Appendix G - Construction Documents - FRCC Westminster Student Center HVAC Upgrades Project Drawings.pdf

PDF 4 MB Posted

Attached to
FRCC-AFB-27-02-W Replace AHU and Exhaust
Solicitation number
IFB1 GJEA 2027000011 1
Issued by
Adams County, Weston CDP, Colorado

About this file

This is a set of construction documents for the Front Range Community College (FRCC) Westminster Student Center HVAC Upgrades Project, a mechanical and electrical renovation project located at 3645 W. 112th Avenue, Westminster, Colorado 80031. The project consists of upgrading HVAC mechanical equipment in the student center, including the removal and replacement of three air handling units (AHU-1, AHU-2, AHU-3), installation of return fans (RF-1, RF-2, RF-3), replacement of exhaust fans, installation of multiple fan-powered terminal boxes with hot water heating coils, new pumps for heating and cooling coil systems, and associated ductwork and piping. The construction documents are dated August 7, 2026, with project number CRA 2025-418, and were prepared by MEP Design Consultant Cator, Ruma & Associates and Architectural Consultant Collab Architecture. The project includes comprehensive mechanical and electrical work governed by the 2018 International Building Code, 2018 International Existing Building Code, 2018 International Energy Code, 2018 International Plumbing Code, 2018 International Mechanical Code, and the 2023 National Electrical Code.

The construction documents provide detailed specifications for mechanical equipment including three identical Trane CSAA025 semi-custom air handling units rated for 11,700 to 12,500 CFM with heating and cooling coil sections, multiple Armstrong inline pumps for heating and cooling systems operating at 480V three-phase, Greenheck inline return fans and exhaust fans, and Price fan-powered terminal boxes with hot water reheat coils throughout the building. Electrical work includes connections to existing panelboards P4B7C and P4B7D at 480V/3ph and 120V/1ph service, new variable frequency drives for fan and pump motors, new control circuits for Building Automation System (BAS) integration with DDC points for monitoring and control, and new branch circuits for terminal box motors and damper controls. The project requires coordination with existing building systems, including provisions for phased demolition to maintain occupied building operations, with contractor responsibility for field verification of existing conditions, protection of owner equipment, and comprehensive testing and balancing of all HVAC systems upon completion.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROXIMITY MAP CODES & REGULATIONS

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL EXISTING BUILDING CODE

2018 INTERNATIONAL ENERGY CODE

2018 INTERNATIONAL PLUMBING CODE

2018 INTERNATIONAL MECHANICAL CODE

2023 NATIONAL ELECTRICAL CODE

PROJECT TEAM

OWNER: FRONT RANGE COMMUNITY COLLEGE

3645 W. 112th Ave.

Westminster, CO 80031

MEP DESIGN CONSULTANT: CATOR, RUMA & ASSOCIATES, CO.

896 TABOR STREET

LAKEWOOD, CO 80401

(303) 232-6200

ARCHITECTURAL CONSULTANT: COLLAB ARCHITECTURE

9217 EASTMAN PARK DR., UNIT 3

WINDSOR, CO 80550

(970) 848-2350

PROJECT DESCRIPTION

THE PROJECT CONSISTS OF UPGRADING HVAC MECHANICAL EQUIPMENT IN

THE STUDENT CENTER OF THE CAMPUS. REFER TO G.001 FOR PROJECT CODE

SUMMARY.

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

:4

0:

P M

G.001

MWJ

RWL

C O

V E

R S

H E

E T

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

FRONT RANGE COMMUNITY COLLEGE

STUDENT CENTER HVAC UPGRADE

CONSTRUCTION DOCUMENTS

AUGUST 7, 2026

CRA PROJECT # 2025-418

SHEET LIST.

Sheet Number Sheet Name

A1.21 OVERALL BUILDING PLAN

A1.22 ENLARGED FLOOR PLAN

A1.31 ENLARGED FAN ROOM PLAN

A1.41 ENLARGED REFLECTED CEILING PLAN

M.001 MECHANICAL LEGENDS & NOTES

M.002 MECHANICAL SCHEDULES

MD.101 PARTIAL LEVEL 1 HVAC DEMO PLAN

MD.102 PARTIAL PENTHOUSE LEVEL HVAC DEMO PLAN

MD.111 PARTIAL LEVEL 1 HVAC PIPING DEMO PLAN

MD.112 PARTIAL PENTHOUSE LEVEL HVAC PIPING DEMO PLAN

M.101 PARTIAL LEVEL 1 HVAC PLAN

M.102 PARTIAL PENTHOUSE LEVEL HVAC PLAN

M.111 PARTIAL LEVEL 1 HVAC PIPING PLAN

M.112 PARTIAL PENTHOUSE LEVEL HVAC PIPING PLAN

M.301 MECHANICAL DETAILS

M.401 MECHANICAL CONTROLS

E.001 ELECTRICAL LEGENDS & NOTES

E.002 ELECTRICAL SCHEDULES

E.011 ELECTRICAL ONE-LINE DIAGRAM

E.121 PARTIAL LEVEL 1 POWER PLAN

ED.121 PARTIAL LEVEL 1 POWER DEMO PLAN

E.122 PARTIAL PENTHOUSE LEVEL POWER PLAN

ED.122 PARTIAL PENTHOUSE LEVEL POWER DEMO PLAN

M A

T C

H L

IN

E

U P

M M

A

A

M

M

N N

P P

Q Q

B

B

C

C

B

B

A

A

A

A

B

B

A

A

L

L

K

K

J

J

H

H

H

H

G G

F F

E E

D D

C C

B B

A A

A

A

A 1.2

27'-4"38'-8"18'-6 3/4"16'-1 1/2"18'-10 1/4"39'-8 1/2"29'-3"

4'-0"

'-0

'-0

'-0

'-0

'-0

'-0

'-0

'-0

'-0

'-10

'-0

'-0

'-7

'-9

'-1"

'-0

216'-8"

'-3

56'-0"56'-0"26'-7"

1'-5" 56'-0"

'-4

'-0

CHECKED BY:DRAWN BY:

SD:

DD:

PERMIT:

NOT FOR

CONSTRUCTION

CD:

A1.21

W th

A v e B ld g

. C , W e st m in st e r, C

O

F R

O N

T R

A N

G E

C O

M M

U N

IT

Y

C O

L L

E G

E

S T

U D

E N

T C

E N

T E

R A

H U

OVERALL BUILDING

PLAN

Author

C2023.0XX

Checker

REV. # DESCRIPTION DATE

A

.2

O

V E

R A

L L F

L O

O R

P L A

N

L E

V E

L C

PLAN

NORTH

UP

G F

C I

G F

C I

GFCI GFCI

UP

M

M

7A 7A

M4

M4

N

N

P

P

Q

Q

7B 7B

7C 7C

7 7

5B 5B

5A 5A

8 8

8A 8A

8B 8B

9 9

L

L

K

KJH2H

6A

6A

18'-11 1/4"

1'-7"

1'

-3

/4

26'-0"

/4

3'-2"

25'-5"

1' -0

/2

3'-0"

35'-8"

6'-8"

/2

16'-0"5'-0 1/4"

E L

E C

W A

L L

14'-9" 2'-2" 5'-6"

15'-4"

/2

6'-11" 17'-0"

23'-11"

23'-9"

1'-3"

2'-10"

STUDENT

ANNEX

C-0574

CONFERENCE

C-0576

CONFERENCE

C-0578

CONFERENCE

C-0577

MULTI-CULTURAL

CENTER

C-0580

VESTIBULE

C-0761

CAMPUS

SAFETY

C-0762

STORAGE

C-0767

C-0771

C -0

A

21'-6"

9'-11"

9'-11"

1"

2'-7"

MEN RR

C-0575

S T

O R

C -0

A

S T

O R

C -0

B

10"

/4

/4

10"

14'-4 1/2" 4'-5 1/2"

/2

/2

1/

/4

A1.31

FAN ROOM ABOVE

LEGEND

CHECKED BY:DRAWN BY:

SD:

DD:

PERMIT:

NOT FOR

CONSTRUCTION

CD:

A1.22

W th

A v e B ld g

. C , W e st m in st e r, C

O

F R

O N

T R

A N

G E

C O

M M

U N

IT

Y

C O

L L

E G

E

S T

U D

E N

T C

E N

T E

R A

H U

ENLARGED FLOOR

PLAN

Author

C2023.0XX

Checker

REV. # DESCRIPTION DATE

1/8" = 1'-0"A1.22

1 PARTIAL EXISTING LEVEL C PLAN

1" = 160'-0"

KEY PLAN

M

M

7A 7A

M4

M4

N

N

7B 7B

7C 7C

7 7

8 8

8A 8A

1/

/4

1/

1'-1 1/4" 17'-6" 26'-10" 11"

18'-7" 27'-9"

11'-2 3/4" 7'-4 1/4"

/4

EXISTING EPDM

MEMBRANE ROOFING

4 LOUVERS @84" LONG

EACH RE: MECH

MECHCANICAL

ROOM

D100

EL. = 112' - 10"

A1.31

EXISTING CONC CURB

EXISTING ROOF MEMBRANE

PATCH AS NEEDED

EXTENDED SILL BY MANUF.

1 1/2" X 1 1/2" STEEL CLIP ANGLE

LOUVER, MATCH EXISTING

OPENING HEIGHT, RE: MECH

3/8" SPACE WITH SEALANT /

BACKER ROD

SEALANT / BACKER ROD

EXISTING EFIS WALL SYSTEM

CHECKED BY:DRAWN BY:

SD:

DD:

PERMIT:

NOT FOR

CONSTRUCTION

CD:

A1.31

W th

A v e B ld g

. C , W e st m in st e r, C

O

F R

O N

T R

A N

G E

C O

M M

U N

IT

Y

C O

L L

E G

E

S T

U D

E N

T C

E N

T E

R A

H U

ENLARGED FAN

ROOM PLAN

Author

C2023.0XX

Checker

REV. # DESCRIPTION DATE

1/8" = 1'-0"A1.31

1 FAN ROOM - ENLARGED VIEW

1 1/2" = 1'-0"A1.31

2 LOUVER SILL HEAD/JAMB DETAIL

F

F

F

F

F

F

F

F

F

F

F

F

2' X 4' LAY-IN LIGHT FIXTURE

RECESSED CAN LIGHT FIXTURE

RECESSED LINEAR LIGHT FIXTURE

SPRINKLER HEAD

4' CEILING FLUORESCENT CEILING MOUNTED

STRIP LIGHT FIXTURE

FIRE ALARM STROBE DEVICE

SECURITY CAMERA

EXIT LIGHT

PROJECTOR

MECHANICAL SUPPLY

MECHANICAL RETURN

EXHAUST FAN

EXPOSED DUCTWORK

P

F

M

M

7A 7A

M4

M4

N

N P Q

7B 7B

7C 7C

5B

5A

8 8

8A 8A

8B 8B

L

L

K

K

J

J

6A

STUDENT

ANNEX

C-0574

CONFERENCE

C-0576

CONFERENCE

C-0578

CONFERENCE

C-0577

MULTI-CULTURAL

CENTER

C-0580

C -0

A

M E

N R

R C

-0

VESTIBULE

C-0761

CAMPUS

SAFETY

C-0762

C-0771

STORAGE

C-0767

C-0770 C-0770

8'-0"

STOR

C-0575A

STOR

C-0575B

P

P

P

ACCESS

PANEL

/4

1'-0 3/4" 2'-0"

1' -8

/4

3'-0 3/4"

1'-11" 2'-3"

2'-3"

2'-8"

1' -2

/2

1' -6

/2

C4 8' - 6"

C3 9' - 6"

C5 9' - 0"

C

C

C4 10' - 0"

C4 10' - 0"

C4 8' - 0"

C4 9' - 0"

C4 9' - 0"

C4 8' - 6"

C4 9' - 0"

C4 9' - 0"

C5 9' - 0"

C1 9' - 0"

2'-0"

C4 8' - 6"

C

1. THE REFLECTED CEILING PLAN IS TO DOCUMENT THE EXISTING

CEILING LAYOUT. ALL ITEMS REMOVED FOR MECHANICAL WORK ARE

TO BE REINSTALLED IN THE SAME LOCATIONS IN THE SAME

CONDITION OR BETTER.

CHECKED BY:DRAWN BY:

SD:

DD:

PERMIT:

NOT FOR

CONSTRUCTION

CD:

A1.41

W th

A v e B ld g

. C , W e st m in st e r, C

O

F R

O N

T R

A N

G E

C O

M M

U N

IT

Y

C O

L L

E G

E

S T

U D

E N

T C

E N

T E

R A

H U

ENLARGED

REFLECTED CEILING

PLAN

Author

C2023.0XX

Checker

SYSTEM NOTES - CEILINGS

EXISTING CEILING ASSEMBLIES

C1 EXPOSED STRUCTURE (DECK) - UNFINISHED.

C2 5/8" GYP BD

C3 2X2 ACT SYSTEM

C4 2X4 ACT SYSTEM

C5 SOFFIT SYSTEM

REV. # DESCRIPTION DATE

1/8" = 1'-0"A1.41

1 EXISTING REFLECTED CEILING PLAN

LEGEND -- CEILINGS

GENERAL NOTES

1" = 160'-0"

KEY PLAN

DOUBLE/SINGLE LINE DUCT LEGEND

45° TEE (ROUND) FLEX DUCT 90° RADIUS ELBOW

RIGID FLEX

45° TEE (RECTANGULAR) 90° TEE (ROUND) MANUAL VOLUME DAMPER 90° ELBOW

DUCT SPLIT REDUCER 45° ELBOWGRD RUNOUT

90° TEE (RECTANGULAR)

SEE DETAIL

CONICAL

TEE

TAKEOFF

WITH VOLUME

DAMPER

SINGLE LINEDOUBLE LINEDOUBLE LINESINGLE LINE SINGLE LINE

FLEXRIGID

SINGLE LINE DOUBLE LINE DOUBLE LINE

R N

D

R E

C

(Not all symbols listed below are used on these drawings)

HVAC LEGEND

SYMBOL DESCRIPTION ABBR. DESCRIPTION

LOW PRESSURE CONDENSATE RETURN PIPING

HEATING WATER SUPPLY PIPING

HEATING WATER RETURN PIPING

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

SUPPLY DUCT UP / DOWN

RETURN DUCT UP / DOWN

FLEXIBLE DUCT CONNECTION

BACKDRAFT DAMPER

TEMP. CONTROL DAMPER-OPPOSED BLADE

MANUAL VOLUME DAMPER

DUCT MOTORIZED DAMPER

CONICAL FITTING WITH MVD

CONDENSER WATER SUPPLY PIPING

LOW PRESSURE STEAM SUPPLY PIPING (0 - 15#)

ROUND DUCT UP / ROUND DUCT DOWN

FLAT OVAL DUCTWORK

ABBR. SYMBOL

COOLING COIL DRAIN PAN PIPING

TEMP. CONTROL DAMPER- PARALLEL BLADE

LPS

LPC

MPS

MVD

MPC

BBD

BF

RL

RS

RHG

TT

MEDIUM PRESSURE STEAM SUPPLY PIPING (16# - 60#)

MEDIUM PRESSURE CONDENSATE RETURN PIPING

HIGH PRESSURE STEAM SUPPLY PIPING (61# - 125#)

HIGH PRESSURE CONDENSATE RETURN PIPING

PUMPED CONDENSATE PIPING

BOILER BLOWDOWN PIPING

REFRIGERANT SUCTION PIPING

BOILER FEED WATER PIPING

FLOAT AND THERMOSTATIC STEAM TRAP

REFRIGERANT LIQUID PIPING

REFRIGERANT HOT GAS PIPING

TCD

FD

FSD

SD

DAD

DUCT FIRE DAMPER (SEE NOTES)

COMBINATION DUCT FIRE/SMOKE DAMPER (SEE NOTES)

DUCT SMOKE DAMPER

DUCT SMOKE DETECTOR

DUCT ACCESS DOOR

ELECTRIC-PNEUMATIC CONTROL VALVE

TURNING VANES IN DUCT ELBOW

WALL SWITCH / EMERGENCY SWITCH

PNEUMATIC-ELECTRIC CONTROL SWITCH

HUMIDISTAT

DUCT RISE

UNIT MOUNTED THERMOSTAT

UNDERCUT DOOR

THERMOSTATIC STEAM TRAP

DUCT DROP

HWS

HWR

CHWS

CHWR

D

CWS

CWR

HPS

HPC

PC

F&T

IBT

TCV

FS

EJ

BJ

RSV

DPS

(2 OR 3-WAY) TEMPERATURE CONTROL VALVE

INVERTED BUCKET STEAM TRAP

VENTURI METER

CALIBRATED BALANCING VALVE

REFRIGERANT SERVICE VALVE

DIFFERENTIAL PRESSURE SWITCH

FLOW SWITCH

EXPANSION JOINT

CONDENSER WATER RETURN PIPING

BALL JOINT EXPANSION COMPENSATOR

ACOUSTICALLY LINED DUCTWORK

TEMPERATURE CONTROL OUTSIDE AIR DAMPER

TEMPERATURE CONTROL RETURN AIR DAMPER

TEMPERATURE CONTROL EXHAUST AIR DAMPER

STATIC PRESSURE IN INCHES WATER COLUMN

SUPPLY AIR DEVICE

RETURN AIR DEVICE

M

F

S

T

H

U

RISE

SD

RG

SP IN WC

TCEAD

TCRAD

TCOAD

A.L.

TCD

BDD

EP

PE

(Not all symbols listed below are used on these drawings)

EXHAUST DUCT UP / DOWN

WALL MOUNTED CARBON DIOXIDE SENSORCO2

EXHAUST AIR DEVICEEG

DP

T IBT

F&T

TT

RETURN AIR DEVICE WITH SOUND BOOTRG

GENERAL LEGEND

SYMBOL DESCRIPTION ABBR. DESCRIPTION

NEW

SECTION DESIGNATION

SECTION CUT ON THIS SHEET

VIEW REFERENCE DESIGNATION

VIEW REFERENCE ON THIS SHEET

EQUIPMENT UNIT IDENTIFICATION

CAP END OF PIPE

PITCH DOWN IN DIRECTION OF ARROW

UNION OR FLANGE

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

PRESSURE AND/OR TEMPERATURE RELIEF VALVE

ISOLATION VALVE (RE: SPEC FOR TYPE)

VERTICAL PIPE VALVE

DIFFUSER IDENTIFICATION

EXISTING

PIPE ANCHOR

PIPE ALIGNMENT GUIDE

ABBR. SYMBOL

EQUIPMENT UNIT NUMBER (UNIT SERVED - FLOOR -

SEQUENCE #)

PRESSURE REDUCING VALVE

(E)

(N)

(R)

PTRV

(F)

DIA

WAD

NIC

AFF

GC

MC

EC

RELOCATED

FUTURE

POINT OF CONNECTION, NEW TO EXISTING

DIRECTION OF FLOW IN PIPE

DUCTWORK, PIPING AND EQUIPMENT TO BE REMOVED

DIAMETER

ABOVE FINISHED FLOOR

WALL ACCESS DOOR

ELECTRICAL CONTRACTOR

NOT IN CONTRACT

GENERAL CONTRACTOR

PRV

CV

P/T

STRAINER W/ BLOWDOWN

CHECK VALVE

SOLENOID / MOTORIZED VALVE

PRESSURE / TEMPERATURE TAP

SOLENOID VALVE

BRAIDED FLEXIBLE PIPE CONNECTOR

HOSE END DRAIN VALVE

STRAINER

CEILING ACCESS PANEL

PRESSURE GAUGE

PUMP

THERMOMETER

SIGHT GLASS

C.A.P.

TB

MECHANICAL CONTRACTOR

1-2-3

X

THRUST BLOCK

P/T

SLOPE

(Not all symbols listed below are used on these drawings)

A DIFFUSER NECK DIAMETER

DIFFUSER CFM

LINEAR DIFFUSER IDENTIFICATION

8ø/24"L

E

LINEAR DIFFUSER NECK DIAMETER

LINEAR DIFFUSER LENGTH

LINEAR DIFFUSER CFM

FINNED TUBE RADIATOR ACTIVE ELEMENT LENGTH

EQUIPMENT UNIT IDENTIFICATION

EQUIPMENT UNIT NUMBER

RADIATOR ENCLOSURE LENGTH (OR W-W=WALL-TO-WALL)

FTR2'-6"

3'-6"

DOUBLE-BOWL FLEXIBLE PIPE CONNECTOR

MANUAL AIR VENT

AUTOMATIC AIR VENT

20 8

GLYCOL HEATING WATER SUPPLY PIPING

GLYCOL HEATING WATER RETURN PIPING

PROCESS CHILLED WATER SUPPLY PIPING

PROCESS CHILLED WATER RETURN PIPING

GHWS

GHWR

PCWS

PCWR

BV

O2 WALL MOUNTED OXYGEN SENSOR

WALL MOUNTED THERMOSTATT

ES

DROP

AUTO FLOW VALVEAFV

MD

KITCHEN/OWNER/MEDICAL EQUIPMENT REFERENCE1

TYPICAL ROOM REFERENCE (TOP = RM #, BOTTOM = FLR)

X X

X KEY NOTE REFERENCE

MAV

AAV

UNO UNLESS NOTED OTHERWISE

Ø

X

X-X

LPS

LPC

MPS

MPC

BBD

BF

RL

RS

RHG

HWS

HWR

CHWS

CHWR

D

CWS

CWR

HPS

HPC

PC

GHWS

GHWR

PCWS

PCWR

48F12

SPIN-IN FITTING WITH MVD

C

NC NORMALLY CLOSED

COMMON

NO NORMALLY OPEN

LOUVER IN DOORL

TEMPERATURE SENSORTS

HIGH TEMPERATURE HEATING WATER SUPPLY PIPING

HIGH TEMPERATURE HEATING WATER RETURN PIPING

HTWS

HTWR

HTWS

HTWR

X

X-X

BAS CONTROL LEGEND & NOTES

SYMBOL DESCRIPTIONABBR.

(Not all symbols listed below are used on these drawings)

DIGITAL INPUT

DIGITAL OUTPUT

ANALOG INPUT

ANALOG OUTPUT

GENERAL NOTES:

1. THE TEMPERATURE CONTROL MATRIX, CONTROL DIAGRAMS, AND THE SEQUENCE OF OPERATIONS ARE ALL BINDING AND COMPLEMENTARY. IF THERE IS A

DISCREPANCY BETWEEN THEM, THE WORST CASE SCENARIO SHALL BE USED FOR BIDDING PURPOSES. ADDITIONAL COSTS WILL NOT BE ALLOWED FOR

DISCREPANCIES BETWEEN THE SPECIFICATIONS AND THE DRAWINGS.

2. IN ADDITION TO THE DDC POINTS LISTED, THE CONTRACTOR SHALL CAREFULLY REVIEW ALL DRAWINGS, ALL SPECIFICATIONS, AND ALL SEQUENCES OF

OPERATION. THE DOCUMENTS ARE ALL INCLUSIVE AND COMPLIMENTARY TO EACH OTHER. THE PROJECT SHALL INCLUDE ANY AND ALL NECESSARY DDC

POINTS TO SUPPORT THE REQUIREMENTS OF ALL THE DOCUMENTS.

3. ALWAYS REFER TO DRAWINGS FOR QUANTITY.

4. PROVIDE OPEN PROTOCOL COMMUNICATION WITH FACTORY SUPPLIED CONTROLLER.

5. BAS CONTRACTOR SHALL COORDINATE STATUS LEVEL FOR EACH ALARM POINT WITH THE OWNER TO DETERMINE WHICH ONES REQUIRE IMMEDIATE

ATTENTION.

6. IF THERE IS A DISCREPANCY BETWEEN ANY DOCUMENTATION, THE WORST CASE SCENARIO SHALL BE USED FOR BIDDING PURPOSES. ADDITIONAL COSTS WILL

NOT BE ALLOWED FOR DISCREPANCIES BETWEEN THE SPECIFICATIONS AND DRAWINGS.

A.O.

A.I.

D.O.

D.I.

A.O.

A.I.

D.O.

D.I.

POINT OF DISCONNECTION, DEMO

PRESSURE SENSOR / PRESSURE MONITORP PM

END OF MAIN DRIPEOMD

SHORT CIRCUIT CURRENT RATINGSCCR

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:2

P

M

M.001

MWJ

RWL

M E

C H

A N

IC

A

L L

E G

E N

D S

N

O T

E S

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

GENERAL NOTES:

1. WORK INCLUDED IN THE CONTRACT IS DENOTED IN BOLD. EXISTING

CONDITIONS TO REMAIN ARE DENOTED LIGHTLY.

2. A DETAILED METHOD OF PROCEDURE IS REQUIRED WHEN A CONSTRUCTION

ACTIVITY AFFECTS THE SAFETY OF THE OCCUPANTS, OWNER'S EQUIPMENT OR

VALUABLE CONTENTS OR ANY SYSTEM WHICH SUPPORTS THESE SYSTEMS;

OR ESSENTIALLY AFFECTS THE BUILDING MANAGEMENT, OPERATIONS OR

SECURITY.

3. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING

CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK AND SHALL NOTIFY

THE ENGINEER/ARCHITECT OF ANY DISCREPANCIES FOR RESOLUTION.

4. COORDINATE WORK WITH ALL TRADES.

5. CONTRACTOR IS RESPONSIBLE FOR SECURING AND WEATHERPROOFING ANY

ROOF OPENING NOT COMPLETED DURING WORKING HOURS.

6. COORDINATE ALL DUCTWORK AND PIPING WITH EQUIPMENT, STRUCTURE,

ETC.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR DEACTIVATION OF ROOF-

MOUNTED EQUIPMENT AND ASSOCIATED INDOOR EQUIPMENT. ONLY ONE UNIT

SHALL BE TAKEN OUT OF SERVICE AT ANY TIME, WITH REMAINDER OF UNITS

LEFT OPERATIONAL.

8. CONTRACTOR SHALL NOT SHUT DOWN / TAKE OUT OF SERVICE ANY SYSTEMS

WITHOUT FIRST COORDINATING WITH OWNER AND PREPARING M.O.P.

DEMOLITION GENERAL NOTES:

1. EXISTING ITEMS TO REMAIN ARE DENOTED LIGHTLY UNLESS OTHERWISE

NOTED. ALL ITEMS SHOWN DASHED & BOLD SHALL BE REMOVED UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL NOT SHUT-OFF OR PUT-OUT OF SERVICE ANY SYSTEMS

OR SERVICE WITHOUT FIRST COORDINATING WITH THE OWNER.

3. CONTRACTOR SHALL DETERMINE AND COORDINATE THE EXACT EXTENT OF

DEMOLITION TO FACILITATE ALL WORK INDICATED BY THE CONTRACT

DOCUMENT.

4. PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK, VERIFY EXISTING

CONDITIONS AND NOTIFY ENGINEER OF ANY DISCREPANCIES FOR

RESOLUTION.

5. ALL ITEMS IDENTIFIED TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY

UNLESS OTHERWISE NOTED. REMOVED ITEMS SHALL BE TURNED OVER TO THE

OWNER UNLESS OTHERWISE NOTED AND STORED IN THE AREA DESIGNATED

BY THE OWNER. REMOVE FROM SITE AND LEGALLY DISPOSE OF ALL ITEMS THE

OWNER CHOOSES NOT TO ACCEPT.

6. WHERE EXISTING PIPING, T.C. TUBING/WIRING ETC. ARE TO BE REMOVED FROM

WALLS WHICH ARE REMAINING, THE WALLS SHALL BE REPAIRED TO MATCH

ORIGINAL CONDITIONS.

7. WHERE EXISTING PIPING TO BE REMOVED PASSES THROUGH FLOORS, THEY

SHALL BE CUT BACK TO WITHIN CONCRETE AND FILLED WITH GROUT TO

ACHIEVE A SMOOTH AND EVEN FINISH WITH CONCRETE SURFACE.

8. PROVIDE TAB PRE-READS ON ALL EXISTING AIR DEVICES AND HEATING COILS

PRIOR TO DEMOLITION. NOTIFY ENGINEER OF ANY DISCREPANCIES.

HVAC PLAN NOTES:

1. ALL SUPPLY AIR DIFFUSERS ARE 4-WAY AIR PATTERN UNLESS SHOWN

OTHERWISE.

2. DUCT SIZE OF BRANCH DUCT TO AIR DEVICE SHALL BE THE SAME SIZE AS

NECK SIZE OF AIR DEVICE UNLESS NOTED OTHERWISE.

3. ALL HEATING WATER SUPPLY AND RETURN BRANCH PIPING TO TERMINAL BOX

REHEAT COILS SHALL BE 3/4" UNLESS NOTED OTHERWISE. ALL PIPING TAKE-

OFFS FROM MAINS SHALL BE TOP TAKE-OFFS WITH SWING JOINTS.

4. BRANCH DUCT SIZE TO INLET OF ALL TERMINAL BOXES SHALL BE THE SAME

SIZE AS THE INLET SCHEDULED UNLESS NOTED OTHERWISE. BRANCH DUCTS

TO TERMINAL BOXES EXCEEDING 15' OR TWO ELBOWS, SHALL BE UP-SIZED TO

NEXT STANDARD DIAMETE.

5. UNLESS OTHERWISE NOTED, ALL SUPPLY AIR DUCTWORK SHALL BE

EXTERNALLY WRAPPED TO THICKNESS AS STATED IN SPECIFICATIONS,

RETURN AND EXHAUST DUCTWORK IS NEITHER LINED NOR WRAPPED.

6. DUCT SIZES INDICATED ARE SHEET METAL SIZES. WHERE INTERNAL DUCT

LINING IS PROVIDED, SHEET METAL SHALL NOT BE INCREASED IN SIZE.

UNLESS NOTED OTHERWISE ALL SCHEDULED DATA IS LISTED AT ELEVATION FT5400

1.

REMARKS:

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

PROVIDE BOX SELECTION TO MEET LAT, DESIGN CFM AND HEATING MBH. FINAL GPM SHALL BE SET DURING BALANCING TO FLOW RATES IN LISTED PRODUCT DATA SUBMITTALS, BUT IN NO CASE SHALL BE LOWER THAN 0.5 GPM.

MAXIMUM STATIC PRESSURE IS BASED ON WIDE OPEN UNIT AT MAXIMUM FLOW FOR TERMINAL UNIT WITH 2-ROW COIL.

HEATING WATER SYSTEM CONTAINS 0% PROPYLENE GLYCOL.

2-ROW HEATING COIL CONDITIONS SHOWN. 1- & 2-ROW HEATING COILS ACCEPTABLE COMPLIANT WITH MBH, WATER FLOW, AIR & WATER PRESSURE DROP REQUIREMENTS & LIMITATIONS.

USE OF 3- & 4-ROW COILS MUST BE SPECIFICALLY IDENTIFIED BY THE SUPPLIER & ACCEPTED BY THE ENGINEER FOR EACH LOCATION PROPOSED.

TERMINAL BOX MAXIMUM AIR FLOW CAPABILITIES: 6"=450 CFM, 8"=800 CFM, 10"=1350 CFM, 12"=2000 CFM, 14"=3000 CFM & 16"=4000 CFM.

MINIMUM 2-ROW COILS REQUIRED ON ALL PERIMETER BOXES.

HEATING COIL SHALL BE LOCATED ON OUTLET OPENING OF UNIT.

ALL FAN TERMINAL BOXES SHALL BE PROVIDED WITH A MERV-A 8 DISPOSABLE FILTER.

COIL LEAVING AIR TEMPERATURE SHALL NOT EXCEED 120ºF DUE TO AMBIENT TEMPERATURE ON FAN MOTOR.

REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZES, AND OVERCURRENT PROTECTIVE DEVICES.

REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR MINIMUM FAULT CURRENT RATING THAT EACH UNIT SHALL EXCEED. UNIT NAMEPLATE SHALL INDICATE THE SHORT CIRCUIT CURRENT RATING.

REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.

REQUIREMENTS APPLYING TO ALL TERMINAL BOXES:

TERMINAL BOX SCHEDULE (PARALLEL FAN, HOT WATER COIL)

DESIG.

INTERIOR

OR

PERIMETER

ZONE MFR MODEL

INLET DIA

(IN)

AIR PRESSURE

DROP MAX (IN

W.C.) AT S.L.

PRIMARY

AIR TEMP

ºF

COOLING DESIGN

CFM FAN DATA

HEATING

DESIGN CFM

FROM BOX AT

ELEV

HEATING WATER COIL DATA

CONTROL

SOUND ATTENUATOR

REMARKSTYPE NO.

MAXIMUM

AT ELEV

MINIMUM

AT ELEV

MOTOR

(ECM/PSC) SIZE CFM

ESP (IN

WC) HP VOLTAGE PHASE EAT ºF MBH GPM

WATER P.D.

MAX (FT WC) EWT ºF COIL LAT ºF AIR OUTLET FAN INLET

FTB 2-1 PERIMETER PRICE FDV5012 12 0.50 55 1800 360 ECM 5012 1800 0.20 1 277 1 1800 65 48.0 1.5 0.14 190 160 BAS No No

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:2

P

M

M.002

MWJ

RWL

M E

C H

A N

IC

A

L S

C H

E D

U L

E S

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

1.

UNIT SPECIFIC REMARKS:

NOTE AA: THESE VALUES REFLECT THE EXPECTED OPERATIONAL CONDITIONS AT INITIAL START-UP (FOR INFORMATION

ONLY.) ACTUAL VALUES SHALL BE DETERMINED BY TESTING & BALANCING.

NOTE AB: COIL FLOW IS ACTUAL FLOW THROUGH COIL. SYSTEM FLOW IS THE FLOW THROUGH THE CONTROL VALVE.

THESE MAY BE DIFFERENT FOR PUMPED COILS.

A.

B.

C.

D.

E.

F.

G.

H.

I.

REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZES, AND OVERCURRENT PROTECTIVE DEVICES.

REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR MINIMUM FAULT CURRENT RATING THAT EACH UNIT SHALL EXCEED. UNIT NAMEPLATE SHALL INDICATE THE SHORT CIRCUIT CURRENT RATING.

UNIT HEIGHT DOES NOT INCLUDE HEIGHT OF CURB.

PROVIDE BASE RAIL OR CURB HEIGHT TO ACCOMMODATE CONDENSATE DRAIN P-TRAP.

PROVIDE SHAFT GROUNDING RINGS FOR EACH BEARING ON MOTORS POWERED THROUGH VARIABLE FREQUENCY DRIVES.

MINIMUM 2-ROW HEATING COIL.

MINIMUM 6-ROW COOLING COIL.

PROVIDE A GRAVITY BACKDRAFT DAMPER ON EACH FAN IN A MULTI-FAN SECTION.

REFER TO SOUND DATA SCHEDULE FOR SOUND INFORMATION.

REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.

COLUMN HEADING NOTES: COMMON NOTES (APPLIES TO ALL AIR...

AIR HANDLING UNIT SCHEDULE (SEMI-CUSTOM)

DESIG.

AREA

SERVED MFR MODEL NO.

OUTDOOR

OR INDOOR

CASING

OUTSIDE

AIR CFM

MIN.

SUPPLY FAN SECTION AIR FILTER SECTIONS UNIT SIZE

CONTROL REMARKSNAME NO.

OPERATIONAL (NOTE-AA)

NO. OF

FANS

CONFIG WHEEL

DRIVE

(BELT/

DIRECT)

RPM

APPROX.

MOTORS

NO.

OF

VFDS

VFD

BYPASS

(YES/NO)

VIBRATION

ISOLATOR

TYPE

PRE-FILTER FINAL

L (IN) W (IN) H (IN)

OPER

WEIGHT

(LBS)

AT ELEV

FANS/

ROW

ROWS

HIGH

DIA.

(IN)

TYPE

(AF/BI)

EACH FAN

SUM OF MAX

HP ALL FANS VOLTAGE PHASE

AREA

(SF)

MERV-A

RATING

AIR P.D.

AREA

(SF)

MERV-A

RATING

AIR P.D.

CFM

ESP (IN

WC)

TSP (IN

WC)

REQ'D

BHP

MAX HP

SIZE

CLEAN

(IN WC)

CHANGE OUT

(IN WC)

CLEAN

(IN WC)

CHANGE OUT

(IN WC)

AHU 1 MULTI

PURPOSE

TRANE CSAA025 INDOOR 2,200 11700 1.20 4.30 2 2 1 18 PLENUM DIRECT 2700 6.5 7.5 15 480 3 1 No 27 8 0.25 1.00 27 13 1.00 2.20 181 80 62 3,238 BAS

AHU 2 OFFICE/

MEETING

TRANE CSAA025 INDOOR 2,400 12000 1.75 4.90 2 2 1 18 PLENUM DIRECT 2859 7.4 10.0 20 480 3 1 No 27 8 0.25 1.00 27 13 1.00 2.20 181 80 62 3,300 BAS

AHU 3 DINING TRANE CSAA025 INDOOR 2,200 12500 1.20 4.50 2 2 1 18 PLENUM DIRECT 2755 6.9 7.5 15 480 3 1 No 27 8 0.25 1.00 27 13 1.00 2.20 180 80 62 3,162 BAS

DESIG.

AREA

SERVED

HEATING COIL SECTION COOLING COIL SECTION

NAME NO.

NET

FACE

AREA

(SF)

AT ELEV

MBH

EAT LAT WATER CONDITIONS (NOTE-AB) NET

FACE

AREA

(SF)

AT ELEV

MBH

SENS

MBH

TOTAL

EAT LAT WATER CONDITIONS (NOTE-AB)

REFRIG

COIL

(YES/NO)CFM

AIR

P.D. (IN

WC)

°F

DB

°F

DB

GPM FROM

SYSTEM

(NOTE-AB)

COIL FLOW PROP

GLYCOL

P.D. (FT

HD) CFM

AIR P.D.

(IN WC)

°F

DB

°F

WB

°F

DB

°F

WB

GPM FROM

SYSTEM

(NOTE-AB)

COIL FLOW PROP

GLYCOL

P.D.

(FT

HD)

GPM

(NOTE-AB)

EWT

°F

GPM

(NOTE-AB)

EWT

°F

AHU 1 MULTI

PURPOSE

25 11,700 0.13 484 45 80 35 48 180 0% 4.02 25 11700 0.34 283 288 80 60 52 51 57 57 44 0% 3.7 No

AHU 2 OFFICE/

MEETING

25 12,000 0.13 484 45 90 40 48 180 0% 4.02 25 12000 0.34 283 288 80 60 52 51 57 57 44 0% 3.7 No

AHU 3 DINING 25 12,500 0.14 504 45 90 42 50 180 0% 4.35 25 12500 0.32 295 300 80 60 52 51 60 60 44 0% 4.0 No

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

MOTORS SHALL BE PROVIDED W/AUTOMATIC THERMAL OVERLOAD PROTECTION.

WATER PRESSURE DROP IS FOR COIL ONLY WITHOUT VALVES OR FITTINGS.

QUICK DISCONNECT FAN MOTOR.

STANDARD COLOR FINISH AS SELECTED BY ARCHITECT.

WHERE REQUIRED, CONTROL VALVES SHALL BE PROVIDED BY THE SECTION 230933 CONTRACTOR.

0.05" REPRESENTS FREE AIR DELIVERY THRU INTEGRAL GRILLES, NO DUCTWORK ATTACHED.

TAMPER RESISTANT FASTENERS ON COVERS.

INSULATED PANELS.

3-POSITION SPEED SWITCH

ALL DATA BASED UPON FAN MOTOR OPERATING AT HIGH SPEED.

HINGED PANEL W/STOP CHAIN (HORIZONTAL INSTALLATIONS ONLY).

RECESSING FLANGE.

REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.

FINAL GPM SHALL BE DETERMINED DURING BALANCING TO FLOW RATES LISTED IN PRODUCT DATA SUBMITTALS, BUT IN NO CASE SHALL BE LOWER THAN 0.5 GPM.

REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZE, AND OVERCURRENT PROTECTIVE DEVICES

REMARKS:

CABINET UNIT HEATER SCHEDULE (HOT WATER)

DESIG.

INSTALLATION STYLE

AIR OPENINGS

MFR

MODEL PROJECT DESIGN HEATING PARAMETERS ELECTRICAL MOTOR FILTER SIZE (INCHES) WATER

VOLUME

(GAL)

OPER WEIGHT

(LBS)

CONTROL

VALVE TYPE REMARKSNAME NO. INLET OUTLET

TYPE &

SIZE

COIL

ROWS

ESP (IN WC)

AT ELEV

CFM AT

ELEV

EWT

(ºF)

LWT

(ºF)

GLYCOL

EAT

(ºF) MBH GPM

MAX WATER

P.D. (FT HD)

LAT

(ºF) TYPE NO

POWER

TOTAL VOLTAGE PHASE TYPE MERV W H D

CUH 1 HORIZONTAL RECESSED BOTTOM BOTTOM TRANE FFCB060 2 0.05 610 190 170 0% 60 40.0 2.7 8.9 95 ECM 0 36 11 30 0.00 0

1.

SPECIFIC REMARKS:

A.

B.

C.

D.

E.

F.

REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZES, AND OVERCURRENT PROTECTIVE DEVICES.

REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR MINIMUM FAULT CURRENT RATING THAT EACH UNIT SHALL EXCEED. UNIT NAMEPLATE SHALL INDICATE THE SHORT CIRCUIT CURRENT RATING.

PROVIDE SHAFT GROUNDING RINGS FOR EACH BEARING ON MOTORS POWERED THROUGH VARIABLE FREQUENCY DRIVES.

FEI = FAN ENERGY INDEX IN ACCORDANCE WITH AMCA 208.

FAN E.S.P. INCLUDES DAMPER PRESSURE DROP. INCULDE DAMPER PRESSURE DROP IN SUBMITTAL.

REFER TO SOUND DATA SCHEDULE FOR SOUND INFORMATION.

REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.

GENERAL REMARKS:

FAN SCHEDULE

DESIG.

MFR MODEL FAN TYPE SERVICE

FAN

CLASS

WHEEL

DIA.

(INCHES)

CFM AT

ELEV.

E.S.P.

(IN. W.C.)

APPROX.

RPM

TIP

SPEED

(FPM)

OUTLET

VELOCITY

(FPM)

MOTOR

FEI

VALUE

DRIVE

TYPE

DAMPER

THROAT

HEIGHT

(INCHES)

THROAT

WIDTH

(INCHES)

SIZE (INCHES)

OPER.

WEIGHT

(LBS.) CONTROL REMARKSNAME NO. BHP HP VOLTAGE PHASE

ECM

(YES/NO)

VFD

(YES/NO)

RELAY

(YES/NO)

STARTER

(YES/NO)

VFD

BYPASS

(YES/NO)

TYPE &

LOCATION

AIR PRESS

DROP (IN WC) L W H

RF 1 GREENHECK AX-80-190-0625 INLINE RETURN AHU-1 I 32.4 10050 0.50 1045 2054 1.98 3 460 3 No Yes No No No 1.54 DIRECT NONE 0.00 39 39 35 36 39 464 BAS

RF 2 GREENHECK AX-80-190-0625 INLINE RETURN AHU-2 I 32.4 11500 0.50 1074 2082 1.98 3 460 3 No Yes No No No 1.54 DIRECT NONE 0.00 39 39 35 36 39 464 BAS

RF 3 GREENHECK AX-80-190-0625 INLINE RETURN AHU-3 I 32.4 12000 0.50 1079 2099 1.98 3 460 3 No Yes No No No 1.54 DIRECT NONE 0.00 39 39 35 36 39 464 BAS

EF 5 GREENHECK G-095-VG CENTRIFUGAL DOWNBLAST RESTROOM I 10.9 650 0.50 1696 582 0.13 0.16 115 1 Yes No Yes No No - DIRECT BACKDRAFT 0.50 10 10 0 22 27 50 BAS

1.

2.

3.

PUMPS OPERATING THRU VFDS: UPON SELECTING THE PUMP FOR THE SPECIFIED DUTY POINT, THE SUPPLIER SHALL PROVIDE THE PUMP WITH THE LARGEST IMPELLER SIZE AVAILABLE FOR THE CASING THAT DOES NOT EXCEED THE DUTY POINT MOTOR HP AT THE RIGHT END OF THE CURVE. SUBMITTAL DATA SHALL SHOW ALL IMPELLER CURVES AVAILABLE FOR THE PUMP MODEL. THIS APPLIES TO ALL MANUFACTURERS.

UNLESS INDICATED BY PUMP MODEL NUMBER, VARIABLE FREQUENCY DRIVE (VFD) IS REMOTE-MOUNTED RATHER THAN PUMP MOUNTED WHEN REQUIRED.

PROVIDE SHAFT GROUNDING RINGS FOR EACH BEARING ON MOTORS POWERED THROUGH VARIABLE FREQUENCY DRIVES.

REMARKS:

A. REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZES, AND OVERCURRENT PROTECTIVE DEVICES.

REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR MINIMUM FAULT CURRENT RATING THAT EACH UNIT SHALL EXCEED. UNIT NAMEPLATE SHALL INDICATE THE SHORT CIRCUIT CURRENT RATING.

APPLIES TO ALL:

PUMP SCHEDULE

DESIG.

MFR MODEL PUMP TYPE SERVICE

MAX PUMP

OPER °F

PROP

GLYCOL (%)

DESIGN GPM

PRESSURE

(FT HD)

NPSH

(FT HD) EFF. %

MOTOR VIBRATION

ISOLATOR

TYPE

INLET SIZE

(IN.)

OUTLET

SIZE (IN.)

SIZE (INCHES) OPER.

WEIGHT

LBS. REMARKSNAME NO.

MAX

FLOW

MIN

FLOW BHP HP

RPM @

60 HZ VOLTAGE PHASE VFD RELAY STARTER

VFD BYPASS

(YES/NO) L W H

CWP 1 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-1 COOLING COIL 55 0% 57 57 20 0.0 0% 0.00 1.5 1680 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0

CWP 2 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-2 COOLING COIL 55 0% 57 57 20 0.0 0% 0.00 1.5 1680 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0

CWP 3 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-3 COOLING COIL 55 0% 60 60 20 0.0 0% 0.00 1.5 1680 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0

HWP 1 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-1 HEATING COIL 200 0% 48 48 20 0.0 0% 0.00 2 1680 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0

HWP 2 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-2 HEATING COIL 200 0% 48 48 20 0.0 0% 0.00 2 1680 460 3 Yes Yes Yes No 2.0 1.5 24 12 24 0

HWP 3 ARMSTRONG 4380 - 0205H-001.5 VERTICAL INLINE AHU-3 HEATING COIL 200 0% 50 50 20 0.0 0% 0.00 2 1680 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0

HWP 4 ARMSTRONG 4380 - 0205H-002.0 VERTICAL INLINE RE-HEAT SYSTEM 200 0% 70 40 60 0.0 0% 0.00 2 3109 460 3 Yes Yes Yes No 2.0 2.0 24 12 24 0

1.

REMARKS:

A.

B.

C.

D.

E.

F.

G.

H.

PROVIDE BOX SELECTION TO MEET LAT, DESIGN CFM AND HEATING MBH. FINAL GPM SHALL BE SET DURING BALANCING TO FLOW RATES IN LISTED PRODUCT DATA SUBMITTALS, BUT IN NO CASE SHALL BE LOWER THAN 0.5 GPM.

MAXIMUM STATIC PRESSURE IS BASED ON WIDE OPEN UNIT AT MAXIMUM FLOW FOR TERMINAL BOX WITH 2-ROW COIL.

HEATING WATER SYSTEM CONTAINS 0% PROPYLENE GLYCOL.

2-ROW HEATING COIL CONDITIONS SHOWN. 1 & 2 ROW HEATING COILS ACCEPTABLE COMPLIANT WITH MBH, WATER FLOW, AIR & WATER PRESSURE DROP REQUIREMENTS & LIMITATIONS.

USE OF 3- & 4-ROW COILS MUST BE SPECIFICALLY IDENTIFIED BY THE SUPPLIER & ACCEPTED BY THE ENGINEER FOR EACH LOCATION PROPOSED.

TERMINAL BOX MAXIMUM AIR FLOW CAPABILITIES: 6"=450 CFM, 7'=650 CFM, 8"=800 CFM, 9"=1050 CFM, 10"=1350 CFM, 12"=2000 CFM, 14"=3000 CFM, 16"=4000 CFM & 24"x16"=8000 CFM.

MINIMUM 2-ROW COILS REQUIRED ON ALL PERIMETER BOXES.

REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.

REQUIREMENTS APPLYING TO ALL TERMINAL BOXES:

TERMINAL BOX SCHEDULE (HOT WATER HEAT)

DESIG. INTERIOR OR

PERIMETER

ZONE MFR MODEL

INLET

SIZE (IN.)

AIR PRESS DROP

MAX (IN W.C.)

(SEA LEVEL)

COOLING DESIGN CFM HEATING

DESIGN CFM

AT ELEV

HEATING WATER COIL DATA MODULATING

CONTROL

VALVE TYPE

SOUND

ATTEN. (Y/N) REMARKSTYPE NO.

MAXIMUM

AT ELEV

MINIMUM

AT ELEV EAT ºF LAT ºF MBH GPM

WATER P.D.

MAX (FT WC) EWT ºF

TB 2-1 PERIMETER PRICE SDV 10 0.59 920 275 310 55 90 11.7 0.6 3.2 190 2-WAY No

TB 2-2 PERIMETER PRICE SDV 6 0.39 300 90 245 55 90 9.3 0.6 0.6 190 2-WAY No

TB 2-3 PERIMETER PRICE SDV 7 0.38 400 120 125 55 90 4.7 0.5 0.8 190 2-WAY No

TB 2-4 PERIMETER PRICE SDV 9 0.38 675 205 205 55 90 7.7 0.5 2.1 190 2-WAY No

TB 2-5 INTERIOR PRICE SDV 6 0.39 200 100 0 55 0 0.0 0.0 0.0 190 2-WAY No

TB 2-6 PERIMETER PRICE SDV 8 0.46 530 160 245 55 90 9.3 0.6 1.3 190 2-WAY No

TB 2-7 PERIMETER PRICE SDV 12 0.74 1340 400 400 55 90 15.1 0.8 6.6 190 2-WAY No

TB 2-8 PERIMETER PRICE SDV 8 0.46 530 160 160 55 90 6.0 0.5 1.3 190 2-WAY No

TB 2-9 PERIMETER PRICE SDV 7 0.38 470 140 140 55 90 5.3 0.5 0.8 190 2-WAY No

TB 2-10 INTERIOR PRICE SDV 8 0.46 610 185 185 55 80 5.0 0.5 1.3 190 2-WAY No

TB 2-11 INTERIOR PRICE SDV 8 0.46 610 185 185 55 80 5.0 0.5 1.3 190 2-WAY No

TB 2-12 PERIMETER PRICE SDV 12 0.74 1230 370 370 55 90 14.0 0.8 6.6 190 2-WAY No

TB 2-13 PERIMETER PRICE SDV 12 0.74 1320 395 430 55 90 16.3 1.0 6.6 190 2-WAY No

TB 2-14 INTERIOR PRICE SDV 9 0.38 720 215 215 55 80 5.8 0.5 2.1 190 2-WAY No

TB 2-15 INTERIOR PRICE SDV 9 0.38 780 235 235 55 80 6.3 0.5 2.1 190 2-WAY No

1.

2.

3.

4.

5.

6.

REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS, INCLUDING COORDINATION OF VOLTAGE, PHASE, SCCR, WIRE SIZES, AND OVERCURRENT PROTECTIVE DEVICES. REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR MINIMUM FAULT CURRENT RATING THAT EACH UNIT SHALL EXCEED. UNIT NAMEPLATE SHALL INDICATE THE SHORT CIRCUIT CURRENT RATING.

MOTORS TO BE PROVIDED WITH AUTOMATIC THERMAL OVERLOAD OR IMPENDANCE PROTECTION.

INTEGRAL FAN GUARD INLET.

HORIZONTAL DISCHARGE LOUVERS.

FINAL GPM SHALL BE DETERMINED DURING BALANCING TO FLOW RATES IN LISTED PRODUCT DATA SUBMITTALS, BUT IN NO CASE SHALL BE LOWER THAN 0.5 GPM.

REFER TO MECHANICAL LEGENDS AND NOTES SHEET FOR PROJECT ELEVATION.

REMARK...

UNIT HEATER SCHEDULE (HYDRONIC)

DESG.

MFR MODEL

PROJECT DESIGN HEATING PARAMETERS ELECTRICAL SIZE (INCHES)

OPER.

WEIGHT

(LBS)

MAX MTG

HEIGHT (FT)

CONTROL

VALVE TYPE REMARKSNAME NO.

CFM AT

ELEV EWT (ºF)

WATER TEMP

DROP (ºF)

GLYCOL

% EAT (ºF) MBH LAT (ºF) GPM

WATER

PRESS DROP

(FT HD) MOTOR TYPE WATTS VOLTAGE PHASE LENGTH WIDTH HEIGHT

UH 2 TRANE UHPA36 550 190 20 0% 50 26.1 90 2.7 3.00 ECM 25 120 1 27 30 27 40 8 SEE CONTROL

DWGS

1. PROVIDE BAROMETRIC GRAVITY RELIEF DAMPER.

REMARKS:

LOUVER SCHEDULE

DESIG.

MFR MODEL

INTAKE OR

DISCHARGE

OVERALL SIZE (IN.)

FREE AREA

(SF)

PEAK

AIRFLOW

(CFM)

AIR VELOCITIES AIR P.D. AT

SEA LEVEL (IN

WC) MATERIAL FINISH REMARKSNAME NO. L H D

FACE AREA

(FPM)

FREE AREA

(FPM)

WL 1 GREENHECK ESD-635 RELIEF 50 40 6 7.63 6400 460 840 0.08 ALUMINUM MILL 1

GENERAL - APPLIES TO ALL AIR DEVICES: MANUAL VOLUME DAMPERS SHALL BE ACCEPTABLE IN DUCTWORK AT THE BRANCH POINT OF THE RUNOUT DUCT OR IN-LINE TO THE AIR DEVICE BY THE CONTRACTOR INSTALLING DUCTWORK. A DAMPER LOCATED AT THE AIR DEVICE SHALL BE ACCEPTABLE WHEN PERMITTED BY ENGINEER ON A CASE-BY-CASE BASIS OR WHEN THE MANUFACTURER

REQUIRES AN INTEGRAL MANUAL VOLUME DAMPER.

REMARKS:

AIR DEVICE SCHEDULE

DESIG. FUNCTION STYLE MFR. MODEL FRAME STYLE MODULE SIZE MATERIAL FINISH REMARKS

A CEILING SUPPLY SQUARE CONE DIFFUSER PRICE SCD LAY-IN 24x24 STEEL WHITE

T

JH

7A

7B

7C

5B

5A

8A

8B

9A

6A

QPNM4MLKH2

C-0770

C-0770

CONFERENCE

C-0577

CONFERENCE

C-0578

CONFERENCE

C-0576

MULTI-CULTURAL

CENTER

C-0580

CAFE

C-0764

Room

C-0564

CAMPUS SAFETY

C-0762

Room

C-0763

Room

C-0765

Room

C-0766

Room

C-0767

VESTIBULE

C-0761

STUDENT ANNEX

C-0574MEN RR

C-0575

RR?

C-0579

563?

C-0584

564?

C-0585

STOR

C-0575A

STOR

C-0575B

STORAGE

C-0767

C-0771

C-0574A

36x30 SA

S A

28 SA

28 SA

S A

S A

(TYP. OF 12)

S A

S A

S A

S A

28 SA

x3 S

A x1 S

A x2 S

A x2 S

A

22x24 SA22x24 SA x2 S

A x2 S

A

16x20 SA 16x20 SA

(TYP. OF 9)

(TYP. OF 12)

(TYP. OF 9)

24x18

10x10

10x10

10x10

(TYP. OF 4)

(TYP. OF 6)

(TYP. OF 8)

x2 S

A x1 S

A

14x12 SA

14x12 SA

40x18 SA 28x22 SA x1 S

A x1 S

A x1 S

A

28x12 SA

14x14 SA

14 SA

x1 S

A x1 S

A x1 S

A

16x14 SA

S A1

S A

12x14 SA x8 E

A

12x8 SA x1 S

A x8 E

A

12x12 EA

16x12 SA x8 S

A x1 S

A

16x12 SA

16x10 SA

8x4 EA

8x8

8x8

14x12 SA

38x30 RA x1 S

A

14x12 SA

8x8

10x6

10x6

10x6

(TYP. OF 4)

M78

M83

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:3

P

M

MD.101

MWJ

RWL

P A

R T

IA

L

L E

V E

L

H V

A C

D E

M O

P L

A N

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

KEYNOTES

M78 REMOVE AND REPLACE EXHAUST FAN, RE: FAN SCHEDULE.

M83 REMOVE EXHAUST FAN AND CAP AND SEAL ROOF CURB AIR AND WATER

TIGHT.

SCALE: 1/8" = 1'-0"

PARTIAL LEVEL 1 HVAC DEMO PLAN

7A

7B

7C

P

NM4

M84

M86

M86

M88

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:3

P

M

MD.102

MWJ

RWL

P A

R T

IA

L

P E

N T

H O

U S

E L

E V

E L

H V

A C

D E

M O

P L

A N

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

KEYNOTES

M84 REMOVE AHUS AS SHOWN AND DISCONNECT SUPPLY AND OUTSIDE AIR

DUCTS FROM UNITS. DUCT CONNECTIONS AT NEW AHU'S WILL NEED TO

BE VERFIED.

M86 REMOVE TRANSFER AIR DUCTS AND SEAL WALL PENETRATIONS.

M88 REMOVE AND REPLACE EXSITNG LOUVERS. PROVIDE GRAVITY

BACK-DRAFT DAMPERS AT EACH SECTION.

SCALE: 1/4" = 1'-0"

PARTIAL PENTHOUSE LEVEL HVAC DEMO PLAN

T T

T

T

T

T

T

T

T

T

T

T

JH

7A

7B

7C

5B

5A

8A

8B

9A

6A

QPNM4MLKH2

REMOVE HWS/R PIPE AND

VALVES ASSOCIATED WITH

RE-HEAT COILS, TYP.

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:3

P

M

MD.111

MWJ

RWL

P A

R T

IA

L

L E

V E

L

H V

A C

P

IP

IN

G

D E

M O

P L

A N

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

KEYNOTES

PARTIAL LEVEL 1 HVAC PIPING DEMO PLAN

7A

7B

7C

8A

NM4M

M85

M89

M90

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:3

P

M

MD.112

MWJ

RWL

P A

R T

IA

L

P E

N T

H O

U S

E L

E V

E L

H V

A C

P

IP

IN

G

D E

M O

P L

A N

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

KEYNOTES

M85 REMOVE PIPING AS NEEDED TO REMOVE AHU'S. RE-INSTALL PIPE AFTER

UNITS ARE IN PLACE.

M89 REMOVE AND REPLACE UNIT HEATER, COORDINATE LOCATION WITH NEW

RETURN FAN AND DUCTWORK.

M90 REMOVE AND REPLACE INLINE PUMPS. COORDINATE LOCATION WITH NEW

UNITS.

PARTIAL PENTHOUSE LEVEL HVAC PIPING DEMO PLAN

CO2

CO2

CO2

CO2

CO2

CO2

T

T T

T

T

JH

C-0770

C-0770

CONFERENCE

C-0577

CONFERENCE

C-0578

CONFERENCE

C-0576

MULTI-CULTURAL

CENTER

C-0580

CAFE

C-0764

Room

C-0564

CAMPUS SAFETY

C-0762

Room

C-0763

Room

C-0765

Room

C-0766

Room

C-0767

VESTIBULE

C-0761

STUDENT ANNEX

C-0574

MEN RR

C-0575

RR?

C-0579

563?

C-0584

564?

C-0585

STOR

C-0575A

STOR

C-0575B

STORAGE

C-0767

C-0771

C-0574A

7A

7B

7C

5B

5A

8A

8B

9A

6A

QPNM4MLKH2

2-1

TB

2-2

TB

2-3

TB

2-4

TB

2-8

TB

2-9

TB2-7

TB

2-12

TB

2-13

TB

2-14

TB

2-1

FTB

8x8

10x6

10x6

10x6

(TYP. OF 4)

8x8

8x8

8x8

8x8

75 10

265 8

(TYP. OF 4)

(TYP. OF 6)

(TYP. OF 8)

(TYP. OF 12)

(TYP. OF 12)

28 SA

28 SA

(TYP. OF 9)

(TYP. OF 12)

(TYP. OF 9)

10x10

10x10

10x10

24x18

40x18 SA 28x24 SA x2 S

A

28x22 SA x1 S

A x1 S

A

12x12 SA x1 S

A

16x14 SA12x14 SA

14x12 SA x8 S

A

16x12 SA

28x12 SA

14x14 SA

36x30 SA

38x30 RA x3 S

A

22x24 SA x2 S

A

22x24 SA x2 S

A 3 x1 S

A x2 S

A x1 S

A

S A

S A

S A

S A

S A

S A

S A

S A x1 S

A

2-6

TB

2-15

TB

EF

CUH

2-5

TB

2-11

TB

2-10

TB

14x12 SA

14x12 SA x1 S

A

12 SA

10x10 SA

S A

S A

12x8 SA

10x10 SA

A

A

A

200 14x12 SA x1 S

A

M82

M79

M81

M94

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:4

P

M

M.101

MWJ

RWL

P A

R T

IA

L

L E

V E

L

H V

A C

P L

A N

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

KEYNOTES

M79 REMOVE AND REPLACE FAN POWERED TERMINAL BOX, RE: SCHEDULE.

VERIFY INLET CONDITIONS FOR BOX.

M81 PROVIDE RE-BALANCE OF ALL AIR DEVICES SERVED BY NEW TERMINAL

BOXES BASED ON ORIGINAL PRE-READS.

M82 AT EXISTING OUTSIDE AIR INTAKE LOUVER PROVIDE FULL SIZE PLENUM

CONNECTION TO LOUVER ABOVE MULTI-CULTURAL CENTER AND

CONNECT TO EXISTING INTAKE DUCT, SEAL EXISTING CONNECTION AIR

TIGHT AND ADD INSULATION TO DUCT CONNECTION TO LOUVER. REPAIR

EXISTING INSULATION AS NEEDED AND VERIFY ALL JOINTS ARE SEALED

AIRTIGHT. FIELD VERIFY EXACT LOCATION OF CONNECTION AND SIZE OF

LOUVER.

M94 SEE PENTHOUSE PLANS FOR CONTINUATION OF DUCT, TYP.

PARTIAL LEVEL 1 HVAC PLAN

7A

7B

7C

8A

NM4M

x

S

A x

S

A x

O

A

22x12 SA x

S

A x

R

A

UH

AHU

AHU

AHU

RF

RF

RF

x

R

A

30x30 RA x

R

A x

R

A x

R

A x

R

A

36x30 SA

38x30 RA x

R

A

M87

M87

M89

M91

M91 x

R

A x

R

A

R A

WL

TYP

48x20 RA

48x20 RA

48x20 RA

M93

M95

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

:3

8:

P M

M.102

MWJ

RWL

P A

R T

IA

L

P E

N T

H O

U S

E L

E V

E L

H V

A C

P L

A N

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

KEYNOTES

M87 ROUTE NEW RETURN AIR DUCT HIGH ABOVE UNIT AND DROP DOWN AND

CONNECT TO NEW UNIT. FIELD VERIFY ROUTE WITH EXISTING

CONDITIONS AND COORDINATE RETURN CONNECTION WITH NEW UNIT.

M89 REMOVE AND REPLACE UNIT HEATER, COORDINATE LOCATION WITH NEW

RETURN FAN AND DUCTWORK.

M91 TURN RETURN DUCT UP INTO PLENUM.

M93 SUPPORT NEW RETURN FANS FROM OVERHEAD STRUCTURE UTILZING

TWO ADJACENT BEAMS.

M95 THE ROOF SYSTEM IN THE PROJECT AREA HAS BEEN REPLACED UNDER A

SEPARATE PROJECT. THIS CONTRACTOR SHALL COORDINATE WITH THE

NEW ROOFING SYSTEM TO ENSURE THAT THE ROOFING IS TERMINATED

APPROPRIATELY AT THE LOCATION OF NEW WALL LOUVERS. REFER TO

A1.31 FOR ADDITIONAL INFORMATION.

PARTIAL PENTHOUSE LEVEL HVAC PLAN

T

T T

T

T

T

T

T

T

T

T

T

CO2

CO2

CO2

CO2

CO2

CO2

T

T T

T

T

JH

7A

7B

7C

5B

5A

8A

8B

9A

6A

QPNM4MLKH2

C-0770

C-0770

CONFERENCE

C-0577

CONFERENCE

C-0578

CONFERENCE

C-0576

MULTI-CULTURAL

CENTER

C-0580

CAFE

C-0764

Room

C-0564

CAMPUS SAFETY

C-0762

Room

C-0763

Room

C-0765

Room

C-0766

Room

C-0767

VESTIBULE

C-0761

STUDENT ANNEX

C-0574

MEN RR

C-0575

RR?

C-0579

563?

C-0584

564?

C-0585

STOR

C-0575A

STOR

C-0575B

STORAGE

C-0767

C-0771

C-0574A

2-15

TB

CUH

2-1

FTB

2-13

TB

2-14

TB

2-10

TB

2-11

TB

2-12

TB

2-7

TB

2-9

TB

2-4

TB

2-5

TB

2-6

TB

2-1

TB

2-2

TB 2-3

TB

2-8

TB

3/4" HWR

3/4" HWS

2" HWR

2" HWR

1 1/2" HWS 2" HWS

1 1/2" HWS

2" HWR

1" HWR

1" HWS

3/4" HWS

1 1/4" HWS

1 1/4" HWS 1 1/4" HWS

1 1/4" HWR

1" HWS

1" HWR

1" HWS

1" HWR

1" HWS

1" HWR

1" HWR

1" HWS1/2" HWS

1/2" HWR

1 1/2" HWS

1 1/2" HWR

/2

H W

S

3" HWR

3" HWS

1" HWS

1" HWR

2 1/2" HWR

M92

TO AHU-3

TO AHU-2

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:4

P

M

M.111

MWJ

RWL

P A

R T

IA

L

L E

V E

L

H V

A C

P

IP

IN

G

P L

A N

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

KEYNOTES

M92 REMOVE EXISTING T'STATS SERVING RE-HEAT COILS, SOME NOT SHOWN.

PROVIDE NEW T'STATS IN SAME LOCATION AND PROVIDE NEW CONTROL

WIRING FROM T'STAT TO TERMINAL BOX, TYP.

PARTIAL LEVEL 1 HVAC PIPING PLAN

7A

7B

7C

NM4M

AHU

AHU

AHU

HWP

UH

CWP

HWP

CWP

HWP

HWP

CWP

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:4

P

M

M.112

MWJ

RWL

P A

R T

IA

L

P E

N T

H O

U S

E L

E V

E L

H V

A C

P

IP

IN

G

P L

A N

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

KEYNOTES

PARTIAL PENTHOUSE LEVEL HVAC PIPING PLAN

8000-12 8.20.20

HOT WATER REHEAT COIL PIPING

DETAIL (2-WAY VALVE, SINGLE COIL)

NOTE: INSTALL HWS

PIPING ON LEAVING

AIR SIDE OF COIL.

SCALE: NONE

HOT

WATER

COILFLOW

AIR

P/T

UNION OR FLANGE FOR

STEEL PIPE ONLY. NOT

REQUIRED FOR COPPER

(TYP.)

P/T

MANUAL

AIR VENT

DRAIN VALVE WITH HOSE

END CONNECTION AND CAP

NOTE:

ARRANGE PIPING TO

ALLOW COIL REMOVAL.

3/4"

H W

S

HWR

CALIBRATED

BALANCING VALVE

HWS MAIN

HWR MAIN

H W

S

MODULATING

CONTROL VALVE

MANUAL AIR VENTS

8000-42 9.17.21

TERMINAL BOX DETAIL

10/10 ACCESS

PANEL ON BOTTOM

SIDE

MIN. 3 DIAMETERS

STRAIGHT DUCT,

SAME SIZE AS

TERMINAL BOX

INLET.

SCALE: NONE

CONTROL PANEL

VAV BOX

UNISTRUT

BETWEEN

BEAMS

PROVIDE MINIMUM CLEARANCE AT

PANEL AT SIDE OF TERMINAL BOX

OF 30" FOR CONTROL POWER UP

THRU 30-VOLTS, 36" CLEAR FOR

ELECTRICAL POWER HIGHER THAN

30-VOLTS, AND LOWER THAN 120-

VOLTS, 42" CLEAR FOR ELECTRICAL

POWER HIGHER THAN 120-VOLTS

AND 48" CLEAR FOR BACK-TO-BACK

ELECTRICAL POWER HIGHER THAN

30-VOLTS.

TRANSITION AS REQUIRED

SEE FLOOR PLAN - HVAC

NOTE: COORDINATE INSTALLATION OF TERMINAL BOX WITH

CEILING GRID TO ASSURE CLEAR ACCESS TO ACCESS

PANELS.

LOW PRESSURE DISCHARGE

STRAP HANGER SCREWED

TO SIDE. DON'T BLOCK

ACCESS SIDE OR BOTTOM.

DON'T TURN STRAPS UNDER

BOX.

2123-07 03.19.25

IN-LINE PUMP PIPING DETAIL

SCALE: NONE

TAPS FOR T.C.

P/T

HANGER ROD WITH VIBRATION

ISOLATOR AND CLEVIS HANGER

SUPPORTING PIPING AS CLOSE TO

PUMP AS PRACTICAL (TYPICAL)

1/2" TUBING OR IPS.

SAME MATERIAL AS

TRANSPORT PIPING

PUMP

P/T

PRESSURE

GAUGE

NOTE:

1. ONLY ONE FLOW MEASURING STATION REQUIRED

FOR PARALLEL PUMP CONFIGURATION.

STRAINER WITH

BLOWDOWN VALVE

FLOW MEASURING

DEVICE AND

BALANCING VALVE

PER SPEC.

3400-01 12.13.22

DOWNBLAST ROOF EXHAUST FAN DETAIL

SCALE: NONE

DUCTWORK AS

NOTED ON

PLANS

ROOF

GRAVITY OR MOTORIZED

BACKDRAFT DAMPER -

REFER TO SCHEDULE

EXHAUST FAN HOUSING

LEVEL CURB

SUPPORT SEE

ARCHITECTURAL

DRAWING

SEE ARCHITECTURAL

DRAWING FOR

ROOFING DETAILS

ROOF CURB BY

FAN MFR. MATCH

ROOF SLOPE

BIRDSCREEN

3400-04

IN-LINE EXHAUST FAN DETAIL

EXHAUST GRILLE REMOVABLE CORE

SCALE: NONE

SUPPORT FROM

OVERHEAD

STRUCTURE

SEE PLAN FOR SIZES

CEILING

EXHAUST

FAN

FLEX CONNECTION

RUBBER IN SHEAR

VIBRATION ISOLATORS

SEE PLAN

FOR SIZE

3600-03 05.04.22

SECTION

FAN POWERED TERMINAL BOX DETAIL (PARALLEL TYPE)

PLAN

NOTE:

EXTREME CARE MUST BE USED IN

LOCATING TERMINAL BOX, SO

ACCESS TO THE UNIT CONTROL

PANEL AND FAN/MOTOR IS NOT

IMPAIRED BY ANY BUILDING

MEMBER OR CONTRACTOR

INSTALLED MATERIALS.

MEDIUM

VELOCITY

DUCTWORK

INLET (BEYOND)

SCALE: NONE

REMOVABLE

BOTTOM PANEL

FLEX CONNECTION

TERMINAL BOX

FAN/MOTOR

PROVIDE LINED INDUCED

AIR DUCT THAT IS 2"

LARGER THAN INLET

OPENING SIZE.

FAN-POWERED

TERMINAL BOX

FAN MOTOR

FILTERS

FILTER SIDE ACCESS

INDUCED AIR INLET

MEDIUM VELOCITY

DUCTWORK INLET

FLEX CONNECTION

FAN-POWERED

TERMINAL BOX

30" MIN. CLEAR SPACE

CONTROL PANEL

SPRING ISOLATOR

TYP. OF (4) PLACES

ANGLE BRACKET

THREADED ROD

8'-0" MIN. TO FIRST

BRANCH DUCT

ACOUSTIC FLEX DUCT (TYP.)

FLEXMASTER 8M

INTERNALLY LINED LOW

PRESSURE DUCTWORK

REHEAT COIL

3713-08

ROUND NECK

AIR DEVICE DETAIL

SCALE: NONE

LONG RADIUS

FLEXIBLE DUCT (MAX. 6'-0")

SUPPORT @ 3'-0" O.C. INSTALLED

PER SPECIFICATIONS

NOTE:

CEILING DIFFUSER SHOWN;

REGISTERS AND GRILLES

SIMILAR.

CEILING

LAY-IN AIR DEVICE

SHEET METAL

DUCTWORK,

INSULATED PER

SPECIFICATIONS.

BELLMOUTH TYPE SPIN-IN WITH

BUTTERFLY TYPE MVD, EXTEND

QUADRANT HANDLE THRU

INSULATION AND SEAL AROUND

INSULATION.

T-BAR OR LAY-IN

FRAME FOR HARD

CEILING.

SUPPORT FROM OVERHEAD

STRUCTURE

INSTALL RUN-OUT PER

SPECIFICATIONS

STAINLESS STEEL WORM

GEAR CLAMP ON BOTH

THE FLEX DUCT JACKET

AND INNER CORE.

HARD CEILING INSTALLATIONS:

1. PROVIDE LAY-IN FRAME TO ALLOW AIR DEVICE TO BE

REMOVED.

2. LOCATE MVD TO BE ACCESSIBLE. IF SPIN-IN IS NOT

ACCESSIBLE PROVIDE A SEPARATE MVD ACCESSIBLE BY

REMOVING THE GRILLE IN LIEU OF THE ONE AT THE SPIN-IN.

ACCESS DOOR OR REMOVABLE

ENCLOSURE SECTION.

8000-08 3.25.24

HOT WATER CABINET UNIT

HEATER PIPING DETAIL

UNION OR FLANGE FOR STEEL PIPE ONLY.

NOT REQUIRED FOR COPPER (TYP.)

SCALE: NONE

HWR MAIN

HWS MAIN

COIL

H W

R

H W

S

MODULATING CONTROL VALVE

CALIBRATED BALANCE VALVE

MANUAL

AIR VENTS

8000-11 3.25.24

UNIT HEATER PIPING DETAIL

SCALE: NONE

H W

S

HWS MAIN

HWR

HWR MAIN

UNIT

HEATER

3/4"

CALIBRATED

BALANCE VALVE

SUSPENDED FROM

OVERHEAD STRUCTURE.

USE RUBBER- IN-SHEAR

VIBRATION ISOLATORS

AND HANGER RODS

UNION OR FLANGE FOR

STEEL PIPE ONLY. NOT

REQUIRED FOR COPPER

(TYP.)

DRAIN VALVE WITH

HOSE END AND CAP

MODULATING

CONTROL VALVE

MANUAL AIR

VENTS

FULL SIZE BYPASS

8000-15a 04.03.26

PUMPED HOT WATER COIL PIPING

DETAIL (2-WAY VALVE, MULTI-COIL)

FLOW MEASURING

STATION, BOTH

SYSTEMS. CALIBRATED

BALANCE VALVES FOR

2" & SMALLER (TYP.)

SCALE: NONE

FLOW

AIR

HOT

WATER

COIL

NOTE:

INSTALL HWS PIPING

ON LEAVING AIR SIDE

OF COIL.

P/T

H W

S

MANUAL AIR VENT

UNION OR FLANGE

FOR STEEL PIPE

ONLY. NOT REQUIRED

FOR COPPER (TYP.)

P/T

DRAIN VALVE WITH HOSE

END CONNECTION AND CAP

AT BOTTOM COIL (S)

NOTE:

1. ARRANGE PIPING TO ALLOW COIL REMOVAL.

2. CONTRACTOR TO VERIFY ACTUAL QUANTITY

OF COILS AND CONNECTION

REQUIREMENTS FOR EQUIPMENT SUPPLIED.

3/4"

N.C.

HWS MAIN

HWR MAIN

PUMP

(SEE IN-LINE PUMP

PIPING DETAIL)

HWR

H W

S

FLOW

AIR

HOT

WATER

COIL

MANUAL AIR VENT

MODULATING

CONTROL VALVE

PRESSURE

GAUGE BYPASS

P/T

P/T

HWS

CALIBRATED

BALANCE

VALVE (TYP)

8000-19

CONDENSATE DRAIN

PIPING DETAIL

SCALE: NONE

NOTES:

1. ALLOW SUFFICIENT SPACE BELOW DRAIN PAN FOR TRAP.

2. PITCH DRAIN FOR PROPER RUN-OFF.

3. MANUALLY PRIME FILL TRAP BEFORE START-UP TO FORM INITIAL DRY SEAL.

4. SUPPORT DRAIN LINES TO PREVENT SAG AND CONDENSATE OVERFLOW.

5. TRAP SEAL MUST BE APPROX. 1-1/2" GREATER THAN STATIC PRESSURE AT SUPPLY AIR

PLENUM. (TYPICAL ALL CHILLED WATER COILS)

TEE

CLEANOUT PLUG

UNION

NOTE 5

DRAIN PAN

DRAIN CONNECTION NIPPLE

DRAIN PIPE

DISCHARGE MUST BE

BELOW LEVEL OF

DRAIN PAN.

TRAP SEAL

PITCH AT

1/8" PER FT.

PITCH

DN

8000-22 04.03.26

PUMPED CHILLED WATER COIL PIPING

DETAIL (2-WAY VALVE, MULTI-COIL)

FLOW MEASURING STATION, BOTH

SYSTEMS. CALIBRATED BALANCE

VALVES FOR 2" & SMALLER.

NOTE:

INSTALL CHWS PIPING

ON LEAVING AIR SIDE

OF COIL. (TYP.)

SCALE: NONE

DRAIN PAN

D

CHILLED

WATER

COIL

COIL COND.

PAN, 3/4"

TO BOTTOM

DRAIN PAN

P/T

P/T

P/T

CHILLED

WATER

COIL

MANUAL AIR VENTFREEZE

PROTECTION

BYPASS PUMP,

SEE IN-LINE

PUMP DETAIL

P/T

TRAP COIL COND. PIPING AT

DRAIN PAN AND RUN FULL SIZE

TO NEAREST FLOOR DRAIN

3/4" DRAIN VALVE WITH

HOSE END AND CAP AT

EACH COIL (TYP.)

C H

W S

CHWS MAIN

CHWS

CHWR

CHWR MAIN

AIR

FLOW

AIR

FLOW

MANUAL AIR VENTS

MODULATING

CONTROL VALVE

NOTE:

1. ARRANGE PIPING TO ALLOW COIL

REMOVAL.

2. CONTRACTOR TO VERIFY ACTUAL

QUANTITY OF COILS AND

CONNECTION REQUIREMENTS FOR

EQUIPMENT SUPPLIED.

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:4

P

M

M.301

MWJ

RWL

M E

C H

A N

IC

A

L D

E T

A

IL

S

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

C O

O L

IN

G C

O

IL

P R

E H

E A

T C

O

IL

OUTSIDE

AIR

DM

NC

DPT

DM

TL

P

SA FAN

M

VFD

SUPPLY

SD

TO

FACP

CHWS

CHWR

TS

2" MERV 8

DPT

TS

TS

VFD

M

RA FAN

DM

HWR

HWS

R E

T U

R N

A

IR

T E

M P

D E

G R

E E

S F

A.I.

R E

T U

R N

F A

N P

L E

N U

M S

T A

T

IC

P R

E S

S U

R E

IN

W

C

A.I.

M

IX

E D

A

IR

T E

M P

D E

G R

E E

S F

A.I.

M E

R V

F

IN

A L F

IL

T

E R

D

IF

F

P R

E S

S

IN

W

C

A.I.

D

IS

C H

A R

G E

A

IR

T E

M P

D E

G R

E E

S F

A.I.

D U

C T

S T

A T

IC

P

R E

S S

U R

E

IN

C

H E

S W

.C

A.I.

O .A

F

L O

W M

O N

IT

O

R

C F

M

A.I.

M E

R V

F

IL

T

E R

D

IF

F

P R

E S

S

IN

W

C

A.I.

R E

T U

R N

F A

N

S P

E E

D

A.O.

R E

L

IE

F A

IR

D

A M

P E

R

C O

N T

R O

L

A.O.

R E

T U

R N

A

IR

D A

M P

E R

C O

N T

R O

L

A.O.

O U

T S

ID

E

A

IR

D A

M P

E R

C O

N T

R O

L

A.O.

M

IN

IM

U

M O

U T

S

ID

E A

IR

D

A M

P E

R

C O

N T

R O

L

A.O.

H W

C O

IL

V

A L

V E

C O

M M

A N

D

A.O.

S U

P P

L Y

F A

N

S P

E E

D

A.O.

C H

W C

O

IL

V A

L V

E

C O

M M

A N

D

A.O.

R E

T U

R N

F A

N

S T

A T

U S

D.I.

H W

P U

M P

S T

A T

U S

D.I.

L O

W T

E M

P

L

IM

IT

D.I.

S U

P P

L Y

F A

N

S T

A T

U S

D.I.

S

M O

K E

D E

T E

C T

O R

A L A

R M

D.I.

S U

P P

L Y

H

IG

H P

R E

S S

U R

E L

IM

IT

IN

W

C

D.I.

R E

T U

R N

F A

N

S T

A R

T /S

T O

P

D.O.

H W

P U

M P

S T

A R

T /S

T O

P

D.O.

S U

P P

L Y

F A

N

S T

A R

T /S

T O

P

D.O.

P

BACNET

INTEGRATION

P

R E

T U

R N

H

IG

H P

R E

S S

U R

E L

IM

IT

IN

W

C

D.I.

HARDWIRED INTERLOCK TO FAN(S)HARDWIRED INTERLOCK TO FAN(S)

BACNET

INTEGRATION

C H

W P

U M

P

S T

A T

U S

D.I.

C H

W P

U M

P

S T

A R

T /S

T O

P

D.O.

P

4" MERV 13

M

F A

N M

O T

O R

S T

A T

U S

D.I.

F A

N M

O T

O R

S T

A R

T /S

T O

P

D.O.

M O

T O

R

IZ

E D

D A

M P

E R

O P

E N

/C L

O S

E

D.O.

M O

T O

R

IZ

E D

D A

M P

E R

P O

S

IT

IO

N

D.I.

STARTER

T

R O

O M

T E

M P

D E

G R

E E

S F

A.I.

F A

N M

O T

O R

S T

A R

T /S

T O

P

D.O.

F A

N M

O T

O R

S T

A T

U S

D.I.

H E

A T

IN

G

C O

IL

V

A L V

E

P O

S

IT

IO

N

A.O.

STARTER

T

R O

O M

T E

M P

D E

G R

E E

S F

A.I.

E X

IS

T

IN

G

F A

N M

O T

O R

S T

A R

T /S

T O

P

D.O.

E X

IS

T

IN

G

F A

N M

O T

O R

S T

A T

U S

D.I.

E X

IS

T

IN

G

H E

A T

IN

G

C O

IL

V

A L V

E

P O

S

IT

IO

N

A.O.

T

ROOM

T'STAT

CO2

WHERE

APPLICABLE

C A

R B

O N

D

IO

X

ID

E

P P

M

A.I.

R O

O M

T E

M P

D E

G R

E E

S F

A.I.

A

IR

F L O

W V

O L U

M E

C F

M

A.I.

V A

V D

A M

P E

R C

O N

T R

O L

P O

S

IT

IO

N

A.O.

R E

H E

A T

C O

N T

R O

L V

A L V

E

P O

S

IT

IO

N

A.O.

D

IS

C H

A R

G E

A

IR

T E

M P

D E

G R

E E

S F

A.I.

Z O

N E

O V

E R

R

ID

E

S W

IT

C

H

D.I.

SHEET NO.

REVISIONS:

DRAWN BY:

Date:

JOB NO:

CHECKED BY:

DRAWING TITLE

TITLE

P :\F

R C

C \W es tm in st er C am pu s\

-1

S ci en ce W in g

H V

A C

U pg ra de

\C ad

8/ 6/

2:

:5

P

M

M.401

MWJ

RWL

M E

C H

A N

IC

A

L C

O N

T R

O L

S

W th A v e

W e s tm in s te r, C O

F R

C C

W E

S T

M

IN

S T

E R

S T

U D

E N

T C

E N

T E

R H

V A

C U

P G

R A

D E

S

2025-418

08/07/2026

CONSTRUCTION DOCUMENTS

1.

SYSTEM SPECIFIC REMARKS:

NOTES:

BAS CONTROL MATRIX

EQUIPMENT, SYSTEM, AND POINT

POINT TYPE

S T

A T

U S

A L

A R

M

N E

T W

O R

K C

O M

M U

N

IC

A T

IO

N

S

REMARKSD

IG

IT

A

L I N

P U

T

D

IG

IT

A

L O

U T

P U

T

A N

A L

O G

I N

P U

T

A N

A L

O G

O U

T P

U T

AHU - RF/SF/HW/CHW

CHW COIL VALVE, COMMAND X

CHW PUMP, START/STOP X

CHW PUMP, STATUS X X

DISCHARGE AIR TEMP, DEGREES F X

DUCT STATIC PRESSURE, INCHES W.C. X LOCATE UPSTREAM OF MOST

CRITICAL TERMINAL BOX OR

BOXES

HW COIL VALVE, COMMAND X

HW PUMP, START/STOP X

HW PUMP, STATUS X X

LOW TEMP, LIMIT X X

MERV 8 FILTER DIFF. PRESS., IN WC X

MERV 13 FINAL FILTER DIFF. PRESS., IN WC X

MINIMUM OUTSIDE AIR DAMPER, CONTROL X

MIXED AIR TEMP, DEGREES F X

O.A. FLOW MONITOR, CFM X PLACE FLOW MONITOR ON

MINIMUM OUTSIDE AIR WHEN

APPLICABLE.

OUTSIDE AIR DAMPER, CONTROL X

RELIEF AIR DAMPER, CONTROL X

RETURN AIR DAMPER, CONTROL X

RETURN AIR TEMP, DEGREES F X

RETURN FAN, SPEED X

RETURN FAN, START/STOP X

RETURN FAN, STATUS X X X PROVIDE STATUS INDICATION

FOR EACH MOTOR IN FAN

ARRAY.

RETURN FAN PLENUM STATIC PRESSURE, IN WC X

RETURN HIGH PRESSURE LIMIT, IN WC X X

SMOKE DETECTOR, ALARM X X

SMOKE DETECTOR, ALARM X X

SUPPLY FAN, SPEED X

SUPPLY FAN, START/STOP X

SUPPLY FAN, STATUS X X PROVIDE STATUS INDICATION

FOR EACH MOTOR IN FAN

ARRAY.

SUPPLY HIGH PRESSURE LIMIT, IN WC X X

1.

SYSTEM SPECIFIC REMARKS:

1.

NOTES:

BAS CONTROL MATRIX

EQUIPMENT, SYSTEM, AND POINT

POINT TYPE

S T

A T

U S

A L

A R

M

N E

T W

O R

K C

O M

M U

N

IC

A T

IO

IT

A

L I N

P U

T

D

IG

IT

A

L O

U T

P U

T

A N

A L

O G

I N

P U

T

A N

A L

O G

O U

T P

U T

CABINET UNIT HEATER - HYDRONIC

FAN MOTOR, START/STOP X

FAN MOTOR, STATUS X X CURRENT SWITCH

HEATING COIL VALVE, POSITION X

ROOM TEMP, DEGREES F X X

1.

SYSTEM SPECIFIC REMARKS:

1.

NOTES:

BAS CONTROL MATRIX

EQUIPMENT, SYSTEM, AND POINT

POINT TYPE

S T

A T

U S

A L

A R

M

N E

T W

O R

K C

O M

M U

N

IC

A T

IO

IT

A

L I N

P U

T

D

IG

IT

A

L O

U T

P U

T

A N

A L

O G

I N

P U

T

A N

A L

O G

O U

T P

U T

UNIT HEATER - HYDRONIC

EXISTING FAN MOTOR, START/STOP X

EXISTING FAN MOTOR, STATUS X X CURRENT SWITCH

EXISTING HEATING COIL VALVE, POSITION X

ROOM TEMP, DEGREES F X X

1.

SYSTEM SPECIFIC REMARKS:

1.

2.

3.

4.

5.

IN ADDITION TO THE DDC POINTS LISTED BELOW, THE CONTRACTOR SHALL CAREFULLY REVIEW ALL

DRAWINGS,

ALL SPECIFICATIONS, AND ALL SEQUENCES OF OPERATION. THE DOCUMENTS ARE ALL INCLUSIVE AND

COMPLIMENTARYTO EACH OTHER. THE PROJECT SHALL INCLUDE ANY AND ALL NECESSARY DDC POINTS TO

SUPPORT THEREQUIREMENTS OF ALL THE DOCUMENTS.

ALWAYS REFER TO DRAWINGS FOR QUANTITY.

PROVIDE OPEN PROTOCOL COMMUNICATION WITH FACTORY SUPPLIED CONTROLLER.

BAS CONTRACTOR SHALL COORDINATE STATUS LEVEL FOR EACH ALARM POINT WITH THE OWNER TO

DETERMINE WHICH ONES REQUIRE IMMEDIATE ATTENTION.

IF THERE IS A DISCREPANCY BETWEEN ANY DOCUMENTATION, THE WORST CASE SCENARIO SHALL BE USED

FOR BIDDING PURPOSES. ADDITIONAL COSTS WILL NOT BE ALLOWED FOR DISCREPANCIES BETWEEN THE...

NOTES:

BAS CONTROL MATRIX

EQUIPMENT, SYSTEM, AND POINT

POINT TYPE

S T

A T

U S

A L

A R

M

N E

T W

O R

K C

O M

M U

N

IC

A T

IO

IT

A

L I N

P U

T

D

IG

IT

A

L O

U T

P U

T

A N

A L

O G

I N

P U

T

A N

A L

O G

O U

T P

U T

TERMINAL BOX - HYDRONIC

AIRFLOW VOLUME, CFM X

AIRFLOW VOLUME, CFM X

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .