Attachment_1_Appendix_5_-_Facility_Inventory.docx
DOCX document 39 KB Posted
- Attached to
- Building Operations and Maintenance Services for the Western Regional Research Center, Albany, California
- Solicitation number
- AG-32SD-S-14-0002
About this file
Attachment 1 Appendix 5 - Facility Inventory
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX NO. 5
FACILITIES INVENTORY
WESTERN REGIONAL RESEARCH CENTER
FACILITIES SUMMARY
MAIN BUILDING
| --- | North Wing (WRRC Laboratories) |
| --- | South Wing (PGEC Laboratories) |
| --- | South Wing (R&D Facility) |
| --- | South Wing (Roof Greenhouse) |
| --- | Administrative Wing |
· Library
· BioInformatics Lab
· Lobby Conference Room
· Cafeteria
· Lunch Room (PGEC)
· Conference Room #1
· Conference Rooms #2/#3
· Conference Room #4
· Conference Room #5
· Copy Room (Basement and 2nd Floor)
· Stock Room
· Shipping & Receiving
· Mail Room
· O&M Contractor’s Office
WEST ANNEX BUILDING
| --- | WRRC |
| --- | Forest Service |
WOOL BUILDING
SERVICE BUILDING
MARSHALLING FACILITY
SOLVENT EXTRACTION BUILDING
QUARANTINE HEADHOUSE/GREENHOUSE
GREENHOUSE #59
WRRC GREENHOUSE COMPLEX NO #1
WRRC GREENHOUSE COMPLEX NO #2
PGEC GREENHOUSE COMPLEX
NORTH WING, MAIN BUILDING
SPACE
GROSS AREA
(SF)
LAB
(LINOLEUM/VCT,SF)
NO. OF “TYPICAL”
LABS
| Basement |
| 8,790 |
| 8,790 |
| 6 |
| 1st Floor |
| 14,457 |
| 14,457 |
| 12 |
| 2nd Floor |
| 13,275 |
| 13,275 |
| 11 |
| 3rd Floor |
| 14,475 |
| 14,475 |
| 10 |
| TOTAL |
| 50,997 |
| 50,997 |
| 39 |
“Typical” North Wing Laboratory:
| --- | Gross Floor Area = 27’ x 48’ = 1,296 SF (Linoleum/VCT) |
| --- | 20 each 2’x 4’ Fluorescent Lighting Fixtures |
| --- | 2’ x 2’ Suspended Acoustical Ceiling Tiles |
| --- | 7 each 2’ x 2’ Ceiling Supply Air Registers |
| --- | 5 each 2’ x 2’ Ceiling Return Air Grilles |
| --- | 2 each 19” x 35” Deep Sinks (composition) |
| --- | 1 each 18” x 15” Countertop Sink (stainless steel) |
| --- | 1 each 6’ x 3’ Fume Hood |
| --- | 1 each 6’ x 3’ Biological Safety Cabinet |
| --- | 2 each Emergency Shower/Eyewash Stations |
SOUTH WING, MAIN BUILDING
GROSS AREA
(SF)
LAB
(LINOLEUM/VCT,SF)
NO. OF “TYPICAL”
LABS
| Basement |
| 4,671 |
| 4,671 |
| N/A |
| 1st Floor |
| 5,096 |
| 5,096 |
| 4 |
| 2nd Floor |
| 5,096 |
| 5,096 |
| 4 |
| 3rd Floor |
| 5,096 |
| 5,096 |
| 4 |
| TOTAL |
| 19,959 |
| 19,959 |
| 12 |
“Typical” South Wing Laboratory:
| --- | Gross Floor Area = 25’-6” x 48’ = 1,224 SF (Linoleum/VCT) | |
| --- | 44 each 1’x 4’ Fluorescent Lighting Fixtures | |
| --- | 2’ x 4’ Suspended Acoustical Ceiling Tiles | |
| --- | 8 each Ceiling HVAC Terminal Devices (i.e., registers/grilles) | |
| --- | 1 each 21” x 29” Deep Sink (composition) | |
| --- | 6 each 12” x 12”/15” x 15” Countertop Sinks (composition) | |
| --- | 2 each 6’ x 3’ Fume Hoods | |
| --- | 1 each 6’ x 3’ Biological Safety Cabinet | |
| --- | 1 each Emergency Shower/Eyewash Station |
ADMINISTRATIVE WING, MAIN BUILDING
LAB
(LINOLEUM/VCT, SF)
OFFICE
(CARPET, SF)
OTHER
(LINOLEUM/VCT,SF)
OTHER
(CARPET, SF)
Basement
1,220
1st Floor
4,337
2nd Floor
| 9,469 |
| 192 |
3rd Floor
6,229
| TOTAL |
| 270 |
| 21,255 |
| 192 |
| 150 |
Administrative Wing, “Typical” Office Bay:
| --- | Gross Floor Area = 12’x 25’-6” = 306 SF (Carpet) |
| --- | 4 each 2’x 4’ Fluorescent Lighting Fixtures |
| --- | 2’ x 2’ Suspended Acoustical Ceiling Tiles |
| --- | 1 each Baseboard Type H/V unit |
NOTE: 68 each “Typical” Office Bays, total.
MISCELLANEOUS, MAIN BUILDING
GROSS
AREA
(SF)
LINOLEUM/VCT
(SF)
CARPET
(SF)
| 1st Floor Lobby Conference Room |
| 820 |
| Lobby Area (incl. receptionist space) |
| 1,354 |
| Cafeteria (basement) |
| 676 |
| 676 |
| Lunch Room (PGEC) |
| 230 |
| 230 |
| Conference Room #1 (Center Director) |
| 288 |
| Conference Rooms #2/#3 (Auditorium) |
| 1,224 |
1,224
| Conference Room #4 |
| 956 |
| Conference Room #5 |
| 306 |
| Copy Room (basement) |
| 336 |
| 336 |
| Stock Room (basement) |
| 312 |
| 312 |
| Shipping & Receiving (basement) |
| 768 |
| 768 |
| Mail Room (basement) |
| 384 |
| 384 |
| Computer Training Center |
| 445 |
| TOTAL |
| 8099 |
| 2706 |
| 4039 |
Lobby Conference Room:
| --- | Gross Floor Area = 30-4”’x 27’= 820 SF (Carpet) |
| --- | 12 each 2’ x 4’ Fluorescent Lighting Fixtures |
| --- | 2X2 Suspended acoustical ceiling tiles |
| --- | 2 each Baseboard Type H/V units |
NOTE: Includes retractable projector screen.
Lobby Area (incl. receptionist space):
| --- | Gross Floor Area = 37’-6” x 36’ = 1,354 SF (Terrazzo Flooring) | |
| --- | 15 each Hanging pendant light Fixtures | |
| --- | Plaster Ceiling | |
| --- | 5 each Baseboard Type H/V units |
NOTE: Wall and column covering marble. Also, 2 each approximately 68” x 48” interior windows and 1 each 96” X 48” interior window (all with Venetian blinds) (=2 (22.7) + 32 = 77 SF).
Cafeteria (basement):
| --- | Gross Floor Area = 25’-6” x 24’ + 8’ x 8’=612 SF = 64 SF = 676 SF (VCT) |
| --- | 10 each 2’ x 4’ Fluorescent Lighting Fixtures |
| --- | 2’ x 2’ Suspended Acoustical Ceiling Tiles |
| --- | 1 each 2’ x 2’ Ceiling Supply/Return Registers and Grilles |
| --- | 1 each 22” x 15” Double Bowl Kitchen Sink (stainless steel) |
| --- | 3 each 3’ x 3’-6” interior windows (all with Venetian Blinds) = 32 SF |
Conference Room #1 (Center Director’s)
| --- | Gross Floor Area = 12’ x 24’ = 288 SF (Carpet) |
| --- | 2 each 4’ x 4’ Fluorescent Lighting Fixtures |
| --- | 12” x 12” Acoustical Ceiling Tiles |
| --- | 1 each Baseboard Type H/V unit |
Conference Rooms #2/#3 (Auditorium):
| --- | Gross Floor Area = 25’-6” x 48’ = 1,224 SF (VCT) |
| --- | 8 each 1’- 6” x 4’ Fluorescent Lighting Fixtures |
| --- | 12” x 12” Acoustical Ceiling Tiles (glued) |
| --- | 2 each 2’ x 2’ Ceiling Supply/Return Registers and Grilles |
| --- | 4 each Baseboard Type H/V units |
NOTE: Inside fenestration consists of roll-up plastic shades.
Conference Room #4:
| --- | Gross Floor Area = 25’-6” x 37’-6” = 956 SF (Carpet) |
| --- | 6 each 1’ - 6” x 4’ Fluorescent Lighting Fixtures |
| --- | 12” x 12” Acoustical Ceiling Tiles (glued) |
| --- | 2 each 2’ x 2’ Ceiling Supply/Return Registers and Grilles |
| --- | 3 each Baseboard Type H/V units |
Conference Room #5:
| --- | Gross Floor Area = 306 SF (Carpet) |
| --- | 4 each 2’ x 4’ Fluorescent Lighting Fixtures |
| --- | 2’ x 2’ Suspended Acoustical Ceiling Tiles |
| --- | 1 each Baseboard Type H/V unit |
NOTE: Includes retractable projector screen.
Copy Room (basement):
| --- | Gross Floor Area = 16’ x 12’ + 12’ x 12’ = 192 SF + 144 SF = 336 SF (VCT) |
| --- | No Ceiling |
| --- | 3 each 2’ x 4’ Fluorescent Lighting Fixtures |
| --- | 15’ x 3’-6” = 53 SF Interior Windows |
| --- | No HVAC Supply/Return Registers and Grilles |
Stock Room (basement):
| --- | Gross Floor Area = 12’ x 26’ = 312 SF (Linoleum/VCT) |
| --- | 2’ x 2’ Suspended Acoustical Ceiling Tiles |
| --- | 10 each 2’ x 4’ Fluorescent Lighting Fixtures |
| --- | 4 each Stacks (36” w shelves) |
Shipping and Receiving (basement):
| --- | Gross Floor Area = 24’ x 32’ = 768 SF (VCT) |
| --- | No Ceiling |
| --- | 16 each 2’ x 4’ Fluorescent Lighting Fixtures |
| --- | 4 each 2’ x 2’ OH HVAC Terminal Devices ( i.e., registers/grilles) |
Mail Room (basement):
| --- | Gross Floor Area = 16’ x 24’ = 384 SF (VCT) |
| --- | 2’ x 2’ Acoustical Ceiling Tiles |
| --- | 8 each 2’ x 4’ Fluorescent Lighting Fixtures |
| --- | 2 each 2’ x 2’ Ceiling HVAC Terminal Devices ( i.e., registers/grilles) |
Computer Training Center
| --- | Gross floor Area = 23’ x 12 ‘ + 13’ x 13’ = 445 SF (Carpet) |
| --- | 2’ x 2’ Suspended Acoustical Ceiling Tiles |
| --- | 12 each 2’ x 4’ Fluorescent Lighting Fixtures |
WEST ANNEX BUILDING
GROSS AREA
(SF)
LINOLEUM/VCT
(SF)
CARPET
(SF)
1st Floor Office Executive Lobby Administration Cafeteria Mail Room Conference Room Computer Room
2,400 3,840 1,292 10,368
2,400 3,840 1,292 10,368
2nd Floor Lobby Room 227 Break Area Rooms 200 thru 220
2,576 9,922
9,922
2,576
3rd Floor
13,298 13,298
4th Floor
Lab 408B Office 408C Office 408D 13,298 13,298
TOTAL
60,925
39,656
21,269
Other Facilities:
| --- | Wool Building, 11,400 SF (concrete floor) | |
| --- | Smoking Shed, 80 SF | |
| --- | Service Bldg, 7,125 SF | |
| --- | Marshalling Facility, 3552 SF | |
| 8 individual lockers, 25 SF each | ||
| - -- Overpass Building, 6,000 SF (gross) | ||
| 1 story (High Bay) with mezzanine | ||
| primary use: storage | ||
| --- | Solvent Extraction Bldg, 1696 SF | |
| --- | Elevators: |
Main Building -
| North Wing | 30 SF | ||||||||
| South Wing | 47 SF | ||||||||
| R & D Facility | 29 SF | ||||||||
| Admin Wing | Passenger, 43 SF | Freight, 42 SF | |||||||
| West Annex Building | Passenger, 42 SF | Freight, 66 SF | |||||||
| Wool Building | 31 SF | ||||||||
| --- | Cold Boxes: | ||||||||
| Main Building – | |||||||||
| South Wing (R&D Fac.), basement | |||||||||
| Cold Box (4) 130 SF | |||||||||
| North Wing (Phase III), basement | |||||||||
| Front Box (3) | 98 SF | ||||||||
| Back Box (3) | 203 SF | ||||||||
| North Wing (Phase VII), basement & 1st – 3rd floors | |||||||||
| Ante Room (4) | 65 SF | ||||||||
| Cold Box (4) | 238 SF | ||||||||
| --- | Restrooms | ||||||||
| Main Building – | |||||||||
| South Wing R&D Facility (4) 180 SF | |||||||||
| North Wing (4) | 214 SF | ||||||||
| Admin. Wing (8) | 178 SF | ||||||||
| West Annex Building- | |||||||||
| 1st floor | 498 SF | ||||||||
| 2ND floor | 304 SF | ||||||||
| 3RD floor | 616 SF | ||||||||
| 4TH floor | 138 SF | ||||||||
| PGEC Greenhouse (2) | 60 SF | ||||||||
| Quarantine Headhouse/Greenhouse (2) | 35 SF | ||||||||
| Wool Building | 128 SF |
NOTE: Where number indicated in parentheses, area (SF) quantities are for each.
North Wing (Phase III), Main Building Cold Boxes (dual), basement:
| --- | Gross Floor Area, Front Box = 6’-6” x 15’= 98 SF |
| --- | All Stainless Steel Construction |
| --- | 3 Fan OH Evaporator |
| --- | 2 each Incandescent Lamps |
| --- | Gross Floor Area, Back Box = 13’-6” x 15’ = 203 SF | |
| --- | All Stainless Steel Construction | |
| --- | 4 Fan OH Evaporator | |
| --- | 3 each Incandescent Lamps |
NOTE: Above quantities are per box.
North Wing (Phase VII), Main Building Cold Boxes, basement and 1st – 3rd floor:
| --- | Gross Floor Area, Ante Room = 5’ x 13’= 65 SF (VCT) |
| --- | 2’ x 2’ Suspended Acoustical Ceiling Tiles |
| --- | 1 each 2’ x 4’ Fluorescent Lighting Fixture |
| --- | No HVAC Supply/Return Registers and Grilles |
| --- | Gross Floor Area, Cold Box = 12’-6” x 15’ + 10’ x 5’ |
| = 188 SF + 50 SF = 238 SF | |
| --- | All Stainless Steel Construction |
| --- | 4 Fan OH Evaporator |
| --- | 7 each Incandescent Light Fixtures (10” x 10”) |
NOTE: Above quantities are per box.
South Wing, Main Building (R&D Facility) Men’s Restroom basement and 1st floor:
| - -- | Gross Floor Area = 12’ x 15 + 12’x 15’ | |
| - -- | = 180 SF + 180 SF = 360 SF | |
| - -- | 2’ x 2’ Suspended Acoustical Ceiling Tiles | |
| - -- | 2 each Fluorescent light fixtures | |
| - -- | 2 each 18” x 12” Oval Countertop Lavs | |
| - -- | 1 each Flushometer Urinal | |
| - -- | 2 each Flushometer W.C.s | |
| - -- | 1 each Shower |
NOTE: 1 each 36” x 44” Mirror, Ceramic Tile on wall, to 6’ height.
Above quantities are per floor.
South Wing, Main Building (R&D Facility) Women’s Restroom basement and 1st floor:
| - -- | Gross Floor Area = 10’-7” x 14’-4” + 10’-8”x 15’-6” | |
| - -- | = 154 SF + 168 SF = 322 SF | |
| - -- | 2’ x 2’ Suspended Acoustical Ceiling Tiles | |
| - -- | 2 each Fluorescent light fixtures | |
| - -- | 2 each 18” x 12” Oval Countertop Lavs | |
| - -- | 2 each Flushometer W.C.s | |
| - -- | 1 each Shower |
NOTE: 1 each 36” x 62” Mirror, Ceramic Tile on wall, to 6’ height.
Above quantities are per floor.
North Wing, Main Building Men’s Restroom (Labs), basement and 3rd floor:
| --- | Gross Floor Area = 14’ x 8’ + 6’ x 17’ | |
| = 112 SF + 102 SF = 214 SF (Terrazo Tile) | ||
| --- | Gypboard Ceiling | |
| --- | 3 each 1’ x 4’Fluorescent Lighting Fixtures (OH) | |
| --- | 1 each 4’ lg (Arch.) Fluorescent Tube (over Lavs) | |
| --- | 2 each 18” x 12” Oval Countertop Lavs | |
| --- | 2 each Flushometer W.C.s | |
| --- | 1 each Flushometer Urinal |
| NOTE: 1 each 30” x 72” Mirror; Ceramic Tile on walls, to 6’ height. | |
| Above quantities are per floor. |
North Wing, Main Building Women’s Restroom (Labs), 1st and 2nd floors:
| --- | Gross Floor Area = 214 SF (Terrazo Tile) | |
| --- | Gypboard Ceiling | |
| --- | 3 each 1’ x 4’ Fluorescent Lighting Fixtures (OH) | |
| --- | 1 each 4’ lg (Arch.) Fluorescent Tube (over Lavs) | |
| --- | 2 each 18” x 12” Oval Countertop Lavs | |
| --- | 2 each Flushometer W.C.s |
| NOTE: 1 each 30” x 84” Mirror; Ceramic Tile on walls, to 6’ height. | |
| Above quantities are per floor. |
Admin. Wing, Main Building Men’s Restroom, basement and 1st- 3rd floors:
| --- | Gross Floor Area = 14’ x 11’ + 4’ x 6’ = 154 SF + 24 SF = 178 SF (Terrazo Tile) |
| --- | 1 each 1’ x 4’ Fluorescent Lighting Fixture (over Lavs) |
| --- | 1 each 2’ x 4’ Fluorescent Lighting Fixture (OH) |
| --- | 2’ x 4’ Suspended Ceiling Tiles | |
| --- | 1 each 2’ x 2’ Sidewall HVAC Grille | |
| --- | 2 each 18” x 12” Oval Countertop Lavs | |
| --- | 3 each Flushometer W.C.s | |
| --- | 2 each Flushometer Urinals |
| NOTE: 1 each 72” x 44” Mirror, Terrazo Tile on walls, to 6’ height. | |
| Above quantities are per floor. |
Admin. Wing, Main Building Women’s Restroom, basement and 1st – 3rd floors:
| --- | Gross Floor Area = 178 SF (Terrazo Tile) |
| --- | 1 each 1’ x 4’ Fluorescent Lighting Fixture (overs Lavs) |
| --- | 1 each 2’ x 4’ Fluorescent Lighting Fixture (OH) |
| --- | 2’ x 4’ Suspended Ceiling Tiles |
| --- | 1 each 2’ x 2’ Sidewall HVAC Grille |
| --- | 2 each 18” x 12” Oval Countertop Lavs |
| --- | 2 each Flushometer W.C.s |
| NOTE: 1 each 72” x 44” Mirror; Terrazo Tile on walls, to 6’ height. | |
| Above quantities are per floor. |
West Annex Building, Men’s Restroom, 1st floor Office Area:
| --- | Gross Floor Area = 56 SF (VCT) |
| --- | 1 each 1’ x 4’ Fluorescent Lighting Fixture (OH) |
| --- | 1 each Exhaust Vent |
| --- | 1 each Lav |
| --- | 1 each Flushometer W.C. |
West Annex Building, Women’s Restroom, 1st floor Office Area:
| --- | Gross Floor Area = 56 SF (VCT) |
| --- | 1 each 1’ x 4’ Fluorescent Lighting Fixture (OH) |
| --- | 1 each Exhaust Vent |
| --- | 1 each Lav |
| --- | 1 each Flushometer W.C. |
West Annex Building, Men’s Restroom, 1st floor Admin. Area:
| --- | Gross Floor Area = 110 SF (VCT) |
| --- | 1 each 1’ x 4’ Fluorescent Lighting Fixture (OH) |
| --- | 1 each Exhaust Vent |
| --- | 1 each Lav |
| --- | 1 each Flushometer W.C. | |
| --- | 1 each Flushometer Urinal |
West Annex Building, Women’s Restroom, 1st floor Admin. Area:
| --- | Gross Floor Area = 276 SF (VCT) |
| --- | 2 each 1’ x 4’ Fluorescent Lighting Fixtures (OH) |
| --- | 2 each Exhaust Vents |
| --- | 1 each Unit Heater |
| --- | 4 each Lavs |
| --- | 5 each Flushometer W.C.s |
| --- | 1 each Mirror |
West Annex Building, Men’s Restroom, 2nd floor:
| --- | Gross Floor Area = 99 SF (Ceramic Tiles) |
| --- | 1 each Fluorescent Lighting Fixture (OH) |
| --- | 1 each Exhaust Vent |
| --- | 1 each Unit Heater |
| --- | 1 each Lav |
| --- | 1 each Flushometer W.C. |
| --- | 1 each Flushometer Urinal |
West Annex Building, Women’s Restroom, 2nd floor:
| --- | Gross Floor Area = 205 SF (Ceramic Tiles) |
| --- | 4 each Fluorescent Lighting Fixtures (OH) |
| --- | 3 each Exhaust Vents |
| --- | 3 each Lavs |
| --- | 3 each Flushometer W.C.s |
| --- | 2 each Shower Stalls |
West Annex Building, Men’s Restroom, 3rd floor:
| --- | Gross Floor Area = 308 SF (Ceramic Tiles) |
| --- | 9 each Fluorescent Lighting Fixtures (OH) |
| --- | 3 each Exhaust Vents |
| --- | 2 each Lavs |
| --- | 2 each Flushometer W.C.s |
| --- | 1 each Flushometer Urinal |
| --- | 3 each Shower Stalls |
West Annex Building, Women’s Restroom, 3rd floor:
| --- | Gross Floor Area = 308 SF (Ceramic Tiles) |
| --- | 4 each 1’ x 4’ Fluorescent Lighting Fixtures (OH) |
| --- | 2 each Exhaust Vents |
| --- | 2 each Lavs |
| --- | 1 each Flushometer W.C. |
West Annex Building, Women’s Restroom, 4th floor:
| --- | Gross Floor Area = 138 SF (Ceramic Tiles) |
| --- | 3 each 1’ x 4’ Fluorescent Lighting Fixtures (OH) |
| --- | 2 each Exhaust Vents |
| --- | 1 each Unit Heater |
| --- | 2 each Lavs |
| --- | 2 each Flushometer W.C.s |
PGEC Greenhouse, Men’s Restroom:
| --- | Gross Floor Area = 10’ x 6’ = 60 SF (VCT) |
| --- | 1 each 10” x 4’ Fluorescent Lighting Fixture (OH) |
| --- | 1 each Exhaust Air Grille |
| --- | 1 each Supply Air Diffuser |
| --- | 1 each Lav |
| --- | 1 each Flushometer W.C. |
PGEC Greenhouse, Women’s Restroom:
| --- | Gross Floor Area = 10’ x 6’ = 60 SF (VCT) |
| --- | 1 each 10” x 4’ Fluorescent Lighting Fixture (OH) |
| --- | 1 each Exhaust Air Grille |
| --- | 1 each Supply Air Diffuser |
| --- | 1 each Lav |
| --- | 1 each Flushometer W.C. |
Quarantine Headhouse/Greenhouse, Men’s Restroom:
| --- | Gross Floor Area = 7’ x 5’ = 35 SF (VCT) |
| --- | 1 each 1’ x 4’ Fluorescent Lighting Fixture (OH) |
| --- | 1 each Exhaust Air Grille |
| --- | 1 each Lav |
| --- | 1 each Flushometer W.C. |
Quarantine Headhouse/Greenhouse, Women’s Restroom:
| --- | Gross Floor Area = 7’ x 5’ = 35 SF (VCT) |
| --- | 1 each 1’ x 4’ Fluorescent Lighting Fixture (OH) |
| --- | 1 each Exhaust Air Grille |
| --- | 1 each Lav |
| --- | 1 each Flushometer W.C. |
Wool Building, Men’s Restroom:
| --- | Gross Floor Area = 16’ x 8’ = 128 SF (Linoleum) |
| --- | 3 each 1’ x 4’ Fluorescent Lighting Fixtures |
| --- | 1 each Exhaust Air Grille |
| --- | 1 each Supply Air Diffuser |
| --- | 1 each Lav |
| --- | 1 each Flushometer W.C. |
| --- | 1 each Flushometer Urinal |
ADMINISTRATIVE WING, MAIN BUILDING CORRIDOR
GROSS AREA (SF)
Basement
2,108
1st Floor
1,544
2nd Floor
1,904
3rd Floor
1,904
TOTAL
7,460
NOTE: Flooring for corridors is Linoleum/VCT.
Admin. Wing, Main Building Corridor, basement:
| --- | Gross Floor Area = 152’ x 10’ + 2 (24’x 8’) + 8’ x 25’ -6” | |
| 1,520 SF + 384 SF + 204 SF = 2,108 SF (VCT) | ||
| No Ceiling | ||
| 14 each 2 lamp x 4’ Fluorescent Lighting Fixtures | ||
| 5 each 4 lamp x 4’ Fluorescent Lighting Fixtures | ||
| No HVAC Supply/Return Registers and Grilles |
Admin. Wing Main Building Corridor, 1st floor (excluding Lobby Area):
| --- | Gross Floor Area = 58’ x 10’ + 24’ x 8’ = 580 SF + 192 SF | |
| --- | 772 SF (S. Side, Linoleum) | |
| 772 SF (N. Side , Linoleum) | ||
| --- | 12” x 12” Acoustical Ceiling Tiles (glued), N. Side (772 SF) | |
| Plaster Ceiling, S. Side (772 SF) | ||
| --- | 1 each 1’ x 4’ Fluorescent Lighting Fixture, N. Side | |
| 6 each 2’ x 2’ Fluorescent Lighting Fixtures, N. Side | ||
| 10 each 10’ lg Fluorescent (Arch., Suspended) Tubes, S. Side | ||
| 1 each 24’ lg Fluorescent (Arch., Suspended) Tube, S. Side | ||
| --- | No HVAC Supply/Return Registers and Grilles |
Admin. Wing, Main Building Corridor, 2nd and 3rd floors:
| --- | Gross Floor Area = 152’ x 10’ + 2 (24’ x 8’) | |
| 1,520 SF + 384 SF = 1,904 SF (Linoleum) | ||
| --- | 12” x 12” Acoustical Ceiling Tiles (glued) | |
| --- | 2 each 1’x 4’ Fluorescent Lighting Fixtures | |
| 15 each 2’ x 2’ Fluorescent Lighting Fixtures | ||
| --- | No HVAC Supply/Return Registers and Grilles |
NOTE: Above quantities are per floor.
NORTH WING, MAIN BUILDING CORRIDOR
| SPACE |
| GROSS AREA (SF) |
| North Wing (Lab) Corridor |
| 9,824 |
| TOTAL |
| 9,824 |
North Wing (Lab), Main Building Corridor:
| --- | Gross Floor Area = 8’ x 307’ x 4 ea. (basement, 1st – 3rd floors) = 9,824 SF |
| (VCT) |
| --- | 152 each 1’ x 4’ Fluorescent Lighting Fixtures | |
| --- | 2’ x 2’ Suspended Acoustical Ceiling Tiles (1st – 3rd Floors only) | |
| --- | 4 each Drinking Fountains (1 each per floor) | |
| --- | 25 each Ceiling/OH HVAC Terminal Devices (i.e., registers/grilles) |
NOTE: Above quantities are totals (i.e., sum of all floors).
SOUTH WING, MAIN BUILDING CORRIDOR
| SPACE |
| GROSS AREA (SF) |
| South Wing (Lab) Corridor |
| 2,624 |
| TOTAL |
| 2,624 |
South Wing (Lab), Main Building Corridor:
| --- | Gross Floor Area = 5’ x 96’ + 4’ x 5’-6” x 8 ea. = 480 SF + 176 SF | |
| = 656 SF x 4 ea. (basement, 1st – 3rd floors) | ||
| = 2,624 SF (VCT) | ||
| --- | 32 each 1’ x 4’ Fluorescent Lighting Fixtures | |
| --- | 96 each 4’ lg Fluorescent (Arch., Suspended) Tubes | |
| --- | 32 each 18” x 18” Ceiling Supply/Return Registers and Grilles | |
| --- | Plaster Ceiling |
NOTE: Above quantities are totals (i.e., sum of all floors).
Main Building Steps/Stairs:
Admin. Wing Steps (front entrance) - NOTE: Concrete with 2 each --- Landings = 140 SF landings and 10 each steps (non skid), --- Steps = 210 SF with steel railing.
| Admin. Wing Stairwell | NOTE: Vinyl landings and steps (non | (interior, two each) - | skid). Four floors with 41 each steps. | ||||
| --- | Landings = 784 SF | --- | Steps = 328 SF |
| South Wing Steps (side entrance) - | NOTE: Concrete landing and steps. | |||||
| --- | Landings = 60 SF | 4 each steps, with steel railing. | ||||
| --- | Steps = 24 SF | |||||
| South Wing Stairs (interior, R & D Facility) - | NOTE: Concrete landings and steps | --- | Landings = 280 SF | (non skid). |
| --- | Steps = 150 SF | ||||
| South Wing Stairwell (interior, PGEC side) - | NOTE: Vinyl landings and steps (non | ||||
| --- | Landings = 400 SF | skid), with steel railing. | --- | Steps = 280 SF |
| North Wing Staircase (exterior, west end)- | NOTE: Steel landings, steps and | |||||
| --- | Landings = 336 SF | railing. | ||||
| --- | Steps = 200 SF | Landings, steps, and railing non skid. | ||||
| No. of Landings = 6 | No. of Steps = 50 |
| North Wing Stairwell (interior) - | NOTE: Vinyl landings and steps (non | ||||
| --- | Landings = 463 SF | skid). | |||
| --- | Steps = 272 SF | No. of Landings = 9 | No. of Steps = 68 |
West Annex Building Stairs:
| Front Stairs- | NOTE: 1. Stairs 1st thru 4th floor. | |||
| --- | Gross Area (landings) = 230 SF | 2. Steps and landing non skid | ||
| --- | No. of Steps = 89 | rubber. |
3. Two each wood landings going to 4th floor and penthouse.
| Back Stairs - | --- | Gross Area (concrete landings) = 226 SF | ||
| --- | No. of Steps = 80 (steel with steel railing) |
R & D FACILITY, MAIN BUILDING
GROSS AREA
(SF)
LAB
(LINOLEUM/VCT, SF)
OFFICE
(LINOLEUM/VCT,SF)
| Basement |
| 2,592 |
| 2,592 |
| 1st Floor |
| 2,204 |
| 1,404 |
| 800 |
| 2nd Floor |
| 2,756 |
| 2,756 |
| 3rd Floor |
| 832 |
| 416 |
| 416 |
| TOTAL |
| 8,384 |
| 7,168 |
| 1,216 |
GREENHOUSES
HID LAMPS (QTY)
| Quarantine Headhouse/Greenhouse |
| 9,267 |
| 37 |
| Roof Greenhouse (Main Bldg) |
| 3,212 |
| 20 |
| Greenhouse #59 |
| 756 |
| 15 |
| WRRC Greenhouse Complex No#1 |
| 4,032 |
| 105 |
| WRRC Greenhouse Complex No#2 |
| 3,000 |
| 16 (see note) |
| PGEC Greenhouse Complex |
| 23,928 |
| 459 |
| TOTAL |
| 44,195 |
| 652 |
NOTE: Phase 1, construction completed (FY 07), consists of Headhouse & 1 ea Grow Room. Phases 2 and 3, each consisting of one Grow Room,(16 ea. HID Lamps).
WINDOW SURVEY
CASEMENT(SF)
FIXED (SF)
MAIN BLDG:
| E. Facing |
| 1,790 |
| 1,790 |
| S. Facing |
| 3,366 |
| 535 |
| 2,831 |
| Courtyard, S. Wing |
| 3,072 |
3,072
| Courtyard, N. Wing |
| 3,588 |
3,588
| Courtyard, Admin. |
| 741 |
| 741 |
| W. Facing, S. Wing |
| 399 |
| W. Facing, N. Wing |
| 51 |
| N. Facing |
| 4,130 |
| 542 |
| 3,588 |
| TOTAL |
| 17,137 |
| 3,608 |
| 13,529 |
WEST ANNEX BLDG:
| E. Facing |
| 2,392 |
2,392
| S. Facing |
| -0- |
-0-
| W. Facing |
| 576 |
| N. Facing |
| 54 |
| TOTAL |
| 3,022 |
| -0- |
| 3,022 |
| GRAND TOTAL |
| 20,159 |
| 3,608 |
| 16,551 |
NOTE: Assume 50% of total window area with Venetian Blinds, or approximately 10,000 SF.
Above areas correspond to window gross area, i.e., include window sash.