2- 01350 Submittals.pdf

PDF 16 KB Posted

Attached to
RECOVERYAkron, CO Repair building 1 HVAC system.
Solicitation number
AG-82HW-S-10-0005
Issued by

About this file

Attachment 2

View the file

Other files

File Type Posted
233600 sf - air terminal units.pdf PDF
233300 sf - air duct accessories.pdf PDF
Amendment 2 - Akron HVAC - ARRA.pdf.pdf PDF
232923 sf - variable frequency motor controllers.pdf PDF
233113 sf - metal ducts.pdf PDF
232123 sf - hydronic pumps.pdf PDF
233119 sf - hvac casings.pdf PDF
Amendment 1.pdf PDF
7- 230548 sf - vibration and seismic controls for hvac piping and equipment.pdf PDF
6- 230529 sf - hangers and supports for hvac piping and equipment.pdf PDF
24- DOL Wage Determiation for Akrion HVAC - ARRA.pdf PDF
14- 230993 sf - sequence of operations for hvac controls.pdf PDF
4- 230519 sf - meters and gages for hvac piping.pdf PDF
22- M601.pdf PDF
18- M101.pdf PDF
5- 230523 sf - general-duty valves for hvac piping.pdf PDF
16- E101.pdf PDF
12- 230800 sf - commissioning of hvac.pdf PDF
21- M502.pdf PDF
23- MD101.pdf PDF
10- 230713 fl - duct insulation.pdf PDF
15- 232113 sf - hydronic piping.pdf PDF
3- 230513 sf - common motor requirements for hvac equipment.pdf PDF
11- 230719 fl - hvac piping insulation.pdf PDF
13- 230900 sf - instrumentation and control for hvac.pdf PDF
1- 01330 Coordination.pdf PDF
AG-82HW-S-10-0005 -B1 HVAC AKRON -ARRA -OPTIONS construction over 100K.pdf PDF
19- M401.pdf PDF
17- G101.pdf PDF
8- 230553 sf - identification for hvac piping and equipment.pdf PDF
9- 230593 sf - testing adjusting and balancing for hvac.pdf PDF
20- M501.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA / ARS

Repair Bldg 1 HVAC System Akron, CO

REQUIRED SUBMITTAL LISTS 01350 - Page 1 of 4

SECTION 01350 - REQUIRED SUBMITTAL LISTS

PART 1 - GENERAL

1.1 REFERENCE

A. See Section 01330 Coordination and Assistance Construction Contracts, Item Number 1.7, Submittal Procedures for procedural directions.

B. This is a list of items that require submittal by the Contractor and approval by the Contracting Officer, Contracting Officer's Representative, or the Area Engineer. This list is not all encompassing, and the Contracting Officer may request submittals in addition to those listed when deemed necessary to adequately describe the work covered in the respective sections.

C. There are different types of submittals, we shall separate them according to when they can be submitted and approved.

1. Preparatory submittals are those that can be prepared before construction begins at the site, such as shop drawings, product data, samples, installation methods, installer certifications, and others.

2. Construction submittals are those that occur during construction, such as short term field tests, and others.

3. Final submittals are those that occur after the majority of the construction is completed, such as warranties, installation certifications, project record documents, long term field tests, operations and maintenance manuals, and others.

PART 2 - PRODUCTS

A. Preparatory Submittals are required where listed on the Required Submittal List and need approvals before the on site construction or demolition can begin. An example is the Product Data for Meters and Gages.

B. Construction Submittals are required where listed on the Required Submittal List and need approvals before other work can proceed.

C. Final Submittals are required where listed on the Required Submittal List and need approvals before Contract is complete. An example is the Certified TAB Report.

D. The Preparatory, Construction, and Final Required Submittal Lists are attached to this section.

PART 3 - EXECUTION

A. Approvals shall occur as stated in Section 01330 Item 1.7 Submittal Procedures.

REQUIRED SUBMITTAL LISTS 01350 - Page 2 of 4

REQUIRED SUBMITTAL LIST

SPECIFICATION

SECTION ITEM

ITEM DESCRIPTION TYPE REQUIRED such as Preparatory (P) Construction (C) Final (F)

DATE OF

SUBMITTAL

ACTION DATE OF

ACTION REMARKS

01330.1.5.A. CONSTRUCTION PROGRESS

& PAYMENT SCHEDULE

P. PLANNED SCHEDULE

PROVIDE BEFORE

PRE-CONSTRUCTION

CONFERENCE

230130.51 HVAC AIR-DISTRIBUTION

SYSTEM CLEANING

P. ASCS

QUALIFICATIONS

230130.51 HVAC AIR-DISTRIBUTION

SYSTEM CLEANING

P. STRATEGIES AND

PROCEDURES PLAN

230130.51 HVAC AIR-DISTRIBUTION

SYSTEM CLEANING

F. CLEANLINESS

VERIFICATION

REPORT

230519 METERS AND GAGES FOR

HVAC PIPING

P. PRODUCT DATA

230519 METERS AND GAGES FOR

HVAC PIPING

WIRING DIAGRAMS

230519 METERS AND GAGES FOR

HVAC PIPING

P. PRODUCT

CERTIFICATES

230519 METERS AND GAGES FOR

HVAC PIPING

P. OPERATION AND

MAINTENANCE DATA

230523 GENERAL-DUTY VALVES

FOR HVAC PIPING

P. PRODUCT DATA

230529 HANGERS AND SUPPORTS

FOR HVAC PIPING AND

EQUIPMENT

P. PRODUCT DATA

230529 HANGERS AND SUPPORTS

FOR HVAC PIPING AND

EQUIPMENT

P. SHOP DRAWINGS

230529 HANGERS AND SUPPORTS

FOR HVAC PIPING AND

P. WELDING

REQUIRED SUBMITTAL LISTS 01350 - Page 3 of 4

SECTION ITEM

ITEM DESCRIPTION TYPE REQUIRED such as Preparatory (P) Construction (C) Final (F)

DATE OF

SUBMITTAL

ACTION DATE OF

ACTION REMARKS

EQUIPMENT

230548 VIBRATION AND SEISMIC

CONTROLS FOR HVAC

PIPING AND EQUIPMENT

230548 VIBRATION AND SEISMIC

CONTROLS FOR HVAC

PIPING AND EQUIPMENT

P. QUALIFICATION

STATEMENTS

230548 VIBRATION AND SEISMIC

CONTROLS FOR HVAC

PIPING AND EQUIPMENT

P. WELDING

CERTIFICATES

230553 IDENTIFICATION FOR HVAC

PIPING AND EQUIPMENT

P. PRODUCT DATA

230593 TESTING, ADJUSTING, AND

BALANCING FOR HVAC

P. STRATEGIES AND

PROCEDURES PLAN

230593 TESTING, ADJUSTING, AND

BALANCING FOR HVAC

F. CERTIFIED TAB

REPORTS

230713 DUCT INSULATION P. PRODUCT DATA

230719 HVAC PIPING INSULATION P. PRODUCT DATA

230900 INSTRUMENTATION AND

CONTROL FOR HVAC

230900 INSTRUMENTATION AND

CONTROL FOR HVAC

P. SHOP DRAWINGS

232113 HYDRONIC PIPING P. PRODUCT DATA

232113 HYDRONIC PIPING P. SHOP DRAWINGS

232123 HYDRONIC PUMPS P. PRODUCT DATA

232123 HYDRONIC PUMPS P. SHOP DRAWINGS

REQUIRED SUBMITTAL LISTS 01350 - Page 4 of 4

SECTION ITEM

ITEM DESCRIPTION TYPE REQUIRED such as Preparatory (P) Construction (C) Final (F)

DATE OF

SUBMITTAL

ACTION DATE OF

ACTION REMARKS

232923 VARIABLE-FREQUENCY

MOTOR CONTROLLERS

232923 VARIABLE-FREQUENCY

P. SHOP DRAWINGS

232923 VARIABLE-FREQUENCY

P. COORDINATION

DRAWINGS

233113 METAL DUCTS P. PRODUCT DATA

233113 METAL DUCTS P. SHOP DRAWINGS

233113 METAL DUCTS P. COORDINATION

DRAWINGS

233113 METAL DUCTS P. WELDING

233119 HVAC CASINGS P. PRODUCT DATA

233119 HVAC CASINGS P. SHOP DRAWINGS

233119 HVAC CASINGS C. FIELD QC REPORTS

233300 AIR DUCT ACCESSORIES P. PRODUCT DATA

233300 AIR DUCT ACCESSORIES P. SHOP DRAWINGS

233300 AIR DUCT ACCESSORIES P. WIRING DIAGRAMS

233600 AIR TERMINAL UNITS P. PRODUCT DATA

233600 AIR TERMINAL UNITS P. SHOP DRAWINGS

233600 AIR TERMINAL UNITS C. FIELD QC REPORTS