Appendix_4_-SPECIAL_NOTICES.pdf

PDF 270 KB Posted

Attached to
Countywide Mast Arms - Group 1 Re-Bid
Solicitation number
23-0183-ITB-CP
Issued by
Pinellas County, Clewiston City, Florida

About this file

Appendix 4 is a Special Notices document for a federally-funded project administered by Pinellas County, Florida, specifically for the Countywide Mast Arms - Group 1 Re-bid. The project involves infrastructure improvements for signalization with mast arms at three intersections, funded through the Federal Emergency Management Administration (FEMA). The project covers multiple Project Identification (P.I.D.) numbers: 004183A-Group 1, 004183J, 004183K, and 004183L, and requires contractors to adhere to specific grant agreement requirements and supplemental conditions.

The project mandates strict utility coordination, with contractors responsible for coordinating and locating all utilities prior to and during work, including specific requirements for directional drilling operations. Contractors must coordinate with St. Petersburg Utilities and Florida Gas Transmission, maintaining a minimum 10-foot clearance from utility lines at Roosevelt Boulevard and US 19, potentially requiring bore depths of 18 feet or more. Additionally, the project involves work on state roadways, requiring coordination with the Florida Department of Transportation Permitting and adherence to a construction agreement included in Appendix 1 of the bid documents.

View the file

Other files

File Type Posted
Section_I-Agreement_23-0183.pdf PDF
Approved_Permit_Package_US19-Roos.pdf PDF
Appendix_6-UWS_West_Bay.pdf PDF
Approved_Permit_Package_Seminole-126.pdf PDF
Plans.pdf PDF
Appendix_6-Geotech_Report.pdf PDF
Attachment_B_23-0183.pdf PDF
Section_F_-_Bid_Submittal_23-0183.xlsx XLSX spreadsheet
Appendix_6-UWS_Roosevelt.pdf PDF
Appendix_6-UWS_Seminole.pdf PDF
Section_E-Specifications.pdf PDF
Attachment_C_23-0183.pdf PDF
Attachment_A_23-0183.pdf PDF
ITB-23-0183.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 4

SPECIAL NOTICES

P.I.D. NO. 004183A-Group 1

Countywide Mast Arms – Group 1 Re-bid

PID Nos. 004183J, 004183K, 004183L

In Pinellas County, Florida

NOTICES TO CONTRACTOR

This is a federally-funded project through the Federal Emergency Management Administration (FEMA) and administered by Pinellas County. The project requires adherence to the grant agreement in Attachment A and Supplemental Conditions contained in Attachment B this Appendix 4, the compliance and reporting of which are required by this contract. There are required forms contained in Attachment C this Appendix 4 that are due upon submittal of the Invitation to bid. Additionally, wherever a conflict occurs within the Invitation to Bid documents, the federal terms of which are contained in this Appendix 4 shall prevail as listed in Section I Agreement, subparagraph 4.

Changes In Requirements:

Federal requirements that apply to Pinellas County under the Underlying Agreement with FEMA and any Amendments thereto may change due to changes in federal law, regulation, other requirements, or guidance, or changes in the Underlying Agreement including any information incorporated by reference and made part of that Underlying Agreement. Any such changes will apply to this Construction Agreement and any sub-contractor agreements.

Section B, Part 21.E.2. Contractor’s Superintendent:

The Contractor’s Superintendent and agent are synonymous with regards to this section and shall be an employee or contract employee of the prime contractor. A sub-contractor shall not serve as an agent for the prime contractor.

Utility Coordination:

Utility coordination and investigations were performed during the design phase of this project and utility work schedules are provided. However, Contractor is fully responsible for coordinating with and locating all utilities prior to beginning and during work, including directional drilling operations for conduits crossing roadways.

Representatives from St Petersburg Utilities and Florida Gas Transmission must be notified of work and present when working near their lines at Roosevelt Boulevard and US 19. Conduits crossing these utilities at Roosevelt Boulevard and US 19 must maintain a minimum 10-foot clearance from said utilities which may result in a bore depth of 18 feet or more.

State Roadways:

Pinellas County has obtained a construction agreement for work proposed on State roadways.

The contractor must adhere to the construction agreement, a copy of which is included in Appendix 1.

The Contractor must coordinate with the Florida Department of Transportation Permitting prior to beginning work on all State roadways (US 19, Seminole Boulevard) and keep them informed of all work activities involving their facility.