Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 26-010
- Issued by
- Santa Rosa County, Mount Carmel CDP, Florida
About this file
This is an Alternative Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project, a construction and site improvement initiative undertaken by Santa Rosa County, Florida. The project encompasses site preparation, structural work, stormwater management, and landscaping improvements. Key line items include clearing and grubbing, structure removal, pollution control, construction surveys, mobilization and demobilization, traffic control, water management, excavation and earthfill work at multiple focal points, concrete structures including inlets and curbing, asphalt work, plastic pipe installation (4-inch and 12-inch HDPE), rock riprap, metal sign fabrication, geotextile materials, vegetative installation, permeable paver systems, and underground storage tanks. The pricing table identifies 33 distinct line items with quantities ranging from single lump-sum items to 14,697 square feet for pervious pavers and 2,400 linear feet for ribbon curb work. The pre-bid meeting is scheduled for January 12, 2026, at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton, in the Engineering/Environmental Conference Room. Questions must be submitted through the procurement portal by 12:00 p.m. on Friday, February 13, 2026, and sealed bid proposals are due by 10:00 a.m. on Friday, February 20, 2026, at which time bids will be publicly opened. Specifications are available through the Santa Rosa County Procurement Portal at https://procurement.opengov.com/portal/santarosafl.
The pricing table is structured as a template requiring bidders to provide unit costs for each line item, with units of measure specified as lump sums, linear feet, tons, each, job, square yards, and square feet. Santa Rosa County encourages participation from small businesses, minority-owned and women-owned businesses, and disadvantaged business enterprises. The County Board of County Commissioners reserves the right to waive irregularities in bids, reject any or all bids for sound documented reasons, and award the bid that it determines to be in the best interest of Santa Rosa County. No specific funding amounts, contract term length, renewal options, or incumbent contractor information is indicated in this pricing table document.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing_Table_Template
| Table 1 | Line Item | Description | Construction Specification Number from Specs Binder Attachment | Unit of Measure | Quantity | Taxable | Unit Cost |
| 1 | Clearing and Grubbing | 2 | Lump Sum | 1 | |||
| 2 | Structure Removal | 3 | Lump Sum | 1 | |||
| 3 | Pollution Control | 5 | Lump Sum | 1 | |||
| 4 | Construction Surveys | 7 | Lump Sum | 1 | |||
| 5 | Mobilization and Demobilization | 8 | Lumjp Sum | 1 | |||
| 6 | Traffic Control | 9 | Lump Sum | 1 | |||
| 6 | Water for Construction | 10 | Lump Sum | 1 | |||
| 7 | Removal of Water | 11 | Lump Sum | 1 | |||
| 7 | Excavation-Focal Point 1,2,3,4,9 Per Plans | 21 | Lump Sum | 1 | |||
| 7 | Earthfill-Placement of Earth Material | 23 | Lump Sum | 1 | |||
| 8 | Earthfill-Focal Point 1-Complete and In Place | 23 | Lump Sum | 1 | |||
| 9 | Earthfill-Focal Point 2-Complete and In Place | 23 | Lump Sum | 1 | |||
| 10 | Earthfill-Focal Point 3-Complete and In Place | 23 | Lump Sum | 1 | |||
| 11 | Earthfill-Focal Point 4-Complete and In Place | 23 | Lump Sum | 1 |
| 16 | Earthfill-Focal Point 9-provide and install | 23 | Lump Sum | 1 |
| 17 | Excavation-Urban Forest Tree Boxes Per Plans | 23 | Lump Sum | 1 |
| 17 | Earthfill-Urban Forest Tree Boxes-provide and install | 23 | Lump Sum | 1 |
| 17 | Drainfill-Within Focal Point and Urban Forest Systems | 24 | Lump Sum | 1 |
| 18 | Topsoiling | 26 | Lump Sum | 1 |
| 19 | Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place) | 32 | Lump Sum | 3 |
| 20 | Structure Concrete-Curbing-Replace Standup Curbs | 32 | Lump Sum | 1 |
| 21 | Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels | 32 | Linear Feet | 2400 |
| 22 | Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings | 32-A | Lump Sum | 1 |
| 23 | Asphalt-Thermoplastic Striping | 32-A | Lump Sum | 1 |
| 23 | Steel Reinforcement-For Concrete Structures | 34 | Lump Sum | 1 |
| 24 | Plastic Pipe-4" Diam. HDPE Pipe | 45 | Linear Feet | 316 |
| 25 | Plastic Pipe-12" Diam. HDPE Pipe | 45 | Linear Feet | 392 |
| 26 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap | 61 | Ton | 100 |
| 27 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers | 61 | Ton | 1000 |
| 28 | Rock Riprap-Drainage Swales within Landscape Islands | 61 | Ton | 300 |
| 29 | Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs | 81 | Each | 10 |
| 30 | Contractor Quality Control-Testing Etc. | 94 | Job | 1 |
| 30 | Geotextile-within Focal Point and Urban Forest Systems | 95 | Lump Sum | 1 |
| 31 | Vegetative Measures-Installation Focal Points 1-4 and 9-Per Plans(plants and trees will be supplied by county) | 440 | Job | 1 |
| 32 | Vegetative Measures-sodding-centipede | 440 | Square Yards | 800 |
| 32 | Excavation-R Tanks Per Plans | Lump Sum | 1 | |
| 32 | Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal) | Lump Sum | 1 | |
| 33 | Excavation-PowerBlock Permeable Pavers Per Plans | Lump Sum | 1 | |
| 33 | Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) | Square Feet | 14697 |