This document is Addendum #2 for the Arapahoe Basin Tank Installation project issued by the Colorado Department of Transportation (CDOT), dated March 18, 2025. The addendum provides detailed clarifications and answers to questions from a pre-bid meeting for a tank installation project, with electronic bids due on Tuesday, March 25, 2025, at 2:00 PM. Contractors are required to register on CDOT's Procurement Website (BidNet) and can attend the bid opening via an online Google Meet link or call-in number.

The addendum includes critical technical specifications and requirements, such as using flow fill for backfill, obtaining a dewatering permit, potential tank removal, and construction details for a 5000-gallon holding tank. Key clarifications include a 120 square yard limit for pavement replacement, confirmation that asphalt will be the final drive surface, and specifications for base course thickness, bedding material, and tank installation. The document also specifies that the contractor is responsible for site staking, utility locates, and coordinating with Level Engineering and CDOT for inspections. Attachments include updated construction drawings and CDOT Road and Bridge Specifications.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Arapahoe Basin Tank Installation Project #28214, Addendum #2, 3/18/2025

2829 W. Howard Place, 5th Floor Denver, CO 80204-2305

Colorado Department of Transportation

Project No.: 28214 Date: 03/18/2025

ADDENDUM #2

This Addendum Number Two supersedes and/or supplements all portions of the Documents with which it conflicts. Bidders must acknowledge receipt of this Addendum and any future Addenda on the Bid Form.

General Notes:

1. The CDOT contact person for this project is Robert Wilson, Property Management Section, 2829 W. Howard Place, 5th Floor, Denver, CO 80204. Email: robert.L.wilson@state.co.us

2. Bids are to be submitted electronically through CDOT’s Procurement Website; BidNet.

Electronic Bids are due Tuesday March 25, 2025 2:00PM.

Contractors need to register at CDOT’s new Procurement Website (BidNet) at:

www.bidnetdirect.com/colorado/colorado-department-of-transportation

Once registered, all CDOT State Buildings bidding opportunities are available at the same website.

If you are having issues seeing this electronic site, registering, or up-loading your bid, please e-mail the following address with specifics about your concerns: support@bidnet.com and cc Robert Wilson (e-mail address above). A BidNet representative will contact you with assistance.

Please note: all communication about bid system issues MUST start with an e-mail to the above Help Desk e-mail; a representative will call or e-mail you back, however, there must be a logged e-mail with the issue you’re experiencing. If you call a phone number you have been given in the past and that individual is not available to help, and are unable to upload your bid before the deadline your bid will NOT be accepted. Multiple agents monitor the e-mail, so always e-mail this help desk e-mail with your bidding system issue.

3. The bid opening may be attended by using the following online meeting information

a. Meeting link: meet.google.com/cqu-nngp-bfd

b. Call-In (audio only): 414-436-8469 PIN: 314 233 422# https://urldefense.proofpoint.com/v2/url?u=https-3A__u4966273.ct.sendgrid.net_ls_click-3Fupn-3DxiWZqGvqomvNir1zj7DpETTSEIzvcBwE-2D2F3WBhRekAm7S7CLYUaDL0RfyDY3dSVuy3kBwrBJJQqlL4Dn5TlxweWf9JHQ5JQVQqCjLMGGhv3MUpwHij4lHl4daWGohRPY2cLz-5F-5F62i4ZQidJAut2vx9TYnJ87y-2D2FfEXZVRRDZRAY-2D2FRJY6-2D2BUpjJ-2D2FsOZ3H1hW-2D2FZovrH3uioVkinINGsu1FJtkEQYvkrd7JonUI8N2f-2D2FONs7UJrsvjC63t44M-2D2FsfDYvhy54QOpJPX8idPeYWpieXFWVhxhkq-2D2FzbKHiAwFr3J9-2D2Bv04Fbcc3DC66NqkXgjqlVQcSdiLfI8KPWWWnxrVe5WKLbJSZkAJW3-2D2FvC-2D2BrOqHcnyoDBMEtjw-2D3D&d=DwMGaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=r83Qxyxy0s_QRs-wC_wqJUN5wkQ9fTiLnd2Wy-qwnsc&m=Usy-2wEUxB1OEK8JkaRzufcW2H4LUFAe5teJIiW8PFA&s=6RSKYoQRcLq1rOVFbmw8XstIxW8B6nsURwDvaVgvDYQ&e= mailto:dot_hq_srm_help@state.co.us

Questions from the Pre-Bid Meeting:

1. Will the contractor be able to use flow fill in the pit?

a. Yes (Meet CDOT Spec). Flow Fill is referenced in Section 206 of the 2023 CDOT Standard Specifications for Road and Bridge Construction. Please see the revised Sheet C3 for instructions for backfill using flowfill.

2. Should the contractor abandon the tank in the pit or remove prior to filling the tank?

a. Please see the revised Sheet C3 for tank removal requirements/clarifications.

Contractor may need to place temporary dewatering pump.

3. Is a dewatering permit required? Or provided by CDOT?

a. Yes, the contractor needs to apply for a dewatering permit and CDOT is NOT listed on the dewatering permits at all. CDOT Standard Spec 107.25 outlines Construction Dewatering in the 2023 CDOT Standard Specifications for Road and Bridge Construction. The link for completing the application is CDPHE CEOS Dewatering Page. it can take up to 30 days for the application to be approved by CDPHE so the Contractor shall apply for the permit more than 30 days prior to starting the site work.

4. Can CDOT provide a specification for rock excavation?

a. Section 203 – Excavation and Embankment. This is found in the 2023 CDOT

Standard Specifications for Road and Bridge Construction.

5. Can the 5000 Gal holding tank be Cast-In-Place, and if so, would Engineered Drawings be required?

a. Yes, a cast-in-place tank is an approved option that the contractor can bid if they choose. If contractor is proposing a cast-in-place holding tank, the following requirements shall be applicable and submitted during pre-construction:

i. Flat top Lid needs to be removable

ii. Engineering drawings will need to be reviewed and approved by Level/CDOT

iii. Contractor is responsible for testing material for concrete.

iv. Additional rebar inspections may be required prior to pouring concrete.

v. Epoxy coated rebar required per CDOT specs

6. Drawing No. C1, Reference the “Approx. 260 LF Erosion Control Curb”: At the Pre-Bid, the

Engineer stated an asphalt curb was to be used. CDOT Standard Plan No. M-609-1, Sheet 2 of 4, shows curb type 6, a 4” high by 8” wide mountable bituminous curb. Can the concrete curb be substituted for the asphalt curb? Can driven rebar dowels be substituted for the 4 ½” x ½” keyway?

a. No, asphalt curb will be required.

7. The existing asphalt and concrete pavement appears to be in poor condition. Can the area of replacement be quantified so the contractor is not responsible for potentially replacing the majority of the parking lot due to the weight of the new storage tank and equipment needed to set it in place?

https://urldefense.proofpoint.com/v2/url?u=https-3A__cdphe.colorado.gov_ceos-2Ddewatering-2Dgeneral-2Dpermit-2Dprogram&d=DwMFaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=TF5HQH71V5lpsAeOabDfpxDqaMN1Gff_Ahy2OfsUx8Q&m=Ye86Rx9vo793Zf-1A0-YZOnA0wdSneMHtGkT_8Dw2ZDejvLhgZu21PULOk54qFqs&s=jkHf6CWC6D5AZ074CQZkgCy3GsOpuuReA7C2IY52lIg&e= https://urldefense.proofpoint.com/v2/url?u=https-3A__cdphe.colorado.gov_ceos-2Ddewatering-2Dgeneral-2Dpermit-2Dprogram&d=DwMFaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=TF5HQH71V5lpsAeOabDfpxDqaMN1Gff_Ahy2OfsUx8Q&m=Ye86Rx9vo793Zf-1A0-YZOnA0wdSneMHtGkT_8Dw2ZDejvLhgZu21PULOk54qFqs&s=jkHf6CWC6D5AZ074CQZkgCy3GsOpuuReA7C2IY52lIg&e=

a. Yes – replacement limit changed to 120 SY. Contractor shall provide and document efforts to protect existing asphalt in place. Quantities over 120 SY will not be paid without approval by Engineer and CDOT.

8. To avoid future potential damage to the 2 new tanks from plowing the parking lot, should the asphalt pavement over and around the new tanks be replaced with a concrete slab approx.

50’ x 25’ encompassing the area of the new tanks?

a. No, asphalt is required as final drive surface around the new tanks.

9. For the contractor that showed up late to the mandatory pre-bid meeting after it was over, will they be allowed to bid on the project?

a. No, that contractor will not be placing a bid for this project. In the future it is recommended that if any bidder is running late to a pre-bid meeting to call before the start of a meeting and inform CDOT of when they will arrive. CDOT will decide on a case-by-case basis if the meeting can be delayed or not with the goal of ensuring that pre-bid meetings are occurring on time, equal information is shared with all bidders, and everyone is traveling to and from the site safely.

10. Will layout/offset points for tanks and drain line be placed on site by CDOT or the engineer before work is started?

a. No, contractor will be responsible for site staking and will review with engineer and acquire engineer’s approval prior to excavation.

11. What is the size and material of the existing drain line that we will be tying into?

a. From limited information, we believe the existing floor drain lines are 3 or 4” steel or ductile iron. Contractor will be responsible to verify outer diameter and material type for each connection and submit proposed couplings for Engineer approval.

12. Is CDOT able to provide locates on site for all existing utilities?

a. No, The Contractor needs to schedule for locates.

13. Will there need to be a plumbing permit for the job?

a. No plumbing permit is required

14. Who will be inspecting the new drain lines and tank connections?

a. Level Engineering and CDOT

15. For the base course in the trenching area and tank area, how thick is that material?

a. 12”

16. Will milling 12'' wide and 2'' deep around the perimeter of the asphalt patch be required?

a. Yes

17. For the bedding material around the pipe would a class 1 fill be sufficient?

a. No, however alternative bedding material of Class 57/67 (3/4” crushed clean rock) is acceptable in lieu of squeegee sand.

18. What is the existing asphalt thickness?

a. Assumed 8” thick

19. Would the bottom of the tank need to be insulated or just the sides and top?

a. See note 4 on Sheet C-4.

20. What is the inlet elevation of the storage tank?

a. No elevation is specified; however the maximum water elevation of the storage tank shall be below the outlet of the separator tank, considering minimum 2% slope between tanks and final location of tanks.

Attachments:

21. Updated Construction Drawings

22. CDOT Road and Bridge Specifications

END OF ADDENDUM NO. TWO