This document is an appendix related to the Operations Management System (OMS) contract opportunity between the Minnesota Department of Information Technology Services (MNIT) and the Minnesota Department of Corrections (DOC). The appendix outlines the roles and responsibilities for interfaces and data exchange, infrastructure and environment, and integration and user acceptance testing for the new OMS solution. The state is seeking a vendor with a mature API-based integration framework to integrate with the department's current internal and external systems. The successful vendor will be responsible for designing, developing, and testing the interfaces, infrastructure, and integration of the new OMS.

The document also outlines the data conversion requirements, where the successful vendor will be expected to convert the DOC's existing Corrections Operations Management System (COMS) data into the new OMS. The state must be able to validate the successful conversion and migration of the existing data to the new system, and the vendor will provide a final report on the converted and unconverted data.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix H: Data and Infrastructure

Data and Infrastructure Interfaces and Data Exchange Interfaces and Data Exchange includes the activities associated with design and development of constructs to transfer data real time, on demand, and daily bi-directional data from the State’s current internal and external systems to the proposed solution. The State is seeking a vendor with a mature API-based integration framework thereby limiting the number of custom integrations that will need to be developed. The State is contracting a specialist system integrator to support the design and development of the enterprise data integration hub (DIH) that the proposed OMS will be required to integrate with.

Refer to Appendix D: Interface Requirements for an outline of identified State OMS interfaces. The reference table is meant to provide additional detail with anticipated data exchange complexity and transaction volumes.

The following table identifies the general roles and responsibilities with respect to configuration, and testing of Interfaces and Data Exchange, where RACI (Responsible Accountable Consulted Informed) designation(s) are assigned to indicate the roles and responsibilities of each organization in performing and/or completing the activity or task:

Interfaces and Data Exchange Roles and Responsibilities

Interfaces and Data Exchange Roles and Responsibilities
Successful Responder
State
Output/Outcome
1. Create interface and data exchange specifications from the new system to State target systems and/or DIH for the interfaces and data exchanges listed in Appendix D.
R, A
R, C
Interface & Data Exchange specification document
2. Approve interface and data exchange design specifications.
I
R, A
Documented approval
3. Develop target interfaces and data exchanges according to approved specifications (API specification)
R, A
-
Interface & Data Exchange specification document
4. Produce all necessary “transaction monitoring” capabilities to support the interfaces effort as detailed in the Interface & Data Exchange specification.
R, A
R, C
Documented successful test results
5. Execute all tasks including the setup of the interfaces to State and external systems in compliance with the Interface & Data Exchange specification documents in an iterative process
R, A
-
Documented successful test results
6. Execute the transformations and rules that were used to map the legacy and target environments to include data clean-up tasks in an iterative process
R, A
-
Documented successful test results
7. Create and develop interface and data exchange test plan
R, A
-
Interface & Data Exchange test plan
8. Review and approve interface and data exchange test plan
I
R, A
Documented feedback and approval
9. Create and develop implementation test plan
R, A
-
Interface & Data Exchange test plan
10. Review and approve implementation test plan
I
R, A
Documented feedback and approval
11. Build, test, and validate environments
R, A
-
Documented successful test results
12. Build, test, and validate “sand box” environments
R, A
-
Documented successful test results
13. Test the interfaces, according to the interface and data exchange test plan, to ensure they comply with the interface and data exchange design specifications and data mapping after each iteration
R, A
-
Documented successful test results
14. Test all previously completed system interfaces in accordance with the Interface and Data Exchange test plan after each iteration. Interfaces will comply with business and system technical requirements identified.
R, A
-
Documented successful test results
15. Present reports and results, including capacity and load, after each iteration
R, A
I
Documentation as described
16. Review and approve reports and test results
I
R, A
Testing results report
17. Ensure and verify that the exchanged data is accurate and complete.
R, A
-
Testing results report
18. Update and implement required data sharing agreements and MOUs with external agencies as per approved interface and data exchange design specifications.
I
R, A
Interface & Data Exchange specification document

Infrastructure and Environment Infrastructure and Environment consists of technical hardware and software environment configurations and specifications (virtual or physical) necessary to operate the OMS solution. The following table identifies the general roles and responsibilities with respect to Infrastructure and Environment, where RACI (Responsible Accountable Consulted Informed) designation(s) are assigned to indicate the roles and responsibilities of each organization in performing and/or completing the activity or task:

Infrastructure and Environment Roles and Responsibilities
Contractor
State
Output/Outcome
1. Define software requirements for the OMS Infrastructure and Environment
R, A
-
Detailed infrastructure, environment, build and deployment plans and procedures
2. Create, develop, and define the strategy for stand-up of the Infrastructure and Environment
R, A
-
Detailed infrastructure, environment, build and deployment plans and procedures
3. Create, develop, and define the quality control procedures for the build of the OMS infrastructure and environment
R, A
R, C
Detailed infrastructure, environment, build and deployment plans and procedures
4. Create, develop, and define the security measures for the build and deployment of the OMS infrastructure and environment as required by the State
R, A
R, C
Detailed infrastructure, environment, build and deployment plans and procedures
5. Create, develop, and define the testing plans and procedures for the build and deployment stages of the OMS infrastructure and environment
R, A
C
Infrastructure, environment, build and deployment test and validation plan
6. Create and develop the documentation as required for the build of the OMS infrastructure and environment
R, A
C
Detailed infrastructure, environment, build and deployment plans and procedures
7. Report on the status of the infrastructure and environment build and deployment as required
R, A
I
Documented status report
8. Work collaboratively in the creation and configuration of all infrastructure and environments
R, A
R, C
Workshop attendance and minutes
9. Review and approve all plans and procedures
-
R, A
Documented feedback and approval
10. Deploy the production infrastructure and environment
R, A
C
Documented successful test results
11. Conduct quality assurance, security, functional, and technical testing, and correct all unsatisfactory test results
R, A
R, C
Documented successful test results
12. Build, test, and validate infrastructure environments
R, A
C
Documented successful test results
13. Build, test, and validate “sand box” infrastructure environments
R, A
C
Documented successful test results
14. Review and approve test results
R, C
R, A
Documented feedback and approval
15. Set disaster recovery expectations
I
R, A
Documented recovery recommendations
16. Create, develop, and provide disaster recovery plan
R, A
C
Disaster recovery plan
17. Approve disaster recovery plan
I
R, A
Document approval
18. Set business continuity expectations
I
R, A
Documented business continuity expectations
19. Create, develop, and provide business continuity plan
R, A
C
Business continuity plan
20. Approve business continuity plan
I
R, A
Document approval
21. Provide audit access and participate in scheduled or unscheduled audits
R, A
-
Monitoring and incident management plan and procedures
22. Provide automated monitoring and incident notification functionality
R, A
-
Monitoring and incident management plan and procedures
23. Provide automated monitoring and incident notification services
R, A
-
Monitoring and incident management plan and procedures
24. Monitor and validate DOJ, CJIS, NIST, CLETS, security, etc. compliance
I
R, A
Monitoring and incident management plan and procedures

Integration and User Acceptance Testing Integration and User Acceptance Testing includes the activities associated with a seamless implementation. The following table identifies the general roles and responsibilities with respect to Integration and User Acceptance Testing, where RACI (Responsible Accountable Consulted Informed) designation(s) are assigned to indicate the roles and responsibilities of each organization in performing and/or completing the activity or task:

Integration and User Acceptance Testing Roles and Responsibilities
Contractor
State
Output/Outcome
1. Create, develop, document, and maintain integration and testing plan that meets requirements and adheres to defined policies.
R, A
C
System Integration and User Acceptance test plan
2. Provide proposed integration and testing plan
R, A
-
System Integration and User Acceptance test plan
3. Review and approve integration and testing plan
I
R, A
Documented approval
4. Create and develop interface test plan for pre-production SIT / UAT
R, A
C
System Integration and User Acceptance test plan
5. Review and approve interface test plan
I
R, A
Documented approval
6. Recommend integration and testing requirements
R, A
I
System Integration and User Acceptance test plan
7. Build, test, and validate environments
R, A
-
Documented successful test results
8. Build, test, and validate “sand box” environments
R, A
-
Documented successful test results
9. Approve integration and testing requirements
I
R, A
Documented approval
10. Manage integration test environment (SIT)
R, A

Status reports

11. Manage issue tracking software solution for tracking defects, progress, and proposed resolutions
R, A
I
Risk/Issue Log
12. Maintain software release matrices across development, quality assurance, and production environments and networks
R, A
I
Status reports
13. Conduct integration and security testing for all systems (such as data, equipment, and networks), based on requirements defined in the plan and MN DOC / MNIT policies and procedures
R, A
R, C
Documented successful test results
14. Evaluate all new and upgraded system components for compliance with MN DOC / MNIT security rules, regulations, and procedures
R, A
R, C
Documentation
15. Assess and communicate the overall impact and potential risk to system components prior to implementing changes
R, A
C
System Integration and User Acceptance test plan
16. Create and develop User Acceptance Testing ("UAT") requirements and scripts
C, I
R, A
System Integration and User Acceptance test plan
17. Create and develop UAT plans and scripts per requirements
R, A
-
System Integration and User Acceptance test plan
18. Review and approve UAT plans
I
R, A
Documented feedback & approval
19. Conduct and document UAT results per requirements
I
R, A
Documented successful test results
20. Support UAT testing
R, A
-
Status Reports, attendance, and minutes
21. Review and approve UAT results
I
R, A
Documented feedback & approval
22. Execute interface test plan
R, A
I
Documented test results (verification of execution)
23. Share all test results with successful Responder
R, A
R, C
Status report
24. Identify, remediate, and resolve any problems with the successful Responder’s product, OMS configuration, data conversion, or with the integration or interfacing of their product with those of other third-party Contractors and State.
R, A
C, I
Successful test results

Data Conversion The selected Responder is expected to convert the DOC’s existing COMS and relevant data to the OMS Solution. A detailed data conversion plan will be required as part of the OMS implementation. The successful Responder will need to convert all records into the new OMS solution. The State must be able to validate successful conversion/migration of their existing OMS data to the new OMS Solution. The successful Responder will provide a final report of the data that successfully converted and the data that could not be converted with appropriate reasons for its failure to convert.

Document Name1
Appendix H1

image2.png