Exhibit 3 - Fletcher Creek Trail Log

View the file

Other files

File Type Posted
SF30 Amend 2.pdf PDF
Revised Moore Cove Trail Log .doc DOC document
Amendment 2 - cover sheet.docx DOCX document
Attachement 1 - Amend 2 - Specification rev.doc DOC document
Exhibit 1 - Revised Drawings.pdf PDF
Section B - rev Schedule of Items.xlsx XLSX spreadsheet
SF30 Amend 1.pdf PDF
Exhibit 1 - Moores Cove Trail Log.pdf PDF
Exhibit 6 - Maps.pdf PDF
Attachment 2 - Wage Determination.doc DOC document
Exhibit 9 - Dwgs 2.pdf PDF
Section A - SF1449.pdf PDF
Exhibit 5 - Ivestor Gap Trail Log.pdf PDF
Exhibit 7 - Design Parameters.pdf PDF
Exhibit 4 - Squirrel Gap Trail Log.pdf PDF
Exhibit 2 - Rainbow Falls Trail Log.10.pdf PDF
Attachment 1 - Specification REV.pdf PDF
Sections C thru M - Solicitation .doc DOC document
Exhibit 8 - Dwgs 1.pdf PDF
Section B - Schedule of Items.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fletcher Creek Trail Log Assessment 1

Fletcher Creek Trail Log Assessment

Inspection Date: 10-01-2009 Inspector Name: Bruce Lowe, Dwayne Stutzman BMP at Hendersonville Reservoir Road, F.S. Road 142 EMP at F.S. Road 5097 Length: 2.4 Trail Class: 3 Designed Use: Horse Existing Width:

Design Tread Width: 18” – 48” Surface: Native

Fletcher Creek Trail (TR350) is 2.4 miles of Class 3 trail, designed for pack and saddle, and managed for pack and saddle, mountain biking and hiking. This trail begins at the Hendersonville Reservoir Road and continues to the end at FS 5097. From the point of beginning at 0+00 to the end point at FS 5097, the trail should be restored to TC3 pack and saddle trail specifications as per USDA Forest Service standards.

Maintenance needs are identified in the attached trail assessment log.

Work will include, but may not be limited to, restoration of the trail tread, installing armored stream crossings, adding surface gravel, replacing culverts, creating and restoring grade dips, brushing vegetation, and felling hazardous trees. In areas with wet tread, work will include filling, restoring tread to provide positive drainage and installing causeways where necessary.

Fletcher Creek Trail Log Assessment 2

Foot Maintenance Need / Point of Interest

Photo

000+00 Begin log Fletcher Creek Trail at Fletcher Creek Reservoir Road

1+27 Social trail down slope to road

Obliterate entrance to social trail

1+80 Root ball upslope -remove

Upslope noted as US in all following comments

2+39 Non-functioning Grade Dip

Non-functioning Grade Dip noted as NFGD in all following comments

3+71- 3+96

Root ball blocking tread – remove and restore tread

4+64 Begin incised tread Will not note incised tread in following comments as incised tread occurs throughout entire length of trail – restore tread, provide positive drainage.

5+50 End incised tread See note above 6+43 NFGD – Rehab 6+82 NFGD – Rehab 8+65 NFGD - Rehab 10+47 NFGD - Rehab 11+65 NFGD - Rehab +

Fletcher Creek Trail Log Assessment 3

11+91 Wet weather stream/spring -armor

Install armored water crossing

13+10 NFGD - Rehab 13+72 NFGD - Rehab 14+25 NFGD - Rehab 15+01 NFGD - Rehab 16+10 NFGD - Rehab 16+71 NFGD w/silt trap -

Rehab Noted as NFGDST in all following comments

17+34 NFGDST - Rehab Note: Stream – 15’ to left 17+91 18” Corrugated metal pipe - ½ filled w/sediment - clean

Corrugated metal pipe noted as CMP in all following comments

18+27 NFGDST - Rehab 18+63 NFGDST - Rehab 19+01 NFGDST - Rehab 19+29 NFGDST - Rehab 19+63 NFGDST - Rehab 20+09 NFGDST - Rehab 20+64 NFGDST - Rehab 21+08 NFGD - Rehab 21+55 NFGDST - Rehab 21+91 NFGD - Rehab 22+54 NFGDST - Rehab 22+98 NFGDST - Rehab 23+36 NFGD - Rehab 23+77 NFGD - Rehab 24+03 Possible buried

CMP

Investigate, clean. If needed, replace with 18” dia. new pipe (if existing pipe is less than 18” dia. or collapsed)

24+45 NFGD - Rehab 25+30 NFGD - Rehab 25+90 NFGD – Rehab 27+55 NFGD - Rehab 27+96 NFGD - Rehab 29+39 NFGD - Rehab 30+60 Crest of ridge 31+46 NFGD - Rehab 33+65 NFGD - Rehab 34+07 NFGD - Rehab Very wet tread – fill, restore tread, provide positive drainage, install causeway if needed.

36+84 NFGD - Rehab 38+11 NFGD - Rehab 40+95 NFGD - Rehab 41+44 NFGD - Rehab

Fletcher Creek Trail Log Assessment 4

46+10 NFGD - Rehab 46+61 NFGD - Rehab 47+00 NFGD - Rehab 48+33 NFGD - Rehab 48+72 NFGD - Rehab 49+65 NFGD - Rehab 50+00 NFGD - Rehab 50+92 NFGD - Rehab 51+34 NFGD - Rehab Install Silt trap – noted as ST in following comments 53+45 NFGD - Rehab 58+48 NFGD - Rehab 61+15 Jct. w/Spenser

Branch Trail

Fletcher Creek Trail Log Assessment 5

Fletcher Creek Trail Log Assessment 6

61+71 Begin stream crossing – armor approaches per armored water crossing specifications

62+10 End stream crossing – armor per specifications

Fletcher Creek Trail Log Assessment 7

62+80 Jct. w/Middle Fork Trail

Fletcher Creek Trail Log Assessment 8

67+11 NFGD

67+89 Social trail to wild life opening on left Wild life opening will be noted as WLO in following comments

71+89 Very wet tread Fill, restore tread, provide positive drainage, install causeway if needed.

72+47 NFGD

76+59 Very Wet Tread Fill, restore tread, provide positive drainage, install causeway if needed.

77+53 Begin WLO

Fletcher Creek Trail Log Assessment 9

82+86 End WLO

83+85 Begin wet tread Fill, restore tread, provide positive drainage, install

84+15 End wet tread 90+11 Wet Fill, restore tread, provide positive drainage, install causeway if needed.

94+51 Wet Fill, restore tread, provide positive drainage, install causeway if needed.

96+51 NFGD

97 +02 NFGD

97 +30 NFGD

99+75 Begin Stream

Crossing - armor per armored water crossing specifications

99+90 End Stream

Crossing - armor per specifications

Fletcher Creek Trail Log Assessment 10

103+10 Very wet tread Fill, restore tread, provide positive drainage, install

108+44 Begin WLO

110+56 End WLO – Incised tread throughout WLO, fill, restore tread, provide positive drainage, install causeway if needed.

May rehab tread by using adjacent onsite material (4 ft either side of trail) to fill

111+06 NFGDST

111+27 18” CMP – Wet tread above CMP Fill, restore tread, provide positive drainage, install causeway if needed.

111+79 NFGDST - wet 111+99 Wet Fill, restore tread, provide positive drainage, install causeway if needed.

112+50 Stream 20’ right 113+37 Exist. ST on left Clean existing Silt Trap 113+57 Begin stream crossing Armor per armored water crossing specifications

113+75 End stream crossing 114+50 Need ST on right Install Silt Trap

114+86 NFGD

115+18 NFGDST

115+61 NFGDST

116+13 NFGDST

116+57 NFGDST

116+90 NFGDST

117+18 NFGDST

117+72 NFGDST

Fletcher Creek Trail Log Assessment 11

122+79 Begin WLO – incised trail throughout WLO – Fill, restore tread, provide positive drainage, install causeway if needed.

125+71 End WLO 126+80 End trail @ F.S.

Road 5097

Fletcher Creek Trail Log Assessment