Appendix_6-UWS_Roosevelt.pdf
PDF 2 MB Posted
- Attached to
- Countywide Mast Arms - Group 1 Re-Bid
- Solicitation number
- 23-0183-ITB-CP
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
The document is a Utility Work Schedule (UWS) for Pinellas County's Countywide Mast Arm Hardening Signalization Plans project, involving multiple utility agencies/owners including Clearwater Gas System, Duke Energy, MCI Metro Access Transmission Services LLC, Frontier, Knology Broadband of Florida (WOW!), and ZAYO Group LLC. The project focuses on utility work related to mast arm hardening at various locations, specifically US 19 at Roosevelt Boulevard, with work involving protecting, adjusting, and potentially relocating utility facilities. The project is based on Pinellas County's final design phase construction plans dated November 2021, with each utility agency providing details on their specific utility work, facility types, and work descriptions.
The utility work schedules outline special conditions and constraints for each utility agency, including requirements for notification, working hours, emergency contacts, and site access. Most agencies are required to provide 48-72 hours notice prior to construction, maintain normal business hours (typically 7:30 AM - 5:00 PM, Monday-Friday), and ensure extreme caution when working near existing facilities. The total non-construction time varies by agency, with Frontier noting 30 calendar days for preliminary work, while others show minimal to no non-construction time. The construction items generally involve protecting existing utilities, adjusting facilities, and coordinating with the county's project construction schedule, with estimated construction times ranging from 0-4 calendar days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section_I-Agreement_23-0183.pdf | ||
| Approved_Permit_Package_US19-Roos.pdf | ||
| Appendix_6-UWS_West_Bay.pdf | ||
| Approved_Permit_Package_Seminole-126.pdf | ||
| Appendix_4_-SPECIAL_NOTICES.pdf | ||
| Plans.pdf | ||
| Appendix_6-Geotech_Report.pdf | ||
| Attachment_B_23-0183.pdf | ||
| Section_F_-_Bid_Submittal_23-0183.xlsx | XLSX spreadsheet | |
| Appendix_6-UWS_Seminole.pdf | ||
| Section_E-Specifications.pdf | ||
| Attachment_C_23-0183.pdf | ||
| Attachment_A_23-0183.pdf | ||
| ITB-23-0183.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5/12/2022
Utilities Coordinator
Tim Messina
File details come from the government source that posted it. Updated .