"1 SPACE AUTHORIZATION CALCULATIONS
1/16" = 1'-0"2 OFFICE SUITE LAYOUT
EXISTING MAIN ENTRY
PROPOSED MAIN ENTRY
CONCEPT RENDERINGS ARE NOT TO SCALE AND ARE FOR ILLUSTRATIVE PURPOSES ONLY. THE DBC SHALL ULTIMATELY BE RESPONSIBLE FOR THE OVERALL DESIGN OF THE BUILDING.
GENERAL DESIGN REQUIREMENT KEYNOTES
DESIGN NEW ENTRY ROOFLINE TO ENHANCE BUILDING MASSING AND
VISUALLY EMPHASIZE THE BUILDING'S PRIMARY ENTRY. EMPHASIS
MAY BE ACHIEVED VIA INCREASED CEILING/ROOF HEIGHT, CHANGE IN
MATERIALITY, VARIATION IN ROOF SLOPE, OR ANY COMBINATION OF
THESE FACTORS.
NEW ADDITION SHOULD INCLUDE A COVERED ENTRY PORTICO WITH
ARCHITECTURAL FEATURES COMPATIBLE WITH GENERAL BLM DESIGN
REQUIREMENTS AND EASTERN OREGON ARCHITECTURAL
VERNACULAR. HEAVY TIMBERS, TRUSSES, STONE PIERS, LARGE
WINDOWS, OR OTHER APPROVED FEATURES SHOULD BE EMPLOYEED
TO PROVIDE VISUAL INTEREST AND TO HIGHLIGHT THE FACILITY'S
PRIMARY PUBLIC ENTRANCE
3 NEW FLAGPOLE AND BASE FEATURE TO REPLACE EXISTING
PROVIDE GENEROUS LIGHTING TO MAXIMIZE NATURAL DAYLIGHT DEEP
INTO BUILDING. SOLUTIONS MAY INCLUDE LARGE WINDOWS, SOLAR
TUBES AND/OR SKYLIGHTS. PROVIDE APPROPRIATE CANOPIES OR
BLIND SYSTEMS TO PREVENT EXCESSIVE HEAT GAIN DURING SUMMER
MONTHS.
5 EXPAND EXISTING ENTRY SIDEWALKS TO PROVIDE AN IMPROVED,
WELCOMING APPROACH TO THE BUILDING.
U N
IT
ED
S
TA
TE
S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
PR
O
JE
C
T N
O
D
ES
IG
N
O
FF
IC
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
K
ED
B
Y:
PR
O
JE
C
T
PH
AS
E:
D
AT
E:
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
O
VE
D
N O
C A
E
BL
M
N at io na l O pe ra tio ns C en te r
9/ 9/
:4
2:
A M
A-103
C O
N C
EP
T
R
EN
D
ER
IN
G
S
VA
LE
D
IS
TR
IC
T
O
FF
IC
E
RE
NO
VA
TI
O N
S
EP
TE
M
BE
R
O R
EG
O
N S
T.
, V
AL
E, O R
EG
O
N
N O
C A
E
N /A
PR
E-
D
ES
IG
N
C
O N
C
EP
T
N O
C A
E
BR
AN
C
NEW GENERAL EXTERIOR ITEMS TO BE PROVIDED:
1. ROOFING FINISHES THROUGHOUT ENTIRE BUILDING, INCLUDING NEW ATTIC VENTILATION
SYSTEM CONSISTING OF RIDGE/SOFFIT VENTS OR SIMILAR.
2. CONTINUOUS INSULATION AND WEATHER BARRIER AT ALL EXTERIOR WALLS.
3. EXTERIOR CLADDING SYSTEM (FINAL STYLE AND COLOR TBD).
4. TRIM THROUGHOUT ENTIRE EXTERIOR, INCLUDING SOFFIT, RAKE, EAVE, CORNER, WINDOW &
DOOR, BASEBOARD AND OTHER APPLICABLE LOCATIONS.
5. NEW SITE DRAINAGE AS NECESSARY TO SUCCESSFULLY DIVERT ROOF RUNOFF WATER FROM
BUILDING PERIMETER.
6. GUTTER AND DOWNSPOUT SYSTEM TO TIE INTO NEW SITE DRAINAGE SYSTEM.
7. CONSTRUCTION OF FULLY-CONDITIONED, FRONT ENTRY ADDITION AS ILLUSTRATED ON THE
SCHEMATIC FLOOR PLAN. DBC SHALL BE RESPONSIBLE FOR ENSURING OVERALL CODE
COMPLIANCE, AESTHETIC COMPATIBILITY W/ EXISTING BUILDING, STRUCTURAL REQUIREMENTS, ROOF DRAINAGE, ACCESSIBILITY, THERMAL REQUIREMENTS, AND OTHER RELEVANT
CONSIDERATIONS.
8. ROOF OVERHANGS AT REAR FACILITY ENTRANCES TO REPLACE PREVIOUS ONES AND TO
ACCOMMODATE IMPROVED ACCESSIBLE SIDEWALKS.
EXTERIOR ITEMS TO BE DEMOLISHED:
1. EXISTING ROOF VENTS AND ROOF FINISHES. PATCH AND REPAIR ROOF SUBSTRATE WHERE
DAMAGE HAS OCCURED AND/OR WHERE PENETRATIONS ARE REMOVED.
2. ALL EXISTING BOXED SOFFIT TRIM.
3. ALL EXISTING BOARD AND BATTEN CLADDING AND ASSOCIATED TRIM.
4. ALL EXISTING EXTERIOR WINDOW AND DOOR TRIM.
5. PORTIONS OF EXTERIOR WALLS AS NECESSARY TO RECONFIGURE THE BUILDING AS OUTLINED
IN THE SCHEMATIC FLOOR PLANS.
6. LANDSCAPE ITEMS INCLUDING SIDEWALKS, GARDENS, FLAGPOLE, ETC. AS REQUIRED TO
CONSTRUCT NEW LANDSCAPE FEATURES.
7. EXISTING ROOF OVERHANGS AT REAR FACILITY ENTRANCES.
TYP. PROVIDE NEW INFILL FRAMING AT ALL
GABLE ENDS. EXISTING GABLE ENDS DO NOT
CONTAIN VERTICAL FRAMING
(REAR OVERHANGS
NOT SHOWN)
U N
IT
ED
S
TA
TE
S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
PR
O
JE
C
T N
O
D
ES
IG
N
O
FF
IC
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
K
ED
B
Y:
PR
O
JE
C
T
PH
AS
E:
D
AT
E:
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
O
VE
D
N O
C A
E
BL
M
N at io na l O pe ra tio ns C en te r
9/ 9/
:4
2:
A M
A-201
PR
O
PO
SE
D E
LE
VA
TI
O
N S
VA
LE
D
IS
TR
IC
T O
FF
IC
E
RE
NO
VA
TI
O
N
S
EP
TE
M
BE
R
O
R
EG
O N
S T.
, V
AL
E, O
R
EG
O N
N O
C A
E
N /A
PR
E-
D
ES
IG
N
C
O N
C
EP
T
N O
C A
E
BR
AN
C
H
0' 4' 8' 16' 32'
1/8" = 1'-0"1 PROPOSED FRONT ELEVATION
1/8" = 1'-0"2 PROPOSED SIDE / RIGHT ELEVATION
| Sheets |
| G-100 - COVER SHEET |
| G-200 - TABLE OF ORGANIZATION |
| AS-101 - ARCHITECTURAL SITE PLAN |
| AR-101 - EXISTING FLOOR PLAN |
| AD-101 - DEMOLITION PLAN |
| A-101 - PROPOSED FLOOR PLAN |
| A-102 - PLAN DIAGRAMS |
| A-103 - CONCEPT RENDERINGS |
| A-201 - PROPOSED ELEVATIONS |
File details come from the government source that posted it. Updated .