Appendix_6-UWS_Roosevelt.pdf

PDF 2 MB Posted

Attached to
Countywide Mast Arms - Group 1 Re-Bid
Solicitation number
23-0183-ITB-CP
Issued by
Pinellas County, Clewiston City, Florida

About this file

The document is a Utility Work Schedule (UWS) for Pinellas County's Countywide Mast Arm Hardening Signalization Plans project, involving multiple utility agencies/owners including Clearwater Gas System, Duke Energy, MCI Metro Access Transmission Services LLC, Frontier, Knology Broadband of Florida (WOW!), and ZAYO Group LLC. The project focuses on utility work related to mast arm hardening at various locations, specifically US 19 at Roosevelt Boulevard, with work involving protecting, adjusting, and potentially relocating utility facilities. The project is based on Pinellas County's final design phase construction plans dated November 2021, with each utility agency providing details on their specific utility work, facility types, and work descriptions.

The utility work schedules outline special conditions and constraints for each utility agency, including requirements for notification, working hours, emergency contacts, and site access. Most agencies are required to provide 48-72 hours notice prior to construction, maintain normal business hours (typically 7:30 AM - 5:00 PM, Monday-Friday), and ensure extreme caution when working near existing facilities. The total non-construction time varies by agency, with Frontier noting 30 calendar days for preliminary work, while others show minimal to no non-construction time. The construction items generally involve protecting existing utilities, adjusting facilities, and coordinating with the county's project construction schedule, with estimated construction times ranging from 0-4 calendar days.

View the file

Other files

File Type Posted
Section_I-Agreement_23-0183.pdf PDF
Approved_Permit_Package_US19-Roos.pdf PDF
Appendix_6-UWS_West_Bay.pdf PDF
Approved_Permit_Package_Seminole-126.pdf PDF
Appendix_4_-SPECIAL_NOTICES.pdf PDF
Plans.pdf PDF
Appendix_6-Geotech_Report.pdf PDF
Attachment_B_23-0183.pdf PDF
Section_F_-_Bid_Submittal_23-0183.xlsx XLSX spreadsheet
Appendix_6-UWS_Seminole.pdf PDF
Section_E-Specifications.pdf PDF
Attachment_C_23-0183.pdf PDF
Attachment_A_23-0183.pdf PDF
ITB-23-0183.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5/12/2022

Utilities Coordinator

Tim Messina

File details come from the government source that posted it. Updated .