Amendment 0002.pdf

PDF 325 KB Posted

Attached to
Conservatory Doors Preventive Maintenance & Repair Services
Solicitation number
AOCSSB26R0062
Issued by

About this file

This is Amendment A0002 to Solicitation AOCSSB26Q0067 issued by the Architect of the Capitol's Design and Construction Acquisition Division, effective August 12, 2026. The amendment extends the receipt date for offers to September 8, 2026 at 12:00 pm EST and pushes back the question submission deadline to August 28, 2026 at 12:00 pm EST. A mandatory site visit has been added on August 26, 2026 at 8:30 am, with updated instructions provided in the revised Instructions and Basis for Award document.

The amendment includes revisions to critical solicitation documents: an updated Statement of Work (SOW) and updated pricing sheet are now part of the solicitation package. Contractors must acknowledge receipt of this amendment prior to the new offer deadline by completing and returning the amendment, acknowledging it on each copy of their proposal, or submitting a separate written or electronic communication referencing both the solicitation and amendment numbers. Failure to acknowledge the amendment by the specified deadline may result in rejection of the offer. Contractors are required to sign and return one copy of this amendment to the issuing office.

View the file

Other files

File Type Posted
J.2 Instructions to Quoters and Basis for Award (L&M), 9.1.2026.docx DOCX document
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
J.2 Instructions to Quoters and Basis for Award (L&M), updated.docx DOCX document
J.3 Pricing Sheet, updated.xlsx XLSX spreadsheet
J.1 SOW, updated.docx DOCX document
J.2 Instructions to Quoters and Basis for Award (L&M), 7.30.2026.docx DOCX document
Amendment 0001.pdf PDF
J.7 Wage Det.txt TXT text file
J.10 USCP Veh Del Proc Ref Gde (5-08).pdf PDF
J.1 SOW.docx DOCX document
J.4 CP-491 (05-18) Fillable.pdf PDF
J.9 Notice to Employees Working on Government Contracts.pdf PDF
J.6 Certificate of Insurance.pdf PDF
J.3 Pricing Sheet.xlsx XLSX spreadsheet
J.5 Employee Eligibility Verify.pdf PDF
J.8 Equal Employment Opportunity.pdf PDF
J.2 Instructions to Quoters and Basis for Award (L&M).docx DOCX document
AOCSSB26R0062.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Number: AOCSSB26R0062 Page 1 of 1

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NUMBER

A0002

3. EFFECTIVE DATE

8/12/2026

4. REQUISITION/PURCHASE REQ. NUMBER 5. PROJECT NUMBER (If applicable)

9901CODE

Architect of the Capitol Design and Construction Acquisition Division Ford House Building Room H2-263 2nd and D Streets SW Washington, DC 20515

6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

AOCSSB26Q0067

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

8/12/2026

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Timothy Nyberg

Contracting Officer

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV.

11/2016) Prescribed by GSA FAR (48 CFR) 53.243

1X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See attached "Continuation Sheet."

X

Continuation Sheet

a) The date set for the receipt of offers has been changed to 9/8/2026 at 12:00 pm

(EST)

b) The due date for the submission of questions has been extended to 8/28/2026 at 12:00 pm (EST)

c) A mandatory site visit has been added for 8/26/2026, and will be held at 8:30am.

• Attachment “J.2 Instructions and Basis for Award, updated” reflects the new due dates, and instructions regarding the site visit (Section L.1).

d) The pricing sheet and the SOW have been updated

• See attachment “J.3 Pricing Sheet, updated”

• See attachment “J.1 SOW, updated”