This is an Alternative Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project in Florida. The project involves construction and green infrastructure improvements to the Santa Rosa County Administration Building, with sealed bids to be received by the Santa Rosa County Board of County Commissioners. A pre-bid meeting is scheduled for January 12, 2026, at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton. Questions must be submitted through the procurement portal by 12:00 p.m. on February 13, 2026, and all proposals must be submitted by 10:00 a.m. on February 20, 2026, at which time bids will be publicly opened. The project includes numerous construction and site development line items with lump sum and unit pricing, including clearing and grubbing, structure removal, pollution control, surveys, excavation, earthfill placement, concrete structures, asphalt work, plastic piping, rock riprap, metal fabrication, geotextile installation, vegetative measures, underground storage tanks, and permeable paver installation. Specific quantities are provided for measurable items, such as 316 linear feet of 4-inch HDPE pipe, 392 linear feet of 12-inch HDPE pipe, 14,697 square feet of pervious pavers, 800 square yards of sodding, and 2,400 linear feet of curbing.
The pricing table requires bidders to provide unit costs and total taxable costs for each line item. Santa Rosa County encourages participation from small businesses, minority and women-owned businesses, and disadvantaged business enterprises. The county reserves the right to waive irregularities in bids, reject any or all bids for sound documented reasons, and award the bid determined to be in the best interest of Santa Rosa County. Specifications are available through the Santa Rosa County Procurement Portal at https://procurement.opengov.com/portal/santarosafl, where bidders must submit electronic proposals.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing_Table_Template
| Table 1 | Line Item | Description | Construction Specification Number from Specs Binder Attachment | Unit of Measure | Quantity | Taxable | Unit Cost |
| 1 | Clearing and Grubbing | 2 | Lump Sum | 1 | |||
| 2 | Structure Removal | 3 | Lump Sum | 1 | |||
| 3 | Pollution Control | 5 | Lump Sum | 1 | |||
| 4 | Construction Surveys | 7 | Lump Sum | 1 | |||
| 5 | Mobilization and Demobilization | 8 | Lumjp Sum | 1 | |||
| 6 | Traffic Control | 9 | Lump Sum | 1 | |||
| 6 | Water for Construction | 10 | Lump Sum | 1 | |||
| 7 | Removal of Water | 11 | Lump Sum | 1 | |||
| 7 | Excavation-Focal Point 1,2,3,4,9 Per Plans | 21 | Lump Sum | 1 | |||
| 7 | Earthfill-Placement of Earth Material | 23 | Lump Sum | 1 | |||
| 8 | Earthfill-Focal Point 1-Complete and In Place | 23 | Lump Sum | 1 | |||
| 9 | Earthfill-Focal Point 2-Complete and In Place | 23 | Lump Sum | 1 | |||
| 10 | Earthfill-Focal Point 3-Complete and In Place | 23 | Lump Sum | 1 | |||
| 11 | Earthfill-Focal Point 4-Complete and In Place | 23 | Lump Sum | 1 |
| 16 | Earthfill-Focal Point 9-provide and install | 23 | Lump Sum | 1 |
| 17 | Excavation-Urban Forest Tree Boxes Per Plans | 23 | Lump Sum | 1 |
| 17 | Earthfill-Urban Forest Tree Boxes-provide and install | 23 | Lump Sum | 1 |
| 17 | Drainfill-Within Focal Point and Urban Forest Systems | 24 | Lump Sum | 1 |
| 18 | Topsoiling | 26 | Lump Sum | 1 |
| 19 | Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place) | 32 | Lump Sum | 3 |
| 20 | Structure Concrete-Curbing-Replace Standup Curbs | 32 | Lump Sum | 1 |
| 21 | Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels | 32 | Linear Feet | 2400 |
| 22 | Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings | 32-A | Lump Sum | 1 |
| 23 | Asphalt-Thermoplastic Striping | 32-A | Lump Sum | 1 |
| 23 | Steel Reinforcement-For Concrete Structures | 34 | Lump Sum | 1 |
| 24 | Plastic Pipe-4" Diam. HDPE Pipe | 45 | Linear Feet | 316 |
| 25 | Plastic Pipe-12" Diam. HDPE Pipe | 45 | Linear Feet | 392 |
| 26 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap | 61 | Ton | 100 |
| 27 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers | 61 | Ton | 1000 |
| 28 | Rock Riprap-Drainage Swales within Landscape Islands | 61 | Ton | 300 |
| 29 | Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs | 81 | Each | 10 |
| 30 | Contractor Quality Control-Testing Etc. | 94 | Job | 1 |
| 30 | Geotextile-within Focal Point and Urban Forest Systems | 95 | Lump Sum | 1 |
| 31 | Vegetative Measures-Installation Focal Points 1-4 and 9-Per Plans(plants and trees will be supplied by county) | 440 | Job | 1 |
| 32 | Vegetative Measures-sodding-centipede | 440 | Square Yards | 800 |
| 32 | Excavation-R Tanks Per Plans | Lump Sum | 1 | |
| 32 | Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal) | Lump Sum | 1 | |
| 33 | Excavation-PowerBlock Permeable Pavers Per Plans | Lump Sum | 1 | |
| 33 | Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) | Square Feet | 14697 |