This is a Colorado State Design/Bid/Build (D/B/B) Agreement template (Form SC-6.21) issued by the Office of the State Architect State Buildings Program for construction projects. The document serves as the master agreement framework between the State of Colorado and contractors for the FRCC-AFB-27-02-W Replace AHU and Exhaust project. The agreement establishes the contractor's obligation to perform all work required for complete and prompt execution as described in the contract documents, with substantial completion required within a specified number of calendar days from the Notice to Proceed, followed by final completion within an additional period to achieve Final Acceptance. The contract documents are fully incorporated by reference, including the General Conditions (SC-6.23), and specify that the agreement becomes effective and enforceable only upon approval and signature by the State Controller or designee.
The contract sum and specific payment terms are to be inserted by the contracting parties and are subject to additions and deductions as provided in the General Conditions. The agreement includes provisions for performance bonds, labor and material payment bonds, and insurance certificates as exhibits. Depending on project characteristics, the contract may incorporate prevailing wage requirements (if construction value exceeds $500,000 and is not federally funded), apprenticeship utilization certifications (if construction value is $1 million or more and not federally funded), Buy Clean Colorado Act compliance (if construction value exceeds $500,000), and Davis-Bacon Act requirements (if federally funded). The template provides optional modifications including waiver of facilitated negotiations for projects valued below $500,000 and deletion of six-month guarantee inspections. Liquidated damages provisions are included for failure to achieve substantial and final completion within specified timeframes, with daily penalty amounts to be determined by the parties. All notices regarding the agreement must be transmitted in writing to designated principal representatives for both the state and contractor.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S
DESIGN/BID/BUILD (D/B/B)
AGREEMENT
(STATE FORM SC-6.21)
State Agency Insert Department or IHE’s Full Legal Name Department I.D.
Insert Department identification Contract I.D. Number Insert CMS number or other contract number Project Number Insert OSC Project Number Project Name Insert Project as as provided by the State Controller's Office Contractor Name Insert Contractor's full Legal Name including "Inc.", "LLC" etc.
SC-6.21
Rev. 079/20265
Principal Representatives
For the State:
Name Department Name Address Line 1 Address Line 2 City, State ZIP Email
For Contractor:
Name Company Name Address Line 1 Address Line 2 City, State ZIP Email
ATTACHMENT 1: The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23)
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
TABLE OF CONTENTS… Page Table of Contents for the entire Agreement is located in THE GENERAL CONDITIONS OF THE CONTRACTOR’S DESIGN/BID/BUILD (D/B/B) AGREEMENT (SC-6.23)
| SIGNATURE PAGE | 1 | |
| RECITALS: | 2 | |
| 1 | ARTICLE 1 PERFORMANCE OF THE WORK | 3 |
| 2 | ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS | 3 |
| 3 | ARTICLE 3 TIME OF COMPLETION | 3 |
| 4 | ARTICLE 4 ESSENTIAL CONDITION | 3 |
| 5 | ARTICLE 5 CONTRACT SUM | 3 |
| 5.1 | CONDITION PRECEDENT | 4 |
| 6 | ARTICLE 6 CONTRACT DOCUMENTS | 4 |
| 6.1 | CAPITALIZED TERMS | 4 |
| 7 | ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS | 4 |
| 7.1 | MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation. | 4 |
| 7.2 | MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples | 5 |
| 7.3 | MODIFICATION 1 OF ARTICLE 27: Labor and Wages | 5 |
| 7.4 | MODIFICATION 2 OF ARTICLE 27: Labor and Wages | 5 |
| 7.5 | MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations | 5 |
| 7.6 | MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion | 5 |
| 7.7 | MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages | 5 |
| 8 | ARTICLE 8 NOTICE IDENTIFICATION | 6 |
| EXHIBIT A: | CONTRACTORS BID | A |
| EXHIBIT B: | PERFORMANCE BOND | B |
| EXHIBIT C: | LABOR AND MATERIAL PAYMENT BOND | C |
| EXHIBIT D: | INSURANCE CERTIFICATE(S) | D |
| EXHIBIT E: | BUILDING CODE COMPLIANCE POLICY | E |
| EXHIBIT F: | STATE SALES AND USE TAX FORM | A |
| EXHIBIT G: | APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP CONTRIBUTION RATES | B |
| EXHIBIT H: | APPRENTICESHIP UTILIZATION CERTIFICATIONS | C |
| SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS | 1 |
| Rev. 079/20265 | TOC |
| SIGNATURE PAGE | Comment by State Buildings Program: Note to Drafter: The SC6.21 template has been waived from a Risk Assessment and legal review so long as the document is not edited beyond the fillable fields. |
THE PARTIES HERETO HAVE EXECUTED THIS AGREEMENT
Each person signing this Agreement represents and warrants that the signer is duly authorized to execute this Agreement and to bind the Party authorizing such signature.
In accordance with §24-30-202, C.R.S., this Contract is not valid until signed by the State Controller (or an authorized delegate) or the Title of IHE CFO per the Fiscal Rules of the individual Institution of Higher Education Comment by State Buildings Program: Note to Drafters: If this contract is for a University that is outside State Fiscal Rule, insert the name of your organization here
Project Number/Name: Insert OSC Project Number followed by Project Name Contract ID No.: Insert CMS Number & Encumbrance Number
SC-5.3
Rev. 02/2022 Page 1
SC-6.21
Rev. 079/20265 15
CONTRACTOR
INSERT: Legal Name of Contractor By: Name & Title of Person Signing for Contractor Date: __________________
STATE OF COLORADO
Jared S. Polis, Governor INSERT: Name of Agency or IHE INSERT: Name & Title of Head of Agency or IHE By: Name & Title of Person Signing for Agency or IHE Date: __________________
OFFICE OF THE STATE ARCHITECT
State Buildings Program
By: Name & Title of Person Signing for State Buildings Date: __________________
LEGAL REVIEW
Philip J. Weiser, Attorney General
By: Assistant Attorney General Date: __________________
STATE CONTROLLER
Robert Jaros, CPA, MBA, JD By: Name of Agency or IHE Delegate Effective Date: __________________
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD (D/B/B) AGREEMENT
(STATE FORM SC-6.21)
Department ID: Insert Dept. Code Contract ID #: Insert Contract ID Project #:Insert Project #
1. PARTIES. THIS AGREEMENT is entered into by and between the STATE OF COLORADO, acting by and through the Insert Department's or IHE's Full Legal Name hereinafter referred to as the State or Principal Representative, and Insert Contractor's full Legal Name including "Inc.", "LLC" etc. having its offices at Street address, City, State and Zip Code hereinafter referred to as the Contractor.
2. EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Agreement shall not be effective or enforceable until it is approved and signed by the State Controller or its designee (hereinafter called the “Effective Date”), but shall be effective and enforceable thereafter in accordance with its provisions. The State shall not be bound by any provision of this Contract before the Effective Date, and shall have no obligation to pay Contractor for any Work performed or expense incurred before the Effective Date.
RECITALS:
WHEREAS, the Principal Representative intends to engage the services of a Contractor for the Insert Project Name as provided by the State Controller's Office hereinafter called the Project; and Comment by State Buildings Program: Note to Drafter: Do not include scope of work here. This is only the Project Name.
WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated, and otherwise made available, and a sufficient unencumbered balance thereof remains available for payment in Fund Number Insert Fund Number Here, Account Number Insert Account Number here; and
WHEREAS, the State has Appropriated and the Principal Representative has been authorized to expend the total sum of Insert Dollar Value in Written Words Dollars ($ ) for this project including all professional services, construction/improvements, project contingencies, furnishings, movable equipment, reimbursable expenses and miscellaneous expenses; and
(WHEREAS, funds are available for only a portion of the services defined herein, as more fully described in the funding Condition Precedent clause in Article 5.1; and) Comment by State Buildings Program: Note to Drafters: If the Condition Precedent clause is to be used REMOVE the parenthesis and the italics.
If not accepting the Condition Precedent strike out the language – DO NOT DELETE
WITNESSETH, that the State of Colorado and the Contractor agree as follows:
1. ARTICLE 1 PERFORMANCE OF THE WORK
The Contractor shall perform all of the Work required for the complete and prompt execution of everything described or shown in, or reasonably implied from the Contract Documents for the above referenced Project.
ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS
The Contractor agrees to perform the Work to the highest industry standards and to the satisfaction of the State of Colorado and its contractor in strict accordance with the provisions of the Contract Documents.
ARTICLE 3 TIME OF COMPLETION
The Contractor agrees to Substantially Complete the Project within calendar days from the date of the Notice to Proceed, in addition, the Contractor agrees to finally complete the Project from Substantial Completion to Final Acceptance within calendar days for a total time of completion of the entire Project of calendar days. The Contractor shall perform the Work with due diligence to completion.
ARTICLE 4 ESSENTIAL CONDITION
Timely completion of the Project is an essential condition of this Agreement. The Contractor shall be subject to any liquidated damages described in Article 7.6 for failure to satisfactorily complete the Work within the time periods in Article 3 above.
ARTICLE 5 CONTRACT SUM
The Contractor shall be paid for the performance of this Agreement, subject to any additions and deductions as provided for in Articles 32, 34 and 35 of The General Conditions of the Construction Contract SC-6.23, the sum of INSERT DOLLAR VALUE IN WORDS DOLLARS AND NO/100 ($ ).
CONDITION PRECEDENT
(At the time of the execution of this Agreement, there are sufficient funds budgeted and appropriated to compensate the Contractor only for performance of the services through and including Insert the project phases that have been fully funded Therefore, it shall be a Condition Precedent to the Contractor’s performance of the remaining services and the State's liability to pay for such performance, sufficient funding must be appropriated and made available to the Principal Representative for the Project prior to and, as a further Condition Precedent, a written Amendment is entered into in accordance with the State of Colorado Fiscal Rules, stating that additional funds are lawfully available for the project. If either Condition Precedent is not satisfied by , the Contractor’s obligation to perform services for Insert the scope pf work or phases that will be completed in the future and the State's obligation to pay for such service is discharged without liability to each other. If funding is eventually made available after , the Contractor has no right to perform services under of this Agreement and the state has no right to require the Architect/Engineer to perform the said services.) Comment by State Buildings Program: Note to Drafter: This is usually PROJECT PHASES not Design Phases Comment by State Buildings Program: Note to Drafter: Insert the latest date that the funds will be released and the Architect/Engineer is willing to hold their fee. Comment by State Buildings Program: Note to Drafter: Insert the latest date that the funds will be released and the Architect/Engineer is willing to hold their fee. Comment by State Buildings Program: Note to Drafter: Insert the last date the architect is willing to hold their fee. Comment by State Buildings Program: Note to Drafter: Insert the latest date that the funds will be released and the Architect/Engineer is willing to hold their fee. Comment by State Buildings Program: Note to Drafter: Insert the last date the architect is willing to hold their fee.
ARTICLE 6 CONTRACT DOCUMENTS
The Contract Documents, as enumerated in Article 1.1 of The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23), (the “General Conditions”). The Contract Documents, including the General Conditions, are all essential parts of this Agreement and are fully incorporated herein.
CAPITALIZED TERMS
Capitalized terms used herein and not defined shall have the meanings ascribed to them in The General Conditions of Design/Bid/Build (D/B/B) Agreement (SC-6.23)
ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS
The provisions of this Article 7 alter or enlarge upon the following Articles (the General Conditions of the Contractor’s Design/Bid/Build Agreement SC-6.23):
| MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation. | Comment by : Note to Drafter: Apprenticeship utilization is required if Construction value is $1 million or more and not federally funded |
| If the box below is marked, certification of apprenticeship utilization is required for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical and plumbing work on the project. | Comment by : Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” |
☒ ______ Principal Representative initial MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples Comment by : Note to Drafter: The Buy Clean Colorado Act applies to all projects with a construction value of $500,000 or more If the box below is marked, the Buy Clean Colorado Act, §24-92-117, C.R.S., shall be applicable to the Project. The Contractor is responsible for submitting Environmental Product Declaration (EPD) information for all eligible materials to be used on the project.
☐ ______ Principal Representative initial
| MODIFICATION 1 OF ARTICLE 27: Labor and Wages | Comment by : Note to Drafter: Federal Davis-Bacon Act might be applicable if federally funded. Confirm with the funding documentation. |
| If the box below is marked, the Federal Davis-Bacon Act shall be applicable to the Project. The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents. | Comment by : Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” |
☐ ______ Principal Representative initial
| MODIFICATION 2 OF ARTICLE 27: Labor and Wages | Comment by : Note to drafter: State prevailing wage is required if the construction value is $500,000 or more and not federally funded. |
| If the box below is marked, the State prevailing wage statute shall be applicable to the Project. The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents. | Comment by : Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” |
☐ ______ Principal Representative initial MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations If the box below is marked, and initialed by the State as noted, the requirement to participate in facilitated negotiations shall be deleted from this Contract. Article 39, Non-Binding Dispute Resolution – Facilitated Negotiations, shall be deleted in its entirety and all references to the right to the same where ever they appear in the contract shall be similarly deleted.
The box may be marked only for projects with an estimated value of less than $500,000. Comment by : Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” ☒ ______ Principal Representative initial MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion If the box below is marked the six month guarantee inspection is not required. Comment by : Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” ☐ ______ Principal Representative initial MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages If an amount is indicated immediately below, liquidated damages shall be applicable to this Project as, and to, the extent shown below. Where an amount is indicated below, liquidated damages shall be assessed in accordance with and pursuant to the terms of The General Conditions of the Design/Bid/Build Agreement Article 46, Time of Completion And Liquidated Damages, in the amounts and as here indicated. The election of liquidated damages shall limit and control the parties right to damages as the State’s sole and exclusive remedy for delay.
Inability To Use The Project For the inability to use the Project, for each day after the number of calendar days specified in the Contractor’s bid for the Project and the Agreement for achievement of Substantial Completion, until the day that the Project has achieved Substantial Completion and the Notice of Substantial Completion is issued, the Contractor agrees that an amount equal Insert dollar value in words Dollars ($ ). shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due, but amounts remaining are insufficient to cover the entire assessment. Comment by State Buildings Program: Note to drafter: If liquidated damages are not applicable Note “Not Applicable” in this field.
Damages Related to Extended Closeout For damages related to or arising from additional administrative, technical, supervisory and professional expenses related to and arising from the extended closeout period, for each day in excess of the number of calendar days specified in the Contractor’s bid for the Project and the Agreement to finally complete the Project as defined by the issuance of the Notice of Final Acceptance (after the issuance of the final Notice of Substantial Completion), the Contractor agrees that an amount equal to Insert dollar value in words Dollars ($ ). shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due but amounts remaining are insufficient to cover the entire assessment. Comment by : Note to drafter: If liquidated damages are not applicable Note “Not Applicable” in this field.
ARTICLE 8 NOTICE IDENTIFICATION
All Notices pertaining to this Agreement and the General Conditions (SC-5.23) or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing.
NOTICE TO PRINCIPAL REPRESENTATIVE:
Insert Name of Individual acting on the PR behalf Insert Street Address City, State Zip Code Insert email address With copies to State Buildings Program (or Delegate) Insert Name of Individual acting on OSA/SBP behalf Insert Street Address City, State Zip Code Insert email address
NOTICE TO CONTRACTOR:
Insert Name of Individual acting on the contractor behalf Insert Street Address City, State Zip Code Insert email address
SC-6.21
Rev. 02/2025 1
SC-6.21
Rev. 079/20265 3
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT A: CONTRACTORS BID
CONTRACTOR’S BID (Form SBP-6.13) Workers’ Compensation Certification (SBP-4.1) Comment by : Note to Drafter: Delete Alternates and Unit Pricing if not applicable Bid Alternates (Form SBP-6.131) Unit Pricing (Form SBP-6.133) Bid Bond (Form SBP-6.14) Comment by : Note to drafter: Labor burden is required on ALL construction projects Labor Burden Calculation (Form SBP-6.18)
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT B: PERFORMANCE BOND
PERFORMANCE BOND (Form SC-6.22)
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT C: LABOR AND MATERIAL PAYMENT BOND
LABOR AND MATERIAL PAYMENT BOND (Form SC-6.221)
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT D: INSURANCE CERTIFICATE(S)
INSURANCE CERTIFICATE(S) (attached)
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT E: BUILDING CODE COMPLIANCE POLICY
BUILDING CODE COMPLIANCE POLICY: COORDINATION OF APPROVED BUILDING CODES, PLAN REVIEWS, BUILDING INSPECTIONS AND STATE DEVELOPMENT REQUIREMENTS
Refer to the Office of the State Architect’s Building Codes Webpage for the Building Code Compliance Policy (Rev. July 2025)
Exhibit A: Approved Building Codes of the Code Compliance Policy dated July 2025 including the Amendments to the International Building Code and Code Compliance Plan Review Procedures (Rev. July 2025);
Exhibit B: Plan Review Procedures of the Code Compliance Policy dated July 2025
Exhibit I: State Development Requirements of the Code Compliance Policy dated July 2025
The State Buildings Program Building Codes Webpage may be found at:
Rev. 079/20265 Ex B https://osa.colorado.gov/state-buildings/building-codes
SC-5.3
Rev. 08/2023 Ex B
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
| EXHIBIT F: | STATE SALES AND USE TAX FORM |
| Comment by : Note to Drafter: The CDOR form should have the bottom half completed by the agency so the contractor may expedite their exemption certificate. |
STATE SALES AND USE TAX FORM
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
| Comment by : Note to Drafter: Delete this page if not applicable | |
| EXHIBIT G: | APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP CONTRIBUTION RATES |
| Applicable Prevailing Wage Determinations (Attached) | Comment by State Buildings Program: If applicable the wage rates and apprenticeship contribution rates MUST be attached. DO NOT REFERENCE THE WEBSITE LINK! |
| Apprenticeship Contribution Rates (Attached) | Comment by State Buildings Program: If prevailing wage rates are applicable, the Apprenticeship Contribution rates must also be attached - this is not related to Apprenticeship Certification. |
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
| Comment by : Note to drafter: Delete this page if not applicable | |
| EXHIBIT H: | APPRENTICESHIP UTILIZATION CERTIFICATIONS |
APPRENTICESHIP UTILIZATION CERTIFICATIONS
Rev. 079/20265 Ex H
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
Comment by : Note to drafter: Delete this page if not applicable
SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS
Supplementary General Conditions Federal Provisions
SLFRF Federal Funds: Contractor Terms and Conditions Certification
SLFRF Federal Funds: Contractor Terms and Conditions
SC-6.21
Rev. 079/20265 image1.emf
Microsoft_Excel_Worksheet.xlsx Sheet1
Name of Document Short Description of Work/Date Dollar Amount
Base Bid Amount Base Bid
Alt. #
Alt. #
Total Contract Sum $ - 0