Appendix_6-UWS_Seminole.pdf

PDF 6 MB Posted

Attached to
Countywide Mast Arms - Group 1 Re-Bid
Solicitation number
23-0183-ITB-CP
Issued by
Pinellas County, Clewiston City, Florida

About this file

This document is a Utility Work Schedule (UWS) for Pinellas County, Florida, involving multiple utility agencies/owners (UAOs) for a Countywide Mast Arm Hardening Signalization Project. The project involves utility work at multiple locations, including West Bay Drive at Indian Rocks Road, US 19 at Roosevelt Boulevard, Seminole Boulevard at 126th Avenue North, and involves various utility companies such as Clearwater Gas System, MCI Metro Access Transmission Services, Duke Energy, Spectrum Communications, Knology Broadband, and ZAYO Group. The project's primary objectives include protecting and adjusting utility facilities, replacing poles, installing switches, de-energizing circuit segments, and preparing for mast arm signalization infrastructure improvements.

The utility work schedules detail specific technical requirements, including precise location coordinates, utility facility types, work descriptions, and dependent activities. Each UAO has unique special conditions and constraints, such as working hours (typically 8am-5pm, Monday-Friday), advance notice requirements (ranging from 48-72 hours), and specific safety protocols. The documents indicate collaboration between Pinellas County, various utility providers, and road contractors, with careful attention to coordinate pole placements, power supply adjustments, and right-of-way considerations. The project appears to be funded through county infrastructure improvement budgets, with multiple utility agencies coordinating to minimize service disruptions and ensure comprehensive infrastructure upgrades.

View the file

Other files

File Type Posted
Section_I-Agreement_23-0183.pdf PDF
Approved_Permit_Package_US19-Roos.pdf PDF
Appendix_6-UWS_West_Bay.pdf PDF
Approved_Permit_Package_Seminole-126.pdf PDF
Appendix_4_-SPECIAL_NOTICES.pdf PDF
Plans.pdf PDF
Appendix_6-Geotech_Report.pdf PDF
Attachment_B_23-0183.pdf PDF
Section_F_-_Bid_Submittal_23-0183.xlsx XLSX spreadsheet
Appendix_6-UWS_Roosevelt.pdf PDF
Section_E-Specifications.pdf PDF
Attachment_C_23-0183.pdf PDF
Attachment_A_23-0183.pdf PDF
ITB-23-0183.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tim Messina 4/27/2022 Utilities Coordinator

4/27/2022 4/27/2022

David McNamara

Senior Engineering Technologist

4/27/2022 4/27/2022

Tim Messina

Utilities Coordinator

4/27/2022

4/27/2022

Marco Rubio

Practice Leader

4/27/22 4/27/2022

File details come from the government source that posted it. Updated .