APPENDIX_1_-_Permits.pdf
PDF 20 MB Posted
- Solicitation number
- 26-0652-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
APPENDIX 1 - PERMITS
This appendix document outlines the permits required for the Ridgewood Estates Sewer Improvements Project (PID 003204I) and the 82nd Avenue & 113th Street Water Main Improvements Project (PID 006170A) in Florida. The permits detailed in this document are necessary approvals and authorizations that must be obtained prior to and during construction of the sewer and water main replacement projects. The document serves as a reference for the contractor to identify all required environmental, regulatory, and local permits that must be secured to comply with federal, state, and local requirements governing the replacement of gravity sewer mains and water distribution infrastructure. The permit requirements ensure that the projects proceed in accordance with applicable regulations related to sanitary sewer overflow mitigation, water quality improvement, and public safety enhancements.
The permits identified in this appendix are essential prerequisites for project execution within the 380 consecutive calendar day contract period. Contractors must coordinate permit acquisition timelines and ensure all necessary approvals are obtained to prevent delays in project completion. This document establishes the framework for identifying responsible parties for permit applications, tracking permit status, and managing compliance throughout the construction phases of both water and sewer improvement projects.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .