Arapahoe Basin - Addendum #1.pdf
PDF 166 KB Posted
- Attached to
- Arapahoe Basin Tank Installation
- Solicitation number
- 28214
- Issued by
- Summit County, Colorado
About this file
This document is Addendum #1 for the Arapahoe Basin Tank Installation project issued by the Colorado Department of Transportation (CDOT), Project No. 28214, dated 03/12/2025. The addendum provides critical bidding information, including electronic bid submission requirements through CDOT's Procurement Website (BidNet) with electronic bids due on Tuesday, March 25, 2025, at 2:00 PM. The final day for submitting questions is Tuesday, March 18, 2025, at noon, with all questions to be directed to Robert Wilson via email. The project involves tank installation at a CDOT site, with CDOT handling tank pumping prior to construction and maintaining site access during the project. The contractor will be responsible for coordinating site work, maintaining a single lane of access, and protecting materials and work areas.
The addendum includes several key specifications: no municipal building permit is required, with CDOT's contracted Code Reviewer handling inspections; state prevailing wages apply, and contractors must submit an Appendix E – Contractor Wage Compliance Form with each pay application; and liquidated damages are set at $875.00 per day. Contractors are permitted to suggest alternative tank sizes or specifications, with CDOT reviewing and potentially approving alternatives in a subsequent addendum. No pollution insurance is required for this contract. The project will begin after CDOT's winter operations are complete, with the site remaining an active CDOT location during the summer. Additional technical details regarding flow fill, tank abandonment, dewatering permits, and rock excavation specifications are noted to be addressed in Addendum #2.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Arapahoe Basin Tank Installation Project #28214, Addendum #1, 3/12/2025
2829 W. Howard Place, 5th Floor Denver, CO 80204-2305
Colorado Department of Transportation
Project No.: 28214 Date: 03/12/2025
ADDENDUM #1
This Addendum Number One supersedes and/or supplements all portions of the Documents with which it conflicts. Bidders must acknowledge receipt of this Addendum and any future Addenda on the Bid Form.
General Notes:
1. The CDOT contact person for this project is Robert Wilson, Property Management Section, 2829 W. Howard Place, 5th Floor, Denver, CO 80204. Email: robert.L.wilson@state.co.us
2. Bids are to be submitted electronically through CDOT’s Procurement Website; BidNet.
Electronic Bids are due Tuesday March 25, 2025 2:00PM.
Contractors need to register at CDOT’s new Procurement Website (BidNet) at:
www.bidnetdirect.com/colorado/colorado-department-of-transportation
Once registered, all CDOT State Buildings bidding opportunities are available at the same website.
If you are having issues seeing this electronic site, registering, or up-loading your bid, please e-mail the following address with specifics about your concerns: support@bidnet.com and cc Robert Wilson (e-mail address above). A BidNet representative will contact you with assistance.
Please note: all communication about bid system issues MUST start with an e-mail to the above Help Desk e-mail; a representative will call or e-mail you back, however, there must be a logged e-mail with the issue you’re experiencing. If you call a phone number you have been given in the past and that individual is not available to help, and are unable to upload your bid before the deadline your bid will NOT be accepted. Multiple agents monitor the e-mail, so always e-mail this help desk e-mail with your bidding system issue.
3. Final day for questions to be submitted is Tuesday March 18, 2025 at Noon. Questions will only be accepted in writing to Robert Wilson by e-mail (e-mail address above). No questions will be accepted or answered after this date and time. A second addendum will be issued by e-mail by the Next Business Day by end of the business day via e-mail.
https://urldefense.proofpoint.com/v2/url?u=https-3A__u4966273.ct.sendgrid.net_ls_click-3Fupn-3DxiWZqGvqomvNir1zj7DpETTSEIzvcBwE-2D2F3WBhRekAm7S7CLYUaDL0RfyDY3dSVuy3kBwrBJJQqlL4Dn5TlxweWf9JHQ5JQVQqCjLMGGhv3MUpwHij4lHl4daWGohRPY2cLz-5F-5F62i4ZQidJAut2vx9TYnJ87y-2D2FfEXZVRRDZRAY-2D2FRJY6-2D2BUpjJ-2D2FsOZ3H1hW-2D2FZovrH3uioVkinINGsu1FJtkEQYvkrd7JonUI8N2f-2D2FONs7UJrsvjC63t44M-2D2FsfDYvhy54QOpJPX8idPeYWpieXFWVhxhkq-2D2FzbKHiAwFr3J9-2D2Bv04Fbcc3DC66NqkXgjqlVQcSdiLfI8KPWWWnxrVe5WKLbJSZkAJW3-2D2FvC-2D2BrOqHcnyoDBMEtjw-2D3D&d=DwMGaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=r83Qxyxy0s_QRs-wC_wqJUN5wkQ9fTiLnd2Wy-qwnsc&m=Usy-2wEUxB1OEK8JkaRzufcW2H4LUFAe5teJIiW8PFA&s=6RSKYoQRcLq1rOVFbmw8XstIxW8B6nsURwDvaVgvDYQ&e= mailto:dot_hq_srm_help@state.co.us
4. All e-mails with questions will get a return acknowledgement that the questions have been received by CDOT. If you don’t get this e-mail back once you’ve sent your questions, please contact Robert Wilson before the Q&A Deadline.
5. There is no municipal building permit required for this project. CDOT’s contracted Code Reviewer will do final inspections; the first code inspection is at CDOT’s cost; subsequent code inspections due to the first inspection not passing are at the contractor’s cost.
6. State Prevailing Wages, see Appendix D – Prevailing Wages apply for all work completed onsite. Contractor is not required to provide certified payrolls for this project. Instead, the contractor is required to provide the Appendix E – Contractor Wage Compliance Form with each pay application.
7. There are liquidated damages of $875.00 per day on this project.
8. It is the contractor’s responsibility to ensure all subs have copies of the Scope of Work and Addenda for this project.
9. It is the contractor’s responsibility to ensure the materials and work area are protected from damage and theft.
Questions from the Pre-Bid Meeting:
1. Will CDOT pump the tank prior to the start of construction?
a. Yes, CDOT will pump the tank prior to the start of construction.
2. Will the contractor be able to use flow fill in the pit?
a. Yes, CDOT will provide a specification for this in addendum #2.
3. Should the contractor abandon the tank in the pit or remove prior to filling the tank?
a. This will be addressed in Addendum #2.
4. What are CDOT’s expectations for use of building during construction?
a. The contractor’s site work will begin after CDOT winter operations are complete for the season however the site will remain an active CDOT site during the summer. A single lane in and out of the building must be maintained for CDOT entrance/egress.
All work and onsite storage of materials/equipment must be coordinated with CDOT.
5. Is a dewatering permit required? Or provided by CDOT?
6. Can CDOT provide a specification for rock excavation?
7. Is pollution insurance required?
a. No, the contractor will not be required to provide a pollution insurance policy with this contract.
8. May the contractor suggest different tank sizes/quantities to accommodate the same system capacity to save cost?
a. Contractors should email a question and/or requests for alternative methods/specifications before the Q&A Deadline (3/18/25). CDOT will review and include any approved project alternatives in Addendum #2 so all bidders can price the same options for bid.
Attachments:
A. The Mandatory Pre-Bid Meeting Sign-In Sheet is attached (1 page)
END OF ADDENDUM NO. ONE