This file comprises mechanical construction documents for the FRCC (Front Range Community College) Westminster Student Center HVAC Upgrade project (Contract No. 2025-418) located in Westminster, Colorado. The project involves replacement of air handling units (AHUs), exhaust fans, terminal boxes, and associated HVAC piping and ductwork systems. The scope includes three new semi-custom AHUs (Models TRANE CSAA025) serving multi-purpose, office/meeting, and dining areas; removal and replacement of existing exhaust fans with new downblast units; installation of multiple fan-powered and standard terminal boxes with hot water reheat coils; and comprehensive ductwork, piping, and control system modifications. The documents detail schedules for 15 terminal boxes (TB 2-1 through TB 2-15), three return fans (RF 1-3), one cabinet unit heater (CUH 1), one unit heater (UH 2), three cooling water pumps (CWP 1-3), and four heating water pumps (HWP 1-4). The construction documents package includes mechanical legends, equipment schedules, demolition plans, HVAC system plans, piping plans, detailed connection schematics, and a comprehensive building automation system (BAS) control matrix prepared as of August 6, 2026.
The HVAC system specifications indicate heating water supply temperatures of 190°F with 0% propylene glycol throughout the system and chilled water at 55°F for cooling coil applications. The project incorporates variable frequency drives (VFDs) on supply and return fans, with all equipment coordinated through BAS integration using open protocol communication and remote monitoring of digital inputs/outputs and analog signals. Control requirements include temperature sensors, CO2 monitors, airflow measurement devices, and pressure monitoring at critical points including supply and return plenums. The documents establish minimum clearance requirements for terminal box access panels (30-48 inches depending on electrical power ratings), mandate coordination with the owner prior to system shutdowns, require pre-demolition TAB readings on existing equipment, and specify that final flow rates during balancing shall not be lower than 0.5 GPM except where otherwise noted. All work is denoted in bold throughout the plans, with existing conditions shown lightly, and field verification of conditions is the contractor's responsibility prior to work commencement.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOUBLE/SINGLE LINE DUCT LEGEND
45° TEE (ROUND) FLEX DUCT 90° RADIUS ELBOW
RIGID FLEX
45° TEE (RECTANGULAR) 90° TEE (ROUND) MANUAL VOLUME DAMPER 90° ELBOW
DUCT SPLIT REDUCER 45° ELBOWGRD RUNOUT
90° TEE (RECTANGULAR)
SEE DETAIL
CONICAL
TEE
TAKEOFF
WITH VOLUME
DAMPER
SINGLE LINEDOUBLE LINEDOUBLE LINESINGLE LINE SINGLE LINE
FLEXRIGID
SINGLE LINE DOUBLE LINE DOUBLE LINE
R N
D
R E
C
(Not all symbols listed below are used on these drawings)
HVAC LEGEND
SYMBOL DESCRIPTION ABBR. DESCRIPTION
LOW PRESSURE CONDENSATE RETURN PIPING
HEATING WATER SUPPLY PIPING
HEATING WATER RETURN PIPING
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
SUPPLY DUCT UP / DOWN
RETURN DUCT UP / DOWN
FLEXIBLE DUCT CONNECTION
BACKDRAFT DAMPER
TEMP. CONTROL DAMPER-OPPOSED BLADE
MANUAL VOLUME DAMPER
DUCT MOTORIZED DAMPER
CONICAL FITTING WITH MVD
CONDENSER WATER SUPPLY PIPING
LOW PRESSURE STEAM SUPPLY PIPING (0 - 15#)
ROUND DUCT UP / ROUND DUCT DOWN
FLAT OVAL DUCTWORK
ABBR. SYMBOL
COOLING COIL DRAIN PAN PIPING
TEMP. CONTROL DAMPER- PARALLEL BLADE
LPS
LPC
MPS
MVD
MPC
BBD
BF
RL
RS
RHG
TT
MEDIUM PRESSURE STEAM SUPPLY PIPING (16# - 60#)
MEDIUM PRESSURE CONDENSATE RETURN PIPING
HIGH PRESSURE STEAM SUPPLY PIPING (61# - 125#)
HIGH PRESSURE CONDENSATE RETURN PIPING
PUMPED CONDENSATE PIPING
BOILER BLOWDOWN PIPING
REFRIGERANT SUCTION PIPING
BOILER FEED WATER PIPING
FLOAT AND THERMOSTATIC STEAM TRAP
REFRIGERANT LIQUID PIPING
REFRIGERANT HOT GAS PIPING
TCD
FD
FSD
SD
DAD
DUCT FIRE DAMPER (SEE NOTES)
COMBINATION DUCT FIRE/SMOKE DAMPER (SEE NOTES)
DUCT SMOKE DAMPER
DUCT SMOKE DETECTOR
DUCT ACCESS DOOR
ELECTRIC-PNEUMATIC CONTROL VALVE
TURNING VANES IN DUCT ELBOW
WALL SWITCH / EMERGENCY SWITCH
PNEUMATIC-ELECTRIC CONTROL SWITCH
HUMIDISTAT
DUCT RISE
UNIT MOUNTED THERMOSTAT
UNDERCUT DOOR
THERMOSTATIC STEAM TRAP
DUCT DROP
HWS
HWR
CHWS
CHWR
D
CWS
CWR
HPS
HPC
PC
F&T
IBT
TCV
FS
EJ
BJ
RSV
DPS
(2 OR 3-WAY) TEMPERATURE CONTROL VALVE
INVERTED BUCKET STEAM TRAP
VENTURI METER
CALIBRATED BALANCING VALVE
REFRIGERANT SERVICE VALVE
DIFFERENTIAL PRESSURE SWITCH
FLOW SWITCH
EXPANSION JOINT
CONDENSER WATER RETURN PIPING
BALL JOINT EXPANSION COMPENSATOR
ACOUSTICALLY LINED DUCTWORK
TEMPERATURE CONTROL OUTSIDE AIR DAMPER
TEMPERATURE CONTROL RETURN AIR DAMPER
TEMPERATURE CONTROL EXHAUST AIR DAMPER
STATIC PRESSURE IN INCHES WATER COLUMN
SUPPLY AIR DEVICE
RETURN AIR DEVICE
M
F
S
T
H
U
RISE
SD
RG
SP IN WC
TCEAD
TCRAD
TCOAD
A.L.
TCD
BDD
EP
PE
(Not all symbols listed below are used on these drawings)
EXHAUST DUCT UP / DOWN
WALL MOUNTED CARBON DIOXIDE SENSORCO2
EXHAUST AIR DEVICEEG
DP
T IBT
F&T
TT
RETURN AIR DEVICE WITH SOUND BOOTRG
GENERAL LEGEND
SYMBOL DESCRIPTION ABBR. DESCRIPTION
NEW
SECTION DESIGNATION
SECTION CUT ON THIS SHEET
VIEW REFERENCE DESIGNATION
VIEW REFERENCE ON THIS SHEET
EQUIPMENT UNIT IDENTIFICATION
CAP END OF PIPE
PITCH DOWN IN DIRECTION OF ARROW
UNION OR FLANGE
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE AND/OR TEMPERATURE RELIEF VALVE
ISOLATION VALVE (RE: SPEC FOR TYPE)
VERTICAL PIPE VALVE
DIFFUSER IDENTIFICATION
EXISTING
PIPE ANCHOR
PIPE ALIGNMENT GUIDE
ABBR. SYMBOL
EQUIPMENT UNIT NUMBER (UNIT SERVED - FLOOR -
SEQUENCE #)
PRESSURE REDUCING VALVE
(E)
(N)
(R)
PTRV
(F)
DIA
WAD
NIC
AFF
GC
MC
EC
RELOCATED
FUTURE
POINT OF CONNECTION, NEW TO EXISTING
DIRECTION OF FLOW IN PIPE
DUCTWORK, PIPING AND EQUIPMENT TO BE REMOVED
DIAMETER
ABOVE FINISHED FLOOR
WALL ACCESS DOOR
ELECTRICAL CONTRACTOR
NOT IN CONTRACT
GENERAL CONTRACTOR
PRV
CV
P/T
STRAINER W/ BLOWDOWN
CHECK VALVE
SOLENOID / MOTORIZED VALVE
PRESSURE / TEMPERATURE TAP
SOLENOID VALVE
BRAIDED FLEXIBLE PIPE CONNECTOR
HOSE END DRAIN VALVE
STRAINER
CEILING ACCESS PANEL
PRESSURE GAUGE
PUMP
THERMOMETER
SIGHT GLASS
C.A.P.
TB
MECHANICAL CONTRACTOR
1-2-3
X
THRUST BLOCK
P/T
SLOPE
(Not all symbols listed below are used on these drawings)
A DIFFUSER NECK DIAMETER
DIFFUSER CFM
LINEAR DIFFUSER IDENTIFICATION
8ø/24"L
E
LINEAR DIFFUSER NECK DIAMETER
LINEAR DIFFUSER LENGTH
LINEAR DIFFUSER CFM
FINNED TUBE RADIATOR ACTIVE ELEMENT LENGTH
EQUIPMENT UNIT IDENTIFICATION
EQUIPMENT UNIT NUMBER
RADIATOR ENCLOSURE LENGTH (OR W-W=WALL-TO-WALL)
FTR2'-6"
3'-6"
DOUBLE-BOWL FLEXIBLE PIPE CONNECTOR
MANUAL AIR VENT
AUTOMATIC AIR VENT
20 8
GLYCOL HEATING WATER SUPPLY PIPING
GLYCOL HEATING WATER RETURN PIPING
PROCESS CHILLED WATER SUPPLY PIPING
PROCESS CHILLED WATER RETURN PIPING
GHWS
GHWR
PCWS
PCWR
BV
O2 WALL MOUNTED OXYGEN SENSOR
WALL MOUNTED THERMOSTATT
ES
DROP
AUTO FLOW VALVEAFV
MD
KITCHEN/OWNER/MEDICAL EQUIPMENT REFERENCE1
TYPICAL ROOM REFERENCE (TOP = RM #, BOTTOM = FLR)
X X
X KEY NOTE REFERENCE
MAV
AAV
UNO UNLESS NOTED OTHERWISE
Ø
X
X-X
LPS
LPC
MPS
MPC
BBD
BF
RL
RS
RHG
HWS
HWR
CHWS
CHWR
D
CWS
CWR
HPS
HPC
PC
GHWS
GHWR
PCWS
PCWR
48F12
SPIN-IN FITTING WITH MVD
C
NC NORMALLY CLOSED
COMMON
NO NORMALLY OPEN
LOUVER IN DOORL
TEMPERATURE SENSORTS
HIGH TEMPERATURE HEATING WATER SUPPLY PIPING
HIGH TEMPERATURE HEATING WATER RETURN PIPING
HTWS
HTWR
HTWS
HTWR
X
X-X
BAS CONTROL LEGEND & NOTES
SYMBOL DESCRIPTIONABBR.
(Not all symbols listed below are used on these drawings)
DIGITAL INPUT
DIGITAL OUTPUT
ANALOG INPUT
ANALOG OUTPUT
GENERAL NOTES:
1. THE TEMPERATURE CONTROL MATRIX, CONTROL DIAGRAMS, AND THE SEQUENCE OF OPERATIONS ARE ALL BINDING AND COMPLEMENTARY. IF THERE IS A
DISCREPANCY BETWEEN THEM, THE WORST CASE SCENARIO SHALL BE USED FOR BIDDING PURPOSES. ADDITIONAL COSTS WILL NOT BE ALLOWED FOR
DISCREPANCIES BETWEEN THE SPECIFICATIONS AND THE DRAWINGS.
2. IN ADDITION TO THE DDC POINTS LISTED, THE CONTRACTOR SHALL CAREFULLY REVIEW ALL DRAWINGS, ALL SPECIFICATIONS, AND ALL SEQUENCES OF
OPERATION. THE DOCUMENTS ARE ALL INCLUSIVE AND COMPLIMENTARY TO EACH OTHER. THE PROJECT SHALL INCLUDE ANY AND ALL NECESSARY DDC
POINTS TO SUPPORT THE REQUIREMENTS OF ALL THE DOCUMENTS.
3. ALWAYS REFER TO DRAWINGS FOR QUANTITY.
4. PROVIDE OPEN PROTOCOL COMMUNICATION WITH FACTORY SUPPLIED CONTROLLER.
5. BAS CONTRACTOR SHALL COORDINATE STATUS LEVEL FOR EACH ALARM POINT WITH THE OWNER TO DETERMINE WHICH ONES REQUIRE IMMEDIATE
ATTENTION.
6. IF THERE IS A DISCREPANCY BETWEEN ANY DOCUMENTATION, THE WORST CASE SCENARIO SHALL BE USED FOR BIDDING PURPOSES. ADDITIONAL COSTS WILL
NOT BE ALLOWED FOR DISCREPANCIES BETWEEN THE SPECIFICATIONS AND DRAWINGS.
A.O.
A.I.
D.O.
D.I.
A.O.
A.I.
D.O.
D.I.
POINT OF DISCONNECTION, DEMO
PRESSURE SENSOR / PRESSURE MONITORP PM
END OF MAIN DRIPEOMD
SHORT CIRCUIT CURRENT RATINGSCCR
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:2
P
M
M.001
MWJ
RWL
M E
C H
A N
IC
A
L L
E G
E N
D S
N
O T
E S
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
GENERAL NOTES:
1. WORK INCLUDED IN THE CONTRACT IS DENOTED IN BOLD. EXISTING
CONDITIONS TO REMAIN ARE DENOTED LIGHTLY.
2. A DETAILED METHOD OF PROCEDURE IS REQUIRED WHEN A CONSTRUCTION
ACTIVITY AFFECTS THE SAFETY OF THE OCCUPANTS, OWNER'S EQUIPMENT OR
VALUABLE CONTENTS OR ANY SYSTEM WHICH SUPPORTS THESE SYSTEMS;
OR ESSENTIALLY AFFECTS THE BUILDING MANAGEMENT, OPERATIONS OR
SECURITY.
3. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING
CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK AND SHALL NOTIFY
THE ENGINEER/ARCHITECT OF ANY DISCREPANCIES FOR RESOLUTION.
4. COORDINATE WORK WITH ALL TRADES.
5. CONTRACTOR IS RESPONSIBLE FOR SECURING AND WEATHERPROOFING ANY
ROOF OPENING NOT COMPLETED DURING WORKING HOURS.
6. COORDINATE ALL DUCTWORK AND PIPING WITH EQUIPMENT, STRUCTURE,
ETC.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR DEACTIVATION OF ROOF-
MOUNTED EQUIPMENT AND ASSOCIATED INDOOR EQUIPMENT. ONLY ONE UNIT
SHALL BE TAKEN OUT OF SERVICE AT ANY TIME, WITH REMAINDER OF UNITS
LEFT OPERATIONAL.
8. CONTRACTOR SHALL NOT SHUT DOWN / TAKE OUT OF SERVICE ANY SYSTEMS
WITHOUT FIRST COORDINATING WITH OWNER AND PREPARING M.O.P.
DEMOLITION GENERAL NOTES:
1. EXISTING ITEMS TO REMAIN ARE DENOTED LIGHTLY UNLESS OTHERWISE
NOTED. ALL ITEMS SHOWN DASHED & BOLD SHALL BE REMOVED UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL NOT SHUT-OFF OR PUT-OUT OF SERVICE ANY SYSTEMS
OR SERVICE WITHOUT FIRST COORDINATING WITH THE OWNER.
3. CONTRACTOR SHALL DETERMINE AND COORDINATE THE EXACT EXTENT OF
DEMOLITION TO FACILITATE ALL WORK INDICATED BY THE CONTRACT
DOCUMENT.
4. PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK, VERIFY EXISTING
CONDITIONS AND NOTIFY ENGINEER OF ANY DISCREPANCIES FOR
RESOLUTION.
5. ALL ITEMS IDENTIFIED TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY
UNLESS OTHERWISE NOTED. REMOVED ITEMS SHALL BE TURNED OVER TO THE
OWNER UNLESS OTHERWISE NOTED AND STORED IN THE AREA DESIGNATED
BY THE OWNER. REMOVE FROM SITE AND LEGALLY DISPOSE OF ALL ITEMS THE
OWNER CHOOSES NOT TO ACCEPT.
6. WHERE EXISTING PIPING, T.C. TUBING/WIRING ETC. ARE TO BE REMOVED FROM
WALLS WHICH ARE REMAINING, THE WALLS SHALL BE REPAIRED TO MATCH
ORIGINAL CONDITIONS.
7. WHERE EXISTING PIPING TO BE REMOVED PASSES THROUGH FLOORS, THEY
SHALL BE CUT BACK TO WITHIN CONCRETE AND FILLED WITH GROUT TO
ACHIEVE A SMOOTH AND EVEN FINISH WITH CONCRETE SURFACE.
8. PROVIDE TAB PRE-READS ON ALL EXISTING AIR DEVICES AND HEATING COILS
PRIOR TO DEMOLITION. NOTIFY ENGINEER OF ANY DISCREPANCIES.
HVAC PLAN NOTES:
1. ALL SUPPLY AIR DIFFUSERS ARE 4-WAY AIR PATTERN UNLESS SHOWN
OTHERWISE.
2. DUCT SIZE OF BRANCH DUCT TO AIR DEVICE SHALL BE THE SAME SIZE AS
NECK SIZE OF AIR DEVICE UNLESS NOTED OTHERWISE.
3. ALL HEATING WATER SUPPLY AND RETURN BRANCH PIPING TO TERMINAL BOX
REHEAT COILS SHALL BE 3/4" UNLESS NOTED OTHERWISE. ALL PIPING TAKE-
OFFS FROM MAINS SHALL BE TOP TAKE-OFFS WITH SWING JOINTS.
4. BRANCH DUCT SIZE TO INLET OF ALL TERMINAL BOXES SHALL BE THE SAME
SIZE AS THE INLET SCHEDULED UNLESS NOTED OTHERWISE. BRANCH DUCTS
TO TERMINAL BOXES EXCEEDING 15' OR TWO ELBOWS, SHALL BE UP-SIZED TO
NEXT STANDARD DIAMETE.
5. UNLESS OTHERWISE NOTED, ALL SUPPLY AIR DUCTWORK SHALL BE
EXTERNALLY WRAPPED TO THICKNESS AS STATED IN SPECIFICATIONS,
RETURN AND EXHAUST DUCTWORK IS NEITHER LINED NOR WRAPPED.
6. DUCT SIZES INDICATED ARE SHEET METAL SIZES. WHERE INTERNAL DUCT
LINING IS PROVIDED, SHEET METAL SHALL NOT BE INCREASED IN SIZE.
UNLESS NOTED OTHERWISE ALL SCHEDULED DATA IS LISTED AT ELEVATION FT5400
1.
REMARKS:
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
PROVIDE BOX SELECTION TO MEET LAT, DESIGN CFM AND HEATING MBH. FINAL GPM SHALL BE SET DURING BALANCING TO FLOW RATES IN LISTED PRODUCT DATA SUBMITTALS, BUT IN NO CASE SHALL BE LOWER THAN 0.5 GPM.
MAXIMUM STATIC PRESSURE IS BASED ON WIDE OPEN UNIT AT MAXIMUM FLOW FOR TERMINAL UNIT WITH 2-ROW COIL.
HEATING WATER SYSTEM CONTAINS 0% PROPYLENE GLYCOL.
2-ROW HEATING COIL CONDITIONS SHOWN. 1- & 2-ROW HEATING COILS ACCEPTABLE COMPLIANT WITH MBH, WATER FLOW, AIR & WATER PRESSURE DROP REQUIREMENTS & LIMITATIONS.
USE OF 3- & 4-ROW COILS MUST BE SPECIFICALLY IDENTIFIED BY THE SUPPLIER & ACCEPTED BY THE ENGINEER FOR EACH LOCATION PROPOSED.
TERMINAL BOX MAXIMUM AIR FLOW CAPABILITIES: 6"=450 CFM, 8"=800 CFM, 10"=1350 CFM, 12"=2000 CFM, 14"=3000 CFM & 16"=4000 CFM.
MINIMUM 2-ROW COILS REQUIRED ON ALL PERIMETER BOXES.
HEATING COIL SHALL BE LOCATED ON OUTLET OPENING OF UNIT.
ALL FAN TERMINAL BOXES SHALL BE PROVIDED WITH A MERV-A 8 DISPOSABLE FILTER.
COIL LEAVING AIR TEMPERATURE SHALL NOT EXCEED 120ºF DUE TO AMBIENT TEMPERATURE ON FAN MOTOR.
REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZES, AND OVERCURRENT PROTECTIVE DEVICES.
REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR MINIMUM FAULT CURRENT RATING THAT EACH UNIT SHALL EXCEED. UNIT NAMEPLATE SHALL INDICATE THE SHORT CIRCUIT CURRENT RATING.
REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.
REQUIREMENTS APPLYING TO ALL TERMINAL BOXES:
TERMINAL BOX SCHEDULE (PARALLEL FAN, HOT WATER COIL)
DESIG.
INTERIOR
OR
PERIMETER
ZONE MFR MODEL
INLET DIA
(IN)
AIR PRESSURE
DROP MAX (IN
W.C.) AT S.L.
PRIMARY
AIR TEMP
ºF
COOLING DESIGN
CFM FAN DATA
HEATING
DESIGN CFM
FROM BOX AT
ELEV
HEATING WATER COIL DATA
CONTROL
SOUND ATTENUATOR
REMARKSTYPE NO.
MAXIMUM
AT ELEV
MINIMUM
AT ELEV
MOTOR
(ECM/PSC) SIZE CFM
ESP (IN
WC) HP VOLTAGE PHASE EAT ºF MBH GPM
WATER P.D.
MAX (FT WC) EWT ºF COIL LAT ºF AIR OUTLET FAN INLET
FTB 2-1 PERIMETER PRICE FDV5012 12 0.50 55 1800 360 ECM 5012 1800 0.20 1 277 1 1800 65 48.0 1.5 0.14 190 160 BAS No No
Mechanical
08/06/2026
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:2
P
M
M.002
MWJ
RWL
M E
C H
A N
IC
A
L S
C H
E D
U L
E S
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
1.
UNIT SPECIFIC REMARKS:
NOTE AA: THESE VALUES REFLECT THE EXPECTED OPERATIONAL CONDITIONS AT INITIAL START-UP (FOR INFORMATION
ONLY.) ACTUAL VALUES SHALL BE DETERMINED BY TESTING & BALANCING.
NOTE AB: COIL FLOW IS ACTUAL FLOW THROUGH COIL. SYSTEM FLOW IS THE FLOW THROUGH THE CONTROL VALVE.
THESE MAY BE DIFFERENT FOR PUMPED COILS.
A.
B.
C.
D.
E.
F.
G.
H.
I.
REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZES, AND OVERCURRENT PROTECTIVE DEVICES.
REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR MINIMUM FAULT CURRENT RATING THAT EACH UNIT SHALL EXCEED. UNIT NAMEPLATE SHALL INDICATE THE SHORT CIRCUIT CURRENT RATING.
UNIT HEIGHT DOES NOT INCLUDE HEIGHT OF CURB.
PROVIDE BASE RAIL OR CURB HEIGHT TO ACCOMMODATE CONDENSATE DRAIN P-TRAP.
PROVIDE SHAFT GROUNDING RINGS FOR EACH BEARING ON MOTORS POWERED THROUGH VARIABLE FREQUENCY DRIVES.
MINIMUM 2-ROW HEATING COIL.
MINIMUM 6-ROW COOLING COIL.
PROVIDE A GRAVITY BACKDRAFT DAMPER ON EACH FAN IN A MULTI-FAN SECTION.
REFER TO SOUND DATA SCHEDULE FOR SOUND INFORMATION.
REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.
COLUMN HEADING NOTES: COMMON NOTES (APPLIES TO ALL AIR...
AIR HANDLING UNIT SCHEDULE (SEMI-CUSTOM)
DESIG.
AREA
SERVED MFR MODEL NO.
OUTDOOR
OR INDOOR
CASING
OUTSIDE
AIR CFM
MIN.
SUPPLY FAN SECTION AIR FILTER SECTIONS UNIT SIZE
CONTROL REMARKSNAME NO.
OPERATIONAL (NOTE-AA)
NO. OF
FANS
CONFIG WHEEL
DRIVE
(BELT/
DIRECT)
RPM
APPROX.
MOTORS
NO.
OF
VFDS
VFD
BYPASS
(YES/NO)
VIBRATION
ISOLATOR
TYPE
PRE-FILTER FINAL
L (IN) W (IN) H (IN)
OPER
WEIGHT
(LBS)
AT ELEV
FANS/
ROW
ROWS
HIGH
DIA.
(IN)
TYPE
(AF/BI)
EACH FAN
SUM OF MAX
HP ALL FANS VOLTAGE PHASE
AREA
(SF)
MERV-A
RATING
AIR P.D.
AREA
(SF)
MERV-A
RATING
AIR P.D.
CFM
ESP (IN
WC)
TSP (IN
WC)
REQ'D
BHP
MAX HP
SIZE
CLEAN
(IN WC)
CHANGE OUT
(IN WC)
CLEAN
(IN WC)
CHANGE OUT
(IN WC)
AHU 1 MULTI
PURPOSE
TRANE CSAA025 INDOOR 2,200 11700 1.20 4.30 2 2 1 18 PLENUM DIRECT 2700 6.5 7.5 15 480 3 1 No 27 8 0.25 1.00 27 13 1.00 2.20 181 80 62 3,238 BAS
AHU 2 OFFICE/
MEETING
TRANE CSAA025 INDOOR 2,400 12000 1.75 4.90 2 2 1 18 PLENUM DIRECT 2859 7.4 10.0 20 480 3 1 No 27 8 0.25 1.00 27 13 1.00 2.20 181 80 62 3,300 BAS
AHU 3 DINING TRANE CSAA025 INDOOR 2,200 12500 1.20 4.50 2 2 1 18 PLENUM DIRECT 2755 6.9 7.5 15 480 3 1 No 27 8 0.25 1.00 27 13 1.00 2.20 180 80 62 3,162 BAS
DESIG.
AREA
SERVED
HEATING COIL SECTION COOLING COIL SECTION
NAME NO.
NET
FACE
AREA
(SF)
AT ELEV
MBH
EAT LAT WATER CONDITIONS (NOTE-AB) NET
FACE
AREA
(SF)
AT ELEV
MBH
SENS
MBH
TOTAL
EAT LAT WATER CONDITIONS (NOTE-AB)
REFRIG
COIL
(YES/NO)CFM
AIR
P.D. (IN
WC)
°F
DB
°F
DB
GPM FROM
SYSTEM
(NOTE-AB)
COIL FLOW PROP
GLYCOL
P.D. (FT
HD) CFM
AIR P.D.
(IN WC)
°F
DB
°F
WB
°F
DB
°F
WB
GPM FROM
SYSTEM
(NOTE-AB)
COIL FLOW PROP
GLYCOL
P.D.
(FT
HD)
GPM
(NOTE-AB)
EWT
°F
GPM
(NOTE-AB)
EWT
°F
AHU 1 MULTI
PURPOSE
25 11,700 0.13 484 45 80 35 48 180 0% 4.02 25 11700 0.34 283 288 80 60 52 51 57 57 44 0% 3.7 No
AHU 2 OFFICE/
MEETING
25 12,000 0.13 484 45 90 40 48 180 0% 4.02 25 12000 0.34 283 288 80 60 52 51 57 57 44 0% 3.7 No
AHU 3 DINING 25 12,500 0.14 504 45 90 42 50 180 0% 4.35 25 12500 0.32 295 300 80 60 52 51 60 60 44 0% 4.0 No
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
MOTORS SHALL BE PROVIDED W/AUTOMATIC THERMAL OVERLOAD PROTECTION.
WATER PRESSURE DROP IS FOR COIL ONLY WITHOUT VALVES OR FITTINGS.
QUICK DISCONNECT FAN MOTOR.
STANDARD COLOR FINISH AS SELECTED BY ARCHITECT.
WHERE REQUIRED, CONTROL VALVES SHALL BE PROVIDED BY THE SECTION 230933 CONTRACTOR.
0.05" REPRESENTS FREE AIR DELIVERY THRU INTEGRAL GRILLES, NO DUCTWORK ATTACHED.
TAMPER RESISTANT FASTENERS ON COVERS.
INSULATED PANELS.
3-POSITION SPEED SWITCH
ALL DATA BASED UPON FAN MOTOR OPERATING AT HIGH SPEED.
HINGED PANEL W/STOP CHAIN (HORIZONTAL INSTALLATIONS ONLY).
RECESSING FLANGE.
REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.
FINAL GPM SHALL BE DETERMINED DURING BALANCING TO FLOW RATES LISTED IN PRODUCT DATA SUBMITTALS, BUT IN NO CASE SHALL BE LOWER THAN 0.5 GPM.
REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZE, AND OVERCURRENT PROTECTIVE DEVICES
REMARKS:
CABINET UNIT HEATER SCHEDULE (HOT WATER)
DESIG.
INSTALLATION STYLE
AIR OPENINGS
MFR
MODEL PROJECT DESIGN HEATING PARAMETERS ELECTRICAL MOTOR FILTER SIZE (INCHES) WATER
VOLUME
(GAL)
OPER WEIGHT
(LBS)
CONTROL
VALVE TYPE REMARKSNAME NO. INLET OUTLET
TYPE &
SIZE
COIL
ROWS
ESP (IN WC)
AT ELEV
CFM AT
ELEV
EWT
(ºF)
LWT
(ºF)
GLYCOL
EAT
(ºF) MBH GPM
MAX WATER
P.D. (FT HD)
LAT
(ºF) TYPE NO
POWER
TOTAL VOLTAGE PHASE TYPE MERV W H D
CUH 1 HORIZONTAL RECESSED BOTTOM BOTTOM TRANE FFCB060 2 0.05 610 190 170 0% 60 40.0 2.7 8.9 95 ECM 0 36 11 30 0.00 0
1.
SPECIFIC REMARKS:
A.
B.
C.
D.
E.
F.
REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZES, AND OVERCURRENT PROTECTIVE DEVICES.
REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR MINIMUM FAULT CURRENT RATING THAT EACH UNIT SHALL EXCEED. UNIT NAMEPLATE SHALL INDICATE THE SHORT CIRCUIT CURRENT RATING.
PROVIDE SHAFT GROUNDING RINGS FOR EACH BEARING ON MOTORS POWERED THROUGH VARIABLE FREQUENCY DRIVES.
FEI = FAN ENERGY INDEX IN ACCORDANCE WITH AMCA 208.
FAN E.S.P. INCLUDES DAMPER PRESSURE DROP. INCULDE DAMPER PRESSURE DROP IN SUBMITTAL.
REFER TO SOUND DATA SCHEDULE FOR SOUND INFORMATION.
REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.
GENERAL REMARKS:
FAN SCHEDULE
DESIG.
MFR MODEL FAN TYPE SERVICE
FAN
CLASS
WHEEL
DIA.
(INCHES)
CFM AT
ELEV.
E.S.P.
(IN. W.C.)
APPROX.
RPM
TIP
SPEED
(FPM)
OUTLET
VELOCITY
(FPM)
MOTOR
FEI
VALUE
DRIVE
TYPE
DAMPER
THROAT
HEIGHT
(INCHES)
THROAT
WIDTH
(INCHES)
SIZE (INCHES)
OPER.
WEIGHT
(LBS.) CONTROL REMARKSNAME NO. BHP HP VOLTAGE PHASE
ECM
(YES/NO)
VFD
(YES/NO)
RELAY
(YES/NO)
STARTER
(YES/NO)
VFD
BYPASS
(YES/NO)
TYPE &
LOCATION
AIR PRESS
DROP (IN WC) L W H
RF 1 GREENHECK AX-80-190-0625 INLINE RETURN AHU-1 I 32.4 10050 0.50 1045 2054 1.98 3 460 3 No Yes No No No 1.54 DIRECT NONE 0.00 39 39 35 36 39 464 BAS
RF 2 GREENHECK AX-80-190-0625 INLINE RETURN AHU-2 I 32.4 11500 0.50 1074 2082 1.98 3 460 3 No Yes No No No 1.54 DIRECT NONE 0.00 39 39 35 36 39 464 BAS
RF 3 GREENHECK AX-80-190-0625 INLINE RETURN AHU-3 I 32.4 12000 0.50 1079 2099 1.98 3 460 3 No Yes No No No 1.54 DIRECT NONE 0.00 39 39 35 36 39 464 BAS
EF 5 GREENHECK G-095-VG CENTRIFUGAL DOWNBLAST RESTROOM I 10.9 650 0.50 1696 582 0.13 0.16 115 1 Yes No Yes No No - DIRECT BACKDRAFT 0.50 10 10 0 22 27 50 BAS
1.
2.
3.
PUMPS OPERATING THRU VFDS: UPON SELECTING THE PUMP FOR THE SPECIFIED DUTY POINT, THE SUPPLIER SHALL PROVIDE THE PUMP WITH THE LARGEST IMPELLER SIZE AVAILABLE FOR THE CASING THAT DOES NOT EXCEED THE DUTY POINT MOTOR HP AT THE RIGHT END OF THE CURVE. SUBMITTAL DATA SHALL SHOW ALL IMPELLER CURVES AVAILABLE FOR THE PUMP MODEL. THIS APPLIES TO ALL MANUFACTURERS.
UNLESS INDICATED BY PUMP MODEL NUMBER, VARIABLE FREQUENCY DRIVE (VFD) IS REMOTE-MOUNTED RATHER THAN PUMP MOUNTED WHEN REQUIRED.
PROVIDE SHAFT GROUNDING RINGS FOR EACH BEARING ON MOTORS POWERED THROUGH VARIABLE FREQUENCY DRIVES.
REMARKS:
A. REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZES, AND OVERCURRENT PROTECTIVE DEVICES.
REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR MINIMUM FAULT CURRENT RATING THAT EACH UNIT SHALL EXCEED. UNIT NAMEPLATE SHALL INDICATE THE SHORT CIRCUIT CURRENT RATING.
APPLIES TO ALL:
PUMP SCHEDULE
DESIG.
MFR MODEL PUMP TYPE SERVICE
MAX PUMP
OPER °F
PROP
GLYCOL (%)
DESIGN GPM
PRESSURE
(FT HD)
NPSH
(FT HD) EFF. %
MOTOR VIBRATION
ISOLATOR
TYPE
INLET SIZE
(IN.)
OUTLET
SIZE (IN.)
SIZE (INCHES) OPER.
WEIGHT
LBS. REMARKSNAME NO.
MAX
FLOW
MIN
FLOW BHP HP
RPM @
60 HZ VOLTAGE PHASE VFD RELAY STARTER
VFD BYPASS
(YES/NO) L W H
CWP 1 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-1 COOLING COIL 55 0% 57 57 20 0.0 0% 0.00 1.5 1680 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0
CWP 2 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-2 COOLING COIL 55 0% 57 57 20 0.0 0% 0.00 1.5 1680 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0
CWP 3 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-3 COOLING COIL 55 0% 60 60 20 0.0 0% 0.00 1.5 1680 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0
HWP 1 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-1 HEATING COIL 200 0% 48 48 20 0.0 0% 0.00 2 1680 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0
HWP 2 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-2 HEATING COIL 200 0% 48 48 20 0.0 0% 0.00 2 1680 460 3 Yes Yes Yes No 2.0 1.5 24 12 24 0
HWP 3 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-3 HEATING COIL 200 0% 50 50 20 0.0 0% 0.00 2 1680 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0
HWP 4 ARMSTRONG 4380 - 0205H-002.0 VERTICAL INLINE RE-HEAT SYSTEM 200 0% 70 40 60 0.0 0% 0.00 2 3109 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0
1.
REMARKS:
A.
B.
C.
D.
E.
F.
G.
H.
PROVIDE BOX SELECTION TO MEET LAT, DESIGN CFM AND HEATING MBH. FINAL GPM SHALL BE SET DURING BALANCING TO FLOW RATES IN LISTED PRODUCT DATA SUBMITTALS, BUT IN NO CASE SHALL BE LOWER THAN 0.5 GPM.
MAXIMUM STATIC PRESSURE IS BASED ON WIDE OPEN UNIT AT MAXIMUM FLOW FOR TERMINAL BOX WITH 2-ROW COIL.
HEATING WATER SYSTEM CONTAINS 0% PROPYLENE GLYCOL.
2-ROW HEATING COIL CONDITIONS SHOWN. 1 & 2 ROW HEATING COILS ACCEPTABLE COMPLIANT WITH MBH, WATER FLOW, AIR & WATER PRESSURE DROP REQUIREMENTS & LIMITATIONS.
USE OF 3- & 4-ROW COILS MUST BE SPECIFICALLY IDENTIFIED BY THE SUPPLIER & ACCEPTED BY THE ENGINEER FOR EACH LOCATION PROPOSED.
TERMINAL BOX MAXIMUM AIR FLOW CAPABILITIES: 6"=450 CFM, 7'=650 CFM, 8"=800 CFM, 9"=1050 CFM, 10"=1350 CFM, 12"=2000 CFM, 14"=3000 CFM, 16"=4000 CFM & 24"x16"=8000 CFM.
MINIMUM 2-ROW COILS REQUIRED ON ALL PERIMETER BOXES.
REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.
REQUIREMENTS APPLYING TO ALL TERMINAL BOXES:
TERMINAL BOX SCHEDULE (HOT WATER HEAT)
DESIG. INTERIOR OR
PERIMETER
ZONE MFR MODEL
INLET
SIZE (IN.)
AIR PRESS DROP
MAX (IN W.C.)
(SEA LEVEL)
COOLING DESIGN CFM HEATING
DESIGN CFM
AT ELEV
HEATING WATER COIL DATA MODULATING
CONTROL
VALVE TYPE
SOUND
ATTEN. (Y/N) REMARKSTYPE NO.
MAXIMUM
AT ELEV
MINIMUM
AT ELEV EAT ºF LAT ºF MBH GPM
WATER P.D.
MAX (FT WC) EWT ºF
TB 2-1 PERIMETER PRICE SDV 10 0.59 920 275 310 55 90 11.7 0.6 3.2 190 2-WAY No
TB 2-2 PERIMETER PRICE SDV 6 0.39 300 90 245 55 90 9.3 0.6 0.6 190 2-WAY No
TB 2-3 PERIMETER PRICE SDV 7 0.38 400 120 125 55 90 4.7 0.5 0.8 190 2-WAY No
TB 2-4 PERIMETER PRICE SDV 9 0.38 675 205 205 55 90 7.7 0.5 2.1 190 2-WAY No
TB 2-5 INTERIOR PRICE SDV 6 0.39 200 100 0 55 0 0.0 0.0 0.0 190 2-WAY No
TB 2-6 PERIMETER PRICE SDV 8 0.46 530 160 245 55 90 9.3 0.6 1.3 190 2-WAY No
TB 2-7 PERIMETER PRICE SDV 12 0.74 1340 400 400 55 90 15.1 0.8 6.6 190 2-WAY No
TB 2-8 PERIMETER PRICE SDV 8 0.46 530 160 160 55 90 6.0 0.5 1.3 190 2-WAY No
TB 2-9 PERIMETER PRICE SDV 7 0.38 470 140 140 55 90 5.3 0.5 0.8 190 2-WAY No
TB 2-10 INTERIOR PRICE SDV 8 0.46 610 185 185 55 80 5.0 0.5 1.3 190 2-WAY No
TB 2-11 INTERIOR PRICE SDV 8 0.46 610 185 185 55 80 5.0 0.5 1.3 190 2-WAY No
TB 2-12 PERIMETER PRICE SDV 12 0.74 1230 370 370 55 90 14.0 0.8 6.6 190 2-WAY No
TB 2-13 PERIMETER PRICE SDV 12 0.74 1320 395 430 55 90 16.3 1.0 6.6 190 2-WAY No
TB 2-14 INTERIOR PRICE SDV 9 0.38 720 215 215 55 80 5.8 0.5 2.1 190 2-WAY No
TB 2-15 INTERIOR PRICE SDV 9 0.38 780 235 235 55 80 6.3 0.5 2.1 190 2-WAY No
1.
2.
3.
4.
5.
6.
REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZES, AND OVERCURRENT PROTECTIVE DEVICES. REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR MINIMUM FAULT CURRENT RATING THAT EACH UNIT SHALL EXCEED. UNIT NAMEPLATE SHALL INDICATE THE SHORT CIRCUIT CURRENT RATING.
MOTORS TO BE PROVIDED WITH AUTOMATIC THERMAL OVERLOAD OR IMPENDANCE PROTECTION.
INTEGRAL FAN GUARD INLET.
HORIZONTAL DISCHARGE LOUVERS.
FINAL GPM SHALL BE DETERMINED DURING BALANCING TO FLOW RATES IN LISTED PRODUCT DATA SUBMITTALS, BUT IN NO CASE SHALL BE LOWER THAN 0.5 GPM.
REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.
REMARK...
UNIT HEATER SCHEDULE (HYDRONIC)
DESG.
MFR MODEL
PROJECT DESIGN HEATING PARAMETERS ELECTRICAL SIZE (INCHES)
OPER.
WEIGHT
(LBS)
MAX MTG
HEIGHT (FT)
CONTROL
VALVE TYPE REMARKSNAME NO.
CFM AT
ELEV EWT (ºF)
WATER TEMP
DROP (ºF)
GLYCOL
% EAT (ºF) MBH LAT (ºF) GPM
WATER
PRESS DROP
(FT HD) MOTOR TYPE WATTS VOLTAGE PHASE LENGTH WIDTH HEIGHT
UH 2 TRANE UHPA36 550 190 20 0% 50 26.1 90 2.7 3.00 ECM 25 120 1 27 30 27 40 8 SEE CONTROL
DWGS
1. PROVIDE BAROMETRIC GRAVITY RELIEF DAMPER.
REMARKS:
LOUVER SCHEDULE
DESIG.
MFR MODEL
INTAKE OR
DISCHARGE
OVERALL SIZE (IN.)
FREE AREA
(SF)
PEAK
AIRFLOW
(CFM)
AIR VELOCITIES AIR P.D. AT
SEA LEVEL (IN
WC) MATERIAL FINISH REMARKSNAME NO. L H D
FACE AREA
(FPM)
FREE AREA
(FPM)
WL 1 GREENHECK ESD-635 RELIEF 50 40 6 7.63 6400 460 840 0.08 ALUMINUM MILL 1
GENERAL - APPLIES TO ALL AIR DEVICES: MANUAL VOLUME DAMPERS SHALL BE ACCEPTABLE IN DUCTWORK AT THE BRANCH POINT OF THE RUNOUT DUCT OR IN-LINE TO THE AIR DEVICE BY THE CONTRACTOR INSTALLING DUCTWORK. A DAMPER LOCATED AT THE AIR DEVICE SHALL BE ACCEPTABLE WHEN PERMITTED BY ENGINEER ON A CASE-BY-CASE BASIS OR WHEN THE MANUFACTURER
REQUIRES AN INTEGRAL MANUAL VOLUME DAMPER.
REMARKS:
AIR DEVICE SCHEDULE
DESIG. FUNCTION STYLE MFR. MODEL FRAME STYLE MODULE SIZE MATERIAL FINISH REMARKS
A CEILING SUPPLY SQUARE CONE DIFFUSER PRICE SCD LAY-IN 24x24 STEEL WHITE
T
JH
7A
7B
7C
5B
5A
8A
8B
9A
6A
QPNM4MLKH2
C-0770
C-0770
CONFERENCE
C-0577
CONFERENCE
C-0578
CONFERENCE
C-0576
MULTI-CULTURAL
CENTER
C-0580
CAFE
C-0764
Room
C-0564
CAMPUS SAFETY
C-0762
Room
C-0763
Room
C-0765
Room
C-0766
Room
C-0767
VESTIBULE
C-0761
STUDENT ANNEX
C-0574MEN RR
C-0575
RR?
C-0579
563?
C-0584
564?
C-0585
STOR
C-0575A
STOR
C-0575B
STORAGE
C-0767
C-0771
C-0574A
36x30 SA
S A
28 SA
28 SA
S A
S A
(TYP. OF 12)
S A
S A
S A
S A
28 SA
x3 S
A x1 S
A x2 S
A x2 S
A
22x24 SA22x24 SA x2 S
A x2 S
A
16x20 SA 16x20 SA
(TYP. OF 9)
(TYP. OF 12)
(TYP. OF 9)
24x18
10x10
10x10
10x10
(TYP. OF 4)
(TYP. OF 6)
(TYP. OF 8)
x2 S
A x1 S
A
14x12 SA
14x12 SA
40x18 SA 28x22 SA x1 S
A x1 S
A x1 S
A
28x12 SA
14x14 SA
14 SA
x1 S
A x1 S
A x1 S
A
16x14 SA
S A1
S A
12x14 SA x8 E
A
12x8 SA x1 S
A x8 E
A
12x12 EA
16x12 SA x8 S
A x1 S
A
16x12 SA
16x10 SA
8x4 EA
8x8
8x8
14x12 SA
38x30 RA x1 S
A
14x12 SA
8x8
10x6
10x6
10x6
(TYP. OF 4)
M78
M83
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:3
P
M
MD.101
MWJ
RWL
P A
R T
IA
L
L E
V E
L
H V
A C
D E
M O
P L
A N
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
KEYNOTES
M78 REMOVE AND REPLACE EXHAUST FAN, RE: FAN SCHEDULE.
M83 REMOVE EXHAUST FAN AND CAP AND SEAL ROOF CURB AIR AND WATER
TIGHT.
SCALE: 1/8" = 1'-0"
PARTIAL LEVEL 1 HVAC DEMO PLAN
7A
7B
7C
P
NM4
M84
M86
M86
M88
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:3
P
M
MD.102
MWJ
RWL
P A
R T
IA
L
P E
N T
H O
U S
E L
E V
E L
H V
A C
D E
M O
P L
A N
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
KEYNOTES
M84 REMOVE AHUS AS SHOWN AND DISCONNECT SUPPLY AND OUTSIDE AIR
DUCTS FROM UNITS. DUCT CONNECTIONS AT NEW AHU'S WILL NEED TO
BE VERFIED.
M86 REMOVE TRANSFER AIR DUCTS AND SEAL WALL PENETRATIONS.
M88 REMOVE AND REPLACE EXSITNG LOUVERS. PROVIDE GRAVITY
BACK-DRAFT DAMPERS AT EACH SECTION.
SCALE: 1/4" = 1'-0"
PARTIAL PENTHOUSE LEVEL HVAC DEMO PLAN
T T
T
T
T
T
T
T
T
T
T
T
JH
7A
7B
7C
5B
5A
8A
8B
9A
6A
QPNM4MLKH2
REMOVE HWS/R PIPE AND
VALVES ASSOCIATED WITH
RE-HEAT COILS, TYP.
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:3
P
M
MD.111
MWJ
RWL
P A
R T
IA
L
L E
V E
L
H V
A C
P
IP
IN
G
D E
M O
P L
A N
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
KEYNOTES
SCALE: 1/8" = 1'-0"
PARTIAL LEVEL 1 HVAC PIPING DEMO PLAN
7A
7B
7C
8A
NM4M
M85
M89
M90
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:3
P
M
MD.112
MWJ
RWL
P A
R T
IA
L
P E
N T
H O
U S
E L
E V
E L
H V
A C
P
IP
IN
G
D E
M O
P L
A N
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
KEYNOTES
M85 REMOVE PIPING AS NEEDED TO REMOVE AHU'S. RE-INSTALL PIPE AFTER
UNITS ARE IN PLACE.
M89 REMOVE AND REPLACE UNIT HEATER, COORDINATE LOCATION WITH NEW
RETURN FAN AND DUCTWORK.
M90 REMOVE AND REPLACE INLINE PUMPS. COORDINATE LOCATION WITH NEW
UNITS.
SCALE: 1/4" = 1'-0"
PARTIAL PENTHOUSE LEVEL HVAC PIPING DEMO PLAN
UP
CO2
CO2
CO2
CO2
CO2
CO2
T
T T
T
T
JH
C-0770
C-0770
CONFERENCE
C-0577
CONFERENCE
C-0578
CONFERENCE
C-0576
MULTI-CULTURAL
CENTER
C-0580
CAFE
C-0764
Room
C-0564
CAMPUS SAFETY
C-0762
Room
C-0763
Room
C-0765
Room
C-0766
Room
C-0767
VESTIBULE
C-0761
STUDENT ANNEX
C-0574
MEN RR
C-0575
RR?
C-0579
563?
C-0584
564?
C-0585
STOR
C-0575A
STOR
C-0575B
STORAGE
C-0767
C-0771
C-0574A
7A
7B
7C
5B
5A
8A
8B
9A
6A
QPNM4MLKH2
2-1
TB
2-2
TB
2-3
TB
2-4
TB
2-8
TB
2-9
TB2-7
TB
2-12
TB
2-13
TB
2-14
TB
2-1
FTB
8x8
10x6
10x6
10x6
(TYP. OF 4)
8x8
8x8
8x8
8x8
75 10
265 8
(TYP. OF 4)
(TYP. OF 6)
(TYP. OF 8)
(TYP. OF 12)
(TYP. OF 12)
28 SA
28 SA
(TYP. OF 9)
(TYP. OF 12)
(TYP. OF 9)
10x10
10x10
10x10
24x18
40x18 SA 28x24 SA x2 S
A
28x22 SA x1 S
A x1 S
A
12x12 SA x1 S
A
16x14 SA12x14 SA
14x12 SA x8 S
A
16x12 SA
28x12 SA
14x14 SA
36x30 SA
38x30 RA x3 S
A
22x24 SA x2 S
A
22x24 SA x2 S
A 3 x1 S
A x2 S
A x1 S
A
S A
S A
S A
S A
S A
S A
S A
S A x1 S
A
2-6
TB
2-15
TB
EF
CUH
2-5
TB
2-11
TB
2-10
TB
14x12 SA
14x12 SA x1 S
A
12 SA
10x10 SA
S A
S A
12x8 SA
10x10 SA
A
A
A
200 14x12 SA x1 S
A
M82
M79
M81
M94
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:4
P
M
M.101
MWJ
RWL
P A
R T
IA
L
L E
V E
L
H V
A C
P L
A N
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
KEYNOTES
M79 REMOVE AND REPLACE FAN POWERED TERMINAL BOX, RE: SCHEDULE.
VERIFY INLET CONDITIONS FOR BOX.
M81 PROVIDE RE-BALANCE OF ALL AIR DEVICES SERVED BY NEW TERMINAL
BOXES BASED ON ORIGINAL PRE-READS.
M82 AT EXISTING OUTSIDE AIR INTAKE LOUVER PROVIDE FULL SIZE PLENUM
CONNECTION TO LOUVER ABOVE MULTI-CULTURAL CENTER AND
CONNECT TO EXISTING INTAKE DUCT, SEAL EXISTING CONNECTION AIR
TIGHT AND ADD INSULATION TO DUCT CONNECTION TO LOUVER. REPAIR
EXISTING INSULATION AS NEEDED AND VERIFY ALL JOINTS ARE SEALED
AIRTIGHT. FIELD VERIFY EXACT LOCATION OF CONNECTION AND SIZE OF
LOUVER.
M94 SEE PENTHOUSE PLANS FOR CONTINUATION OF DUCT, TYP.
SCALE: 1/8" = 1'-0"
PARTIAL LEVEL 1 HVAC PLAN
7A
7B
7C
8A
NM4M
x
S
A x
S
A x
O
A
22x12 SA x
S
A x
R
A
UH
AHU
AHU
AHU
RF
RF
RF
x
R
A
30x30 RA x
R
A x
R
A x
R
A x
R
A
36x30 SA
38x30 RA x
R
A
M87
M87
M89
M91
M91 x
R
A x
R
A
R A
WL
TYP
48x20 RA
48x20 RA
48x20 RA
M93
M95
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
:3
8:
P M
M.102
MWJ
RWL
P A
R T
IA
L
P E
N T
H O
U S
E L
E V
E L
H V
A C
P L
A N
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
KEYNOTES
M87 ROUTE NEW RETURN AIR DUCT HIGH ABOVE UNIT AND DROP DOWN AND
CONNECT TO NEW UNIT. FIELD VERIFY ROUTE WITH EXISTING
CONDITIONS AND COORDINATE RETURN CONNECTION WITH NEW UNIT.
M89 REMOVE AND REPLACE UNIT HEATER, COORDINATE LOCATION WITH NEW
RETURN FAN AND DUCTWORK.
M91 TURN RETURN DUCT UP INTO PLENUM.
M93 SUPPORT NEW RETURN FANS FROM OVERHEAD STRUCTURE UTILZING
TWO ADJACENT BEAMS.
M95 THE ROOF SYSTEM IN THE PROJECT AREA HAS BEEN REPLACED UNDER A
SEPARATE PROJECT. THIS CONTRACTOR SHALL COORDINATE WITH THE
NEW ROOFING SYSTEM TO ENSURE THAT THE ROOFING IS TERMINATED
APPROPRIATELY AT THE LOCATION OF NEW WALL LOUVERS. REFER TO
A1.31 FOR ADDITIONAL INFORMATION.
SCALE: 1/4" = 1'-0"
PARTIAL PENTHOUSE LEVEL HVAC PLAN
UP
T
T T
T
T
T
T
T
T
T
T
T
CO2
CO2
CO2
CO2
CO2
CO2
T
T T
T
T
JH
7A
7B
7C
5B
5A
8A
8B
9A
6A
QPNM4MLKH2
C-0770
C-0770
CONFERENCE
C-0577
CONFERENCE
C-0578
CONFERENCE
C-0576
MULTI-CULTURAL
CENTER
C-0580
CAFE
C-0764
Room
C-0564
CAMPUS SAFETY
C-0762
Room
C-0763
Room
C-0765
Room
C-0766
Room
C-0767
VESTIBULE
C-0761
STUDENT ANNEX
C-0574
MEN RR
C-0575
RR?
C-0579
563?
C-0584
564?
C-0585
STOR
C-0575A
STOR
C-0575B
STORAGE
C-0767
C-0771
C-0574A
2-15
TB
CUH
2-1
FTB
2-13
TB
2-14
TB
2-10
TB
2-11
TB
2-12
TB
2-7
TB
2-9
TB
2-4
TB
2-5
TB
2-6
TB
2-1
TB
2-2
TB 2-3
TB
2-8
TB
3/4" HWR
3/4" HWS
2" HWR
2" HWR
1 1/2" HWS 2" HWS
1 1/2" HWS
2" HWR
1" HWR
1" HWS
3/4" HWS
1 1/4" HWS
1 1/4" HWS 1 1/4" HWS
1 1/4" HWR
1" HWS
1" HWR
1" HWS
1" HWR
1" HWS
1" HWR
1" HWR
1" HWS1/2" HWS
1/2" HWR
1 1/2" HWS
1 1/2" HWR
/2
H W
S
3" HWR
3" HWS
1" HWS
1" HWR
2 1/2" HWR
M92
TO AHU-3
TO AHU-2
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:4
P
M
M.111
MWJ
RWL
P A
R T
IA
L
L E
V E
L
H V
A C
P
IP
IN
G
P L
A N
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
KEYNOTES
M92 REMOVE EXISTING T'STATS SERVING RE-HEAT COILS, SOME NOT SHOWN.
PROVIDE NEW T'STATS IN SAME LOCATION AND PROVIDE NEW CONTROL
WIRING FROM T'STAT TO TERMINAL BOX, TYP.
SCALE: 1/8" = 1'-0"
PARTIAL LEVEL 1 HVAC PIPING PLAN
7A
7B
7C
NM4M
AHU
AHU
AHU
HWP
UH
CWP
HWP
CWP
HWP
HWP
CWP
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:4
P
M
M.112
MWJ
RWL
P A
R T
IA
L
P E
N T
H O
U S
E L
E V
E L
H V
A C
P
IP
IN
G
P L
A N
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
KEYNOTES
SCALE: 1/4" = 1'-0"
PARTIAL PENTHOUSE LEVEL HVAC PIPING PLAN
8000-12 8.20.20
HOT WATER REHEAT COIL PIPING
DETAIL (2-WAY VALVE, SINGLE COIL)
NOTE: INSTALL HWS
PIPING ON LEAVING
AIR SIDE OF COIL.
SCALE: NONE
HOT
WATER
COILFLOW
AIR
P/T
UNION OR FLANGE FOR
STEEL PIPE ONLY. NOT
REQUIRED FOR COPPER
(TYP.)
P/T
MANUAL
AIR VENT
DRAIN VALVE WITH HOSE
END CONNECTION AND CAP
NOTE:
ARRANGE PIPING TO
ALLOW COIL REMOVAL.
3/4"
H W
S
HWR
CALIBRATED
BALANCING VALVE
HWS MAIN
HWR MAIN
H W
S
MODULATING
CONTROL VALVE
MANUAL AIR VENTS
8000-42 9.17.21
TERMINAL BOX DETAIL
10/10 ACCESS
PANEL ON BOTTOM
SIDE
MIN. 3 DIAMETERS
STRAIGHT DUCT,
SAME SIZE AS
TERMINAL BOX
INLET.
SCALE: NONE
CONTROL PANEL
VAV BOX
UNISTRUT
BETWEEN
BEAMS
PROVIDE MINIMUM CLEARANCE AT
PANEL AT SIDE OF TERMINAL BOX
OF 30" FOR CONTROL POWER UP
THRU 30-VOLTS, 36" CLEAR FOR
ELECTRICAL POWER HIGHER THAN
30-VOLTS, AND LOWER THAN 120-
VOLTS, 42" CLEAR FOR ELECTRICAL
POWER HIGHER THAN 120-VOLTS
AND 48" CLEAR FOR BACK-TO-BACK
ELECTRICAL POWER HIGHER THAN
30-VOLTS.
TRANSITION AS REQUIRED
SEE FLOOR PLAN - HVAC
NOTE: COORDINATE INSTALLATION OF TERMINAL BOX WITH
CEILING GRID TO ASSURE CLEAR ACCESS TO ACCESS
PANELS.
LOW PRESSURE DISCHARGE
STRAP HANGER SCREWED
TO SIDE. DON'T BLOCK
ACCESS SIDE OR BOTTOM.
DON'T TURN STRAPS UNDER
BOX.
2123-07 03.19.25
IN-LINE PUMP PIPING DETAIL
SCALE: NONE
TAPS FOR T.C.
P/T
HANGER ROD WITH VIBRATION
ISOLATOR AND CLEVIS HANGER
SUPPORTING PIPING AS CLOSE TO
PUMP AS PRACTICAL (TYPICAL)
1/2" TUBING OR IPS.
SAME MATERIAL AS
TRANSPORT PIPING
PUMP
P/T
PRESSURE
GAUGE
NOTE:
1. ONLY ONE FLOW MEASURING STATION REQUIRED
FOR PARALLEL PUMP CONFIGURATION.
STRAINER WITH
BLOWDOWN VALVE
FLOW MEASURING
DEVICE AND
BALANCING VALVE
PER SPEC.
3400-01 12.13.22
DOWNBLAST ROOF EXHAUST FAN DETAIL
SCALE: NONE
DUCTWORK AS
NOTED ON
PLANS
ROOF
GRAVITY OR MOTORIZED
BACKDRAFT DAMPER -
REFER TO SCHEDULE
EXHAUST FAN HOUSING
LEVEL CURB
SUPPORT SEE
ARCHITECTURAL
DRAWING
SEE ARCHITECTURAL
DRAWING FOR
ROOFING DETAILS
ROOF CURB BY
FAN MFR. MATCH
ROOF SLOPE
BIRDSCREEN
3400-04
IN-LINE EXHAUST FAN DETAIL
EXHAUST GRILLE REMOVABLE CORE
SCALE: NONE
SUPPORT FROM
OVERHEAD
STRUCTURE
SEE PLAN FOR SIZES
CEILING
EXHAUST
FAN
FLEX CONNECTION
RUBBER IN SHEAR
VIBRATION ISOLATORS
SEE PLAN
FOR SIZE
3600-03 05.04.22
SECTION
FAN POWERED TERMINAL BOX DETAIL (PARALLEL TYPE)
PLAN
NOTE:
EXTREME CARE MUST BE USED IN
LOCATING TERMINAL BOX, SO
ACCESS TO THE UNIT CONTROL
PANEL AND FAN/MOTOR IS NOT
IMPAIRED BY ANY BUILDING
MEMBER OR CONTRACTOR
INSTALLED MATERIALS.
MEDIUM
VELOCITY
DUCTWORK
INLET (BEYOND)
SCALE: NONE
REMOVABLE
BOTTOM PANEL
FLEX CONNECTION
TERMINAL BOX
FAN/MOTOR
PROVIDE LINED INDUCED
AIR DUCT THAT IS 2"
LARGER THAN INLET
OPENING SIZE.
FAN-POWERED
TERMINAL BOX
FAN MOTOR
FILTERS
FILTER SIDE ACCESS
INDUCED AIR INLET
MEDIUM VELOCITY
DUCTWORK INLET
FLEX CONNECTION
FAN-POWERED
TERMINAL BOX
30" MIN. CLEAR SPACE
CONTROL PANEL
SPRING ISOLATOR
TYP. OF (4) PLACES
ANGLE BRACKET
THREADED ROD
8'-0" MIN. TO FIRST
BRANCH DUCT
ACOUSTIC FLEX DUCT (TYP.)
FLEXMASTER 8M
INTERNALLY LINED LOW
PRESSURE DUCTWORK
REHEAT COIL
3713-08
ROUND NECK
AIR DEVICE DETAIL
SCALE: NONE
LONG RADIUS
FLEXIBLE DUCT (MAX. 6'-0")
SUPPORT @ 3'-0" O.C. INSTALLED
PER SPECIFICATIONS
NOTE:
CEILING DIFFUSER SHOWN;
REGISTERS AND GRILLES
SIMILAR.
CEILING
LAY-IN AIR DEVICE
SHEET METAL
DUCTWORK,
INSULATED PER
SPECIFICATIONS.
BELLMOUTH TYPE SPIN-IN WITH
BUTTERFLY TYPE MVD, EXTEND
QUADRANT HANDLE THRU
INSULATION AND SEAL AROUND
INSULATION.
T-BAR OR LAY-IN
FRAME FOR HARD
CEILING.
SUPPORT FROM OVERHEAD
STRUCTURE
INSTALL RUN-OUT PER
SPECIFICATIONS
STAINLESS STEEL WORM
GEAR CLAMP ON BOTH
THE FLEX DUCT JACKET
AND INNER CORE.
HARD CEILING INSTALLATIONS:
1. PROVIDE LAY-IN FRAME TO ALLOW AIR DEVICE TO BE
REMOVED.
2. LOCATE MVD TO BE ACCESSIBLE. IF SPIN-IN IS NOT
ACCESSIBLE PROVIDE A SEPARATE MVD ACCESSIBLE BY
REMOVING THE GRILLE IN LIEU OF THE ONE AT THE SPIN-IN.
ACCESS DOOR OR REMOVABLE
ENCLOSURE SECTION.
8000-08 3.25.24
HOT WATER CABINET UNIT
HEATER PIPING DETAIL
UNION OR FLANGE FOR STEEL PIPE ONLY.
NOT REQUIRED FOR COPPER (TYP.)
SCALE: NONE
HWR MAIN
HWS MAIN
COIL
H W
R
H W
S
MODULATING CONTROL VALVE
CALIBRATED BALANCE VALVE
MANUAL
AIR VENTS
8000-11 3.25.24
UNIT HEATER PIPING DETAIL
SCALE: NONE
H W
S
HWS MAIN
HWR
HWR MAIN
UNIT
HEATER
3/4"
CALIBRATED
BALANCE VALVE
SUSPENDED FROM
OVERHEAD STRUCTURE.
USE RUBBER- IN-SHEAR
VIBRATION ISOLATORS
AND HANGER RODS
UNION OR FLANGE FOR
STEEL PIPE ONLY. NOT
REQUIRED FOR COPPER
(TYP.)
DRAIN VALVE WITH
HOSE END AND CAP
MODULATING
CONTROL VALVE
MANUAL AIR
VENTS
FULL SIZE BYPASS
8000-15a 04.03.26
PUMPED HOT WATER COIL PIPING
DETAIL (2-WAY VALVE, MULTI-COIL)
FLOW MEASURING
STATION, BOTH
SYSTEMS. CALIBRATED
BALANCE VALVES FOR
2" & SMALLER (TYP.)
SCALE: NONE
FLOW
AIR
HOT
WATER
COIL
NOTE:
INSTALL HWS PIPING
ON LEAVING AIR SIDE
OF COIL.
P/T
H W
S
MANUAL AIR VENT
UNION OR FLANGE
FOR STEEL PIPE
ONLY. NOT REQUIRED
FOR COPPER (TYP.)
P/T
DRAIN VALVE WITH HOSE
END CONNECTION AND CAP
AT BOTTOM COIL (S)
NOTE:
1. ARRANGE PIPING TO ALLOW COIL REMOVAL.
2. CONTRACTOR TO VERIFY ACTUAL QUANTITY
OF COILS AND CONNECTION
REQUIREMENTS FOR EQUIPMENT SUPPLIED.
3/4"
N.C.
HWS MAIN
HWR MAIN
PUMP
(SEE IN-LINE PUMP
PIPING DETAIL)
HWR
H W
S
FLOW
AIR
HOT
WATER
COIL
MANUAL AIR VENT
MODULATING
CONTROL VALVE
PRESSURE
GAUGE BYPASS
P/T
P/T
HWS
CALIBRATED
BALANCE
VALVE (TYP)
8000-19
CONDENSATE DRAIN
PIPING DETAIL
SCALE: NONE
NOTES:
1. ALLOW SUFFICIENT SPACE BELOW DRAIN PAN FOR TRAP.
2. PITCH DRAIN FOR PROPER RUN-OFF.
3. MANUALLY PRIME FILL TRAP BEFORE START-UP TO FORM INITIAL DRY SEAL.
4. SUPPORT DRAIN LINES TO PREVENT SAG AND CONDENSATE OVERFLOW.
5. TRAP SEAL MUST BE APPROX. 1-1/2" GREATER THAN STATIC PRESSURE AT SUPPLY AIR
PLENUM. (TYPICAL ALL CHILLED WATER COILS)
TEE
CLEANOUT PLUG
UNION
NOTE 5
DRAIN PAN
DRAIN CONNECTION NIPPLE
DRAIN PIPE
DISCHARGE MUST BE
BELOW LEVEL OF
DRAIN PAN.
TRAP SEAL
PITCH AT
1/8" PER FT.
PITCH
DN
8000-22 04.03.26
PUMPED CHILLED WATER COIL PIPING
DETAIL (2-WAY VALVE, MULTI-COIL)
FLOW MEASURING STATION, BOTH
SYSTEMS. CALIBRATED BALANCE
VALVES FOR 2" & SMALLER.
NOTE:
INSTALL CHWS PIPING
ON LEAVING AIR SIDE
OF COIL. (TYP.)
SCALE: NONE
DRAIN PAN
D
CHILLED
WATER
COIL
COIL COND.
PAN, 3/4"
TO BOTTOM
DRAIN PAN
P/T
P/T
P/T
CHILLED
WATER
COIL
MANUAL AIR VENTFREEZE
PROTECTION
BYPASS PUMP,
SEE IN-LINE
PUMP DETAIL
P/T
TRAP COIL COND. PIPING AT
DRAIN PAN AND RUN FULL SIZE
TO NEAREST FLOOR DRAIN
3/4" DRAIN VALVE WITH
HOSE END AND CAP AT
EACH COIL (TYP.)
C H
W S
CHWS MAIN
CHWS
CHWR
CHWR MAIN
AIR
FLOW
AIR
FLOW
MANUAL AIR VENTS
MODULATING
CONTROL VALVE
NOTE:
1. ARRANGE PIPING TO ALLOW COIL
REMOVAL.
2. CONTRACTOR TO VERIFY ACTUAL
QUANTITY OF COILS AND
CONNECTION REQUIREMENTS FOR
EQUIPMENT SUPPLIED.
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:4
P
M
M.301
MWJ
RWL
M E
C H
A N
IC
A
L D
E T
A
IL
S
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
C O
O L
IN
G C
O
IL
P R
E H
E A
T C
O
IL
OUTSIDE
AIR
DM
NC
DPT
DM
TL
P
SA FAN
M
VFD
SUPPLY
SD
TO
FACP
CHWS
CHWR
TS
2" MERV 8
DPT
TS
TS
VFD
M
RA FAN
DM
HWR
HWS
R E
T U
R N
A
IR
T E
M P
D E
G R
E E
S F
A.I.
R E
T U
R N
F A
N P
L E
N U
M S
T A
T
IC
P R
E S
S U
R E
IN
W
C
A.I.
M
IX
E D
A
IR
T E
M P
D E
G R
E E
S F
A.I.
M E
R V
F
IN
A L F
IL
T
E R
D
IF
F
P R
E S
S
IN
W
C
A.I.
D
IS
C H
A R
G E
A
IR
T E
M P
D E
G R
E E
S F
A.I.
D U
C T
S T
A T
IC
P
R E
S S
U R
E
IN
C
H E
S W
.C
A.I.
O .A
F
L O
W M
O N
IT
O
R
C F
M
A.I.
M E
R V
F
IL
T
E R
D
IF
F
P R
E S
S
IN
W
C
A.I.
R E
T U
R N
F A
N
S P
E E
D
A.O.
R E
L
IE
F A
IR
D
A M
P E
R
C O
N T
R O
L
A.O.
R E
T U
R N
A
IR
D A
M P
E R
C O
N T
R O
L
A.O.
O U
T S
ID
E
A
IR
D A
M P
E R
C O
N T
R O
L
A.O.
M
IN
IM
U
M O
U T
S
ID
E A
IR
D
A M
P E
R
C O
N T
R O
L
A.O.
H W
C O
IL
V
A L
V E
C O
M M
A N
D
A.O.
S U
P P
L Y
F A
N
S P
E E
D
A.O.
C H
W C
O
IL
V A
L V
E
C O
M M
A N
D
A.O.
R E
T U
R N
F A
N
S T
A T
U S
D.I.
H W
P U
M P
S T
A T
U S
D.I.
L O
W T
E M
P
L
IM
IT
D.I.
S U
P P
L Y
F A
N
S T
A T
U S
D.I.
S
M O
K E
D E
T E
C T
O R
A L A
R M
D.I.
S U
P P
L Y
H
IG
H P
R E
S S
U R
E L
IM
IT
IN
W
C
D.I.
R E
T U
R N
F A
N
S T
A R
T /S
T O
P
D.O.
H W
P U
M P
S T
A R
T /S
T O
P
D.O.
S U
P P
L Y
F A
N
S T
A R
T /S
T O
P
D.O.
P
BACNET
INTEGRATION
P
R E
T U
R N
H
IG
H P
R E
S S
U R
E L
IM
IT
IN
W
C
D.I.
HARDWIRED INTERLOCK TO FAN(S)HARDWIRED INTERLOCK TO FAN(S)
BACNET
INTEGRATION
C H
W P
U M
P
S T
A T
U S
D.I.
C H
W P
U M
P
S T
A R
T /S
T O
P
D.O.
P
4" MERV 13
M
F A
N M
O T
O R
S T
A T
U S
D.I.
F A
N M
O T
O R
S T
A R
T /S
T O
P
D.O.
M O
T O
R
IZ
E D
D A
M P
E R
O P
E N
/C L
O S
E
D.O.
M O
T O
R
IZ
E D
D A
M P
E R
P O
S
IT
IO
N
D.I.
STARTER
T
R O
O M
T E
M P
D E
G R
E E
S F
A.I.
F A
N M
O T
O R
S T
A R
T /S
T O
P
D.O.
F A
N M
O T
O R
S T
A T
U S
D.I.
H E
A T
IN
G
C O
IL
V
A L V
E
P O
S
IT
IO
N
A.O.
STARTER
T
R O
O M
T E
M P
D E
G R
E E
S F
A.I.
E X
IS
T
IN
G
F A
N M
O T
O R
S T
A R
T /S
T O
P
D.O.
E X
IS
T
IN
G
F A
N M
O T
O R
S T
A T
U S
D.I.
E X
IS
T
IN
G
H E
A T
IN
G
C O
IL
V
A L V
E
P O
S
IT
IO
N
A.O.
T
ROOM
T'STAT
CO2
WHERE
APPLICABLE
C A
R B
O N
D
IO
X
ID
E
P P
M
A.I.
R O
O M
T E
M P
D E
G R
E E
S F
A.I.
A
IR
F L O
W V
O L U
M E
C F
M
A.I.
V A
V D
A M
P E
R C
O N
T R
O L
P O
S
IT
IO
N
A.O.
R E
H E
A T
C O
N T
R O
L V
A L V
E
P O
S
IT
IO
N
A.O.
D
IS
C H
A R
G E
A
IR
T E
M P
D E
G R
E E
S F
A.I.
Z O
N E
O V
E R
R
ID
E
S W
IT
C
H
D.I.
SHEET NO.
REVISIONS:
DRAWN BY:
Date:
JOB NO:
CHECKED BY:
DRAWING TITLE
TITLE
P :\F
R C
C \W es tm in st er C am pu s\
-1
S ci en ce W in g
H V
A C
U pg ra de
\C ad
8/ 6/
2:
:5
P
M
M.401
MWJ
RWL
M E
C H
A N
IC
A
L C
O N
T R
O L
S
W th A v e
W e s tm in s te r, C O
F R
C C
W E
S T
M
IN
S T
E R
S T
U D
E N
T C
E N
T E
R H
V A
C U
P G
R A
D E
S
2025-418
08/07/2026
CONSTRUCTION DOCUMENTS
1.
SYSTEM SPECIFIC REMARKS:
NOTES:
BAS CONTROL MATRIX
EQUIPMENT, SYSTEM, AND POINT
POINT TYPE
S T
A T
U S
A L
A R
M
N E
T W
O R
K C
O M
M U
N
IC
A T
IO
N
S
REMARKSD
IG
IT
A
L I N
P U
T
D
IG
IT
A
L O
U T
P U
T
A N
A L
O G
I N
P U
T
A N
A L
O G
O U
T P
U T
AHU - RF/SF/HW/CHW
CHW COIL VALVE, COMMAND X
CHW PUMP, START/STOP X
CHW PUMP, STATUS X X
DISCHARGE AIR TEMP, DEGREES F X
DUCT STATIC PRESSURE, INCHES W.C. X LOCATE UPSTREAM OF MOST
CRITICAL TERMINAL BOX OR
BOXES
HW COIL VALVE, COMMAND X
HW PUMP, START/STOP X
HW PUMP, STATUS X X
LOW TEMP, LIMIT X X
MERV 8 FILTER DIFF. PRESS., IN WC X
MERV 13 FINAL FILTER DIFF. PRESS., IN WC X
MINIMUM OUTSIDE AIR DAMPER, CONTROL X
MIXED AIR TEMP, DEGREES F X
O.A. FLOW MONITOR, CFM X PLACE FLOW MONITOR ON
MINIMUM OUTSIDE AIR WHEN
APPLICABLE.
OUTSIDE AIR DAMPER, CONTROL X
RELIEF AIR DAMPER, CONTROL X
RETURN AIR DAMPER, CONTROL X
RETURN AIR TEMP, DEGREES F X
RETURN FAN, SPEED X
RETURN FAN, START/STOP X
RETURN FAN, STATUS X X X PROVIDE STATUS INDICATION
FOR EACH MOTOR IN FAN
ARRAY.
RETURN FAN PLENUM STATIC PRESSURE, IN WC X
RETURN HIGH PRESSURE LIMIT, IN WC X X
SMOKE DETECTOR, ALARM X X
SMOKE DETECTOR, ALARM X X
SUPPLY FAN, SPEED X
SUPPLY FAN, START/STOP X
SUPPLY FAN, STATUS X X PROVIDE STATUS INDICATION
FOR EACH MOTOR IN FAN
ARRAY.
SUPPLY HIGH PRESSURE LIMIT, IN WC X X
1.
SYSTEM SPECIFIC REMARKS:
1.
NOTES:
BAS CONTROL MATRIX
EQUIPMENT, SYSTEM, AND POINT
POINT TYPE
S T
A T
U S
A L
A R
M
N E
T W
O R
K C
O M
M U
N
IC
A T
IO
IT
A
L I N
P U
T
D
IG
IT
A
L O
U T
P U
T
A N
A L
O G
I N
P U
T
A N
A L
O G
O U
T P
U T
CABINET UNIT HEATER - HYDRONIC
FAN MOTOR, START/STOP X
FAN MOTOR, STATUS X X CURRENT SWITCH
HEATING COIL VALVE, POSITION X
ROOM TEMP, DEGREES F X X
1.
SYSTEM SPECIFIC REMARKS:
1.
NOTES:
BAS CONTROL MATRIX
EQUIPMENT, SYSTEM, AND POINT
POINT TYPE
S T
A T
U S
A L
A R
M
N E
T W
O R
K C
O M
M U
N
IC
A T
IO
IT
A
L I N
P U
T
D
IG
IT
A
L O
U T
P U
T
A N
A L
O G
I N
P U
T
A N
A L
O G
O U
T P
U T
UNIT HEATER - HYDRONIC
EXISTING FAN MOTOR, START/STOP X
EXISTING FAN MOTOR, STATUS X X CURRENT SWITCH
EXISTING HEATING COIL VALVE, POSITION X
ROOM TEMP, DEGREES F X X
1.
SYSTEM SPECIFIC REMARKS:
1.
2.
3.
4.
5.
IN ADDITION TO THE DDC POINTS LISTED BELOW, THE CONTRACTOR SHALL CAREFULLY REVIEW ALL
DRAWINGS,
ALL SPECIFICATIONS, AND ALL SEQUENCES OF OPERATION. THE DOCUMENTS ARE ALL INCLUSIVE AND
COMPLIMENTARYTO EACH OTHER. THE PROJECT SHALL INCLUDE ANY AND ALL NECESSARY DDC POINTS TO
SUPPORT THEREQUIREMENTS OF ALL THE DOCUMENTS.
ALWAYS REFER TO DRAWINGS FOR QUANTITY.
PROVIDE OPEN PROTOCOL COMMUNICATION WITH FACTORY SUPPLIED CONTROLLER.
BAS CONTRACTOR SHALL COORDINATE STATUS LEVEL FOR EACH ALARM POINT WITH THE OWNER TO
DETERMINE WHICH ONES REQUIRE IMMEDIATE ATTENTION.
IF THERE IS A DISCREPANCY BETWEEN ANY DOCUMENTATION, THE WORST CASE SCENARIO SHALL BE USED
FOR BIDDING PURPOSES. ADDITIONAL COSTS WILL NOT BE ALLOWED FOR DISCREPANCIES BETWEEN THE...
NOTES:
BAS CONTROL MATRIX
EQUIPMENT, SYSTEM, AND POINT
POINT TYPE
S T
A T
U S
A L
A R
M
N E
T W
O R
K C
O M
M U
N
IC
A T
IO
IT
A
L I N
P U
T
D
IG
IT
A
L O
U T
P U
T
A N
A L
O G
I N
P U
T
A N
A L
O G
O U
T P
U T
TERMINAL BOX - HYDRONIC
AIRFLOW VOLUME, CFM X
AIRFLOW VOLUME, CFM X
CARBON DIOXIDE, PPM X X
CARBON DIOXIDE, PPM X X
DISCHARGE AIR TEMP, DEGREES F X
DISCHARGE AIR TEMP, DEGREES F X
REHEAT CONTROL VALVE, POSITION X
REHEAT CONTROL VALVE, POSITION X
ROOM TEMP, DEGREES F X X
ROOM TEMP, DEGREES F X X
VAV DAMPER CONTROL, POSITION X
VAV DAMPER CONTROL, POSITION X
ZONE OVERRIDE, SWITCH X
ZONE OVERRIDE, SWITCH X
1.
SYSTEM SPECIFIC REMARKS:
1.
NOTES:
BAS CONTROL MATRIX
EQUIPMENT, SYSTEM, AND POINT
POINT TYPE
S T
A T
U S
A L
A R
M
N E
T W
O R
K C
O M
M U
N
IC
A T
IO
IT
A
L I N
P U
T
D
IG
IT
A
L O
U T
P U
T
A N
A L
O G
I N
P U
T
A N
A L
O G
O U
T P
U T
FAN POWERED TERMINAL BOX - HYDRONIC
DISCHARGE AIR TEMP, DEGREES F X
FAN MOTOR, STATUS X X X
FAN SPEED CONTROL, 0 - 10 VDC X
HEATING COIL VALVE, POSITION X
ROOM TEMP, DEGREES F X
SCALE: NONE
AIR HANDLING UNIT - AHUS -1 2 3
SCALE: NONE
EXHAUST FAN - WITHOUT VFD
1. EXISTING EXHAUST FAN SHALL BE REINTIGRATED WITH NEW BAS CONTROL SYSTEM.
SYSTEM SPECIFIC REMARKS:
1.
2.
3.
4.
5.
IN ADDITION TO THE DDC POINTS LISTED BELOW, THE CONTRACTOR SHALL CAREFULLY REVIEW ALL
DRAWINGS,
ALL SPECIFICATIONS, AND ALL SEQUENCES OF OPERATION. THE DOCUMENTS ARE ALL INCLUSIVE AND
COMPLIMENTARYTO EACH OTHER. THE PROJECT SHALL INCLUDE ANY AND ALL NECESSARY DDC POINTS TO
SUPPORT THEREQUIREMENTS OF ALL THE DOCUMENTS.
ALWAYS REFER TO DRAWINGS FOR QUANTITY.
PROVIDE OPEN PROTOCOL COMMUNICATION WITH FACTORY SUPPLIED CONTROLLER.
BAS CONTRACTOR SHALL COORDINATE STATUS LEVEL FOR EACH ALARM POINT WITH THE OWNER TO
DETERMINE WHICH ONES REQUIRE IMMEDIATE ATTENTION.
IF THERE IS A DISCREPANCY BETWEEN ANY DOCUMENTATION, THE WORST CASE SCENARIO SHALL BE USED
FOR BIDDING PURPOSES. ADDITIONAL COSTS WILL NOT BE ALLOWED FOR DISCREPANCIES BETWEEN THE...
NOTES:
BAS CONTROL MATRIX
EQUIPMENT, SYSTEM, AND POINT
POINT TYPE
S T
A T
U S
A L
A R
M
N E
T W
O R
K C
O M
M U
N
IC
A T
IO
IT
A
L I N
P U
T
D
IG
IT
A
L O
U T
P U
T
A N
A L
O G
I N
P U
T
A N
A L
O G
O U
T P
U T
EXHAUST FAN - WITHOUT VFD
FAN MOTOR, START/STOP X
FAN MOTOR, START/STOP X
FAN MOTOR, STATUS X X
FAN MOTOR, STATUS X X
MOTORIZED DAMPER, OPEN/CLOSE X
MOTORIZED DAMPER, OPEN/CLOSE X
MOTORIZED DAMPER, POSITION X X TWO END SWITCHES REQUIRED
MOTORIZED DAMPER, POSITION X X TWO END SWITCHES REQUIRED
SCALE: NONE
CABINET UNIT HEATER - HYDRONIC
SCALE: NONE
UNIT HEATER - HYDRONIC
SCALE: NONE
TERMINAL BOX - HYDRONIC
| M-001 - MECHANICAL LEGENDS & NOTES |
| M-002 - MECHANICAL SCHEDULES |
| MD-101 - PARTIAL LEVEL 1 HVAC DEMO PLAN |
| MD-102 - PARTIAL PENTHOUSE LEVEL HVAC DEMO PLAN |
| MD-111 - PARTIAL LEVEL 1 HVAC PIPING DEMO PLAN |
| MD-112 - PARTIAL PENTHOUSE LEVEL HVAC PIPING DEMO PLAN |
| M-101 - PARTIAL LEVEL 1 HVAC PLAN |
| M-102 - PARTIAL PENTHOUSE LEVEL HVAC PLAN |
| M-111 - PARTIAL LEVEL 1 HVAC PIPING PLAN |
| M-112 - PARTIAL PENTHOUSE LEVEL HVAC PIPING PLAN |
| M-301 - MECHANICAL DETAILS |
| M-401 - MECHANICAL CONTROLS |
| 2026-08-06T16:58:42-0600 | |
| Ryan Lee | |
| I attest to the accuracy and integrity of this document |
File details come from the government source that posted it. Updated .