Appendix E - DTA-F-004-24_ClearancePermitRequest-v1.1 (new).pdf

PDF 1 MB Posted

Attached to
R/R Diesel Tank
Solicitation number
AEW-0170-0553
Issued by
Macomb County, Westland City, Michigan

About this file

The document appears to be an Adobe Reader configuration message indicating that the PDF requires Adobe Reader 8 or higher to be properly viewed. No substantive contract, procurement, or project details can be extracted from this single page of technical instructions about PDF viewing requirements.

Without additional pages or content, there is insufficient information to provide a comprehensive summary of the state and local contract opportunity for the R/R Diesel Tank project at Detroit Arsenal in Michigan.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader.

For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.

DTA-F-004-24

v1.1 of

DETROIT ARSENAL DPW WORK CLEARANCE PERMIT REQUEST

SECTION 1. PERMIT REQUEST (COMPLETED BY REQUESTER/REQUESTING ORGANIZATION)

DESCRIPTION OF PROPOSED WORK AND SCOPE OF EXCAVATION / DATE CLEARANCE NEEDED BY:

SIGNATURE OR REQUESTING OFFICIAL

TELEPHONE NO.

DATE SUBMITTED

Work clearance is requested to proceed with work on Work-Order No. , or Contract No. , involving excavation or utility disturbance per the BELOW sketch. Proposed excavation area of this site been staked or more clearly marked.

TYPE OF FACILITY / WORK INVLOVED

SITE DIAGRAM / SKETCH (attach additional sheets as needed, attach photos of excavation site):

SECTION 2. DIRECTORATE OF PUBLIC WORKS

ORGANIZATION

REMARKS

REVIEWER'S SIGNATURE

A. ELECTRICAL ENGINEER

B. CIVIL ENGINEER

C. ENERGY MANAGER

D. LEAD GENERAL ENGINEER

E. ENVIRONMENTAL DIVISION

SECTION 3. NETWORK ENTERPRISE CENTER (14 Calendar Days to Mark Utilities and Return)

DATE RECEIVED

DATE MARKED

REVIEWER'S SIGNATURE

REVIEWER'S SIGNATURE

DATE MARKED

DATE RECEIVED

SECTION 4. BASE OPERATIONS CONTRACTOR (7 Calendar Days to Mark Utilities and Return)

REVIEWER'S SIGNATURE

MISS DIG: POSITIVE RESPONSE DATE - (Attach screen shot)

DATE CONTACTED MISS DIG/ MISS DIG TICKET NUMBER

SECTION 5. EXCAVATION ORGANIZATION / CONTRACTOR (14 Calendar Days to Submit and Return)

SECTION 6. APPROVAL /DISAPPROVAL

(This section must describe specific precautionary measure to be taken before and during work accomplishment. Reasons for Permit Disapproval shall be identified.)

PERMIT REQUEST IS:

6.4.0.20180228.1.932123.929382

CurrentMasterPage:
MasterPageCount:
RequestNumbers:
ContractNumbers:
Has:
HasNot:
PAVE:
FIRE:
VEHICLE:
SECURITY:
UTILITY:
DRAINAGE:
OTHER:
COMM:
RAILROAD:
OH1:
OH2:
UG1:
UG2:
DescText:
SignatureField1:
NumericField1:
DateField1:
SketchField1:
EERemarks:
CERemarks:
EMRemarks:
LGERemarks:
EDRemarks:
EESig:
CESig:
EMsig:
LGEsig:
EDsig:
Section3Sig:
DateFieldRec3:
DateFieldMkd3:
DateFieldRec4:
DateFieldMkd4:
Seciton4Sig:
MissDigRespDate:
MIssDigTix:
ReviewerSig5Field:
PermitApproved:
PermitDisapproved:
PermitAppName:
PermitDecSign:
PermitDecDate:
TextField1:

File details come from the government source that posted it. Updated .