Asphalt Walkways -bid
1000 KB Posted
- Attached to
- Asphalt Walkways
- Solicitation number
- 22-100
- Issued by
- Jefferson County, Georgia
About this file
This is an Invitation to Bid document issued by the Jones County Board of Commissioners for the construction of asphalt walkways at Morris Bank Recreation Complex in Gray, Georgia. The project involves the construction of approximately 3,240 linear feet of 10-foot-wide asphalt walkways, along with a new 110-foot walkway connecting the concession stand to the existing pathway system. Sealed bids will be accepted until 3:00 PM on Monday, April 11, 2022, and must be mailed via USPS, FedEx, or UPS, or hand-delivered to the County Administrator's Office at 166 Industrial Blvd., Gray, GA 31032. Bids will be opened and read aloud at the Government Center Conference Room on the same date. Bidders are encouraged to schedule site visits by contacting Parks and Recreation at 478-845-8177. The project is expected to be completed within 60 days from the notice to proceed, with work hours limited to end by 5:00 PM daily, no Saturday work, and Sunday work permitted only if scheduled in advance.
The bid package includes a base bid for resurfacing existing paths and creating a new pathway, plus an Add Alternate #1 for paving a 4,800-square-foot patio area at the concession stand. Bidders must submit separate pricing for the base bid and the alternate. Three references from similar projects completed within the past five years are required, along with subcontractor information and references if applicable. Contractors must comply with insurance requirements including Commercial General Liability coverage of $1,000,000 per occurrence and $2,000,000 general aggregate, as well as Workers' Compensation at statutory limits. All contractors and subcontractors must provide E-Verify affidavits and County Public Benefit Applications prior to work commencement. The County reserves the right to reject any or all bids and does not guarantee purchase of services. Proposals are treated as best and final with no opportunity for fee negotiation.
Text of this file
INVITATION TO BID
Asphalt Walkways
Issue Date: Thursday, March 10, 2022
JONES COUNTY BOARD OF COMMISSIONERS
166 INDUSTRIAL BLVD./P.O. BOX 1359
GRAY, GA 31032
PHONE: (478) 986-6405
BIDS WILL BE RECEIVED UNTIL Monday, April 11, 2022 at 3:00 P.M.
PROPOSALS ARE TO BE SEALED AND MAILED VIA USPS, FEDEX OR UPS TO THE ABOVE ADDRESS OR HAND DELIVERED TO THE COUNTY ADMINISTRATOR’S OFFICE LOCATED IN THE JONES COUNTY GOVERNMENT CENTER AT
166 INDUSTRIAL BLVD., GRAY, GA 31032. ENVELOPES SHOULD BE MARKED WITH “SEALED BID – ASPHALT WALKWAYS.”
INVITATION TO BID
The Jones County Board of Commissioners is accepting sealed bids for the construction of approximately 3,240 linear feet of 10’ wide asphalt walkways at Morris Bank Recreation Complex located at 146 Recreation Road, Gray, GA 31032. Sealed bids will be accepted until 3:00 PM on Monday, April 11, 2022 when they will be opened and read aloud in the Government Center Conference Room, 166 Industrial Blvd. Gray, GA
31032. Any questions should be directed to Julie Happoldt via e-mail at Julie.Happoldt@jonescountyga.org.
Background
Morris Bank Recreation Complex added a number of fields approximately 6 years ago. The walkways between the fields remained dirt after the initial construction. Approximately 3 years ago, surface treatment paving was installed on the interior walkways. The surface treatment has failed in many locations, and the County now desires to install asphalt walkways. This project will involve milling the existing surface treatment and paving the walkways. The base bid also includes the construction of one additional walkway in the vicinity of the concession stand.
In addition to the base bid, there is an Add Alternate that involves paving a patio area near the concession stand. This area is currently covered by large gravel, and that gravel will need to be removed prior to the installation of asphalt.
Base Bid
Resurfacing Existing Paths – 3,240 linear feet
- Mill in place all existing surface treatment to a width of 10 feet o All excess beyond the 10 feet shall be hauled off
- Roll and compact milled in place material
- Clip with grader
- Wet, roll and compact the milled material
- Furnish and install 2.25 inches of 9.5 mm asphalt o Roll and compact asphalt
- Furnish and install topsoil to dress edges of asphalt
- Tie in to existing concrete aprons
Create New Path From Concession Stand to Walkway – 110 feet
- Using excess milled material, install base for new 110 foot walkway
- Furnish and install 2.25 inches of 9.5 mm asphalt 10 feet wide o Roll and compact asphalt
- Tie in to existing concrete walkway at concession stand mailto:Julie.Happoldt@jonescountyga.org
Add Alternate #1
Patio Area at concession stand - 4800 square feet
- Remove existing gravel that is currently in place
- Compact base and add excess reclamation material if necessary
- Furnish and install 2.25 inches of 9.5 mm asphalt o Roll and compact asphalt
Other Information
A sketch is attached showing the approximate locations of the walkways. Bidders are encouraged to review the site location prior to submittal of bid. To schedule an appointment, please contact Parks and Recreation at 478-845-8177.Project should be completed 60 days from the notice to proceed.
Scheduling: Contractors can start as early as they wish and must be at a stopping point by 5:00PM each day. There will be no work performed on Saturdays. Contractors may work on Sunday if scheduled in advance.
Terms and Conditions
- The County reserves the right to reject and or all bids or proposals, to waive technicalities, and to make a selection and final award as deemed to be in the best interest of the County.
- Provider selection will be based on the information contained in the bids, and incomplete or inaccurate information may result in disqualification of a proposal or a bidder.
- The Jones County Board of Commissioners reserves the right to amend or revise bid documents. Vendors are responsible for monitoring the Vendor Registry site for any addenda that may be issued.
- Bidders are required to submit three references from projects similar in size and cost that have been completed in the past 5 years.
- The proposal submitted by each proposed vendor will be treated as best and final.
There will be no opportunity to negotiate fees during the selection process.
- If you plan to use subcontractors to perform any of the work described above, please identify the subcontractors you plan to use and explain the role they would play in this project. Also provide 3 references for the subcontractor you plan to use.
- The County does not guarantee the purchase of any/all equipment.
- The County reserves the right to terminate any contract for this equipment and/or services for any of the following reasons:
o a. If the equipment/service is not delivered/completed on an agreed-upon schedule.
o b. If the equipment/services delivered is not the same equipment/services bid.
o c. Receipt of substandard product/service.
o d. Poor workmanship.
Bid Form
Checklist
Contractor complies with insurance requirements
References attached
Subcontractor information and references attached (if applicable)
E-Verify Affidavit attached
Application for Public Benefit attached
I understand that I will need to provide a certificate of insurance as outlined in the attached insurance requirements prior to beginning work.
I further understand that I will be required to submit the attached Prime and Subcontractor’s Work Authorization Certification and affidavit verifying status for County Public Benefit Application (copy attached), prior to beginning work.
I certify that the bid below includes the following work and meets all specifications outlined in the bid documents:
Base Bid: $____________
ADD ALTERNATE #1 AMOUNT: $ ____________
Company: ________________________________________
Address: _________________________________________
Contact: _________________________________________
E-mail Address: ___________________________________
Phone: ______________________________
Signature of Company Official: ______________________________________
References
Government/Company: ______________________________
Contact Person: ______________________________
Title: ______________________________
Phone Number: ______________________________
Project Description: _______________________________________________
Date of Project: ______________________________
Title: ______________________________
Phone Number: ______________________________
Project Description: ______________________________________________
Title: ______________________________
Phone Number: ______________________________
Project Description: ______________________________________________
Contractor Insurance Requirements
Contractor’s Insurance Provisions: During the life of the contract and for such additional time as may be required, the contractor will provide, pay for, and maintain in full force and effect the insurance outlined here for coverage at not less than the prescribed minimum limits of liability, covering the contractor’s activities, those of any and all subcontractors, or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable.
Certificate of Insurance: Before starting work, the contractor will give the owner a certificate of insurance completed by a duly authorized representative of their insurer certifying that at least the minimum coverage required here are in effect and specifying that the liability coverage are written on an occurrence form and that the coverage will not be canceled, non-renewed, or materially changed by endorsement or through issuance of other policy(ies) of insurance without 60 days advance written notice to:
Jones County Board of Commissioners P. O. Box 1359 Gray, Ga. 31032
Failure of the owner to demand such certificate or other evidence of full compliance with these insurance requirements or failure of the owner to identify a deficiency from evidence provided will not be construed as a waiver of the contractor’s obligation to maintain such insurance.
The acceptance of delivery by the owner of any certificate of insurance evidencing the required coverage and limits does not constitute approval or agreement by the owner that the insurance requirements have been met or that the insurance policies shown in the certificates of insurance are in compliance with the requirements.
If the contractor fails to maintain the insurance as set forth here, the owner will have the right, but not the obligation, to purchase said insurance at the contractor’s expense. Alternately, the contractor’s failure to maintain the required insurance may result in termination of this contract at owner’s option.
Insurance Primary: All coverage required of the contractor will be primary over any insurance or self-insurance program carried by the owner.
No Reduction or Limit of Obligation: By requiring insurance, the owner does not represent that coverage and limits will necessarily be adequate to protect the contractor. Insurance affected or procured by the contractor will not reduce or limit the contractor’s contractual obligation to indemnify and defend the owner for claims or suits which result from or are connected with the performance of this contract.
Duration of Coverage: All required coverage will be maintained without interruption during the entire term of this contract and following final acceptance of the property by the owner.
Subcontractor’s Insurance: The contractor will cause each sub-contractor employed by contractor to purchase and maintain insurance of the types specified below. When requested by the owner, the contractor will furnish copies of certificates of insurance evidencing coverage for each subcontractor.
Insurance Limits and Coverage: To the extent applicable, the amounts and types of insurance will conform to the minimum terms, conditions, and coverage of Insurance Service Office (ISO) policies, forms, and endorsements.
If the contractor has any self-insured retentions, or deductible under any of the following minimum required coverage, the contractor must identify on the certificate of insurance the nature and amount of such self-insured retentions or deductible and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retentions or deductible will be the contractor’s sole responsibility.
Commercial General Liability: The contractor will maintain commercial general liability insurance covering all operations by or on behalf of the contractor on an occurrence basis against claims for personal injury (including bodily injury and death) and property damage (including loss of use).
Such insurance will have these minimum limits and coverage:
Minimum limits: $1,000,000 each occurrence $2,000,000 general aggregate with dedicated limits per project site $2,000,000 products and completed operations aggregate
Worker’s Compensation: Contractor’s that have employees, sub-contractors, helpers, assistants, or individuals providing assistance on the contract work will maintain workers’ compensation covering them during the term of this contract.
Minimum limits: Workers’ compensation –Statutory Limit Employer’s liability:
$100,000 bodily injury for each accident $100,000 bodily injury by disease for each employee $500,000 bodily injury disease aggregate
Contractor Affidavit under O.C.G.A. § 13-10-91(b)(1)
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of (Jones County) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A.
§ 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number Date of Authorization Name of Contractor Name of Project Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on ______, ___, 202__ in _____(city), ______(state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________,202__.
NOTARY PUBLIC
My Commission Expires:
Subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(3)
By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10- 91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with (___________________________________________-name of contractor) on behalf of (Jones County ) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b). Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice of receipt of an affidavit from any sub-subcontractor that has contracted with a sub-subcontractor to forward, within five business days of receipt, a copy of such notice to the contractor. Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number Date of Authorization Name of Subcontractor Name of Project Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on ______, ___, 202__ in _____(city), ______(state).
Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________,202__.
NOTARY PUBLIC
Subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(3)
By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10- 91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with (___________________________________________-name of contractor) on behalf of (Jones County ) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b). Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice of receipt of an affidavit from any sub-subcontractor that has contracted with a sub-subcontractor to forward, within five business days of receipt, a copy of such notice to the contractor. Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number Date of Authorization Name of Subcontractor Name of Project Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on ______, ___, 202__ in _____(city), ______(state).
Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________,202__.
NOTARY PUBLIC
Affidavit Verifying Status County Public Benefit Application
Jones County Board of Commissioners
By executing this affidavit under oath, as an applicant for a Jones County Georgia Business Occupation Tax Certificate, Alcohol License, Taxi Permit or other public benefit as referenced in O.C.G.A. Section 50- 36-1, I am stating the following with respect to my application for a Jones County Business Occupation Tax Certificate, Alcohol License, Taxi Permit or other public benefit (circle one) for . [Name of natural person applying on behalf of individual, business, corporation, partnership, or other private entity]
1)_______ I am a United States citizen
OR
2) _______ I am a legal permanent resident 18 years of age or older or I am an otherwise qualified alien or non-immigrant under the Federal Immigration and Nationality Act 18 years of age or older and lawfully present in the United States.*
In making the above representation under oath, I understand that any person who knowingly and willfully makes a false, fictitious, or fraudulent statement or representation in an affidavit shall be guilty of a violation of Code Section 16-10-20 of the Official Code of Georgia.
Signature of Applicant: Date
Printed Name:
SUBSCRIBED AND SWORN
BEFORE ME ON THIS THE
____ DAY OF ____________, 20__ Alien Registration number for non-citizens
Notary Public _______ My Commission Expires:
*Note: O.C.G.A. § 50-36-1(e)(2) requires that aliens under the federal Immigration and Nationality Act, Title 8 U.S.C., as amended, provide their alien registration number. Because legal permanent residents are included in the federal definition of “alien”, legal permanent residents must also provide their alien registration number. Qualified aliens that do not have an alien registration number may supply another identifying number below:
Receipt of Addenda
Number Signature
OPTIONAL — FOR NON-BIDDERS ONLY
JONES COUNTY BOARD OF COMMISSIONERS – PURCHASING DEPARTMENT
NO BID STATEMENT
In an effort to make the procurement of goods and services for the County as competitive as possible, we are soliciting information from contractors and/or vendors who cannot bid. Your responsiveness and constructive comments will be appreciated. Completion of this form will assist us in evaluating factors which relate to the competitiveness of our bids.
Please check any of the boxes below which may apply. Please explain any issues that you feel needs to be addressed.
Specifications - Restrictive, too light", unclear, specialty item, geared toward one (1) brand or manufacturer only. (Please explain in detail below).
Manufacturing - Unique item, production time for model has expired, etc.
Bid Time - Insufficient time to properly respond to bid or proposal.
Delivery Time - Specified delivery time cannot be met.
Payment - Payment terms unacceptable. (Please be specific)
Bonding - We are unable to meet bonding requirements.
Insurance - We are unable to meet insurance requirements.
Removal - Remove our firm from your bidders list for the particular commodity or service.
Keep - Please keep our company on your bidders list for future reference.
___________ Project is: _____________/ Too Large ___________ / Too Small / Site or Location is Too Distant
Miscellaneous - Do not wish to bid, do not handle this type of item(s) or services, unable to compete, Contract clauses are unacceptable, etc. (Please be specific)
Our company would only be interested in this project as a subcontractor or supplier.
VENDOR STATEMENT:
Bid Description: ______________________________________________________
Company Name: _____________________________________________________
Company Official Name: _______________________________________________
Company Official Signature: ____________________________________________
Telephone Number: ___________________________________________________
Email Address: _______________________________________________________
JONES COUNTY BOARD OF COMMISSIONERS – PURCHASING DEPARTMENT
(478) 986-6405 Julie.Happoldt@jonescountyga.org
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .