Appendix D.pdf
PDF 108 KB Posted
- Attached to
- Elevator, Escalator and Accessible Lifts Maintenance, Repair, Inspection, and Modernization Services IDIQ
- Solicitation number
- ElevatorRFIMarch2026
- Issued by
-
Architect of the Capitol
About this file
This is an appendix providing elevator, escalator, and accessible lift inventory data for a federal maintenance and repair contract covering the period of April 7, 2023 through April 6, 2024.
The document details equipment counts across 21 buildings divided between two sectors. Sector 1 (ELCON Enterprises, Inc.) encompasses 11 Senate and Library of Congress buildings containing 96 traction elevators, 13 hydraulic elevators, 4 escalators, and 6 accessible lifts. Sector 2 (Quality Elevator Company, Inc.) covers 10 House and Library of Congress buildings containing 123 traction elevators, 36 hydraulic elevators, 38 escalators, and 11 accessible lifts. Notable facilities include the United States Capitol Building (22 traction and 7 hydraulic elevators with 4 escalators), Rayburn House Office Building (28 traction and 8 hydraulic elevators with 20 escalators), and Capitol Visitors Center (19 hydraulic elevators and 6 escalators). The document notes that Hart Senate Office Building's accessible lift count includes one stair lift, Cannon House Office Building will add two additional traction elevators in the next contract period, and the United States Botanic Garden's three hydraulic elevators will be serviced by a single contractor for a five-year term consisting of a base period and four option periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AOC Elevator IDIQ RFI Amnd 01.pdf | ||
| Draft Elevator IDIQ Pricelist Amnd 01.xlsx | XLSX spreadsheet | |
| Draft Elevator IDIQ SOW March 2026.pdf | ||
| Draft Elevator IDIQ Pricelist.xlsx | XLSX spreadsheet | |
| Appendix B.pdf | ||
| Appendix E.pdf | ||
| AOC Elevator IDIQ RFI.pdf | ||
| Appendix A.pdf | ||
| Appendix C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX D
Elevator background for the number and types of elevators, escalators, and accessible lifts per Building
Period of Performance: April 7, 2023 through April 6, 2024
BUILDING
NUMBER OF
TRACTION
ELEVATORS
NUMBER OF
HYDRO
ELEVATORS
NUMBER OF
ESCALATORS
NUMBER OF
ACCESSIBLE
LIFTS
SECTOR 1 – ELCON Enterprises, Inc.
Russell Senate Office Building 15 - - 1 Dirksen Senate Office Building 12 1 1 - Hart Senate Office Building 15 - - 2* Senate Child Care Center - 1 - Webster Hall Page School Dormitory
1 - - -
Senate Warehouse - 1 - - St. Cecilia - 1 - - United States Capitol Building 22 7 4 2 Library of Congress – John Adams Building
14 - - -
United States Botanic Garden - 3 - - SECTOR 2 – Quality Elevator Company, Inc.
Cannon House Office Building 16** 1 - 1 Longworth House Office Building 14 3 8 1 Rayburn House Office Building 28 8 20 3 Ford House Office Building 8 - - - O'Neill House Office Building 8 - - 1 United States Supreme Court Building
7 2 - 1
Capitol Visitors Center - 19 6 3 Library of Congress – James Madison Memorial Building
22 - 4 -
Library of Congress – Thomas Jefferson Building
12 3 - 1
Notes:
1. *Hart Senate Office Building has one (1) accessible lift and one (1) stair lift.
2. **Cannon House Office Building will add two (2) more traction elevators in the next elevator repair contract period.
3. The United States Botanic Garden has three (3) hydraulic elevators. One (1) contractor shall provide maintenance, repair, and inspection services for a total of five (5) years (base and four option periods).
File details come from the government source that posted it. Updated .