This is Addendum Number 2 for the Detroit Arsenal Diesel Tank project, issued by the U.S. Army Garrison - Detroit Arsenal and prepared by Anderson, Eckstein & Westrick, Inc. on February 10, 2025, with the project identification IGSA-CI-RFS-25-01 and Work Order DTA-15023. The addendum provides clarifications and responses to bidder questions, specifically addressing technical inquiries about generator breaker ground protective relay (GPR), interior tank coating specifications, and potential exterior coating requirements for the diesel tank replacement project.

The addendum includes three key bidder questions and corresponding responses: (1) confirming that GPR means Ground Protective Relay, (2) instructing contractors to obtain standard interior coating specifications from their chosen manufacturer, and (3) directing bidders to Federal Acquisition Regulation (FAR) Clause part 25, Subparts 25.1 and 25.2 for guidance on potential domestic steel requirements. No changes were noted in architectural, mechanical, electrical drawings, or specifications, and no substitutions or attachments were included in this addendum. Bidders are required to acknowledge receipt of this addendum in their bid form, with failure to do so potentially resulting in disqualification.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOCUMENT 00 91 00

ADDENDA

ADDENDUM NUMBER 2

DATE: February 10, 2025

PROJECT: Detroit Arsenal Diesel Tank

IGSA-CI-RFS-25-01

Work Order DTA-15023

AEW Project No.: 0170-0553

OWNER: U.S. Army Garrison – Detroit Arsenal

ARCHITECT/ENGINEER: Anderson, Eckstein & Westrick, Inc.

TO: Prospective Bidders

This Addendum forms a part of the Contract Documents and modifies the

Bidding Documents dated 1/21/2025, with amendments and additions noted below.

The following changes to and/or clarifications of the Contract Documents will be incorporated in said Contract Documents and such changes shall be allowed for in the price bid by the Contractor, such that the price indicated in the Proposal shall represent the conditions as set forth in the original Contract Documents as modified by this Addendum.

Acknowledgment of receipt of this Addendum and the Bidder’s Acceptance of these revised conditions prior to submittal of the bid shall be indicated by adding the Addendum number in the space provided in the Bid Form. Failure to do so may disqualify the Bidder.

A. BIDDER QUESTIONS AND RESPONSES:

1. On the one line there is GPR on the generator breaker. Can you find out what that is? We are assuming at the moment it is a Ground

Protective Relay. But I would like to get clarification.

A: Yes, GPR is a Ground Protective Relay.

2. I’ve gotten started on your quote for the Detroit Arsenal project, but when reviewing I noticed spec section 2.6.1 calls out that the interior of the tank is to be coated with manufactures standard coating, however we do not have a standard interior coating. Any chance you can advise on the coating systems required?

A: Contractor shall ask whichever manufacturer they go with for their standard interior coating. This is a manufactures standard coating.

3. I also know many times on military projects that there’s a special exterior coating required and might require 100% domestic steel. I didn’t see anything called out in the spec but was wondering if you happened to know if that is true with this project as well?

A: FAR Clause part 25 shall provide guidance. Subpart 25.1 and 25.2 https://www.acquisition.gov/browse/index/far

B. DOCUMENT REVISIONS:

ARCHITECTURAL DRAWING ITEMS:

None

MECHANICAL DRAWING ITEMS:

ELECTRICAL DRAWING ITEMS:

SPECIFICATIONS

https://www.acquisition.gov/browse/index/far

C. SUBSTITUTIONS:

D. ATTACHMENTS:

End of Addenda