Arapahoe Basin - Addendum #2 - Attachment 1 - Updated Construction Drawings.pdf
PDF 2 MB Posted
- Attached to
- Arapahoe Basin Tank Installation
- Solicitation number
- 28214
- Issued by
- Summit County, Colorado
About this file
These construction drawings are for the Arapahoe Basin Tank Installation project, prepared for the Colorado Department of Transportation (CDOT) by Level Engineering, located at Highway 6 in Dillon, Colorado. The project involves installing a 5,000-gallon storage tank, a 2,500-gallon sand/oil separator tank, and associated infrastructure, with specific quantities including 65 linear feet of 4" drainline, 1 storage tank, 1 sand/oil separator tank, 260 linear feet of erosion control curb, and various site preparation and utility work. The drawings are part of Addendum #2, issued for bid on 6/17/2024, with a project location near Loveland Pass.
The construction drawings provide detailed site plans, tank layout, connection details, and technical specifications for the tank installation. The project site includes a covered bulk storage area, office, and bathroom, with careful consideration for drainage, utility connections, and site grading. The drawings specify technical requirements such as pipe trenching, insulation details, concrete surfaces, and installation specifications for tanks, including minimum cover depths, bedding materials, and positioning of various infrastructure components. The project appears to be a infrastructure improvement for CDOT's facility in a mountainous region, with specific engineering considerations for the challenging terrain and environmental conditions.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
DRAWING NO.
Revision
Date
Scale
DRAWN BY
RevisionsDateNo.
3/19/2025
Client
Job Title
Drawing Title
ADDENDUM #2
ISSUED FOR BID
6/17/2024 AP
AS SHOWN
ARAPAHOE BASIN TANK
INSTALLATION
COLORADO DEPARTMENT OF
TRANSPORTATION
LEVEL Job # 17133
CHECKED BY JDB
PRIOR TO THE COMMENCEMENT OF ANY WORK,
THE CONTRACTOR IS TO CHECK AND/OR
DETERMINE ALL CONSTRUCTION DETAILS
INCLUDING BUT NOT LIMITED TO CHECKING
EXISTING SITE LEVELS AND DIMENSIONS. THE
DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL OTHER PROJECT DRAWINGS, CONSTRUCTION
NOTES, AND/OR PROJECT SPECIFICATIONS. ALL
DISCREPANCIES SHOULD BE REPORTED
IMMEDIATELY.
COVER
ISSUED FOR BID CONSTRUCTION DRAWINGS
ARAPAHOE BASIN TANK INSTALLATION
COLORADO DEPARTMENT OF TRANSPORTATION
28214 HIGHWAY 6, DILLON, COLORADO 80435
SS
T
OHP
RWL RWL
FO
T
SAN SAN
G
W
UGE
QUANTITIES
ITEM QUANTITY UNIT
4" DRAINLINE 65 LF
2,500 GAL SAND/OIL SEPARATOR 1 EA
5,000 GAL HOLDING TANK 1 EA
EROSION CONTROL CURB 260 LF
CONCRETE DRAINAGE PAN 20 LF
ASPHALT PATCH 120 SY
CONCRETE PATCH 20 SY
03/19/2025
UGE
UGE
UG
E
U G
E
U G
E U
G E
T
T
T
T
T T
OH
P
OH
P
OH
P
OH
P
SA
N
SA
N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
SA
N
UGE UGE UGE
U G
E
UGE
UGE UGE UGE UGE
U G
E
UG
E
UGE UGE UGE UGE
U G
E
UG
E
UGE UGE UGE UGE
U G
E U
G E
UGE UGE UGE
U G
E U
G E
UGE UGE
NOTES:
DRAWING NO.
Revision
Date
Scale
DRAWN BY
RevisionsDateNo.
3/19/2025
Client
Job Title
Drawing Title
ADDENDUM #2
ISSUED FOR BID
6/17/2024 AP
AS SHOWN
ARAPAHOE BASIN TANK
INSTALLATION
COLORADO DEPARTMENT OF
TRANSPORTATION
LEVEL Job # 17133
CHECKED BY JDB
PRIOR TO THE COMMENCEMENT OF ANY WORK,
THE CONTRACTOR IS TO CHECK AND/OR
DETERMINE ALL CONSTRUCTION DETAILS
INCLUDING BUT NOT LIMITED TO CHECKING
EXISTING SITE LEVELS AND DIMENSIONS. THE
DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL OTHER PROJECT DRAWINGS, CONSTRUCTION
NOTES, AND/OR PROJECT SPECIFICATIONS. ALL
DISCREPANCIES SHOULD BE REPORTED
IMMEDIATELY.
C1
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
U G
E
U G
E U
G E
U G
E
UGE
T
T
T
T
T
T
T
T
T T
T
T
SA
N
SA
N
SA
N
SA
N
SA
N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
UGE UGE UGE UGE UGE UGE
UGE
U G
E
UG
E
UG
E
UGE
UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UG
E
UG
E
UG
E
UGE
UGE UGE UGE UGE UGE UGE UGE UGE
UGE
U G
E
UG
E
UG
E
UGE
UGE UGE UGE UGE UGE UGE UGE UGE
U G
E U
G E
U G
E U
G E
UGE UGE UGE UGE UGE UGE
U G
E
UGE UGE UGE UGE UGE
NOTES:
DRAWING NO.
Revision
Date
Scale
DRAWN BY
RevisionsDateNo.
3/19/2025
Client
Job Title
Drawing Title
ADDENDUM #2
ISSUED FOR BID
6/17/2024 AP
AS SHOWN
ARAPAHOE BASIN TANK
INSTALLATION
COLORADO DEPARTMENT OF
TRANSPORTATION
LEVEL Job # 17133
CHECKED BY JDB
PRIOR TO THE COMMENCEMENT OF ANY WORK,
THE CONTRACTOR IS TO CHECK AND/OR
DETERMINE ALL CONSTRUCTION DETAILS
INCLUDING BUT NOT LIMITED TO CHECKING
EXISTING SITE LEVELS AND DIMENSIONS. THE
DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL OTHER PROJECT DRAWINGS, CONSTRUCTION
NOTES, AND/OR PROJECT SPECIFICATIONS. ALL
DISCREPANCIES SHOULD BE REPORTED
IMMEDIATELY.
C2
Revision
Date
Scale
DRAWN BY
RevisionsDateNo.
3/19/2025
Client
Job Title
Drawing Title
ADDENDUM #2
ISSUED FOR BID
6/17/2024 AP
AS SHOWN
ARAPAHOE BASIN TANK
INSTALLATION
COLORADO DEPARTMENT OF
TRANSPORTATION
LEVEL Job # 17133
CHECKED BY JDB
PRIOR TO THE COMMENCEMENT OF ANY WORK,
THE CONTRACTOR IS TO CHECK AND/OR
DETERMINE ALL CONSTRUCTION DETAILS
INCLUDING BUT NOT LIMITED TO CHECKING
EXISTING SITE LEVELS AND DIMENSIONS. THE
DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL OTHER PROJECT DRAWINGS, CONSTRUCTION
NOTES, AND/OR PROJECT SPECIFICATIONS. ALL
DISCREPANCIES SHOULD BE REPORTED
IMMEDIATELY.
C3
4'
Revision
Date
Scale
DRAWN BY
RevisionsDateNo.
3/19/2025
Client
Job Title
Drawing Title
ADDENDUM #2
ISSUED FOR BID
6/17/2024 AP
AS SHOWN
ARAPAHOE BASIN TANK
INSTALLATION
COLORADO DEPARTMENT OF
TRANSPORTATION
LEVEL Job # 17133
CHECKED BY JDB
PRIOR TO THE COMMENCEMENT OF ANY WORK,
THE CONTRACTOR IS TO CHECK AND/OR
DETERMINE ALL CONSTRUCTION DETAILS
INCLUDING BUT NOT LIMITED TO CHECKING
EXISTING SITE LEVELS AND DIMENSIONS. THE
DRAWING IS TO BE READ IN CONJUNCTION WITH
ALL OTHER PROJECT DRAWINGS, CONSTRUCTION
NOTES, AND/OR PROJECT SPECIFICATIONS. ALL
DISCREPANCIES SHOULD BE REPORTED
IMMEDIATELY.
C4
| Sheets and Views |
| CDOT ABasin ADD#2-COVER |
| CDOT ABasin ADD#2-C1 |
| CDOT ABasin ADD#2-C2 |
| CDOT ABasin ADD#2-C3 |
| CDOT ABasin ADD#2-C4 |
File details come from the government source that posted it. Updated .