Text version
USDA / ARS
Repair Bldg 1 HVAC System Akron, CO
REQUIRED SUBMITTAL LISTS 01350 - Page 1 of 4
SECTION 01350 - REQUIRED SUBMITTAL LISTS
PART 1 - GENERAL
1.1 REFERENCE
A. See Section 01330 Coordination and Assistance Construction Contracts, Item Number 1.7, Submittal Procedures for procedural directions.
B. This is a list of items that require submittal by the Contractor and approval by the Contracting Officer, Contracting Officer's Representative, or the Area Engineer. This list is not all encompassing, and the Contracting Officer may request submittals in addition to those listed when deemed necessary to adequately describe the work covered in the respective sections.
C. There are different types of submittals, we shall separate them according to when they can be submitted and approved.
1. Preparatory submittals are those that can be prepared before construction begins at the site, such as shop drawings, product data, samples, installation methods, installer certifications, and others.
2. Construction submittals are those that occur during construction, such as short term field tests, and others.
3. Final submittals are those that occur after the majority of the construction is completed, such as warranties, installation certifications, project record documents, long term field tests, operations and maintenance manuals, and others.
PART 2 - PRODUCTS
A. Preparatory Submittals are required where listed on the Required Submittal List and need approvals before the on site construction or demolition can begin. An example is the Product Data for Meters and Gages.
B. Construction Submittals are required where listed on the Required Submittal List and need approvals before other work can proceed.
C. Final Submittals are required where listed on the Required Submittal List and need approvals before Contract is complete. An example is the Certified TAB Report.
D. The Preparatory, Construction, and Final Required Submittal Lists are attached to this section.
PART 3 - EXECUTION
A. Approvals shall occur as stated in Section 01330 Item 1.7 Submittal Procedures.
REQUIRED SUBMITTAL LISTS 01350 - Page 2 of 4
REQUIRED SUBMITTAL LIST
SPECIFICATION
SECTION ITEM
ITEM DESCRIPTION TYPE REQUIRED such as Preparatory (P) Construction (C) Final (F)
DATE OF
SUBMITTAL
ACTION DATE OF
ACTION REMARKS
01330.1.5.A. CONSTRUCTION PROGRESS
& PAYMENT SCHEDULE
P. PLANNED SCHEDULE
PROVIDE BEFORE
PRE-CONSTRUCTION
CONFERENCE
230130.51 HVAC AIR-DISTRIBUTION
SYSTEM CLEANING
P. ASCS
QUALIFICATIONS
230130.51 HVAC AIR-DISTRIBUTION
SYSTEM CLEANING
P. STRATEGIES AND
PROCEDURES PLAN
230130.51 HVAC AIR-DISTRIBUTION
SYSTEM CLEANING
F. CLEANLINESS
VERIFICATION
REPORT
230519 METERS AND GAGES FOR
HVAC PIPING
P. PRODUCT DATA
230519 METERS AND GAGES FOR
HVAC PIPING
WIRING DIAGRAMS
230519 METERS AND GAGES FOR
HVAC PIPING
P. PRODUCT
CERTIFICATES
230519 METERS AND GAGES FOR
HVAC PIPING
P. OPERATION AND
MAINTENANCE DATA
230523 GENERAL-DUTY VALVES
FOR HVAC PIPING
P. PRODUCT DATA
230529 HANGERS AND SUPPORTS
FOR HVAC PIPING AND
EQUIPMENT
P. PRODUCT DATA
230529 HANGERS AND SUPPORTS
FOR HVAC PIPING AND
EQUIPMENT
P. SHOP DRAWINGS
230529 HANGERS AND SUPPORTS
FOR HVAC PIPING AND
P. WELDING
REQUIRED SUBMITTAL LISTS 01350 - Page 3 of 4
SECTION ITEM
ITEM DESCRIPTION TYPE REQUIRED such as Preparatory (P) Construction (C) Final (F)
DATE OF
SUBMITTAL
ACTION DATE OF
ACTION REMARKS
EQUIPMENT
230548 VIBRATION AND SEISMIC
CONTROLS FOR HVAC
PIPING AND EQUIPMENT
230548 VIBRATION AND SEISMIC
CONTROLS FOR HVAC
PIPING AND EQUIPMENT
P. QUALIFICATION
STATEMENTS
230548 VIBRATION AND SEISMIC
CONTROLS FOR HVAC
PIPING AND EQUIPMENT
P. WELDING
CERTIFICATES
230553 IDENTIFICATION FOR HVAC
PIPING AND EQUIPMENT
P. PRODUCT DATA
230593 TESTING, ADJUSTING, AND
BALANCING FOR HVAC
P. STRATEGIES AND
PROCEDURES PLAN
230593 TESTING, ADJUSTING, AND
BALANCING FOR HVAC
F. CERTIFIED TAB
REPORTS
230713 DUCT INSULATION P. PRODUCT DATA
230719 HVAC PIPING INSULATION P. PRODUCT DATA
230900 INSTRUMENTATION AND
CONTROL FOR HVAC
230900 INSTRUMENTATION AND
CONTROL FOR HVAC
P. SHOP DRAWINGS
232113 HYDRONIC PIPING P. PRODUCT DATA
232113 HYDRONIC PIPING P. SHOP DRAWINGS
232123 HYDRONIC PUMPS P. PRODUCT DATA
232123 HYDRONIC PUMPS P. SHOP DRAWINGS
REQUIRED SUBMITTAL LISTS 01350 - Page 4 of 4
SECTION ITEM
ITEM DESCRIPTION TYPE REQUIRED such as Preparatory (P) Construction (C) Final (F)
DATE OF
SUBMITTAL
ACTION DATE OF
ACTION REMARKS
232923 VARIABLE-FREQUENCY
MOTOR CONTROLLERS
232923 VARIABLE-FREQUENCY
P. SHOP DRAWINGS
232923 VARIABLE-FREQUENCY
P. COORDINATION
DRAWINGS
233113 METAL DUCTS P. PRODUCT DATA
233113 METAL DUCTS P. SHOP DRAWINGS
233113 METAL DUCTS P. COORDINATION
DRAWINGS
233113 METAL DUCTS P. WELDING
233119 HVAC CASINGS P. PRODUCT DATA
233119 HVAC CASINGS P. SHOP DRAWINGS
233119 HVAC CASINGS C. FIELD QC REPORTS
233300 AIR DUCT ACCESSORIES P. PRODUCT DATA
233300 AIR DUCT ACCESSORIES P. SHOP DRAWINGS
233300 AIR DUCT ACCESSORIES P. WIRING DIAGRAMS
233600 AIR TERMINAL UNITS P. PRODUCT DATA
233600 AIR TERMINAL UNITS P. SHOP DRAWINGS
233600 AIR TERMINAL UNITS C. FIELD QC REPORTS