This Storm Water Management Plan (SWMP) Notebook is prepared by the Colorado Department of Transportation (CDOT) Region 3 for the A-Basin Tank Installation project located at 28214 Highway 6 in Dillon, Colorado. The project involves the installation of two tanks on a 0.8-acre site with 0.58 acres of proposed disturbance, after which the disturbed areas will be repaved with asphalt. The site is located 2,450 feet southwest of the North Fork Snake River, with soil characterized as Cryaquolls-Leighcan family with 0 to 15% slopes, and currently has no existing vegetation within the disturbance area.
The SWMP details comprehensive stormwater management controls, including specific best management practices (BMPs) such as aggregate bags, vehicle tracking pad, and perimeter control measures. The project requires implementing erosion and sediment control strategies, with particular attention to preventing pollutants from leaving the construction site and entering stormwater drainage systems or state waters. The notebook includes specific quantitative details like 260 linear feet of aggregate bags, one pre-fabricated vehicle tracking pad, and anticipated maintenance activities such as 4 hours of sweeping and sediment removal. The document emphasizes that the SWMP is a "living document" to be continuously reviewed and modified during construction, with the SWMP Administrator responsible for implementing and maintaining the plan in accordance with CDOT and Colorado Department of Public Health and Environment (CDPHE) standards.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 SWMP Plan Sheets
• Notes, tabulation, site description, sequence of major activities, area of disturbance, existing soil data, existing vegetation percent cover, potential pollutant sources, receiving water, non-stormwater discharges and environmental impacts.
1 S W
M P
P lan S heets
SWMP TEMPLATE TEXT FOR PROJECTS WITH LESS THAN 1 ACRE OF DISTURBANCE
1. SITE DESCRIPTION
A. PROJECT SITE LOCATION: CDOT A-Basin Property – 28214 Highway 6, Dillon, CO 80435
B. PROJECT SITE DESCRIPTION: The project involves installation of two tanks on the project site. After the installation is complete, the disturbed areas are be repaved with asphalt.
C. ACRES OF DISTURBANCE:
1. Total area of construction site (LOC AREA): 0.8 acres
2. Total area of proposed disturbance (LDA): 0.58 acres
3. Total area of seeding: N/A
D. RECEIVING WATER:
1. Outfall Locations: None
2. Names of receiving water(s) on site: None
3. Ultimate receiving water: North Fork Snake River
4. Horizontal distance nearest water of the state is from project: 2,450 feet southwest of site.
E. EXISTING SOIL DATA: Cryaquolls-Leighcan family, 0 to 15 % slopes; poorly drained soils, occasional frequency of flooding.
F. EXISTING VEGETATION, INCLUDING PERCENT COVER:
Vegetative transects are not required, by permit, on projects with under an acre of disturbance. However, it is advised that transects be completed prior to construction, as a quality control for post construction revegetation assessment. If transects are not completed on a project, at a minimum describe the quality of the existing vegetation.
Vegetation does not exist within the area of disturbance.
2. STORMWATER MANAGEMENT CONTROLS FIRST CONSTRUCTION ACTIVITIES
THE CONTRACTOR SHALL PERFORM THE FOLLOWING:
A. POTENTIAL POLLUTANT SOURCES
1. Evaluate, identify and describe all potential sources of pollutants at the site in accordance with subsection 107.25 and place any BMPs/Control Measures required to contain potential pollutants.
B. OFFSITE DRAINAGE (RUN ON WATER)
1. Place BMPs/Control Measures to address run-on water in accordance with subsection 208.03.
C. CONSTRUCTION DEWATERING:
1. Obtain a dewatering permit from CDPHE if conditions of their low risk guidance for Discharges of
Uncontaminated Groundwater to Land are not met; see subsection 107.25(b) 8.
D. VEHICLE TRACKING PAD
1. BMPs/Control Measures shall be implemented in accordance with subsection 208.04.
E. PERIMETER CONTROL
1. Perimeter control shall be established as the first item on the SWMP to prevent the potential for pollutants leaving the construction site boundaries, entering the stormwater drainage system, or discharging to state waters.
2. Perimeter control may consist of vegetation buffers, berms, silt fence, erosion logs, existing landforms, or other BMPs/Control Measures as approved.
3. Perimeter control shall be in accordance with subsection 208.04.
3. SWMP ADMINISTRATOR:
A. SWMP ADMINISTRATOR FOR DESIGN:
Name/Title Contact Information
Tim Hagert 720-582-0694 tim.hagert@state.co.us
B. SWMP ADMINISTRATOR FOR CONSTRUCTION: (As defined in Subsection 208) The Contractor shall designate a SWMP Administrator for Construction upon ownership of the SWMP. The SWMP Administrator shall become the owner/operator and assume responsibility for all design changes to the SWMP implementation and maintenance in accordance to 208.03. The SWMP Administrator shall be responsible for implementing, maintaining and revising SWMP, including the title and contact information. The activities and responsibilities of the SWMP Administrator shall address all aspects of the projects SWMP. (Update the information below for each new SWMP Administrator) (Copy of TECS Certification must also be included in the SWMP Notebook.) The SWMP Administration for construction is not a separate pay item but is included in the cost of the work.
Name/Title Contact Information Certification # Start Date Engineer Approval
4. DURING CONSTRUCTION
The SWMP should be considered a “living document” that is continuously reviewed and modified. During construction, the following items shall be added, updated, or amended as needed by the Contractor in accordance with Section 208
A. MATERIALS HANDLING AND SPILL PREVENTION: prior to construction commencing the Contractor shall submit a
Spill Prevention, Control and Countermeasure Plan, see subsection 208.06. Materials handling shall be in accordance with subsection 208.06.
B. STOCKPILE MANAGEMENT: shall be done in accordance with subsection 107.25 and 208.07
C. CONCRETE WASHOUT: Concrete wash out water or waste from field laboratories and paving equipment shall be contained in accordance with subsection 208.05.
D. SAW CUTTING: shall be done in accordance with subsection 107.25, 208.04, 208.05
E. STREET SWEEPING: shall be done in accordance with subsection 208.04
5. BMP/CONTROL MEASURE MAINTENANCE
A. Maintenance shall be in accordance with subsection 208.04 (f).
6. INTERIM AND PERMANENT STABILIZATON
A. SEEDING PLAN: Seeding will not be required for this project.
7. PRIOR TO PROJECT FINAL ACCEPTANCE
A. Partial Acceptance shall be in accordance with subsection 107.25 (d), 208.10 and 214.04 at the Partial Acceptance of the project, it shall be determined by the SWMP Administrator for
Construction and the Engineer which temporary BMPs/Control Measures shall remain until 70% revegetation is established or which shall be removed.
B. At the end of the project, all ditch checks shall either consist of temporary erosion logs (or equivalent) or permanent riprap.
C. All storm drains shall be cleaned prior to the Final Acceptance of the project. Work shall be included in 202 Clean Culvert.
mailto:tim.hagert@state.co.us
8. NARRATIVES:
A. ADDITIONAL BMPS/CONTROL MEASURES AND NARRATIVES:
BMP/Control Measure details and narratives not covered by the SWMP or Standard Plan M-208, M-216 shall be added to the SWMP notebook by the SWMP Administrator.
BMP Matrix:
1. M-Standards have been included along with standard BMP narratives. If a Non-Standard BMP will be used or the standard narrative does not apply, the SWMP Administrator shall write a Non-Standard BMP narrative, place an
“X” in the column and complete a Non-Standard BMP Specification and Narrative for the SWMP notebook.
2. The SWMP Administrator for Construction shall place an “X” in the column In Use on Site when the BMP/Control Measure has been installed.
3. Place an “X” in the column BMP/Control Measure to be located by SWMP Administrator for Construction if the SWMP Administrator shall locate the BMP/Control Measure during construction. These BMP/Control Measures are not currently located on SWMP Plans but are anticipated to be used during construction (i.e. Vehicle Tracking Pad, Batch Plants, etc.). The SWMP Administrator for Construction shall locate these prior to or during construction and reflect on SWMP Map.
4. Place an “X” in the column Initial Construction if the BMP/Control Measure is to be installed prior to construction activity.
STRUCTURAL BMPs/Control Measures that may be potentially used on the project for erosion and sediment control; practices may include, but are not limited to:
APPLICATION,
BMP/CONTROL MEASURE
NARRATIVE
M -S
TA
N
D A
R D o r
X fo r
N O
N -S
TA
N
D A
R D
IN
U
S E O
N S
IT
E
B M
P /C
O N
TR
O
L M
E A
S U
TO
E L
O C
A
TE
D B
Y S
W
P
A
M
IN
S
TR
A
BMP/CONTROL MEASURE
IMPLEMENTATION PHASE
IN
IT
IA
L
C O
N S
TR
U C
TI
O
N
C
TI
V
Y
(C
N
TR
O L
M E A
S U
S
TA
LE
E D
P R
E
C O
N S
TR
U C
TI
O
N
IN
TE
IM
N S
TR
U C
TI
TI
V
IT
IE
R
M A
N E N
T
S
TA
B
IL
IZ
A
TI
PROTECTION OF EXISTING
WETLANDS
Fence (plastic) and erosion logs
Fence (plastic) shall be placed in combination with erosion logs to prevent encroachment of construction traffic and sediment into state waters prior to start of construction disturbances. Fence (plastic) shall be placed adjacent to the wetlands; erosion logs shall be placed between the plastic fence and disturbance area. Logs shall be placed to direct flows away from or filter water running into wetlands from disturbance areas.
NA NA
PROTECTION OF EXISTING
TREES/LANDSCAPING
Fence (plastic)
Fence (plastic) shall be used in areas indicated in the plans to prevent encroachment of construction traffic and sediment for the protection of mature trees and/or existing landscaping prior to start of construction disturbances. X X
CHECK DAM/DITCH CHECK
Erosion log, silt berm, silt dike, rock check dam
Placed in ditches immediately upon completion of ditch grading to reduce velocity of runoff in ditch. For existing ditches, place prior to start of construction disturbances. M-208 NA NA
Storm Drain Inlet Protection In
Paved Roadways (Type 1, 2 and 3 as shown on M-208-1, sheet 5 of 11)
Manufactured storm drain inlet protection placed prior to construction disturbances as detailed in M-208-1, to protect existing inlets or immediately upon completion of new inlets to prevent sediment from entering the inlet throughout construction. M-208 X X
Storm Drain Inlet Protection In
Native Seed Areas (M-604 Standard
Inlets Type C and D)
Erosion logs or aggregate bags placed around inlet grate to prevent sediment from entering inlet. Place prior to construction disturbances to protect existing inlets or immediately upon completion of new inlets. M-208 X X
CULVERT INLET/OUTLET PROTECTION
Erosion logs, aggregate bags
Placed at mouth of culvert inlets and over top of culvert at inlet and outlet where disturbance may be occurring adjacent to pipe to prevent sediment laden water from entering pipe or drainage. Place prior to start of construction disturbances.
M-208 X X
TYPE C, TYPE D AND TYPE 13
PROTECTION
Erosion logs, aggregate bags, erosion bales
Placed around inlet grate or slope and ditch paving to prevent sediment from entering inlet. Place prior to start of construction disturbances.
M-208 X X
STOCKPILE PROTECTION
Temporary berm, erosion logs, aggregate bags*
Placed within specified distance, in accordance with subsection 208.06, from toe to contain sediment around stockpile. *Aggregate bags are easily moved and replaced for access during the work day. Place prior to start of stockpile, increase control as stock pile increases size.
M-208 X X
TOE OF FILL PROTECTION
Erosion logs, temporary berm, silt fence, topsoil windrow*
Place prior to slope/embankment work to capture sediment and protect and delineate undisturbed areas. *Can be used to stockpile topsoil for salvage. M-208 NA NA
PERIMETER CONTROL
Erosion logs, silt fence, temporary berm, topsoil windrow*
Placed prior to construction commencing to address potential run-on water from off site, and to divert around disturbed area. *Can be used to stockpile topsoil for salvage. M-208 NA NA
SEDIMENT CONTROL/
SLOPE CONTROL
Silt fence, erosion logs
Placed on the contour of a slope to contain and slow down construction runoff. Place prior to start of construction disturbances.
M-208 X X
TEMPORARY SEDIMENT TRAP
Used to capture sediment laden runoff from disturbed areas < 5 acres during construction. Place prior to start of construction disturbances.
M-208 NA NA
EMBANKMENT PROTECTION OR
TEMPORARY SLOPE DRAIN
Placed as a conduit or chute to drain runoff down slope and to prevent erosion of slope.
M-208 NA NA
OUTLET PROTECTION
Riprap, or approved other
Material placed as energy dissipater to prevent erosion at outlet structure. M-
601-
NA NA
CONCRETE WASHOUT
In-ground or fabricated
Construction control, used for waste management of concrete and concrete equipment cleaning. Place prior to start of concrete activities.
M-208 NA NA
VEHICLE TRACKING PAD
Source control, placed to prevent tracking of sediment from disturbed area to offsite surface. Place prior to start of construction disturbances.
M-208 X X
SWEEPING
Source control, used to remove sediment tracked onto paved surfaces and to prevent sediment from entering drainage system.
Sweep daily and at the end of the construction shift as needed. Kick brooms shall not be permitted.
X X
Engineered SEDIMENT BASIN
Constructed early in project, prior to storm sewer/ditches and in accordance with 208.05(p) to capture storm flow. Outlet structure and/or outfall shall be modified for temporary sediment control using an approved non-standard detail.
X NA NA
DEWATERING
(Contractor is responsible for obtaining a permit from Colorado
Department of Health and
Environment.)
Shall be done in such a manner to prevent potential pollutants from entering state waters.
X
If
Requi-red
TEMPORARY STREAM CROSSING
Constructed over stream or drainage to prevent discharge of pollutants from construction equipment into water.
CLEAN WATER DIVERSION
Placed to divert clean surface or ground water around disturbance area to prevent it from mixing with construction runoff.
OTHER
NON-STRUCTURAL BMPs/Control Measures that may be potentially used on the project for erosion and sediment control; practices may include, but are not limited to:
Erosion control devices are used to limit the amount of soil loss on site. Sediment control devices are designed to capture sediment on the project site. Construction controls are BMPs/Control Measures related to construction access and staging. BMP/Control Measure locations are indicated on the SWMP Site Map.
* Use of vegetative buffer strip requirements. The CDPHE Water Quality Control Division Technical Memorandum dated August 27, 2015 clarifies the requirements for utilization of existing vegetation as a buffer type of sediment control measure, while maintaining compliance with the CDPS permit for Stormwater Discharges Associated with Construction Activity – CDPS Permit No. COR0300000. In general, the division does not recommend that vegetated buffers be implemented as a sediment removal control measure for runoff from disturbed areas at construction sites, unless implemented as a “finishing” component of a treatment train comprised of additional, adequate up-gradient control measures. The entire memorandum can be found at: https://www.colorado.gov/pacific/sites/default/files/Vegetative%20Buffer%20Memo.pdf
APPLICATION,
BMP/CONTROL MEASURE
NARRATIVE
M -S
TA
N
D A
R D o r
X fo r
N O
N -S
TA
N
D A
U
S E O
N S
P /C
O N
TR
O
L M
E A
S U
E L
O C
A
TE
D B
Y S
W
M
IN
S
TR
A
BMP/CONTROL MEASURE
IMPLEMENTATION PHASE
IN
IT
IA
L
C O
N S
TR
U C
TI
TI
V
Y
(C
N
TR
O L
M E A
S U
TA
LE
E D
P R
E
C O
N S
TR
U C
TI
O
N
IN
TE
IM
N S
TR
U C
TI
TI
V
IT
IE
R
M A
N E N
T
S
TA
B
IL
IZ
A
TI
* VEGETATIVE BUFFER STRIP
Fence (plastic)
Filter sediment laden runoff from disturbance area. Area to be identified on SWMP prior to construction starting.
X
X X
GRADING APPLICATIONS
(LANDFORM)
Existing or created landforms may be used as a BMP/Control Measure if they prevent sediment from entering or leaving the disturbance area. If a landform directs flow of water to a concentrated outfall point, the outfall point shall be protected to prevent erosion. Area to be identified on SWMP prior to construction starting.
M-208
NA NA
https://www.colorado.gov/pacific/sites/default/files/Vegetative%20Buffer%20Memo.pdf
TOPSOIL MANAGEMENT
STOCKPILE/SALVAGE
Windrow or stockpile
Prior to any site disturbance work commencing, existing topsoil shall be scraped to a depth of 4 inches, and placed in stockpiles or windrows. Upon completion of slope work/final grading (less 4 inches), topsoil shall be evenly distributed over embankment to a depth of 4 inches.
M-208
SURFACE ROUGHENING / GRADING
TECHNIQUES
Temporary stabilization of disturbance and to minimize wind and erosion.
X
SEEDING (TEMPORARY)
Temporary stabilization used for over wintering of disturbance or used to control erosion for areas scheduled for future construction.
NA
BONDED FIBER MATRIX and Spray-on Mulch Blanket (hydraulic applied mulch
Not to be used in areas of concentrated flows, i.e. ditch lines. To be for either Interim or Permanent Stabilization placed as a surface cover for erosion control. May be used as surface cover when work is temporarily halted and as approved by the Engineer for stockpiles.
Straw or Hay MULCH/MULCH
TACKIFIER
Interim or Permanent Stabilization placed as a surface cover for erosion control and or seeding establishment. To be installed as
Interim Stabilization as a surface cover when work is temporarily halted and as approved by the Engineer
SPRAY-ON MULCH BLANKET (Not to be used in areas of concentrated flows, i.e. ditch lines.)
Temporary or Final Stabilization placed as a surface cover for erosion control and or seeding establishment. To be installed as temporary surface cover when work is temporarily halted and as approved by the Engineer
SEEDING PERMANENT (NATIVE)
Final Stabilization of disturbance and to reduce runoff and control erosion on disturbed areas.
SOIL RETENTION BLANKET (SRB)
Final Stabilization of disturbance and to reduce runoff and control erosion on disturbed areas.
M-216
TURF REINFORCEMENT MAT (TRM)
Final Stabilization of disturbance and to reduce runoff and control erosion on disturbed areas. Placed in channels or on slopes for erosion control, channel liner and seeding establishment.
M-216
OTHER
9. TABULATION OF STORMWATER QUANTITIES
A. BMP/Control Measure sediment removal and disposal shall be paid for as: 208 Removal and
Disposal of Sediment (Equipment) and 208 Removal and Disposal of Sediment (Labor). All other
BMP/Control Measure maintenance shall be included in the cost of the BMP/Control Measure.
Pay Item Description Pay
Unit
Initial
Const.
Interim
Const.
Permanent
Stabilization
*Total
Quantity
208-00035 Aggregate Bag LF 260 260
208-00075 Pre-fabricated Vehicle Tracking Pad Each 1 1
208-00103 Removal and Disposal of Sediment
(Labor)
Hour 4 4
Pay Item Description Pay
Unit
Initial
Const.
Interim
Const.
Permanent
Stabilization
*Total
Quantity
208-00106 Sweeping (Sediment Removal) Hour 4 4
208-00107 Removal of Trash Hour 2 2
*It is anticipated that additional BMPs/Control Measures and BMP/Control Measure quantities not shown on the
SWMP Site Maps shall be required on the project for unforeseen conditions and replacement of items that are beyond their useful service life, see subsection 208.03 and 208.04. Quantities for all BMPs/Control Measures shown above are estimated, and have been increased for unforeseen conditions and normal BMP/Control Measure life expectancy. Quantities shall be adjusted according to the conditions encountered in the field as directed and approved by the Engineer. Payment shall be for the actual work completed and material used.
**Pay Item 208-00071 is included for anticipated maintenance of vehicle tracking pads based on the service life of the BMP in the field. The use of the material shall be directed and approved by the Engineer.
10. BIOLOGIC IMPACTS and DEWATERING
A. ENVIRONMENTAL IMPACTS:
1. Wetland Impacts: NO
2. Stream Impacts: NO
3. Threatened and Endangered Species: None
4. DEWATERING: Not Anticipated
11. Notes
1. EMC (or SWMP Administrator for Construction or Erosion Control Inspector) is included in the cost of the work.
2 SWMP Site Maps and Project Plan Title Sheet
2 S ite M aps
CDOT Region 3 A-Basin Tank Installation
Storm Water Management Plan Notebook
This Storm Water Management Plan Notebook includes site specific documents and examples to assist with implementation of the Plan.
The sample documents are based on CDOT’s current knowledge of the expectations of CDPHE, but have not been reviewed or approved by CDPHE
A-Basin SWMP Figure
Legend
70 ft
N
N
= Limit of Disturbed Area (0.58 acres)
= Aggregate Bags
= Vehicle Tracking Pad
AG
AG
AG
AG
AG
AG
AG
AG AG AG
FLOW
DIRECTION
hagertt Rectangle hagertt Oval hagertt Rectangle hagertt Oval hagertt Line
3 Specifications
3 S pecifications
4 CDOT Standard Plans
4.1 M-208-1, M-216-1 and M-615-1
4 S tandard P lans
NOTES:
NOTES:EXCEPT AT THE OPENING.
INSTALLED AROUND THE CONCRETE WASHOUT STRUCTURE,
A FENCE (PLASTIC) CONFORMING TO SECTION 607 SHALL BE
SUBSECTION 630.02.
AT LEAST 3 INCHES HIGH AND CONFORM TO
THE CONCRETE WASHOUT SIGN SHALL HAVE LETTERS
1.
2.
3.
4.
1.
2.
3.
AGGREGATE SHALL CONFORM TO SUBSECTION 208.02 (m).
SHALL BE INCLUDED IN THE COST OF WORK AND NOT PAID FOR SEPARATELY.
ALL MATERIALS AND LABOR TO COMPLETE THE CONCRETE WASHOUT STRUCTURE
SHALL BE INCLUDED IN THE COST OF WORK AND NOT PAID FOR SEPARATELY.
ALL MATERIALS AND LABOR TO COMPLETE THE VEHICLE TRACKING PAD4.
5. THE PAY ITEM NUMBER FOR CONCRETE WASHOUT STRUCTURE (EACH) IS 208-00045.
CONCRETE WASHOUT STRUCTURE
5. THE PAY ITEM NUMBER FOR VEHICLE TRACKING PAD (EACH) IS 208-00070.
VEHICLE TRACKING PAD
GEOTEXTILE SHALL CONFORM TO SUBSECTION 712.08.
AND NOT PAID FOR SEPARATELY.
CURB AND GUTTER SHALL BE INCLUDED IN THE COST OF WORK
OF WATER THRU STRUCTURE. PROTECTION OF THE
CROSSES THE ENTRANCE FROM DAMAGE, WHILE NOT BLOCKING FLOW
THE CONTRACTOR SHALL PROTECT CURB AND GUTTER THAT
BE IN ACCORDANCE WITH 208.02 (k).
ABOVE GROUND WATER. IF NOT, THE BOTTOM OF EXCAVATION SHALL
THE BOTTOM OF EXCAVATION SHALL BE A MINIMUM OF FIVE FEET
EXCAVATED AND
LIMIT OF BERM
PLAN VIEW
AA
TRUCK ACCESS
CONTAINMENT AREA
3:1
RAMP
EXISTING
SECTION A-A
SIGN
3' MIN.
GROUND
(PLASTIC)
FENCE
OPERATION.
SHALL EXTEND FULL WIDTH
OF INGRESS AND EGRESS
PLAN VIEW
B
B
EXISTING
GROUND
EXISTING
PAVEMENT
GROUND
EXISTING
EXISTING
PAVEMENT
MIN.
GEOTEXTILE
(DEPTH VARIES)
ELEVATION SECTION
GROUND
EXISTING
(CLASS 2)
EROSION CONTROL
2:1 (TYP.)
TEMPORARY BERM
(SEE M-216-1, SHEET 1)
ANCHOR TRENCH
AREA
EXCAVATED
AS NEEDED (SEE NOTE 4)
IMPERMEABLE SYNTHETIC LINER
FENCE (PLASTIC)
(SEE NOTE 3)
CONTROL (CLASS 2)
GEOTEXTILE EROSION
(SEE NOTE 1)
AGGREGATE
2/3 OF VOLUME AREA
MAXIMUM STORAGE IS
9 FT. MIN.
MIN.
4 FT.
MIN.
15 FT.
MIN.
24 IN.
18 IN. MIN.
MIN.
5 FT.
MIN.
18 IN.
10 FT.
10 FT.
MIN.
12 FT.
70 FT. MIN.
6 IN.
12 FT. MIN.
MIN.
6 IN.
SECTION B-B
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 1 of 11
Designer Initials: DK
Last Modification Date: 05/16/24
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Construction Engineering Services Issued by the Project Development Branch: July 31, 2019DK
05/16/24
Vehicle Tracking Pad Note 1.
Structure Notes 1 and 4, and
Revised Concrete Washout
TYPICAL STAKE INSTALLATION
SECTION A-A
EROSION LOG
PLAN VIEW
FLOW
TO EACH OTHER
(TYP.)
FLOW FLOW
FL
O
W
FL
O W
FLOW
INLET
STAKES
SECTION B-B
FLOW
A A
B B
APPROXIMATELY 90°
PLAN VIEW
EROSION LOG FILTER AT DROP INLET
NOTE:
SECTION C-C
EROSION LOG CULVERT INLET PROTECTION
EROSION LOG
FLOW
C
EROSION LOG CULVERT OUTLET PROTECTION
C
PLAN VIEW
FLOW
FLOW
1.5 X DIA. OF PIPE
MIN. DISTANCE
EDGE OF THE CONCRETE APRON.
LOCATE EROSION LOGS AT THE OUTSIDE
208-00012
208-00002
208-00013
208-00007
208-00008
208-00009
EROSION LOGS PAY ITEMS
NUMBER DESCRIPTION
(SEDIMENT CONTROL LOG) APPLICATIONS
EROSION LOG
(NOT ALL LOGS SHOWN)
EROSION LOG
ENDS OR JOINTS
AT ALL EROSION LOG
USE TWO WOOD STAKES
CONTINUOUS SECTION
END TO FORM
TIGHTLY ABUT
ENDS OR JOINTS
AT ALL EROSION LOG
USE TWO WOOD STAKES
EROSION LOG ENDS OR JOINTS (TYP.)
USE TWO WOOD STAKES AT ALL
EROSION LOG
SECTION
TO FORM CONTINUOUS
TIGHTLY ABUT END
OVERLAP JOINING DETAIL
J-HOOK JOINING DETAIL
LOG
EROSION
FLOW
JOINING EROSION LOG APPLICATIONS
JOINING EROSION LOG APPLICATIONS.
FOR JOINING LOGS IN OTHER SITUATIONS, SEE THE
EROSION LOG ENDS SHALL BE TIGHTLY ABUTTING.
FLOW
1.
THE COST OF THE EROSION LOGS.
STAKES SHALL BE INCLUDED IN
NOTE
THE LENGTH OF THE EROSION LOG
ORIENTATION THROUGHOUT
AND CONTINUE ALTERNATE
USE A STAKE EVERY 24IN
208-00022
208-00023
208-00024
NOTE:
TOP OF EROSION LOG MORE THAN 2 IN.
TOP OF STAKE SHALL NOT EXTEND PAST
REQUIRING PROTECTION
WETLANDS OR FEATURES
WITH NO GAPS (TYP.)
BE TIGHTLY ABUTTED
EROSION LOGS SHALL
NOTE:
INTO GRADE 2 IN.
TRENCH LOG
OVERLAP
12 IN. MIN.
24 IN.
STAKE EVERY
USE A WOOD MIN.
12 IN.
24 IN.
STAKE EVERY
USE A WOOD
48 IN. MAX.
24 IN.
(TYP.)
INTO GRADE 2 IN.
TRENCH LOGS
(TYP.)
INTO GRADE 2 IN.
TRENCH LOGS
TYPE 1 (9 IN.)
TYPE 1 (12 IN.)
TYPE 1 (20 IN.)
TYPE 2 (8 IN.)
TYPE 2 (12 IN.)
TYPE 2 (18 IN.)
TYPE 3 (9 IN.)
TYPE 3 (12 IN.)
TYPE 3 (20 IN.)
THE TOPS OF EROSION LOGS.
EXTEND MORE THAN 2 INCHES ABOVE
THE TOPS OF ALL STAKES SHALL NOT
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 2 of 11
Designer Initials:
Last Modification Date:
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Issued by the Project Development Branch: July 31, 2019
ABUTTED WITH NO GAPS.
NOTE: EROSION LOGS SHALL BE TIGHTLY
05/16/24
Inlet" plan view. Revised title.
dimension note to the "... Drop
Added "Erosion Logs...No Gaps"DK
05/16/24
Construction Engineering Services DK
FLOW TO EACH OTHER
(TYP.)
STAKES
APPROXIMATELY 90°
SECTION A-A
ISOMETRIC VIEW
F L O
W
F L O
W
FLOW
SECTION B-B
SILT FENCE
ISOMETRIC VIEW
TOE OF SLOPE PROTECTION APPLICATIONS
TOE OF SLOPE TO PROVIDE STORAGE CAPACITY.
SILT FENCE USED AT TOE OF SLOPE SHALL BE PLACED 5 TO 10 FEET BEYOND
1.
2.
3.
BEYOND TOE OF SLOPE TO PROVIDE STORAGE CAPACITY.
EROSION LOGS USED AT TOE OF SLOPE SHALL BE PLACED 5 TO 10 FEET 1.
2.
NOTES:
UP SLOPE.
EROSION LOGS SHALL BE PLACED ON THE CONTOUR WITH ENDS FLARED
SILT FENCE TOE OF SLOPE PROTECTION
B
EROSION LOG TOE OF SLOPE PROTECTION
3.
4.
NOTES
TURNING UPSLOPE IS 150 FEET.
THE MAXIMUM LENGTH OF EROSION LOGS OR SILT FENCES WITHOUT A FLARED END
NOTE: THE PAY ITEM NUMBER FOR SILT FENCE (LF) IS 208-00020.
FLOW
B
SILT FENCE POST
SEE SHEET 2 OF 11 FOR JOINING LOGS DETAIL.
IS 100 FEET.
PER 100 FEET OF SILT FENCE LENGTH; MAXIMUM SLOPE LENGTH BEHIND BARRIER
SILT FENCE SHALL HAVE A MAXIMUM DRAINAGE AREA OF ONE-QUARTER ACRE
SILT FENCE SHALL BE PLACED PARALLEL TO THE CONTOUR WITH ENDS FLARED UP SLOPE.
NOTE:
THE TOPS OF EROSION LOGS.
EXTEND MORE THAN 2 INCHES ABOVE
THE TOPS OF ALL STAKES SHALL NOT
MIN.
46 IN.
A
A
(TYP.)
INTO GRADE 2 IN.
TRENCH LOG
5 FT. TO 10 FT.
MIN.
24 IN.
MIN.
18 IN.
TRENCH AND FIRMLY ATTACHED TO POST
12 IN. INTO (6 IN. SIDEWALL x 6 IN. BOTTOM)
SILT FENCE - GEOTEXTILE BURIED
TRENCH
6 IN. x 6 IN.
5 FT. TO 10 FT.
208-00012
208-00002
208-00013
208-00007
208-00008
208-00009
EROSION LOGS PAY ITEMS
NUMBER DESCRIPTION
208-00022
208-00023
208-00024
TYPE 1 (9 IN.)
TYPE 1 (12 IN.)
TYPE 1 (20 IN.)
TYPE 2 (8 IN.)
TYPE 2 (12 IN.)
TYPE 2 (18 IN.)
TYPE 3 (9 IN.)
TYPE 3 (12 IN.)
TYPE 3 (20 IN.)
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 3 of 11
Designer Initials:
Last Modification Date:
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Issued by the Project Development Branch: July 31, 2019
DK
2 FT. MIN.
4 FT. MIN. 5 FT. MIN. 4 FT. MIN.
2 FT. MIN.
PLAN VIEW
FLOW FLOW
FL
O
W
FL
O W
FLOW
INLET
SECTION A-A
FLOW
A A
PLAN VIEW
INLET
UPSTREAM OF
AGGREGATE BAGS
NUMBER OF
WITH NO GAPS (TYP.)
BE TIGHTLY ABUTTED
AGGREGATE BAGS SHALL
AGGREGATE BAGS AT DROP INLET
OF THE CONCRETE APRON.
AT THE OUTSIDE EDGE
LOCATE AGGREGATE BAGSNOTE:
AGGREGATE BAG APPLICATIONS
NOTE: THE PAY ITEM NUMBER FOR AGGREGATE BAG (LF) IS 208-00035
FLOW CURB INLET
CURB
GUTTER
FLOW
AGGREGATE BAGAGGREGATE BAG
MANHOLE
AGGREGATE BAGS AT STORM DRAIN INLET (TYPE I)
NOTE:
EDGE OF ROADWAY
EDGE OF TRAVELED WAY
FACE OF CURB
THE ADJACENT CURB
ALWAYS BE 1IN BELOW THE HEIGHT OF
THE TOPS OF AGGREGATE BAGS SHALL
TO THE FACE OF CURB.
FROM THE EDGE OF THE TRAVELED WAY (INCLUDING CONDITIONS DURING DETOURS)
USE AGGREGATE BAGS ONLY WHEN THERE IS A MINIMUM CLEARANCE OF 3 FEET
FT.
OF INLET
LENGTH (L)
0 - 5
6 - 10
L > 10
FROM THE INLET OPENING (TYP.)
BE PLACED 5 FT. MIN. UPSTREAM
CURB FACE AND SHALL
PLACED TIGHTLY AGAINST
AGGREGATE BAG SHALL BE
5 FT. MIN.
3 FT.
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 4 of 11
Designer Initials:
Last Modification Date:
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Issued by the Project Development Branch: July 31, 2019
DK
MANHOLE
PLAN VIEW
SECTION A-A
F L
O W
FLOW
OVERFLOW
A
A
STORM DRAIN INLET PROTECTION (TYPE I)
CURB INLET
SECTION B-B
FLOW
OVERFLOW
PLAN VIEW
B
B
CURB
GUTTER
INLET GRATE
LIFTING STRAPS
CURB FILTER
GUTTER
CURB
OVERFLOW
F L
O W
ISOMETRIC VIEW
COVERS INLET GRATE
INLET PROTECTION DEVICE
DEVICE
PROTECTION
INLET
GRATE
INLET
INLET
CURB
GUTTER
AND
CURB
INLET PROTECTION
STORM DRAIN
INLET
CURB
FLOW
FILTERED
NOTES:
1.
2.
CROSS SLOPE
ROADWAY
CROSS SLOPE
ROADWAY
FLOWLINE
PROJECTED
FLOWLINE
PROJECTED
OPENING
OVERFLOW
CONTAINMENT AREA
WITH SEDIMENT AND DEBRIS
INLET PROTECTION DEVICE
WITHOUT STORAGE CAPACITY
INLET PROTECTION DEVICE
STRAPS
LIFTING
CONTAINMENT AREA
WITH SEDIMENT AND DEBRIS
INLET PROTECTION DEVICE
STORM DRAIN INLET PROTECTION TYPES
OF THE INLET.
INLET PROTECTION DEVICE SHALL EXTEND 12 INCHES PAST EACH END
FLOW
FILTERED
STORM DRAIN INLET PROTECTION (TYPE II)
OPTION A
STORM DRAIN INLET PROTECTION (TYPE II)
OPTION B
3.
INLET PROTECTION
STORM DRAIN
STORM DRAIN INLET PROTECTION (TYPE III)
OPTION A
STORM DRAIN INLET PROTECTION (TYPE III)
OPTION B
NOTE: THE PAY ITEM NUMBER FOR STORM DRAIN INLET PROTECTION (TYPE III) (EACH) IS 208-00056.
BAGS AT STORM DRAIN INLET (TYPE I) DETAIL ON SHEET 4 INSTEAD.
FROM THE EDGE OF THE TRAVELED WAY TO THE FACE OF CURB, USE THE AGGREGATE
FOR STORM DRAIN INLET TYPES I AND II, IF THERE IS A MINIMUM CLEARANCE OF 3 FEET
NOTE:
ARE 208-00054 (EACH).
THE PAY ITEM NUMBERS FOR STORM DRAIN INLET PROTECTION (TYPE II)
12 IN. 12 IN.
IN.
IN.
OR 72 IN. X 31 IN.
36 IN. X 31 IN.
VANE INLET GRATE
TRANSITION
2 FT. APRON
OR 72 IN.
36 IN.
AND 208-00058 204 INCHES (EACH).
ARE 208-00051 (LF), 208-00053 84 INCHES (EACH), 208-00057 144 INCHES (EACH),
THE PAY ITEM NUMBERS FOR STORM DRAIN INLET PROTECTION (TYPE I)
OR 72 IN. X 31 IN.
36 IN. X 31 IN.
VANE INLET GRATE
OR 72 IN.
36 IN.
TRANSITION
2 FT. APRON
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 5 of 11
Designer Initials:
Last Modification Date:
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Issued by the Project Development Branch: July 31, 2019
DK
4 FT.
FRONT VIEW
POINT A
POINT B
PLAN VIEW
BERM SECTION
SILT BERM
FLOW
FLOW
DRAINAGE DITCH APPLICATIONS
PLAN VIEW
EROSION LOGS
POINT A
POINT B
FL
O
W
TO EACH OTHER
APPROXIMATELY 90°
STAKES
(TYP.)
A
A
BLANKET
SOIL RETENTION
OF SPIKES PER SECTION OF SILT BERM.)
SPIKES (USE A MINIMUM OF 3 SETS
BLANKET
SOIL RETENTION
FILL AND COMPACT TRENCH.
SECTIONS OF THE SILT BERM SHALL BE OVERLAPPED WITH NO GAPS.
1.
2.
3.
4.
DETAIL ON SHEET 11 OF 11.
FOR SLOPE AND CHANNEL SPACING SEE THE "SECTION VIEW ALONG DITCH FLOWLINE"
POINT A
POINT B
DOWNSTREAM UPSTREAM
NOTES:
MINIMUM 4 NAILS PER SEGMENT (UPSTREAM).
MINIMUM 2 NAILS PER SEGMENT (DOWNSTREAM).
1.
2.
5.
NOTES
FLOWBLANKET
RETENTION
SOIL
ALONG EDGE
STAPLES 1 FOOT O.C.
SECURE BLANET WITH
SILT BERM (2) SECTION VIEW
THE PAY ITEM NUMBER FOR SILT BERM (LF) IS 208-00004.6.
POINT B
POINT A POINT A
ELEVATION
NOTES:
SECTION A-A
RELEASE
OVERFLOW
OVERFLOW
SHALL BE HIGHER THAN
ROADWAY ELEVATION
STAPLES PLACED AT 1 FOOT INTERVALS ALONG EDGE.
ANCHOR SOIL RETENTION BLANKET INTO TRENCH WITH 8 INCHES MIN.
FOR DETAILS)
(SEE M-216-1
WITH STAPLES
SECURE BLANKET
POINT A
EROSION LOG INSTALLATION
SILT BERM (1) SECTION VIEW
SILT BERM INSTALLATION
SOIL RETENTION BLANKET SHALL ALWAYS BE REQUIRED.
3. MINIMUM 2 WOOD STAKES PER SEGMENT.
WATER FLOWS OVER THE BERM AND NOT AROUND THE ENDS.
POINT "A" SHALL BE HIGHER THAN POINT "B" TO ENSURE THAT
EROSION LOGS SHALL BE EMBEDDED 2 INCHES INTO THE SOIL.
EROSION LOGS SHALL BE TIGHTLY ABUTTED WITH NO GAPS.
1.
2.
3.
NOTE:
THE TOPS OF EROSION LOGS.
THAN 2 INCHES ABOVE
SHALL NOT EXTEND MORE
THE TOPS OF ALL STAKES
INTO GRADE 2 IN.
TRENCH LOGS
NOTE: POINTS "A" SHALL BE A MINIMUM 4 IN. HIGHER THAN POINT "B".
INTO GRADE 2 IN.
TRENCH LOGS
SHAL BE GRADED IN A PARABOLIC OR TRAPEZOIDAL SHAPE.
V-SHAPED TEMPORARY DITCHES SHALL NOT BE USED. DITCHES
M-216-1 FOR DETAILS)
6 IN. X6 IN. (SEE
ANCHOR TRENCH
4 FT.
2 FT. MIN. (TYP.)
(SEE M-216-1 FOR DETAILS)
ANCHOR TRENCH 6 IN. X 6 IN.
SPIKES 10 - 12 IN. DEEP (TYP.)
SECURE SILT BERM WTTH
HARDWOOD STAKES
1 IN. X 1 IN. X 18 IN. NOMINAL PINE OR
CABLE TIES
UV-STABLE
BLACK 11 IN.
9 IN.
2 IN. OF TOPSOIL
EDGE FLAP WITH
BACKFILL LEADING
ANCHOR TRENCH
6 IN. X 6 IN.
(TRIANGULAR SPACING)
STAPLES 1.5 FT. O.C.
SECURE BLANKET WITH
12 IN.
BRIGHT COMMON
6 IN. NAILS 60D
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 6 of 11
Designer Initials:
Last Modification Date:
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Issued by the Project Development Branch: July 31, 2019
DK
2:1 OR FLATTER
2:1 OR FLATTER
COMPACTED SOIL
4'-6" MINIMUM
18" MIN.
TEMPORARY SLOPE DRAINS
TEMPORARY BERM
FLOW
TEMPORARY DIVERSION
FLOW
2:1 OR FLATTER
BERM
TEMPORARY
ANCHOR SIZE VARIES ACCORDING TO PIPE SIZE
NOTES:
1.
2.
3.
A DESIGNATED OUTLET.
BERMS SHALL BE USED TO INTERCEPT AND DIVERT DRAINAGE TO
BERMS SHALL NOT BE USED WHERE DRAINAGE AREA EXCEEDS 10 ACRES.
BERM
TEMPORARY
1.
2.
3.
THE PAY ITEM NUMBER FOR TEMPORARY DIVERSION (LF) IS 208-00301.5.
1.
2.
4.
OR AROUND THE PERIMETER OF A DISTURBED AREA.
USE THE TEMPORARY DIVERSION DITCH IMMEDIATELY ABOVE A NEW CUT, FILL SLOPE,
FROM THE OUTSIDE LIMITS OF DISTURBED AREA BOUNDARY.
THE DIVERSION FLOWLINE SHALL ALWAYS BE LOCATED A MINIMUM 10 FEET
BUT SHALL NOT BE SO STEEP AS TO RESULT IN EROSION DUE TO HIGH VELOCITY.
THE GRADIENT ALONG THE FLOW PATH SHALL HAVE A POSITIVE GRADE TO ASSURE DRAINAGE,
TO INTERCEPT RUNOFF AND DIRECT IT TO A STABLE OUTLET OR SEDIMENT TRAP.
TEMPORARY DIVERSION DITCHES SHALL BE CONSTRUCTED ACROSS THE SLOPE
3.
SHALL ALWAYS BE REQUIRED
GEOTEXTILE EROSION CONTROL (CLASS 2)
4.
PERPENDICULAR DISCHARGE TO A CHANNEL SHALL NOT BE ACCEPTABLE.
THE OUTLET SHALL BE ALIGNED WITH THE FLOW DIRECTION OF THE EXISTING GRADE.
5.
THE GRADE AROUND THE INLET TO THE PIPE SHALL BE COMPACTED.
AND SPECIFICATION 506 "RIPRAP" FOR REQUIREMENTS)
FOR MIN. HORIZONTAL LAYOUT AND THICKNESS,
RIPRAP OUTLET PROTECTION (SEE M-601-12
6. THE PAY ITEM NUMBER FOR TEMPORARY BERM (LF) IS 208-00300.
BETWEEN THEM ABOVE AND ACROSS THE PIPE'S WIDTH.
TO SECURE THE PIPE, DRIVE STAKES INTO GROUND, THEN TIE A 12 GUAGE WIRE
GRADING APPLICATIONS
4.
AND RECEIVE AT A MINIMUM HEAVY EQUIPMENT WHEEL ROLLED COMPACTION.
BERMS SHALL BE CONSTRUCTED OUT OF ACCEPTABLE MATERIAL THAT CAN BE COMPACTED
THE PAY ITEM NUMBER FOR TEMPORARY SLOPE DRAINS (LF) IS 208-00060.
5.
6.
IN NO CIRCUMSTANCE CONSTRUCTED OUT OF SALVAGED TOPSOIL.
TEMPORARY BERMS SHALL BE CONSTRUCTED OUT OF EMBANKMENT (SUBSOIL) AND
OR AS SHOWN ON THE PLANS.
RIPRAP SIZE D = 6 IN.
MIN.
18 IN.
4 FT. - 6 IN. MIN.
10 FT. - 0 IN. MIN.
4 FT. - 6 IN. MIN.
18 IN. MIN.
12 IN.
2 FT. MAX.
SEE SHEET 3 OF 11 FOR DETAILS.
INSTALL TOE OF SLOPE CONTOL MEASURES.
FOR BERMS TALLER THAN 2 FT.,
2:1 OR FLATTER AND A MINIMUM BASE WIDTH OF 4 FT. -6 IN.
BERMS SHALL HAVE A HEIGHT OF 18 INCHES, SIDE SLOPES OF
4 FT. - 6 IN. MIN.
18 IN. MIN.
(SEE NOTE 2)
PINE OR HARDWOOD STAKES
2 IN. X 2 IN. (NOMINAL) X 30 IN.
12 IN. MIN. DIAMETER PIPE
FT.
MAX.
CONSTRUCTED OUT OF SALVAGED TOPSOIL.
DIVERSION BERMS SHALL BE CONSTRUCTED OUT OF EMBANKMENT (SUBSOIL) AND IN NO CIRCUMSTANCE
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 7 of 11
Designer Initials:
Last Modification Date:
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Issued by the Project Development Branch: July 31, 2019
DK
SILT FENCE
FLOW
JOINING SECTION DETAIL (PLAN VIEW)
END SECTION DETAIL (PLAN VIEW)
FLOW
GRADE
T-POST SAFETY CAP
T-POST SAFETY CAP
SIDE VIEW
SILT FENCE (REINFORCED)
FLOW
ELEVATION VIEW
NOTES:
1.
3.
BACKFILL
COMPACT
1.
2.
NOTES:
3. THE PAY ITEM NUMBER FOR SILT FENCE (LF) IS 208-00020.
1.
OF SEDIMENT AT JOINT.
GAPS TO PREVENT POTENTIAL FLOW-THROUGH
POSTS SHALL BE TIGHTLY ABUTTED WITH NO
NOTES:
1.
6 HEAVY DUTY WIRE STAPLES AT LEAST 1 INCH LONG.
POST ONE FULL TURN, THEN SECURED ALONG THE POST WITH
BY WRAPPING APPROX. 6 INCHES OF EACH END AROUND A WOODEN
THE ENDS OF THE SILT FENCE FABRIC SHALL BE JOINED TOGETHER
POST "B"
FABRIC "A"
GEOTEXTILE
FABRIC "B"
GEOTEXTILE
POST "A"
WIRE STAPLES AT LEAST 1 INCH LONG.
THEN SECURED ALONG THE POST WITH 6 HEAVY DUTY
APPROX. 6 INCHES AROUND A WOODEN POST ONE FULL TURN,
THE END OF THE SILT FENCE FABRIC SHALL BE WRAPPED
POSTS (TYP.)
STAPLED TO
GEOTEXTILE
IN TRENCH
ANCHORED
GEOTEXTILE
GEOTEXTILE FABRIC
POST (TYP.)
SILT FENCE APPLICATIONS
SECTION A-A
A
A
4.
2.
4. THE PAY ITEM NUMBER FOR SILT FENCE (REINFORCED) (LF) IS 208-00021.
SILT FENCES SHALL NOT BE USED FOR CHECK DAMS.
WIRE TIES (MINIMUM 3 PER POST)
ATTACH WIRE PANEL TO POST WITH
ALONG THE POST WITH WIRE TIES (MINIMUM 3 PER POST, AT THE TOP, MIDDLE, AND BOTTOM).
APPROXIMATELY 6 INCHES OF EACH END AROUND A STEEL T-POST, THEN SECURED
THE ENDS OF THE SILT FENCE FABRIC SHALL BE JOINED TOGETHER BY WRAPPING
2.
OF SEDIMENT AT JOINT.
POSTS SHALL BE TIGHTLY ABUTTED WITH NO GAPS TO PREVENT POTENTIAL FLOW-THROUGH
AND AT LEAST 1 INCH LONG.
MORE STAPLES PER POST. STAPLES SHALL BE HEAVY DUTY WIRE
GEOTEXTILE SHALL BE ATTACHED TO WOOD POSTS WITH THREE OR
MAXIMUM MESH SPACING 6 IN.
14-GUAGE WELDED WIRE FENCING.
14-GUAGE WELDED WIRE FENCING. MAXIMUM MESH SPACING 6 IN.
GEOTEXTILE AND FENCE - BURIED 12IN TOTAL IN TRENCH
6 IN. X 6 IN.
TRENCH
MAX.
10 FT.
MIN.
24 IN.
MIN.
24 IN.
MIN.
46 IN.
MIN.
18 IN.
TO POST
AND FIRMLY ATTACHED
12 IN. BURIED IN TRENCH
GEOTEXTILE-
TRENCH
6 IN. X 6 IN.
8 FT.- 0 IN. MAXIMUM
66 IN. STEEL T-POST
FOR THE FIRST 8 IN. ABOVE GRADE.
DO NOT INSTALL WIRE TIES
CABLE TIES 12 IN. O.C. (TYP.)
OR 11 IN. UV-STABLE NYLON
TO PANEL WITH WIRE TIES
ATTACH SILT FENCE FABRIC
WOOD POST SHALL BE INSTALLED PER 208.02 (b).
THE ENDS SHALL BE FLARED UP SLOPE (MINIMUM ELEVATION GAIN OF 18 IN.).
THE SILT FENCE SHALL BE PLACED ON THE CONTOUR (AT THE SAME ELEVATION Î6 IN.).
NOTE:
6 IN.
36 IN.
IN.
66 IN. STEEL T-POST
WIRE TIES OR 11 IN. UV-STABLE NYLON CABLE TIES (TYP.)
GEOTEXTILE - ATTACHED TO WIRE FABRIC WITH
6 IN. X 6 IN. TRENCH
24 IN.
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 8 of 11
Designer Initials:
Last Modification Date:
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Issued by the Project Development Branch: July 31, 2019
DK
05/16/24
Construction Engineering Services DK
05/16/24 Silt Fence (Reinforced) Note 1.
Revised Silt Fence Note 2 and
SECTION B-B
WEIR LENGTH TABLE
SECTION A-A
A A
PLAN VIEW
B
BTHE LENGTH TO WIDTH RATIO IS 2:1
BOTTOM
LENGTH
W
ID
T H
W
VARIES
WEIR LENGTH (X)
WEIR INVERT2:1
SIDE SLOPE 2:1 OR FLATTER
2:1 OR FLATTER
FLAT BOTTOM
2:1
NOTES
SEDIMENT TRAP
(ACRES)
DRAINAGE AREA
(FEET)
WEIR LENGTH
THE MAXIMUM DRAINAGE AREA IS 5 ACRES.1.
THE MAXIMUM STRUCTURE LIFE IS 2 YEARS.2.
THE STORAGE AREA IS 1800 CUBIC FEET PER ACRE.3.
4.
5.
6.
MEASURED ON THE DOWNSTREAM SIDE.
THE MAXIMUM EMBANKMENT HEIGHT SHALL BE 5 FT.
SITE CONDITIONS WHEN APPROVED BY THE ENGINEER.
THE LENGTH/WIDTH RATIO MAY BE ADJUSTED TO MEET
FLOW
OUTLET
COMPACTED BACKFILL
NATIVE SOIL OR
(Q)
INLET FLOW FLATTER
2:1 OR
(X)
WEIR LENGTH
(CLASS 1)
CONTROL
EROSION
GEOTEXTILE
(CLASS 1)
GEOTEXTILE EROSION CONTROL
7.
THE ENGINEER.
SEDIMENT TRAP DESIGN SHALL BE APPROVED BY
EQUAL TO THE WEIR LENGTH (X).
WIDTH (W) OF SEDIMENT TRAP IS APPROXIMATELY
8.
THE PAY ITEM NUMBER FOR SEDIMENT TRAP (EACH) IS 208-00033.9.
FLOW
DEPENDENT ON SITE CONDITIONS.
DISCHARGES. THE LENGTH IS
TO ACCOMMODATE OVERFLOW
NON-ERODIBLE CONDITIONS
FLOW
THE DOWN GRADE FROM WEIR SHALL BE STABLE AND NON-ERODIABLE.
3.5 FT. MAX.
4 FT. MIN.
18 IN. MIN.
OVERFLOW
18 IN. (MIN.)
D = 12 IN.
5 FT.
IN
(M
.) 12
. (M
IN
18 IN. (MIN.)
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 9 of 11
Designer Initials:
Last Modification Date:
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Issued by the Project Development Branch: July 31, 2019
DK
05/16/24
05/16/24 Revised General Note 9.
TWINE OR WIRE
FL
OW
FL
OW
WOOD STAKE (TYP.)
PIPE END SECTION
TOE OF FILL
END EROSION BALES TO BE
KEYED INTO FILL SLOPE
PLAN VIEW
EROSION BALE CULVERT INLET PROTECTION
FLOW
EROSION BALES
WOOD STAKES
PLAN VIEW
WITH GRATE
DROP INLET
B
FLOW FILTERED FLOW
TWINE OR WIRE
WOOD STAKE (TYP.)
EROSION BALE APPLICATIONS
NOTES
EROSION BALE TRENCHING AND STAKING
B
4. EROSION BALES CANNOT BE USED FOR CHECK DAMS.
SECTION A-A
BETWEEN EROSION BALES
WEED FREE STRAW
WEDGE LOOSE CERTIFIED
A
A
5.
THE PAY ITEM NUMBER FOR EROSION BALES (WEED FREE) (EA) IS 208-00011.6.
IN A SUMP CONDITION.
EROSION BALE FILTER SHALL BE LOWER THAN BERM ELEVATION OR USED
FLOW
INLET
SECTION B-B
FLOW
EROSION LOG FILTER AT DROP INLET
NOTE:
EDGE OF THE CONCRETE APRON.
LOCATE EROSION BALES AT THE OUTSIDE
AROUND THE ENTIRE OUTSIDE PERIMETER.
SOIL, THIGHTLY ABUTTED WITH NO GAPS, STAKED, AND BACKFILLED
EROSION BALES SHALL BE ENTRENCHED 4 IN. MINIMUM INTO THE
1.
2.
3.
EROSION BALES SHALL BE 18 IN. X 18 IN. X 36 IN.
STAKES SHALL BE WOOD AND SHALL BE 2 IN. X 2 IN. X 30 IN. NOMINAL.
BALE
WI
DTH
EROSI
ON
STEP 1. EXCAVATE THE TRENCH.
MIN.
4 IN.
(TYP.)
WOOD STAKE
4 IN. MIN.
12 IN. MIN.
(TYP.)
INTO GRADE 2 IN.
TRENCH LOGS
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 10 of 11
Designer Initials:
Last Modification Date:
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Issued by the Project Development Branch: July 31, 2019
DK
POINT C
POINT A
POINT B
TYPICAL SECTION VIEW
* * POINT A
POINT C
L VARIES
OR DITCH
GEOTEXTILE
EROSION CONTROL
(CLASS 2)
FL
L
FLOW
SECTION VIEW ALONG DITCH FLOWLINE
SUBEXCAVATE
RIPRAP
DITCH
2:1 OR FLATTER
GEOTEXTILE
EROSION CONTROL
(CLASS 2)
FLOW
BELOW FLOWLINE
FL
NOTES:
POINT "B" AND BELOW POINTS "C".
POINTS "A" SHALL BE HIGHER THAN
SPACES SHOULD BE USED ON TOP
LARGER ROCKS WITH LARGER VOID
RIPRAP SIZE D = 6IN OR AS SHOWN ON THE PLANS.
OF 6 IN. HIGHER THAN CENTER OF CHECK DAM.
THE ENDS OF RIPRAP CHECK DAM SHALL BE A MINIMUM
1.
3.
4.
5. THE PAY ITEM NUMBER FOR ROCK CHECK DAM (EA) IS 208-00041.
2.
NOT FOR PERMANENT INSTALLATIONS.
FOR USE AS TEMPORARY CHECK DAMS ONLY AND
SECTION A-A
A
A
AND CONFORM TO THE REQUIREMENTS OF SUBSECTION 712.08.
THE GEOTEXTILE EROSION CONTROL SHALL BE CLASS 2
ROCK CHECK DAM
8FT
0% SLOPE
6 IN. MIN.
6 IN. MIN. COVER OVER GEOTEXTILE (TYP).
OF RIPRAP HEIGHT WITH
2TO EXTEND UP
GEOTEXTILE EROSION CONTROL (CLASS 2)
6 IN. MIN. COVER OVER GEOTEXTILE (TYP).
OF RIPRAP HEIGHT WITH
2TO EXTEND UP
GEOTEXTILE EROSION CONTROL (CLASS 2)
24 IN. CREST HEIGHT
NOTE:
SHALL BE INCLUDED IN THE COST OF WORK.
ALL MATERIALS AND LABOR TO COMPLETE THE ROCK CHECK DAM
6 IN. MIN.
24 IN. MIN.
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
STANDARD PLAN NO.
R-X
R-X
R-X
R-X
07/31/19
M-208-1
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English Project Sheet Number:
EROSION CONTROL
TEMPORARY
Standard Sheet No. 11 of 11
Designer Initials:
Last Modification Date:
Detailer Initials: LTA
Colorado Department of Transportation
Phone: 303-757-9021 FAX: 303-757-9868
Denver, CO 80204
CDOT HQ, 3rd Floor
2829 West Howard Place
Issued by the Project Development Branch: July 31, 2019
DK
>-f-------- 71-6 11 -------i APPLY SEED AND GENERAL NOTESf-- 3' ----+--- 3' ----+-- 1'-6" -j
ANY REQUIRED SOIL STAPLE 12" O.C.
1. Z SHAPED FOLD TD BE USED ON SLOPECONDITIONERS PRIORTT:----=-=--- SINGLE EVERY 35 FEET MAXIMUM.TD COVERING6"7 BLANKET
2' J_ - COMPACTED SOIL 2. STAPLE CHECK LOCATIONS SHOULD BE AT
WITH BLANKET LEAST 15 FEET FROM THE BOTTOM OF SLOPE.1_:
ANCHOR
TRENCH
COMPACTED SOIL
12" o.c.
12" D.C. CONSECUTIVE ROLL OVERLAP @
STEP 1 STEP 2
TD BE USED WHEREVER ONE ROLLANCHOR TRENCH @ OF BLANKET ENDS AND ANOTHER
BEGINS WITH UPSTREAM BLANKETTD BE USED AT THE BEGINNING AND END OF THE CHANNEL ACROSS IT'S ENTIRE WIDTH.
PLACED ON TOP OF THE BLANKET
ON THE DOWNSTREAM SIDE.
SIDE SEAM OVERLAP @
TD BE USED FOR OVERLAP WHEN
2 WIDTHS OF BLANKET ARE APPLIED
SIDE BY SIDE WITH THE UPHILL
BLANKET PLACED ON TOP OF
THE BLANKET ON THE DOWNHILL SIDE.
1-- 1'-6" --- 3' ---+---- 3' ----I
TYPICAL STAPLE PATTERN APPLY SEED AND ANY REQUIRED
FOR CHANNEL APPLICATION SOIL CONDITIONERS PRIOR TD
COVERING COMPACTED SOIL WITH
SEE SUBSECTION 216.05. BLANKET
6" EDGE
OVERLAP
COMPACTED SOIL
STAPLE 12" D.C.
>7%~~~~'<(~" CHANNEL CHECK SLOT @
TD BE USED AT 30' INTERVALS IN CHANNEL FLDWLINE.
SOIL FILLED TRM APPLICATION : ~ ~ ij_~~'>«~'0/Jj1. PLACE 3" TOPSOIL DR SOIL AMENDED WITH SOIL CONDITIONING. A>7>v7>.Y ~~..........~~~~~~2:.:L~~>iJ
2. APPLY HALF OF THE SPECIFIED SEED AT THE BROADCAST RATE ~ ~~~~~ ~ ~ ~ ~ T-E12'0.C.
AND RAKE IT INTO THE SOIL.
3. INSTALL TRM. 6"
4. PLACE 1" TOPSOIL OR SOIL AMENDED WITH SOIL CONDITIONING I
INTO THE MATRIX TD COVER THE PRODUCT'S THICKNESS. SOIL RETENTION BLANKETS/TURF REINFORCEMENT MATS (TRM)
5. APPLY THE REMAINING HALF OF THE SPECIFIED SEED CHANNEL APPLICATION
AT THE BROADCAST RATE AND RAKE IT INTO THE SOIL. TERMINATION OF CHANNEL ~
IN ACCORDANCE WITH SECTION 216.6. INSTALL SOIL RETENTION BLANKET (CLASS 1).
Com uter File Information Sheet Revisions Colorado Department of Transportation Creation Date: 07/31/19 Date: Comments ~ 2829 West Howard Place Designer Initials: JBK CR-X) COOT HO, 3rd Floor81-----+------------1 Last Modification Date: 07/31/19 CH) ~ Denver, CO 80204
~ Phone: 303-757-9021 FAX: 303-757-9868 Detailer Initials: LT A CR-X) CAD Ver.: MicroStation VB Scale: Not to Scale Units: English ( R-X) ---------------1 Project Development Branch JBK
SOIL RETENTION
COVERING
STANDARD PLAN NO.
M-216-1
Standard Sheet No. 1 of2 Issued by the Project Development Branch: July 31, 2019 Project Sheet Number:
f-- 3'
APPLY SEED AND STAPLE 12" O.C.I 1'-6" 1'-6" 1
ANY REQUIRED SOIL DR EARTH ANCHOR
CONDITIONERS PRIORII I - - - • - - - I
TD COVERINGI l'--i5" I - - - - - - - - - - - - - - - - - - - - .c SINGLE BLANKET6"7 COMPACTED SOIL
WITH BLANKET
3' l_ T i1
6"• ANCHOR
STAPLE 12" O.C.TRENCHLI DR EARTH ANCHOR
COMP ACTED SOIL
/ EARTH ANCHOR (TYP.) 12" O.C. CONSECUTIVE ROLL OVERLAP @
12" O.C.
STEP 1. - . STEP 2
TD BE USED WHEREVER ONE ROLL OF BLANKET ENDSANCHOR TRENCH @
AND ANOTHER BEGINS WITH THE UPHILL BLANKET
TD BE USED AT THE UPSLOPE AND DOWNSLOPE ENDS OF BLANKET ACROSS THE ENTIRE WIDTH PLACED ON TOP OF THE BLANKET ON THE DOWNHILL SIDE.
OF SLOPE UNLESS SLOPE RUNS INTO RECEIVING WATER. (SEE DOWNSLOPE END STAPLE CHECK) .
r-i r-i
6" FOLD DV~ER~L~~{L------
____________________ I
---•---1 STAPLE CHECK ©
TYPICAL STAPLE DR EARTH ANCHOR STAPLE DR
EARTH ANCHORPATTERN FOR SLOPE APPLICATION
SOIL RETENTION BLANKET
IF EARTH ANCHORS ARE NOT SPECIFIED ON (CLASS 1)
THE PLANS,DNLY STAPLES SHALL BE USED. ½ OF SPECIFIED SEED RATE T
SEE SUBSECTION 216.04 1" TOPSOIL DR SOIL AMENDED 6"
WITH SOIL CONDITIONING TD
COVER TRM'S THICKNESS
TURF REINFORCEMENT MAT
(TRM) TERMINATION OF CHANNEL@
36"½ OF SPECIFIED
SEED RATE
3" TOPSOIL DR SOIL SOIL RETENTION
AMENDED WITH BLANKETS/TURF REINFORCEMENT MATS (TRM)SOIL CONDITIONING
SLOPE APPLICATION
STAPLE (TYP.)SOIL FILLED TRM APPLICATION IN ACCORDANCE WITH SECTION 216.
I. PLACE 3" TOPSOIL DR SOIL AMENDED WITH SOIL CONDITIONING.
2. APPLY HALF OF THE SPECIFIED SEED AT THE BROADCAST RATE
r-iEARTH ANCHOR AND RAKE IT INTO THE SOIL.
3. INST ALL TRM.NOTES: I. EARTH ANCHORS WILL BE USED INSTEAD
OF STAPLES WHEN SPECIFIED IN THE PLANS. 4. PLACE 1" TOPSOIL DR SOIL AMENDED WITH SOIL CONDITIONING
INTO THE MATRIX TD COVER THE PRODUCT'S THICKNESS. DOWNSLOPE END STAPLE CHECK2. EARTH ANCHORS SHALL BE PAID FDR SEPERATL Y AS SPECIFIED IN SECTION 216. 5. APPLY THE REMAINING HALF OF THE SPECIFIED SEED TD BE USED WHEN SLOPE RUNS INTO A RECEIVING WATER
AT THE BROADCAST RATE AND RAKE IT INTO THE SOIL. AND CANNOT BE EXTENDED 3 FEET BEYOND SLOPE.
6. INST ALL SOIL RETENTION BLANKET (CLASS 1).
Com uter File Information Sheet Revisions Colorado Department of Transportation Date: Comments 2829 West Howard Place
CR-X) 1-------1--------------1 ~ COOT HO, 3rd Floor CH) ~ Denver, CO 80204
1-------1--------------1 ~ Phone: 303-757-9021 FAX: 303-757-9868
CR-X)
CR-X> --------------1 Project Development Branch JBK
SOIL RETENTION
COVERING
STANDARD PLAN NO.
Creation Date: 07/31/19
M-216-1Designer Initials: JBK
Last Modification Date: 07/31/19 Standard Sheet No. 2 of2 Detailer Initials: LT A
Issued by the Project Development Branch: July 31, 2019 Project Sheet Number:CAD Ver.: MicroStation VB Scale: Not to Scale Units: English
ITEM 507 SLOPE ROLL TD
TYPE 4 DR AND DITCH PAVING MEET SLOPE A
TYPE 6 GUARDRAIL POSTS \ ;; HMA PAVEMENT(SECTION M) (IF REQUIRED) RAIL NORMAL EDGE OF
(LAP PAVEMENT OVER EDGE
CURBING (IF REQUIRED) SHOULDER PAVEMENT
OF END SECTION)
WITH CURB~
~:::::::::::::::::::;::~:::::;: 70° 8"
~~t-~~~~ ~ ~~~~t~1~-
INCREASE THE CURB HEIGHT BEHIND
THE GUARDRAIL TD MATCH THE INLET
SECTION HEIGHT (TYP.). THE COST FDR
INCREASED CURB HEIGHT WILL NOT BE
PAID FOR SEPARATELY BUT WILL BE
--------------+---- 26' ----------,~ INCLUDED IN THE WORK.
TRASH GUARD REQUIRED WHEN
SPECIFIED ON THE PLANS
FLEXIBLE PIPE:
PLASTIC DR MET AL PIPE
(PLASTIC PIPE SHOWN)
THICKNESS
TYPE OF APRON MATERIAL
IN.
TYPE 3 PLAN VIEW SLOPE AND DITCH PAVING (507)
SHOWING DRAINAGE FLOW FROM LEFT DRY RUBBLE 6
TD RIGHT. REVERSE DETAIL WHEN CONCRETE 4
DRAINAGE FLOW IS RIGHT TD LEFT. r/ HMA 4
GROUTED RUBBLE 4
6'-0" RIPRAP (506) 9 (MIN.)
l ~ ~4'-0"~
NORMAL EDGE OF
12" 2" SHOULDER PAVEMENT
WARP EMBANKMENT
TD COVER PIPE
4" MIN.
WARP APRON MATERIAL
AROUND AND OVER OUTLET.
SAME THICKNESS AS t. DITCH SAME THICKNESS AS
SHOULDER PAVEMENT SHOULDER PAVEMENT
I
6" TOE PLATE
6" TOE PLATE
FOR PIPE LENGTH
APRONSEE THE PLANS
SECTION A-A
FOR PLASTIC PIPE
GENERAL NOTES
1. IF THE EMBANKMENT PROTECTOR IS LOCATED IN THE BOTTOM OF A VERTICAL
CURVE, FLARE THE CURB ON EACH SIDE OF THE INLET TD ALLOW FOR FLOW
FROM BOTH DIRECTIONS.
2. DETAILS OF GUARD RAIL INSTALLATIDN ARE SHOWN IN STANDARD PLAN M-606-1.
3. THE END SECTION-TD-PIPE STUB JOINT FDR CORRUGATED METAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .