Text version

Schedule of Items - Moore Cove, Rainbow Falls, Fletcher Creek, Squirrel Gap, and Ivestor Gap Trails Trails Maintenance Package 8 - Pisgah RD, Pisgah NF

Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.

TRAIL NAME OPTIONAL ITEM OPTIONAL ITEM

1 Non-Wilderness Wild. Segment

UNIT Moore Rainbow Fletcher Squirrel Seg. Ivestor Ivestor DESCRIPTION PRICE QTY Cove Trl QTY Falls Trl QTY Creek Trl QTY Gap Trl QTY Gap Trl QTY Gap Trl

Existing trail restoration to include all work items as identified in specifications and trail logs; including but not limited to: corridor clearing,drainage improvements, hazard tree removal, armored water crossings, installation of turnpike, fill, aggregate surfacing. Installation of puncheon, culverts, hand rail, cribbing, retaining walls, steps, etc. Mile 0.7 1.3 2.4 8.0 N/A N/A

Non-Wilderness Segment of Ivestor Gap Trail shall be restored to provide positive drainage: De-berm, install grade dips as necessary to provide positive drainage. Mile N/A N/A N/A N/A 2.2 N/A

Wilderness Segment of Ivestor Gap Trail: Existing trail restoration to include all work items as identified in specifications and trail logs; including but not limited to:

corridor clearing, drainage improvements., hazard tree removal, armored water crossings, etc. Mile N/A N/A N/A N/A N/A 2.1

BID AMOUNT PER TRAIL - SUBTOTALS

TOTAL BID AMOUNT

Supplement to Schedule of Items - Bidder Provided Quantities

Bidder to provide quantities per trail (based on their detailed site review). All line items (i.e., features) may not be required on each trail.

TRAIL NAME

OPTIONAL ITEM OPTIONAL ITEM

Moore Cove Rainbow Falls Fletcher Creek Squirrel Gap 1 Non-Wilderness Seg. Wilderness Segment Trail Trail Trail Trail Ivestor Gap Trail Ivestor Gap Trail

DESCRIPTION Unit Quantities Quantities Quantities Quantities Quantities Quantities Existing trail restoration, corridor clearing, maintenance of ex. drain. struct. Mile 0.7 1.3 2.4 8.0 N/A N/A

Hazard tree removal Each N/A N/A

Install Grade dips Each N/A N/A

Install Armored grade dips Each N/A N/A

Install Armored water crossing approaches Each N/A N/A

Install Puncheon LF N/A N/A Install Turnpike and/or Compacted Fill and/or Aggregate Surfacing LF N/A N/A

Culvert replacement Each N/A N/A

Install Hand rail LF N/A N/A

Install Cribbing - P.T. timber SF N/A N/A

Install Cribbing - stone SF N/A N/A

Install Steps - P.T. timber Each N/A N/A

Install Steps - stone Each N/A N/A Wilderness Existing trail restoration, corridor clearing, maintenance of ex. drain. struct. Mile N/A N/A N/A N/A N/A 2.1

Wilderness Hazard Tree Removal Each N/A N/A N/A N/A N/A

Wilderness Install grade dips Each N/A N/A N/A N/A N/A

Wilderness Install armored grade dips Each N/A N/A N/A N/A N/A 1 De-berm, install grade dips as necessary to provide positive drainage Mile N/A N/A N/A N/A 2.2 N/A

1 Non-Wilderness Segment of Ivestor Gap Trail shall be rehabilitated to provide positive drainage however standard tread restoration will not be implemented on this segment.