This is an Alternate Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project in Florida, a construction-focused procurement managed by the Santa Rosa County Procurement Office. The project encompasses comprehensive stormwater management and site improvement work, including clearing and grubbing, structure removal, pollution control, excavation, and the installation of multiple focal points with earthfill, drainage systems, and permeable paving surfaces. Key line items include five focal point systems (numbered 1-4 and 9), urban forest tree boxes, HDPE plastic piping in multiple diameters (4-inch, 12-inch, and 15-inch), riprap installation, concrete structures, asphalt work, steel reinforcement, geotextile materials, and vegetative measures totaling 34 distinct bid items. The pre-bid conference is scheduled for January 12, 2026, at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton in the Engineering/Environmental Conference Room, with questions due by 12:00 p.m. on Friday, February 13, 2026. Sealed bid proposals must be submitted through the Santa Rosa County Procurement Portal by 10:00 a.m. on Friday, February 20, 2026, at which time bids will be publicly opened.

The pricing table presents a lump-sum format for most construction items with specific quantities for measurable line items such as 1,600 linear feet of ribbon curb border concrete, 392 linear feet of 12-inch HDPE pipe, 800 square yards of centipede sodding, and 14,700 square feet of pervious pavers. Unit costs and total costs remain blank in the document, indicating this is a template for bidders to complete with their pricing. Santa Rosa County encourages participation from small businesses, minority/women-owned businesses, and disadvantaged business enterprises, with no discrimination based on race, color, religion, national origin, disability, sex, or age. The County reserves the right to waive irregularities, reject any or all bids for sound documented reasons, and award the contract based on its determination of the best interest to Santa Rosa County.

View the file

Other files

File Type Posted
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
PAYMENT_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Untitled

Line ItemDescriptionQuantityUnit of MeasureUnit CostTotal
1Clearing and Grubbing1Lump Sum
2Structure Removal1Lump Sum
3Pollution Control1Lump Sum
4Construction Surveys1Lump Sum
5Mobilization and Demobilization1Lump Sum
6Traffic Control1Lump Sum
6Water for Construction1Lump Sum
7Removal of Water1Lump Sum
7Excavation-Focal Point 1,2,3,4,9 Per Plans
1Lump Sum
7Earthfill-Placement of Earth Material1Lump Sum
8Earthfill-Focal Point 1-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
9Earthfill-Focal Point 2-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)
1Lump Sum
10Earthfill-Focal Point 3-Complete and In Place
1Lump Sum
11Earthfill-Focal Point 4-Complete and In Place
1Lump Sum
16Earthfill-Focal Point 9-Complete and In Place
1Lump Sum
17Excavation-Urban Forest Tree Boxes Per Plans
1Lump Sum
17Earthfill-Urban Forest Tree Boxes-provide and install4Each
17Drainfill-Within Focal Point and Urban Forest Systems1Lump Sum
18Topsoiling1Job
19Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place)1Lump Sum
20Structure Concrete-Curbing-Replace Standup Curbs1Lump Sum
21Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels1600Linear Feet
22Structure Concrete-Mitered End Section1Each
23Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings1Lump Sum
24Asphalt-Thermoplastic Striping1Lump Sum
23Steel Reinforcement-For Concrete Structures1Lump Sum
25Plastic Pipe-4" Diam. HDPE Pipe175Linear Feet
25Plastic Pipe-12" Diam. HDPE Pipe392Linear Feet
26Plastic Pipe-15" Diam. HDPE Pipe84Linear Feet
27Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap30Ton
28Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers500Ton
29Rock Riprap-Drainage Swales within Landscape Islands90Ton
30Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs10Each
31Contractor Quality Control-Testing Etc.1Job
30Geotextile-within Focal Point and Urban Forest Systems1Lump Sum
32Vegetative Measures-Installation Focal Points 1-4 and 9-Per Plans(plants and trees will be supplied by county)
1Job
33Vegetative Measures-sodding-centipede800Square Yards
32Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal)1Lump Sum
33Excavation-PowerBlock Permeable Pavers Per Plans
1Lump Sum
34Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal)14700Square Feet
Total$0.00