Appendix_6-UWS_West_Bay.pdf
PDF 3 MB Posted
- Attached to
- Countywide Mast Arms - Group 1 Re-Bid
- Solicitation number
- 23-0183-ITB-CP
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
The documents are a series of Utility Work Schedules (UWS) for the Pinellas County Countywide Mast Arm Hardening Project (County Project #004183), involving multiple utility agencies including Clearwater Gas System, MCI Metro Access Transmission Services, Duke Energy Florida, Frontier, Spectrum Communications, and ZAYO Group LLC. The project focuses on installing and hardening mast arm signalization at various intersections, with specific work including utility line adjustments, pole relocations, underground conduit installations, and overhead conductor modifications at locations like West Bay Drive and Indian Rocks Road. The utility work schedules detail technical specifications, work activities, dependent activities, and consecutive day requirements for each utility agency's specific scope of work.
Each utility agency's work schedule follows a consistent format with sections detailing non-construction items, construction items, special conditions/constraints, and specific work activities. The documents indicate careful coordination between Pinellas County and various utility providers, with precise requirements for notification, work hours, access, and excavation procedures. The project appears to be part of a broader infrastructure improvement initiative, with final design phase construction plans dated between November 2019 and June 2021. The utility agencies are required to notify the county in writing prior to starting, stopping, or resuming work, and must exercise due diligence in managing their respective utility facility modifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section_I-Agreement_23-0183.pdf | ||
| Approved_Permit_Package_US19-Roos.pdf | ||
| Approved_Permit_Package_Seminole-126.pdf | ||
| Appendix_4_-SPECIAL_NOTICES.pdf | ||
| Plans.pdf | ||
| Appendix_6-Geotech_Report.pdf | ||
| Attachment_B_23-0183.pdf | ||
| Section_F_-_Bid_Submittal_23-0183.xlsx | XLSX spreadsheet | |
| Appendix_6-UWS_Roosevelt.pdf | ||
| Appendix_6-UWS_Seminole.pdf | ||
| Section_E-Specifications.pdf | ||
| Attachment_C_23-0183.pdf | ||
| Attachment_A_23-0183.pdf | ||
| ITB-23-0183.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5/12/2022
Tim Messina
Utilities Coordinator
File details come from the government source that posted it. Updated .