This is a Budget Appendix document for a state or local contract opportunity involving system equipment procurement and related services. The project encompasses the supply and installation of system equipment along with associated spare parts, test equipment, project management, engineering support, installation services, and training. The contract structure indicates an Integrated Project Delivery (IPD) Design/Build (D/B) arrangement under a Lump Sum (LS) request for proposal (RFP) format.
The budget allocation totals approximately $30.4 million, distributed across four primary cost categories: system equipment at $22,356,670; spare and test equipment at $2,253,310; project management, engineering, and installation services at $5,639,760; and training at $188,930. This budget structure reflects a comprehensive approach to equipment deployment that includes not only the capital equipment costs but also the supporting services and training necessary for successful implementation and ongoing operational support.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Bond.doc | DOC document | |
| RFP 2016000096 FINAL.docx | DOCX document | |
| Appendix D8 Cost Proposal Forms .xlsx | XLSX spreadsheet | |
| LMBond.doc | DOC document | |
| Appendix E Building codes.doc | DOC document | |
| Appendix A1-2.docx | DOCX document | |
| Appendix B2 SC8.1.doc | DOC document | |
| Appendix D1- Non Disclosure Agreement .docx | DOCX document | |
| Appendix D8 1COST PROPOSAL Summary.docx | DOCX document | |
| Appendix D Specifications.docx | DOCX document | |
| RFP 2016000096 REVISED 1-14.docx | DOCX document | |
| Appendix D9 Compliance Matrix.xlsx | XLSX spreadsheet | |
| Appendix C. UI Formdocx.docx | DOCX document | |
| MW Q_A final.docx | DOCX document | |
| Appendix D8 Pricing Instructions.docx | DOCX document | |
| Appendix B1 Sc 8.0.docx | DOCX document | |
| Authorization to Bid.doc | DOC document | |
| FINAL Round 2 QA.docx | DOCX document | |
| PerfBond.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix F
BUDGET
| System Equipment |
| Spare & Test Equipment |
| PM/Engineering/ Installation |
| Training |
| $22,356,670. |
| $2,253,310. |
| $5,639,760. |
| $188,930. |
IPD D/B LS RFP