10- 230713 fl - duct insulation.pdf

PDF 17 KB Posted

Attached to
RECOVERYAkron, CO Repair building 1 HVAC system.
Solicitation number
AG-82HW-S-10-0005
Issued by

About this file

Attachment 10

View the file

Other files

File Type Posted
233600 sf - air terminal units.pdf PDF
233300 sf - air duct accessories.pdf PDF
Amendment 2 - Akron HVAC - ARRA.pdf.pdf PDF
232923 sf - variable frequency motor controllers.pdf PDF
233113 sf - metal ducts.pdf PDF
232123 sf - hydronic pumps.pdf PDF
233119 sf - hvac casings.pdf PDF
Amendment 1.pdf PDF
7- 230548 sf - vibration and seismic controls for hvac piping and equipment.pdf PDF
6- 230529 sf - hangers and supports for hvac piping and equipment.pdf PDF
24- DOL Wage Determiation for Akrion HVAC - ARRA.pdf PDF
14- 230993 sf - sequence of operations for hvac controls.pdf PDF
4- 230519 sf - meters and gages for hvac piping.pdf PDF
22- M601.pdf PDF
18- M101.pdf PDF
5- 230523 sf - general-duty valves for hvac piping.pdf PDF
16- E101.pdf PDF
12- 230800 sf - commissioning of hvac.pdf PDF
2- 01350 Submittals.pdf PDF
21- M502.pdf PDF
23- MD101.pdf PDF
15- 232113 sf - hydronic piping.pdf PDF
3- 230513 sf - common motor requirements for hvac equipment.pdf PDF
11- 230719 fl - hvac piping insulation.pdf PDF
13- 230900 sf - instrumentation and control for hvac.pdf PDF
1- 01330 Coordination.pdf PDF
AG-82HW-S-10-0005 -B1 HVAC AKRON -ARRA -OPTIONS construction over 100K.pdf PDF
19- M401.pdf PDF
17- G101.pdf PDF
8- 230553 sf - identification for hvac piping and equipment.pdf PDF
9- 230593 sf - testing adjusting and balancing for hvac.pdf PDF
20- M501.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA / ARS

Repair Bldg 1 HVAC System Akron, CO

DUCT INSULATION 230713 - Page 1 of 5

SECTION 230713 - DUCT INSULATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes insulating the following duct services:

1. Indoor, concealed supply air.

B. Related Sections:

1. Division 23 Section "HVAC Piping Insulation."

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product indicated. Include thermal conductivity, water-vapor permeance thickness, and jackets (both factory- and field-applied if any).

PART 2 - PRODUCTS

2.1 INSULATION MATERIALS

A. Comply with requirements in "Duct Insulation Schedule, General," article for where insulating materials shall be applied.

B. Products shall not contain asbestos, lead, mercury, or mercury compounds.

C. Mineral-Fiber Blanket Insulation: Mineral or glass fibers bonded with a thermosetting resin.

Comply with ASTM C 553, Type II and ASTM C 1290, Type III with factory-applied FSK jacket. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.

1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:

a. CertainTeed Corp.; SoftTouch Duct Wrap.

b. Johns Manville; Microlite.

c. Knauf Insulation; Friendly Feel Duct Wrap.

d. Manson Insulation Inc.; Alley Wrap.

e. Owens Corning; SOFTR All-Service Duct Wrap.

DUCT INSULATION 230713 - Page 2 of 5

2.2 ADHESIVES

A. Materials shall be compatible with insulation materials, jackets, and substrates and for bonding insulation to itself and to surfaces to be insulated unless otherwise indicated.

2.3 SEALANTS

A. FSK and Metal Jacket Flashing Sealants:

1. Materials shall be compatible with insulation materials, jackets, and substrates.

2. Fire- and water-resistant, flexible, elastomeric sealant.

3. Service Temperature Range: Minus 40 to plus 250 deg F.

4. Color: Aluminum.

2.4 FACTORY-APPLIED JACKETS

A. Insulation system schedules indicate factory-applied jackets on various applications. When factory-applied jackets are indicated, comply with the following:

1. FSK Jacket: Aluminum-foil, fiberglass-reinforced scrim with kraft-paper backing;

complying with ASTM C 1136, Type II.

2.5 TAPES

A. ASJ Tape: White vapor-retarder tape matching factory-applied jacket with acrylic adhesive, complying with ASTM C 1136.

PART 3 - EXECUTION

3.1 PREPARATION

A. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application.

3.2 GENERAL INSTALLATION REQUIREMENTS

A. Install insulation materials, accessories, and finishes with smooth, straight, and even surfaces;

free of voids throughout the length of ducts and fittings.

B. Install insulation materials, vapor barriers or retarders, jackets, and thicknesses required for each item of duct system as specified in insulation system schedules.

DUCT INSULATION 230713 - Page 3 of 5

C. Install accessories compatible with insulation materials and suitable for the service. Install accessories that do not corrode, soften, or otherwise attack insulation or jacket in either wet or dry state.

D. Install insulation with longitudinal seams at top and bottom of horizontal runs.

E. Install multiple layers of insulation with longitudinal and end seams staggered.

F. Keep insulation materials dry during application and finishing.

G. Install insulation with tight longitudinal seams and end joints. Bond seams and joints with adhesive recommended by insulation material manufacturer.

H. Install insulation with least number of joints practical.

I. Where vapor barrier is indicated, seal joints, seams, and penetrations in insulation at hangers, supports, anchors, and other projections with vapor-barrier mastic.

1. Install insulation continuously through hangers and around anchor attachments.

2. For insulation application where vapor barriers are indicated, extend insulation on anchor legs from point of attachment to supported item to point of attachment to structure. Taper and seal ends at attachment to structure with vapor-barrier mastic.

3. Install insert materials and install insulation to tightly join the insert. Seal insulation to insulation inserts with adhesive or sealing compound recommended by insulation material manufacturer.

J. Apply adhesives, mastics, and sealants at manufacturer's recommended coverage rate and wet and dry film thicknesses.

K. Install insulation with factory-applied jackets as follows:

1. Draw jacket tight and smooth.

2. Cover circumferential joints with 3-inch- wide strips, of same material as insulation jacket. Secure strips with adhesive and outward clinching staples along both edges of strip, spaced 4 inches o.c.

3. Overlap jacket longitudinal seams at least 1-1/2 inches. Clean and dry surface to receive self-sealing lap.

4. Cover joints and seams with tape, according to insulation material manufacturer's written instructions, to maintain vapor seal.

5. Where vapor barriers are indicated, apply vapor-barrier mastic on seams and joints and at ends adjacent to duct flanges and fittings.

L. Cut insulation in a manner to avoid compressing insulation more than 75 percent of its nominal thickness.

M. Finish installation with systems at operating conditions. Repair joint separations and cracking due to thermal movement.

DUCT INSULATION 230713 - Page 4 of 5

N. Repair damaged insulation facings by applying same facing material over damaged areas.

Extend patches at least 4 inches beyond damaged areas. Adhere, staple, and seal patches similar to butt joints.

3.3 INSTALLATION OF MINERAL-FIBER INSULATION

A. Blanket Insulation Installation on Ducts and Plenums: Secure with adhesive and insulation pins.

1. Apply adhesives according to manufacturer's recommended coverage rates per unit area, for percent coverage of duct and plenum surfaces.

2. For ducts and plenums with surface temperatures below ambient, install a continuous unbroken vapor barrier. Create a facing lap for longitudinal seams and end joints with insulation by removing 2 inches from one edge and one end of insulation segment.

Secure laps to adjacent insulation section with 1/2-inch outward-clinching staples, 1 inch o.c. Install vapor barrier consisting of factory- or field-applied jacket, adhesive, vapor-barrier mastic, and sealant at joints, seams, and protrusions.

a. Repair punctures, tears, and penetrations with tape or mastic to maintain vapor-barrier seal.

3. Overlap unfaced blankets a minimum of 2 inches on longitudinal seams and end joints.

At end joints, secure with steel bands spaced a maximum of 18 inches o.c.

4. Install insulation on rectangular duct elbows and transitions with a full insulation section for each surface. Install insulation on round and flat-oval duct elbows with individually mitered gores cut to fit the elbow.

5. Insulate duct stiffeners, hangers, and flanges that protrude beyond insulation surface with 6-inch- wide strips of same material used to insulate duct. Secure on alternating sides of stiffener, hanger, and flange with pins spaced 6 inches o.c.

3.4 DUCT INSULATION SCHEDULE, GENERAL

A. Plenums and Ducts Requiring Insulation:

1. Indoor, concealed supply air.

B. Items Not Insulated:

1. Metal ducts with duct liner of sufficient thickness to comply with energy code and

ASHRAE/IESNA 90.1.

2. Factory-insulated flexible ducts.

3. Flexible connectors.

DUCT INSULATION 230713 - Page 5 of 5

3.5 INDOOR DUCT AND PLENUM INSULATION SCHEDULE

A. Concealed, round and flat-oval, supply-air duct insulation shall be the following:

1. Mineral-Fiber Blanket: 1-1/2 inches thick and 0.75-lb/cu. ft. nominal density.

B. Concealed, rectangular, supply-air duct insulation shall be the following:

1. Mineral-Fiber Blanket: 1-1/2 inches thick and 0.75-lb/cu. ft. nominal density.

END OF SECTION 230713