Line Item Schedules (REV 30 JAN 2015)

View the file

Other files

File Type Posted
AMEND_12.pdf PDF
AMEND_11.pdf PDF
AMEND_10.pdf PDF
AMEND_9.pdf PDF
INSTRUCTIONS_FOR_QUOTES_30JAN2015.pdf PDF
AMEND_7.pdf PDF
AMEND_6.pdf PDF
AMEND_5.pdf PDF
PWS_21JAN2015.pdf PDF
Location_of_Services_and_Line_Item_Schedule_21JAN2015.pdf PDF
AMEND_4_01152015.pdf PDF
AMEND_3_14JAN2015.pdf PDF
AMEND_2.pdf PDF
Location_of_Services_and_Line_Item_Schedule_7JAN2015.pdf PDF
AMEND_1_5JAN2015.docx DOCX document
QASP_.pdf PDF
PastPerformanceQuestionaire.doc DOC document
ATTACHMENTS_1.pdf PDF
CTR_INFORMATION.pdf PDF
LINE_ITEM_LOCATION_PWS.pdf PDF
WAGE_DET_FOREST_9DEC2014.pdf PDF
AG-52B1-S-15-0007_18DEC2014.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. Location of Services/Schedule of Items (REV 30 JAN 2015)

1. EACH OFFEROR SHALL IDENTIFY THE LOCATION(S) OF WORK FOR WHICH THEY ARE QUOTING IN ORDER TO BE CONSIDERED FOR CONTRACT AWARD IN THAT AREA. ALL WORK ON THE LINE ITEM SCHEDULE MUST BE INCLUDED IN THE QUOTE. QUOTES THAT DO NOT PROVIDE PRICING FOR ALL LINE ITEMS FOR THE AREA(S) INDICATED WILL NOT BE CONSIDERED.

Check the box(es) of the units/districts the quote includes. If quoting more than one area, a line item schedule must be completed for each area and labeled to indicate which area the prices correspond.

PLACE AN “X” IF YOUR FIRM’S QUOTE

INCLUDES THE FOLLOWING DISTRICTS.

FOR EACH DISTRICT SELECTED, A

CORRESPONDING LINE ITEM SCHEDULE

NEEDS TO BE INCLUDED (e.g. If quoting for Ava and Cassville there would be two completed line item schedules and two checked boxes, one labeled Ava and the other Cassville)

Locations:

Mark Twain National Forest

Ava/Cassville/Willow Springs Ranger District

Houston/Rolla/Cedar Creek Ranger District

Poplar Bluff Ranger District

Potosi/Fredericktown Ranger District

Salem Ranger District

Doniphan/Eleven Point Ranger District

2. SCHEDULE OF ITEMS

DISTRICT/UNIT Ava/Cassville/Willow Springs

Task/SubTask Estimated

Quantity* Unit Unit

Price Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Base Year

Option 1

Option 2 Option 3 Option 4

4.1. STAND

IMPROVEMENT

4.1.1. Release -

Manual

35 Acre

4.1.2. Non-

commercial Thinning (area thinning)

25 Acre

4.1.3.

Precommercial Thinning (crop tree release)

50 Acre

4.1.4. Slash

Disposal (30 inches)

1 Acre

4.1.5. Slash

Disposal (18 inches)

1 Acre

4.2 SITE

PREPARATION

BY FELLING

4.2.1.

Unevenaged Regeneration

150 Acre

4.2.2 Storm

Damage Salvage Regeneration

25 Acre

4.2.3 Evenaged

100 Acre

4.2.4. Evenaged

Regeneration (5- 9” class removed)

50 Acre

4.2.5. Slash

Disposal (30 inches)

1 Acre

4.2.6. Slash

Disposal (18 inches)

1 Acre

4.3. PLANTING

4.3.1. Hardwood

tree planting

10 Acre

4.3.2. Pine tree

planting

50 Acre

4.3.3.

Supplemental Pine Planting

25 Acre

4.4.

HERBICIDE

APPLICATION

(not all inclusive)

4.4.1. Broadcast

herbicide

10 Acre

4.4.2. Strip

herbicide

10 Acre

4.4.3 Spot

herbicide

10 Acre

4.4.4 Basal Bark

herbicide (thin line bole treatment)

25 Acre

4.4.5 Hack and

Squirt (herbicide injection)

25 Acre

4.5.

RESTORATION

TREATMENTS

4.5.1. Glade

restoration

25 Acre

4.5.2. Glade

restoration w/herbicide (stump treat)

25 Acre

4.5.3. Midstory

Control

50 Acre

4.5.4. Midstory

Control w/herbicide (stump treat)

25 Acre

4.5.5. Hardwood

Non-commercial Thinning

25 Acre

4.5.6. Slash

Disposal (30 inches)

2 Acre

4.5.7. Slash

Disposal (18 inches)

2 Acre

4.5.8. Slash

Disposal (Hand Piling)

15 Acre

4.5.9. Slash

Disposal (Dispersal)

15 Acre

4.6. SURVEYS

4.6.1. 1st year Stocking Surveys

100 Acre

4.6.2. 3rd year Stocking Surveys

100 Acre

4.6.3. 1st year Survival Surveys

10 Acre

4.6.4. 3rd year Survival Surveys

10 Acre

TOTAL FOR

EACH PERIOD

TOTAL BASE +

4 OPTIONS

*Quantities are estimates for the base and option year periods only. Estimated quantities in no way obligate the Government to issue orders for the estimated quantities or any maximum indicated (Reference 52.216-21, Requirements, as included in full text in the solicitation).

1. EACH OFFEROR SHALL IDENTIFY THE LOCATION(S) OF WORK FOR WHICH THEY ARE QUOTING IN ORDER TO BE CONSIDERED FOR CONTRACT AWARD IN THAT AREA. ALL WORK ON THE LINE ITEM SCHEDULE MUST BE INCLUDED IN THE QUOTE. QUOTES THAT DO NOT PROVIDE PRICING FOR ALL LINE ITEMS FOR THE AREA(S) INDICATED WILL NOT BE CONSIDERED.

Check the box(es) of the units/districts the quote includes. If quoting more than one area, a line item schedule must be completed for each area

FOR EACH DISTRICT SELECTED, A

CORRESPONDING LINE ITEM SCHEDULE

NEEDS TO BE INCLUDED (e.g. If quoting for Ava and Cassville there would be two completed line item schedules and two checked boxes, one labeled Ava and the other Cassville)

Locations:

Mark Twain National Forest

DISTRICT/UNIT Doniphan/Eleven Point

Unit Unit

Price Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item

200 Acre

4.1.2. Non-

commercial Thinning (area thinning)

50 Acre

4.1.3.

Precommercial Thinning (crop tree release)

100 Acre

4.1.4. Slash

Disposal (30 inches)

2 Acre

4.1.5. Slash

Disposal (18 inches)

2 Acre

4.2 SITE

Regeneration

100 Acre

4.2.2 Storm

Damage Salvage

250 Acre

4.2.4. Evenaged

Regeneration (5- 9” class removed)

150 Acre

4.2.5. Slash

Disposal (30 inches)

2 Acre

4.2.6. Slash

Disposal (18 inches)

2 Acre

4.3. PLANTING

4.3.1. Hardwood

tree planting

20 Acre

4.3.2. Pine tree

planting

175 Acre

4.3.3.

Supplemental Pine Planting

85 Acre

4.4.

HERBICIDE

APPLICATION

25 Acre

4.4.2. Strip

herbicide

25 Acre

4.4.3 Spot

herbicide

25 Acre

4.4.4 Basal Bark

herbicide (thin line bole treatment)

85 Acre

4.4.5 Hack and

Squirt (herbicide injection)

85 Acre

4.5.

10 Acre

4.5.2. Glade

restoration w/herbicide (stump treat)

10 Acre

4.5.3. Midstory

Control

175 Acre

4.5.4. Midstory

Control w/herbicide (stump treat)

85 Acre

4.5.5. Hardwood

Non-commercial Thinning

10 Acre

4.5.6. Slash

Disposal (30 inches)

1 Acre

4.5.7. Slash

Disposal (18 inches)

1 Acre

4.5.8. Slash

Disposal (Hand Piling)

25 Acre

4.5.9. Slash

Disposal (Dispersal)

25 Acre

4.6. SURVEYS

4.6.1. 1st year Stocking Surveys

250 Acre

4.6.2. 3rd year Stocking Surveys

250 Acre

4.6.3. 1st year Survival Surveys

25 Acre

4.6.4. 3rd year Survival

*Quantities are estimates for the base and option year periods only. Estimated quantities in no way obligate the Government to issue orders for the estimated quantities or any maximum indicated (Reference 52.216-21, Requirements, as included in full text in

1. EACH OFFEROR SHALL IDENTIFY THE LOCATION(S) OF WORK FOR WHICH THEY ARE QUOTING IN ORDER TO BE CONSIDERED FOR CONTRACT AWARD IN THAT AREA. ALL WORK ON THE LINE ITEM SCHEDULE MUST BE INCLUDED IN THE QUOTE. QUOTES THAT DO NOT PROVIDE PRICING FOR ALL LINE ITEMS FOR THE AREA(S) INDICATED WILL NOT BE CONSIDERED.

Check the box(es) of the units/districts the quote includes. If quoting more than one area, a line item schedule must be completed for each area

FOR EACH DISTRICT SELECTED, A

CORRESPONDING LINE ITEM SCHEDULE

NEEDS TO BE INCLUDED (e.g. If quoting for Ava and Cassville there would be two completed line item schedules and two checked boxes, one labeled Ava and the other Cassville)

Locations:

Mark Twain National Forest

DISTRICT/UNIT Houston/Rolla/Cedar Creek

Unit Unit

Price Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item

35 Acre

4.1.2. Non-

commercial Thinning (area thinning)

25 Acre

4.1.3.

Precommercial Thinning (crop tree release)

50 Acre

4.1.4. Slash

Disposal (30 inches)

1 Acre

4.1.5. Slash

Disposal (18 inches)

1 Acre

4.2 SITE

Regeneration

150 Acre

4.2.2 Storm

Damage Salvage

100 Acre

4.2.4. Evenaged

Regeneration (5- 9” class removed)

50 Acre

4.2.5. Slash

Disposal (30 inches)

1 Acre

4.2.6. Slash

Disposal (18 inches)

1 Acre

4.3. PLANTING

4.3.1. Hardwood

tree planting

10 Acre

4.3.2. Pine tree

planting

50 Acre

4.3.3.

Supplemental Pine Planting

25 Acre

4.4.

HERBICIDE

APPLICATION

10 Acre

4.4.2. Strip

herbicide

10 Acre

4.4.3 Spot

herbicide

10 Acre

4.4.4 Basal Bark

herbicide (thin line bole treatment)

25 Acre

4.4.5 Hack and

Squirt (herbicide injection)

25 Acre

4.5.

25 Acre

4.5.2. Glade

restoration w/herbicide (stump treat)

25 Acre

4.5.3. Midstory

Control

50 Acre

4.5.4. Midstory

Control w/herbicide (stump treat)

25 Acre

4.5.5. Hardwood

Non-commercial Thinning

25 Acre

4.5.6. Slash

Disposal (30 inches)

2 Acre

4.5.7. Slash

Disposal (18 inches)

2 Acre

4.5.8. Slash

Disposal (Hand Piling)

15 Acre

4.5.9. Slash

Disposal (Dispersal)

15 Acre

4.6. SURVEYS

4.6.1. 1st year Stocking Surveys

100 Acre

4.6.2. 3rd year Stocking Surveys

100 Acre

4.6.3. 1st year Survival Surveys

10 Acre

4.6.4. 3rd year Survival

*Quantities are estimates for the base and option year periods only. Estimated quantities in no way obligate the Government to issue orders for the estimated quantities or any maximum indicated (Reference 52.216-21, Requirements, as included in full text in

1. EACH OFFEROR SHALL IDENTIFY THE LOCATION(S) OF WORK FOR WHICH THEY ARE QUOTING IN ORDER TO BE CONSIDERED FOR CONTRACT AWARD IN THAT AREA. ALL WORK ON THE LINE ITEM SCHEDULE MUST BE INCLUDED IN THE QUOTE. QUOTES THAT DO NOT PROVIDE PRICING FOR ALL LINE ITEMS FOR THE AREA(S) INDICATED WILL NOT BE CONSIDERED.

Check the box(es) of the units/districts the quote includes. If quoting more than one area, a line item schedule must be completed for each area

FOR EACH DISTRICT SELECTED, A

CORRESPONDING LINE ITEM SCHEDULE

NEEDS TO BE INCLUDED (e.g. If quoting for Ava and Cassville there would be two completed line item schedules and two checked boxes, one labeled Ava and the other Cassville)

Locations:

Mark Twain National Forest

DISTRICT/UNIT Poplar Bluff

Unit Unit

Price Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item

100 Acre

4.1.2. Non-

commercial Thinning (area thinning)

50 Acre

4.1.3.

Precommercial Thinning (crop tree release)

100 Acre

4.1.4. Slash

Disposal (30 inches)

2 Acre

4.1.5. Slash

Disposal (18 inches)

2 Acre

4.2 SITE

Regeneration

250 Acre

4.2.2 Storm

Damage Salvage

200 Acre

4.2.4. Evenaged

Regeneration (5- 9” class removed)

100 Acre

4.2.5. Slash

Disposal (30 inches)

2 Acre

4.2.6. Slash

Disposal (18 inches)

2 Acre

4.3. PLANTING

4.3.1. Hardwood

tree planting

20 Acre

4.3.2. Pine tree

planting

50 Acre

4.3.3.

Supplemental Pine Planting

45 Acre

4.4.

HERBICIDE

APPLICATION

15 Acre

4.4.2. Strip

herbicide

15 Acre

4.4.3 Spot

herbicide

15 Acre

4.4.4 Basal Bark

herbicide (thin line bole treatment)

45 Acre

4.4.5 Hack and

Squirt (herbicide injection)

45 Acre

4.5.

10 Acre

4.5.2. Glade

restoration w/herbicide (stump treat)

10 Acre

4.5.3. Midstory

Control

50 Acre

4.5.4. Midstory

Control w/herbicide (stump treat)

45 Acre

4.5.5. Hardwood

Non-commercial Thinning

15 Acre

4.5.6. Slash

Disposal (30 inches)

2 Acre

4.5.7. Slash

Disposal (18 inches)

2 Acre

4.5.8. Slash

Disposal (Hand Piling)

25 Acre

4.5.9. Slash

Disposal (Dispersal)

25 Acre

4.6. SURVEYS

4.6.1. 1st year Stocking Surveys

200 Acre

4.6.2. 3rd year Stocking Surveys

200 Acre

4.6.3. 1st year Survival Surveys

20 Acre

4.6.4. 3rd year Survival

20 Acre

*Quantities are estimates for the base and option year periods only. Estimated quantities in no way obligate the Government to issue orders for the estimated quantities or any maximum indicated (Reference 52.216-21, Requirements, as included in full text in

1. EACH OFFEROR SHALL IDENTIFY THE LOCATION(S) OF WORK FOR WHICH THEY ARE QUOTING IN ORDER TO BE CONSIDERED FOR CONTRACT AWARD IN THAT AREA. ALL WORK ON THE LINE ITEM SCHEDULE MUST BE INCLUDED IN THE QUOTE. QUOTES THAT DO NOT PROVIDE PRICING FOR ALL LINE ITEMS FOR THE AREA(S) INDICATED WILL NOT BE CONSIDERED.

Check the box(es) of the units/districts the quote includes. If quoting more than one area, a line item schedule must be completed for each area

FOR EACH DISTRICT SELECTED, A

CORRESPONDING LINE ITEM SCHEDULE

NEEDS TO BE INCLUDED (e.g. If quoting for Ava and Cassville there would be two completed line item schedules and two checked boxes, one labeled Ava and the other Cassville)

Locations:

Mark Twain National Forest

DISTRICT/UNIT Potosi/Fredericktown

Unit Unit

Price Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item

30 Acre

4.1.2. Non-

commercial Thinning (area thinning)

25 Acre

4.1.3.

Precommercial Thinning (crop tree release)

100 Acre

4.1.4. Slash

Disposal (30 inches)

2 Acre

4.1.5. Slash

Disposal (18 inches)

2 Acre

4.2 SITE

Regeneration

100 Acre

4.2.2 Storm

Damage Salvage

200 Acre

250 Acre

4.2.4. Evenaged

Regeneration (5- 9” class removed)

100 Acre

4.2.5. Slash

Disposal (30 inches)

2 Acre

4.2.6. Slash

Disposal (18 inches)

2 Acre

4.3. PLANTING

4.3.1. Hardwood

tree planting

20 Acre

4.3.2. Pine tree

planting

25 Acre

4.3.3.

Supplemental Pine Planting

25 Acre

4.4.

HERBICIDE

APPLICATION

15 Acre

4.4.2. Strip

herbicide

15 Acre

4.4.3 Spot

herbicide

15 Acre

4.4.4 Basal Bark

herbicide (thin line bole treatment)

25 Acre

4.4.5 Hack and

Squirt (herbicide injection)

25 Acre

4.5.

15 Acre

4.5.2. Glade

restoration w/herbicide (stump treat)

15 Acre

4.5.3. Midstory

Control

25 Acre

4.5.4. Midstory

Control w/herbicide (stump treat)

25 Acre

4.5.5. Hardwood

Non-commercial Thinning

15 Acre

4.5.6. Slash

Disposal (30 inches)

2 Acre

4.5.7. Slash

Disposal (18 inches)

2 Acre

4.5.8. Slash

Disposal (Hand Piling)

10 Acre

4.5.9. Slash

Disposal (Dispersal)

10 Acre

4.6. SURVEYS

4.6.1. 1st year Stocking Surveys

250 Acre

4.6.2. 3rd year Stocking Surveys

250 Acre

4.6.3. 1st year Survival Surveys

10 Acre

4.6.4. 3rd year Survival

*Quantities are estimates for the base and option year periods only. Estimated quantities in no way obligate the Government to issue orders for the estimated quantities or any maximum indicated (Reference 52.216-21, Requirements, as included in full text in

1. EACH OFFEROR SHALL IDENTIFY THE LOCATION(S) OF WORK FOR WHICH THEY ARE QUOTING IN ORDER TO BE CONSIDERED FOR CONTRACT AWARD IN THAT AREA. ALL WORK ON THE LINE ITEM SCHEDULE MUST BE INCLUDED IN THE QUOTE. QUOTES THAT DO NOT PROVIDE PRICING FOR ALL LINE ITEMS FOR THE AREA(S) INDICATED WILL NOT BE CONSIDERED.

Check the box(es) of the units/districts the quote includes. If quoting more than one area, a line item schedule must be completed for each area

FOR EACH DISTRICT SELECTED, A

CORRESPONDING LINE ITEM SCHEDULE

NEEDS TO BE INCLUDED (e.g. If quoting for Ava and Cassville there would be two completed line item schedules and two checked boxes, one labeled Ava and the other Cassville)

Locations:

Mark Twain National Forest

DISTRICT/UNIT Salem

Unit Unit

Price Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item Price

Unit Price

Total Line Item

100 Acre

4.1.2. Non-

commercial Thinning (area thinning)

25 Acre

4.1.3.

Precommercial Thinning (crop tree release)

100 Acre

4.1.4. Slash

Disposal (30 inches)

2 Acre

4.1.5. Slash

Disposal (18 inches)

2 Acre

4.2 SITE

Regeneration

250 Acre

4.2.2 Storm

Damage Salvage

200 Acre

100 Acre

4.2.4. Evenaged

Regeneration (5- 9” class removed)

50 Acre

4.2.5. Slash

Disposal (30 inches)

2 Acre

4.2.6. Slash

Disposal (18 inches)

2 Acre

4.3. PLANTING

4.3.1. Hardwood

tree planting

20 Acre

4.3.2. Pine tree

planting

150 Acre

4.3.3.

Supplemental Pine Planting

45 Acre

4.4.

HERBICIDE

APPLICATION

25 Acre

4.4.2. Strip

herbicide

25 Acre

4.4.3 Spot

herbicide

25 Acre

4.4.4 Basal Bark

herbicide (thin line bole treatment)

45 Acre

4.4.5 Hack and

Squirt (herbicide injection)

45 Acre

4.5.

15 Acre

4.5.2. Glade

restoration w/herbicide (stump treat)

15 Acre

4.5.3. Midstory

Control

150 Acre

4.5.4. Midstory

Control w/herbicide (stump treat)

45 Acre

4.5.5. Hardwood

Non-commercial Thinning

10 Acre

4.5.6. Slash

Disposal (30 inches)

1 Acre

4.5.7. Slash

Disposal (18 inches)

1 Acre

4.5.8. Slash

Disposal (Hand Piling)

10 Acre

4.5.9. Slash

Disposal (Dispersal)

10 Acre

4.6. SURVEYS

4.6.1. 1st year Stocking Surveys

100 Acre

4.6.2. 3rd year Stocking Surveys

100 Acre

4.6.3. 1st year Survival Surveys

25 Acre

4.6.4. 3rd year Survival

*Quantities are estimates for the base and option year periods only. Estimated quantities in no way obligate the Government to issue orders for the estimated quantities or any maximum indicated (Reference 52.216-21, Requirements, as included in full text in

File details come from the government source that posted it. Updated .