233600 sf - air terminal units.pdf

PDF 19 KB Posted

Attached to
RECOVERYAkron, CO Repair building 1 HVAC system.
Solicitation number
AG-82HW-S-10-0005
Issued by

About this file

233600 sf - air terminal units

View the file

Other files

File Type Posted
233300 sf - air duct accessories.pdf PDF
Amendment 2 - Akron HVAC - ARRA.pdf.pdf PDF
232923 sf - variable frequency motor controllers.pdf PDF
233113 sf - metal ducts.pdf PDF
232123 sf - hydronic pumps.pdf PDF
233119 sf - hvac casings.pdf PDF
Amendment 1.pdf PDF
7- 230548 sf - vibration and seismic controls for hvac piping and equipment.pdf PDF
6- 230529 sf - hangers and supports for hvac piping and equipment.pdf PDF
24- DOL Wage Determiation for Akrion HVAC - ARRA.pdf PDF
14- 230993 sf - sequence of operations for hvac controls.pdf PDF
4- 230519 sf - meters and gages for hvac piping.pdf PDF
22- M601.pdf PDF
18- M101.pdf PDF
5- 230523 sf - general-duty valves for hvac piping.pdf PDF
16- E101.pdf PDF
12- 230800 sf - commissioning of hvac.pdf PDF
2- 01350 Submittals.pdf PDF
21- M502.pdf PDF
23- MD101.pdf PDF
10- 230713 fl - duct insulation.pdf PDF
15- 232113 sf - hydronic piping.pdf PDF
3- 230513 sf - common motor requirements for hvac equipment.pdf PDF
11- 230719 fl - hvac piping insulation.pdf PDF
13- 230900 sf - instrumentation and control for hvac.pdf PDF
1- 01330 Coordination.pdf PDF
AG-82HW-S-10-0005 -B1 HVAC AKRON -ARRA -OPTIONS construction over 100K.pdf PDF
19- M401.pdf PDF
17- G101.pdf PDF
8- 230553 sf - identification for hvac piping and equipment.pdf PDF
9- 230593 sf - testing adjusting and balancing for hvac.pdf PDF
20- M501.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA / ARS

Repair Bldg 1 HVAC System Akron, CO

AIR TERMINAL UNITS 233600 - Page 1 of 6

SECTION 233600 - AIR TERMINAL UNITS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Shutoff, single-duct air terminal units.

1.2 PERFORMANCE REQUIREMENTS

A. Structural Performance: Hangers and supports shall withstand the effects of gravity loads and stresses within limits and under conditions described in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible"".

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Field quality-control reports.

C. Operation and maintenance data.

1.4 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1, Section 5 - "Systems and Equipment" and Section 7 - "Construction and System Start-Up."

PART 2 - PRODUCTS

2.1 SHUTOFF, SINGLE-DUCT AIR TERMINAL UNITS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Anemostat Products; a Mestek Company.

2. Environmental Technologies, Inc.

3. Krueger.

4. METALAIRE, Inc.

AIR TERMINAL UNITS 233600 - Page 2 of 6

5. Nailor Industries Inc.

6. Price Industries.

7. Titus.

8. Trane; a business of American Standard Companies.

B. Configuration: Volume-damper assembly inside unit casing with control components inside a protective metal shroud.

C. Casing: 0.034-inch steel, single wall.

1. Casing Lining: Adhesive attached, 1/2-inch- thick, coated, fibrous-glass duct liner complying with ASTM C 1071, and having a maximum flame-spread index of 25 and a maximum smoke-developed index of 50, for both insulation and adhesive, when tested according to ASTM E 84.

a. Cover liner with nonporous foil.

2. Air Inlet: Round stub connection or S-slip and drive connections for duct attachment.

3. Air Outlet: S-slip and drive connections.

4. Access: Removable panels for access to parts requiring service, adjustment, or maintenance; with airtight gasket.

5. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in ASHRAE 62.1.

D. Regulator Assembly: System-air-powered bellows section incorporating polypropylene bellows for volume regulation and thermostatic control. Bellows shall operate at temperatures from 0 to 140 deg F, shall be impervious to moisture and fungus, shall be suitable for 10-inch wg static pressure, and shall be factory tested for leaks.

E. Volume Damper: Galvanized steel with peripheral gasket and self-lubricating bearings.

1. Maximum Damper Leakage: ARI 880 rated, 2 percent of nominal airflow at 3-inch wg inlet static pressure.

2. Damper Position: Normally open.

F. Attenuator Section: 0.034-inch steel sheet.

1. Lining: Adhesive attached, 1/2-inch- thick, coated, fibrous-glass duct liner complying with ASTM C 1071, and having a maximum flame-spread index of 25 and a maximum smoke-developed index of 50, for both insulation and adhesive, when tested according to

ASTM E 84.

a. Cover liner with nonporous foil.

b. Cover liner with nonporous foil and perforated metal.

2. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in ASHRAE 62.1.

G. Multioutlet Attenuator Section: With two 6-inch- diameter collars, each with locking butterfly balancing damper.

AIR TERMINAL UNITS 233600 - Page 3 of 6

H. Hydronic Coils: Copper tube, with mechanically bonded aluminum fins spaced no closer than

0.1 inch, and rated for a minimum working pressure of 200 psig and a maximum entering-water temperature of 220 deg F. Include manual air vent and drain valve.

I. Direct Digital Controls: Bidirectional damper operators and microprocessor-based controller and room sensor. Control devices shall be compatible with temperature controls specified in Division 23 Section "Instrumentation and Control for HVAC" and shall have the following features:

1. Damper Actuator: 24 V, powered open.

2. Terminal Unit Controller: Pressure-independent, variable-air-volume controller with electronic airflow transducer with multipoint velocity sensor at air inlet, factory calibrated to minimum and maximum air volumes, and having the following features:

a. Occupied and unoccupied operating mode.

b. Remote reset of airflow or temperature set points.

c. Adjusting and monitoring with portable terminal.

d. Communication with temperature-control system specified in Division 23 Section

"Instrumentation and Control for HVAC."

3. Room Sensor: Wall mounted, with temperature set-point adjustment and access for connection of portable operator terminal.

2.2 HANGERS AND SUPPORTS

A. Hanger Rods for Noncorrosive Environments: Cadmium-plated steel rods and nuts.

B. Hanger Rods for Corrosive Environments: Electrogalvanized, all-thread rods or galvanized rods with threads painted with zinc-chromate primer after installation.

C. Steel Cables: Galvanized steel complying with ASTM A 603.

D. Steel Cable End Connections: Cadmium-plated steel assemblies with brackets, swivel, and bolts designed for duct hanger service; with an automatic-locking and clamping device.

E. Air Terminal Unit Attachments: Sheet metal screws, blind rivets, or self-tapping metal screws;

compatible with duct materials.

F. Trapeze and Riser Supports: Steel shapes and plates for units with steel casings; aluminum for units with aluminum casings.

2.3 SOURCE QUALITY CONTROL

A. Factory Tests: Test assembled air terminal units according to ARI 880.

1. Label each air terminal unit with plan number, nominal airflow, maximum and minimum factory-set airflows, coil type, and ARI certification seal.

AIR TERMINAL UNITS 233600 - Page 4 of 6

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install air terminal units according to NFPA 90A, "Standard for the Installation of Air Conditioning and Ventilating Systems."

B. Install air terminal units level and plumb. Maintain sufficient clearance for normal service and maintenance.

C. Install wall-mounted thermostats.

3.2 HANGER AND SUPPORT INSTALLATION

A. Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Chapter 5, "Hangers and Supports."

B. Building Attachments: Concrete inserts, powder-actuated fasteners, or structural-steel fasteners appropriate for construction materials to which hangers are being attached.

1. Where practical, install concrete inserts before placing concrete.

2. Install powder-actuated concrete fasteners after concrete is placed and completely cured.

3. Use powder-actuated concrete fasteners for standard-weight aggregate concretes and for slabs more than 4 inches thick.

4. Do not use powder-actuated concrete fasteners for lightweight-aggregate concretes and for slabs less than 4 inches thick.

5. Do not use powder-actuated concrete fasteners for seismic restraints.

C. Hangers Exposed to View: Threaded rod and angle or channel supports.

D. Install upper attachments to structures. Select and size upper attachments with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.

3.3 CONNECTIONS

A. Install piping adjacent to air terminal unit to allow service and maintenance.

B. Hot-Water Piping: In addition to requirements in Division 23 Section "Hydronic Piping," connect heating coils to supply with shutoff valve, strainer, control valve, and union or flange;

and to return with balancing valve and union or flange.

C. Connect ducts to air terminal units according to Division 23 Section "Metal Ducts."

D. Make connections to air terminal units with flexible connectors complying with requirements in Division 23 Section "Air Duct Accessories."

AIR TERMINAL UNITS 233600 - Page 5 of 6

3.4 IDENTIFICATION

A. Label each air terminal unit with plan number, nominal airflow, and maximum and minimum factory-set airflows. Comply with requirements in Division 23 Section "Identification for HVAC Piping and Equipment" for equipment labels and warning signs and labels.

3.5 FIELD QUALITY CONTROL

A. Perform tests and inspections.

1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing.

B. Tests and Inspections:

1. After installing air terminal units and after electrical circuitry has been energized, test for compliance with requirements.

2. Leak Test: After installation, fill water coils and test for leaks. Repair leaks and retest until no leaks exist.

3. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.

4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

C. Air terminal unit will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

3.6 STARTUP SERVICE

A. Engage a factory-authorized service representative to perform startup service.

1. Complete installation and startup checks according to manufacturer's written instructions.

2. Verify that inlet duct connections are as recommended by air terminal unit manufacturer to achieve proper performance.

3. Verify that controls and control enclosure are accessible.

4. Verify that control connections are complete.

5. Verify that nameplate and identification tag are visible.

6. Verify that controls respond to inputs as specified.

3.7 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain air terminal units.

AIR TERMINAL UNITS 233600 - Page 6 of 6

END OF SECTION 233600