Exhibit 3 - Fletcher Creek Trail log.pdf
PDF 726 KB Posted
- Solicitation number
- AG-4419-S-10-0361
About this file
Exhibit 3 - Fletcher Creek Trail Log
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amend 2.pdf | ||
| Revised Moore Cove Trail Log .doc | DOC document | |
| Amendment 2 - cover sheet.docx | DOCX document | |
| Attachement 1 - Amend 2 - Specification rev.doc | DOC document | |
| Exhibit 1 - Revised Drawings.pdf | ||
| Section B - rev Schedule of Items.xlsx | XLSX spreadsheet | |
| SF30 Amend 1.pdf | ||
| Exhibit 1 - Moores Cove Trail Log.pdf | ||
| Exhibit 6 - Maps.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Exhibit 9 - Dwgs 2.pdf | ||
| Section A - SF1449.pdf | ||
| Exhibit 5 - Ivestor Gap Trail Log.pdf | ||
| Exhibit 7 - Design Parameters.pdf | ||
| Exhibit 4 - Squirrel Gap Trail Log.pdf | ||
| Exhibit 2 - Rainbow Falls Trail Log.10.pdf | ||
| Attachment 1 - Specification REV.pdf | ||
| Sections C thru M - Solicitation .doc | DOC document | |
| Exhibit 8 - Dwgs 1.pdf | ||
| Section B - Schedule of Items.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fletcher Creek Trail Log Assessment 1
Fletcher Creek Trail Log Assessment
Inspection Date: 10-01-2009 Inspector Name: Bruce Lowe, Dwayne Stutzman BMP at Hendersonville Reservoir Road, F.S. Road 142 EMP at F.S. Road 5097 Length: 2.4 Trail Class: 3 Designed Use: Horse Existing Width:
Design Tread Width: 18” – 48” Surface: Native
Fletcher Creek Trail (TR350) is 2.4 miles of Class 3 trail, designed for pack and saddle, and managed for pack and saddle, mountain biking and hiking. This trail begins at the Hendersonville Reservoir Road and continues to the end at FS 5097. From the point of beginning at 0+00 to the end point at FS 5097, the trail should be restored to TC3 pack and saddle trail specifications as per USDA Forest Service standards.
Maintenance needs are identified in the attached trail assessment log.
Work will include, but may not be limited to, restoration of the trail tread, installing armored stream crossings, adding surface gravel, replacing culverts, creating and restoring grade dips, brushing vegetation, and felling hazardous trees. In areas with wet tread, work will include filling, restoring tread to provide positive drainage and installing causeways where necessary.
Fletcher Creek Trail Log Assessment 2
Foot Maintenance Need / Point of Interest
Photo
000+00 Begin log Fletcher Creek Trail at Fletcher Creek Reservoir Road
1+27 Social trail down slope to road
Obliterate entrance to social trail
1+80 Root ball upslope -remove
Upslope noted as US in all following comments
2+39 Non-functioning Grade Dip
Non-functioning Grade Dip noted as NFGD in all following comments
3+71- 3+96
Root ball blocking tread – remove and restore tread
4+64 Begin incised tread Will not note incised tread in following comments as incised tread occurs throughout entire length of trail – restore tread, provide positive drainage.
5+50 End incised tread See note above 6+43 NFGD – Rehab 6+82 NFGD – Rehab 8+65 NFGD - Rehab 10+47 NFGD - Rehab 11+65 NFGD - Rehab +
Fletcher Creek Trail Log Assessment 3
11+91 Wet weather stream/spring -armor
Install armored water crossing
13+10 NFGD - Rehab 13+72 NFGD - Rehab 14+25 NFGD - Rehab 15+01 NFGD - Rehab 16+10 NFGD - Rehab 16+71 NFGD w/silt trap -
Rehab Noted as NFGDST in all following comments
17+34 NFGDST - Rehab Note: Stream – 15’ to left 17+91 18” Corrugated metal pipe - ½ filled w/sediment - clean
Corrugated metal pipe noted as CMP in all following comments
18+27 NFGDST - Rehab 18+63 NFGDST - Rehab 19+01 NFGDST - Rehab 19+29 NFGDST - Rehab 19+63 NFGDST - Rehab 20+09 NFGDST - Rehab 20+64 NFGDST - Rehab 21+08 NFGD - Rehab 21+55 NFGDST - Rehab 21+91 NFGD - Rehab 22+54 NFGDST - Rehab 22+98 NFGDST - Rehab 23+36 NFGD - Rehab 23+77 NFGD - Rehab 24+03 Possible buried
CMP
Investigate, clean. If needed, replace with 18” dia. new pipe (if existing pipe is less than 18” dia. or collapsed)
24+45 NFGD - Rehab 25+30 NFGD - Rehab 25+90 NFGD – Rehab 27+55 NFGD - Rehab 27+96 NFGD - Rehab 29+39 NFGD - Rehab 30+60 Crest of ridge 31+46 NFGD - Rehab 33+65 NFGD - Rehab 34+07 NFGD - Rehab Very wet tread – fill, restore tread, provide positive drainage, install causeway if needed.
36+84 NFGD - Rehab 38+11 NFGD - Rehab 40+95 NFGD - Rehab 41+44 NFGD - Rehab
Fletcher Creek Trail Log Assessment 4
46+10 NFGD - Rehab 46+61 NFGD - Rehab 47+00 NFGD - Rehab 48+33 NFGD - Rehab 48+72 NFGD - Rehab 49+65 NFGD - Rehab 50+00 NFGD - Rehab 50+92 NFGD - Rehab 51+34 NFGD - Rehab Install Silt trap – noted as ST in following comments 53+45 NFGD - Rehab 58+48 NFGD - Rehab 61+15 Jct. w/Spenser
Branch Trail
Fletcher Creek Trail Log Assessment 5
Fletcher Creek Trail Log Assessment 6
61+71 Begin stream crossing – armor approaches per armored water crossing specifications
62+10 End stream crossing – armor per specifications
Fletcher Creek Trail Log Assessment 7
62+80 Jct. w/Middle Fork Trail
Fletcher Creek Trail Log Assessment 8
67+11 NFGD
67+89 Social trail to wild life opening on left Wild life opening will be noted as WLO in following comments
71+89 Very wet tread Fill, restore tread, provide positive drainage, install causeway if needed.
72+47 NFGD
76+59 Very Wet Tread Fill, restore tread, provide positive drainage, install causeway if needed.
77+53 Begin WLO
Fletcher Creek Trail Log Assessment 9
82+86 End WLO
83+85 Begin wet tread Fill, restore tread, provide positive drainage, install
84+15 End wet tread 90+11 Wet Fill, restore tread, provide positive drainage, install causeway if needed.
94+51 Wet Fill, restore tread, provide positive drainage, install causeway if needed.
96+51 NFGD
97 +02 NFGD
97 +30 NFGD
99+75 Begin Stream
Crossing - armor per armored water crossing specifications
99+90 End Stream
Crossing - armor per specifications
Fletcher Creek Trail Log Assessment 10
103+10 Very wet tread Fill, restore tread, provide positive drainage, install
108+44 Begin WLO
110+56 End WLO – Incised tread throughout WLO, fill, restore tread, provide positive drainage, install causeway if needed.
May rehab tread by using adjacent onsite material (4 ft either side of trail) to fill
111+06 NFGDST
111+27 18” CMP – Wet tread above CMP Fill, restore tread, provide positive drainage, install causeway if needed.
111+79 NFGDST - wet 111+99 Wet Fill, restore tread, provide positive drainage, install causeway if needed.
112+50 Stream 20’ right 113+37 Exist. ST on left Clean existing Silt Trap 113+57 Begin stream crossing Armor per armored water crossing specifications
113+75 End stream crossing 114+50 Need ST on right Install Silt Trap
114+86 NFGD
115+18 NFGDST
115+61 NFGDST
116+13 NFGDST
116+57 NFGDST
116+90 NFGDST
117+18 NFGDST
117+72 NFGDST
Fletcher Creek Trail Log Assessment 11
122+79 Begin WLO – incised trail throughout WLO – Fill, restore tread, provide positive drainage, install causeway if needed.
125+71 End WLO 126+80 End trail @ F.S.
Road 5097
Fletcher Creek Trail Log Assessment