About this file

This document contains a template for a Performance Assessment Report (PAR) to be used for evaluating contractor performance on the Los Angeles County Drainage Area (LACDA) & Santa Ana River Basin (SARB) Channel, Levee, and Flood Control Basin Maintenance Services contract in Los Angeles and San Bernardino Counties, California. The PAR template includes blocks for entering the contract and task order numbers, contractor name, type of services, quality assurance personnel information, performance deficiencies, corrective actions, and sign-offs. It provides instructions on using the template to document contractor performance reviews and any necessary corrective actions.

The related federal contract opportunity is for channel, levee and flood control basin maintenance services in Los Angeles and San Bernardino Counties, California. The solicitation is being conducted by the Department of the Army Corps of Engineers Engineering District Los Angeles, and interested parties should refer to the RFP and attached appendices and bid schedule for more details on the required services and response requirements.

View the file

Other files

File Type Posted
Amendment 0003 W912PL-20-R-0022.pdf PDF
Site Visit Sign-In Sheets New CMC.pdf PDF
SF33.pdf PDF
Amendment 0002 W912PL-20-R-0022.pdf PDF
Copy of Contractor Bid Schedule_CMC-Level_2_FY20.xlsx XLSX spreadsheet
Copy of Contractor Bid Schedule_CMC-Level_1_FY20.xlsx XLSX spreadsheet
SF-30.pdf PDF
Appendix L - Sample Avian SPOTREP.pdf PDF
LADM-NO 1130-2-24 Sepulveda Dam FCB OM Manual 12-1970.pdf PDF
LADM-NO 1130-2-20 Santa Fe Dam FCB OM Manual 07-1963.pdf PDF
LADM NO. 1130-2-18 Lopez Dam FCB O&M Manual 07-1963.pdf PDF
LADM NO. 1130-2-14, Draft San Bernardino Channel, Levee, FCB O&M Project Manual 08-1964.pdf PDF
Appendix A - Overview Fcility Location Map.pdf PDF
LADM-NO 1130-2-22 Whittier Narrows Dam FCB OM Manual 07-1963.pdf PDF
BidSchedule_CMC_Level2_FY20.xlsx XLSX spreadsheet
LADM NO. 1130-2-21 Hansen Dam FCB O&M Manual 04-1963.pdf PDF
LADM NO. 1130-2-13 LACDA Channel, Levee, FCB O&M Project Manual 12-1999.pdf PDF
Appendix K - Section A - ETL-1110-2-583.pdf PDF
LADM NO. 1130-2-29 Carbon Canyon Dam FCB O&M Manual 10-1962.pdf PDF
BidSchedule_CMC_Level1_FY20.xlsx XLSX spreadsheet
Appendix B - USACE Facility Address Listing.pdf PDF
LADM NO. 1130-2-5 Mojave River Dam FCB O&M Manual 10-1972.pdf PDF
Appendix E - Dams Maps FY20 CMC Contract.pdf PDF
LADM NO. 1130-2-25 Brea Dam FCB O&M Manual 10-1971.pdf PDF
CORPS FACILITIES without an Operations and Maintenance Manual.pdf PDF
Appendix G - EP 1110-2-18.pdf PDF
Appendix M - Sediment Testing Sample Report Format.pdf PDF
W912PL-20-R-0022 RFP.pdf PDF
LADM-NO 1130-2-23 San Antonio Dam FCB OM Manual 02-1960.pdf PDF
LADM NO. 1130-2-36 Fullerton Dam FCB O&M Manual 08-1970.pdf PDF
Appendix H - Corrective Action Request (CAR).pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER NUMBER 2. CONTRACTOR 3. TYPE OF SERVICES

4. QUALITY ASSURANCE PERSONNEL (QAP) SIGNATURE AND DATE 5. QAP PHONE 6. SUSPENSE DATE

I. PERFORMANCE

7. DEFICIENCY (CHECK ALL BOXES THAT APPLY)

NEW

REPEAT

NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS

CHECKED)

10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE CONCUR NON-

CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-

CONCURRENCE OF QAP CITED DEFICIENCY

III. ACTION KORRECTED

14. CONCUR NON-CONCUR QAP SIGNATURE AND DATE

15. QAP REMARKS (REQUIRED)

16. CONTRACTOR REPRESENTATIVE REMARKS

Performance Assessment Report (PAR) Instructions

Block 1. Quality Assurance Personnel (QAP) enters contract or task order number.

Block 2. QAP enters contractor name.

Block 3. QAP enters type of services.

Block 4. QAP signs and dates.

Block 5. QAP enters telephone number.

Block 6. QAP assigns suspense date for Contractor Representative validation if a deficiency box was checked in Block 7.

Part I. Contractor Performance

Block 7. QAP checks all boxes that apply.

Block 8. QAP enters Services Summary or Statement of Work (PWS) paragraph item reviewed.

Block 9. QAP enters brief description of deficiency and tracking number if the deficiency box was checked in Block 7. Detailed description will be on Corrective Action Report (CAR).

Block 10. QAP enters a detailed performance assessment if the deficiency box in Block 7 was not checked.

Parts II and III will be used only if a deficiency was documented in Part I.

Part II. Contractor Validation

Block 11. Contractor Representative checks one box in response to QAP cited deficiency. If Concurrence is indicated, Contractor Representative continues to Block 12. If Non-Concurrence is indicated, continue to Block 13 and state reason(s) for Non-Concurrence with QAP cited deficiency and return PAR to QAP.

Block 12. Contractor Representative enters Estimated Completion Date of Corrective Action and continues to Block 13.

Block 13. Contractor Representative details Corrective Action and the Action Taken to Prevent Recurrence or Reason for Non-Concurrence of QAP cited deficiency.

Part III. Deficiency Corrected

Block 14. QAP checks appropriate block, signs, and dates.

Block 15. (Required Entry) QAP remarks regarding the Corrective Action and the Action Taken to

Prevent Recurrence. If Non-Concur was checked, this block should be very detailed to explain why.

Block 16. Contractor Representative enters remarks if further discussion is needed about QAP concurrence with Contractor’s Corrective Action and Action Taken to Prevent Recurrence.

Continuation Sheet. A Continuation Sheet is to be used to expand on any information that will not fit in the applicable numbered block.