Appendix F budget.docx

DOCX document 13 KB Posted

Attached to
6130-EGBA-FY2016-PSCN INFRA: Microwave Replacement
Solicitation number
RFP EGBA 2016000096 6
Issued by
Denver County, Denver City, Colorado

About this file

This is a Budget Appendix document for a state or local contract opportunity involving system equipment procurement and related services. The project encompasses the supply and installation of system equipment along with associated spare parts, test equipment, project management, engineering support, installation services, and training. The contract structure indicates an Integrated Project Delivery (IPD) Design/Build (D/B) arrangement under a Lump Sum (LS) request for proposal (RFP) format.

The budget allocation totals approximately $30.4 million, distributed across four primary cost categories: system equipment at $22,356,670; spare and test equipment at $2,253,310; project management, engineering, and installation services at $5,639,760; and training at $188,930. This budget structure reflects a comprehensive approach to equipment deployment that includes not only the capital equipment costs but also the supporting services and training necessary for successful implementation and ongoing operational support.

View the file

Other files

File Type Posted
Bid Bond.doc DOC document
RFP 2016000096 FINAL.docx DOCX document
Appendix D8 Cost Proposal Forms .xlsx XLSX spreadsheet
LMBond.doc DOC document
Appendix E Building codes.doc DOC document
Appendix A1-2.docx DOCX document
Appendix B2 SC8.1.doc DOC document
Appendix D1- Non Disclosure Agreement .docx DOCX document
Appendix D8 1COST PROPOSAL Summary.docx DOCX document
Appendix D Specifications.docx DOCX document
RFP 2016000096 REVISED 1-14.docx DOCX document
Appendix D9 Compliance Matrix.xlsx XLSX spreadsheet
Appendix C. UI Formdocx.docx DOCX document
MW Q_A final.docx DOCX document
Appendix D8 Pricing Instructions.docx DOCX document
Appendix B1 Sc 8.0.docx DOCX document
Authorization to Bid.doc DOC document
FINAL Round 2 QA.docx DOCX document
PerfBond.doc DOC document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix F

BUDGET

System Equipment
Spare & Test Equipment
PM/Engineering/ Installation
Training
$22,356,670.
$2,253,310.
$5,639,760.
$188,930.

IPD D/B LS RFP

File details come from the government source that posted it. Updated .