This document is a Utility Work Schedule (UWS) for Pinellas County, Florida, involving multiple utility agencies/owners (UAOs) for a Countywide Mast Arm Hardening Signalization Project. The project involves utility work at multiple locations, including West Bay Drive at Indian Rocks Road, US 19 at Roosevelt Boulevard, Seminole Boulevard at 126th Avenue North, and involves various utility companies such as Clearwater Gas System, MCI Metro Access Transmission Services, Duke Energy, Spectrum Communications, Knology Broadband, and ZAYO Group. The project's primary objectives include protecting and adjusting utility facilities, replacing poles, installing switches, de-energizing circuit segments, and preparing for mast arm signalization infrastructure improvements.
The utility work schedules detail specific technical requirements, including precise location coordinates, utility facility types, work descriptions, and dependent activities. Each UAO has unique special conditions and constraints, such as working hours (typically 8am-5pm, Monday-Friday), advance notice requirements (ranging from 48-72 hours), and specific safety protocols. The documents indicate collaboration between Pinellas County, various utility providers, and road contractors, with careful attention to coordinate pole placements, power supply adjustments, and right-of-way considerations. The project appears to be funded through county infrastructure improvement budgets, with multiple utility agencies coordinating to minimize service disruptions and ensure comprehensive infrastructure upgrades.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section_I-Agreement_23-0183.pdf | ||
| Approved_Permit_Package_US19-Roos.pdf | ||
| Appendix_6-UWS_West_Bay.pdf | ||
| Approved_Permit_Package_Seminole-126.pdf | ||
| Appendix_4_-SPECIAL_NOTICES.pdf | ||
| Plans.pdf | ||
| Appendix_6-Geotech_Report.pdf | ||
| Attachment_B_23-0183.pdf | ||
| Section_F_-_Bid_Submittal_23-0183.xlsx | XLSX spreadsheet | |
| Appendix_6-UWS_Roosevelt.pdf | ||
| Section_E-Specifications.pdf | ||
| Attachment_C_23-0183.pdf | ||
| Attachment_A_23-0183.pdf | ||
| ITB-23-0183.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tim Messina 4/27/2022 Utilities Coordinator
4/27/2022 4/27/2022
David McNamara
Senior Engineering Technologist
4/27/2022 4/27/2022
Tim Messina
Utilities Coordinator
4/27/2022
4/27/2022
Marco Rubio
Practice Leader
4/27/22 4/27/2022
File details come from the government source that posted it. Updated .