APPENDIX_6_-_Geotechnical_Report_-_82nd_Ave_&_113th_Street_Water_Main.pdf
PDF 13 MB Posted
- Solicitation number
- 26-0652-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This geotechnical report serves as a supporting technical document for the County of Florida's 82nd Avenue & 113th Street Water Main Improvements Project (PID 006170A), one component of a broader infrastructure modernization initiative. The report provides subsurface investigation data and soil analysis necessary for the design and construction of water main replacement work in the specified project area. The geotechnical findings inform construction methodology, material selection, and installation depth requirements for the aging water main replacement project, which is scheduled for completion within 380 consecutive calendar days. This technical appendix is essential for contractors bidding on the combined Ridgewood Estates Sewer Improvements and 82nd Avenue & 113th Street Water Main Improvements contract to understand subsurface conditions and engineering constraints at the project site.
The geotechnical report documents soil composition, groundwater conditions, and bearing capacity data critical for proper installation of the water infrastructure. These findings directly impact construction sequencing, excavation requirements, and material specifications for the water main replacement. Contractors must review this technical data during the bid preparation phase to accurately assess site conditions and develop appropriate construction approaches, as the subsurface characteristics documented in this report will govern installation procedures and potential cost implications for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .