Attachment_1_Appendix_3a_-_Workload_Data_for_Additional_Work_UPDATED.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Building Operations and Maintenance Services for the Western Regional Research Center, Albany, California
- Solicitation number
- AG-32SD-S-14-0002
About this file
UPDATED Appendix 3a - Workload Data for Additional Work
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| WORKLOAD DATA FOR ADDITIONAL WORK - UPDATED | ||||||
| Date | Cost Proposal # | Requestor | WO # | Scope of Work | Company Name | Amount |
| 12/2/09 | AW-AFM09-003* | Mark Carter | 2008-01637 | Security upgrades to WAB rooms 320W and 408W | Opening Technologies Inc | $40,024.60 |
| 8/6/09 | AW-AFM09-012 | Clarice Dixson | 2008-03303 | Install 5 magnetic doors/smoke detectors in SW PGEC | Simplex Grinnell | $87,392.18 |
| 2/9/09 | AW-AFM09-018 | Jerry Mayer | 2008-03255 | Upgrade pneumatic controls WAB for EMS | Automated Control Inc. | $41,804.90 |
| 3/4/09 | AW-AFM09-021 | Lone Santacera | 2009-01565 | Remove/Replace gutters and drains in Wool Building | $7,190.40 | |
| 8/4/09 | AW-AFM09-027 | Adam Salvadalena | 2005-01569 | Install communication wire from PG&E to existing communication system | $7,773.15 | |
| 5/28/09 | AW-AFM09-045 | Wendell Brown | 2009-01372 | Replace inoperable Gyrotech auto operators | $6,300.00 | |
| 5/28/09 | AW-AFM09-045 (III) | Wendell Brown | 2009-01372 | Double doors NW 2nd floor leading to labs are not closed | $6,300.00 | |
| 6/2/09 | AW-AFM09-046 (II) | Stanley Green | 2009-02578 | Pipe installation in Boiler and Mechanical room | $5,831.50 | |
| AW-AFM09-047 | Pete Toledo | Install air filters for WAB | Air Filter Maintenance, Inc. | $4,673.56 | ||
| 6/26/09 | AW-AFM09-048 | Lone Santacera | 2009-02911 | Replace main water back flow preventer | Fluid Gauge Company, Inc. | $8,792.08 |
| 7/1/09 | AW-AFM09-049 | David Orong | Industrial Labeling System | Grainger | $3,208.93 | |
| 7/13/09 | AW-AFM09-050 | Lone Santacera | 2009-03083 | Replace refractory liner in Boiler room | $5,885.00 | |
| 7/13/09 | AW-AFM09-052 | Lone Santacera | 2009-03085 | Correct deficiencies on Elevator inspection report | Ascent | $4,012.50 |
| 9/15/09 | AW-AFM09-053 | Gelu Nistor | Purchase Variable Frequency Drive | DrivesWarehouse.com | $4,586.43 | |
| 7/13/09 | AW-AFM09-054 | Gelu Nistor | Purchase Photo Electric Switch with Receiver Reflector | Alameda Electric | $1,058.36 | |
| 7/14/09 | AW-AFM09-055 | David Orong | 2009-03088 | Conduct survey for Asbestos containing materials and lead | RGA Environmental | $2,022.30 |
| 7/20/09 | AW-AFM09-056 | Tom Moreno | 2009-02632 | Replace all exit lights in facility buildings with new fixtures using LED's | Wesco | $29,892.49 |
| 8/4/09 | AW-AFM09-056 (II) | Gelu Nistor | 2009-03176 | Install emergency lighting, women's bathroom 4th floor and Room 311 | $1,822.37 | |
| 10/9/09 | AW-AFM09-058 | Clarice Dixson | 2009-03351 | Replace Library A/C unit | C&E Enterprises | $16,591.42 |
| 9/23/09 | AW-AFM09-059 | Lone Santacera | 2009-03365 | Repair Air/Resurface Main Parking Lot | $28,667.44 | |
| 9/3/09 | AW-AFM09-060 | Clarice Dixson | 2009-02899 | Improve Ventilation in autoclave room W312L | Automated Services and Products | $3,317.00 |
| 9/3/09 | AW-AFM09-061 | Lone Santacera | 2009-03552 | Replace NW R.O. water system with Industrial Capacity units | Siemens | $16,529.36 |
| 9/3/09 | AW-AFM09-062 | Lone Santacera | 2008-01639 | Paint wool building | Pembra Bldg. Contractor | $30,755.01 |
| 9/3/09 | AW-AFM09-063 | Lone Santacera | 2009-03553 | Repair/Replace NW Attic low pressure steam line insulation | Plant Hazardous Services | $11,181.55 |
| 9/3/09 | AW-AFM09-064 | Lone Santacera | 2009-02623 | Install false wall in room 3034 | New High Protection Roofing Co. | $2,996.00 |
| 9/24/09 | AW-AFM09-066 | Gelu Nistor | 2009-03596 | Provide underground communications | $27,252.18 | |
| 9/24/09 | AW-AFM09-067 | Wendell Brown | 2009-03595 | Repair roof leak WAB | Pembra Bldg. Contractor | $5,077.15 |
| 9/22/09 | AW-AFM09-068 | Wendell Brown | 2009-03627 | Replace 8 windows in WAB Wellness suite | Pembra Bldg. Contractor | $4,612.77 |
| 10/2/09 | AW-AFM09-069 | Rebecca Haussman | Replace X-Ray with Kodak 2000 Processor (refurbished) | Merry X-Ray | $10,165.00 | |
| 10/19/09 | AW-AFM09-073 | Gwyn Watson | 2010-00088 | Replace carpet/Install laminate floor in Gym 1st floor WAB | Pembra Bldg. Contractor | $6,933.60 |
| 11/6/09 | AW-AFM09-074 | Lone Santacera | 2010-00391 | Repair York Chiller #1 in Service building | Delta T HVAC Services | $5,992.00 |
| 11/17/09 | AW-AFM09-075* | David Orong | 2010-00453 | Repairs/Re-Testing 2009 WAB room 408B | TSS | $7,720.37 |
| 12/29/09 | AW-AFM09-076 | Clarice Dixson | 2010-00830 | Repair/Install Cameras in WAB and Main Building | Integra Systems LLC | $8,538.60 |
| 4/9/10 | AW-AFM10-066 | Gelu Nistor | 2009-03596 | Fiber cable installation in Quarantine Green House | Alameda Electric | $15,509.06 |
| 1/15/10 | AW-AFM10-082 | Michael Pierce | 2010-01113 | Install Unistruts for HID Lamps in Roof Top G.H. Room 4 | $2,733.85 | |
| 2/16/10 | AW-AFM10-082 | Michael Pierce | 2010-01113 | Install Unistruts for HID Lamps in Roof Top G.H. Room 4 | McMaster-Carr | $3,064.16 |
| 2/3/10 | AW-AFM10-083 | Stanley Green | 2010-01352 | Replace Fitness Center Roof | Pembra Bldg. Contractor | $14,600.15 |
| 2/3/10 | AW-AFM10-084 | Stanley Green | 2010-01353 | Replace Purify Pipe Line in Attic Main Building | Pembra Bldg. Contractor | $3,151.15 |
| 2/10/10 | AW-AFM10-087 | Lone Santacera | 2010-01392 | Repair Linoleum at the Laboratory Entry 4th Floor WAB | Pembra Bldg. Contractor | $2,616.15 |
| 2/10/10 | AW-AFM10-087 | Lone Santacera | 2010-01392 | Repair Linoleum at the Laboratory Entry 4th Floor WAB | Pembra Bldg. Contractor | $1,760.15 |
| 2/22/10 | AW-AFM10-088 | Stanley Green | 2010-01436 | Replace York cooling system condenser in the Courtyard | Pembra Bldg. Contractor | $28,718.80 |
| 4/9/10 | AW-AFM10-088 | Stanley Green | 2010-01436 | Replace York cooling system condenser in the Courtyard | C&E Enterprises | $21,013.57 |
| 3/10/10 | AW-AFM10-089 | David Hantz | 2009-03628 | Replace pad reservoirs in PGEC G.H. 1-6 both are rusted out and leaking | Pembra Bldg. Contractor | $21,266.25 |
| 4/1/10 | AW-AFM10-089 II | David Hantz | 2009-03628 | Replace pad reservoirs in PGEC G.H. 1-6 both are rusted out and leaking | Pembra Bldg. Contractor | $30,912.30 |
| 2/23/10 | AW-AFM10-089** | David Hantz | 2009-03628 | Replace pad reservoirs in PGEC G.H. 1-6 both are rusted out and leaking | Grainger/ Harrington Industrial Plastics | $36,548.88 |
| 4/5/10 | AW-AFM10-090 | Clarice Dixson | 2010-01642 | Relocate Akima Project Office and Stockroom from Room 0024 to Library | $4,051.32 | |
| 3/9/10 | AW-AFM10-090* | Clarice Dixson | 2010-01642 | Relocate Akima Project Office and Stockroom from Room 0024 to Library | Pembra Bldg. Contractor | $14,505.99 |
| 3/9/10 | AW-AFM10-091 | Stanley Green | 2010-00846 | Replace Leaking Deteriorated Condensate Line between North & South Wing | Pembra Bldg. Contractor | $4,756.15 |
| 4/1/10 | AW-AFM10-092 | Clarice Dixson | 2010-01642 | Retrofit overhead lights in current Library area | Alameda Electric | $3,129.16 |
| 4/23/10 | AW-AFM10-096 | Stanley Green | 2010-02012 | Carpet replacement in the new Training Area | Pembra Bldg. Contractor | $2,872.95 |
| 5/3/10 | AW-AFM10-097 | Stanley Green | 2010-02056 | Install A/C Unit in new Computer classroom | C&E Enterprises | $8,791.12 |
| 5/3/10 | AW-AFM10-098 | Lone Santacera | 2010-02057 | Replacement of Underground 4 Inch Steam Expansion Joint | Pembra Bldg. Contractor | $9,239.45 |
| 5/11/10 | AW-AFM10-099 | Clarice Dixson | Building of Training Center | Pembra Bldg. Contractor | $25,966.23 | |
| 5/18/10 | AW-AFM10-099 | Clarice Dixson | Building of Training Center | Pembra Bldg. Contractor | $18,930.97 | |
| 5/18/10 | AW-AFM10-102 | Clarice Dixson | Building of Training Center - Roll Up Grill | Pembra Bldg. Contractor | $7,035.25 | |
| 5/19/10 | AW-AFM10-103 | Clarice Dixson | Building of Computer Training Center - Electrical | Alameda Electric | $3,914.43 | |
| 6/11/10 | AW-AFM10-105 | David Orong | 2010-02548 | Air Balance 14 rooms in the WAB | Tabco | $9,587.20 |
| 6/24/10 | AW-AFM10-106 | Raymond Carruthers | 2010-02395 | Electrical and Equipment rack Installation at Quarantine Greenhouse | Wesco | $20,324.47 |
| 7/13/10 | AW-AFM10-106 | Raymond Carruthers | 2010-02395 | Electrical and Equipment rack Installation at Quarantine Greenhouse | Wesco | $5,465.66 |
| 8/19/10 | AW-AFM10-107 | Lone Santacera | 2010-03219 | Underground Water Leak repair (North Wing at West End of building) | Pembra Bldg. Contractor | $8,554.65 |
| 9/2/10 | AW-AFM10-108 | Clarice Dixson | 2010-01666 | Install Additional PA Speakers in the Following Areas | Valcom | $13,104.33 |
| 9/3/10 | AW-AFM10-109 | Ildefonso Arroyo | 2010-02592 | Replace (9) remaining Heaters in the PGEC Greenhouse | Refrigeration Supplies Distributor | $23,278.41 |
| 9/14/10 | AW-AFM10-110 | Clarice Dixson | Build Bicycle shed | Pembra Bldg. Contractor | $22,394.03 | |
| 9/14/10 | AW-AFM10-111 | Stanley Green | Wool building Elevator pit emergency pump installation | Pembra Bldg. Contractor | $4,421.24 | |
| 9/30/10 | AW-AFM10-112 | Wen-Xian Du | 2010-03196 | Install new Heat Pump in room #3127 | Bay-Valley Heating & Air Conditioning | $8,185.88 |
| 2/15/11 | AW-AFM10-112 | Wen-Xian Du | 2010-03196 | Install new Heat Pump in room #3127 | RSD & Alameda Electrical | $3,953.17 |
| 2/10/11 | AW-AFM11-001 | Lone Santacera | 2011-01242 | Repair Emergency Generator | American Power Corp. | $5,330.88 |
| 3/10/11 | AW-AFM10-112 | Wen-Xian Du | 2011-03196 | Install new Heat Pump in room #3127 | RSD & Alameda Electrical | $6,446.57 |
| 3/14/11 | AW-AFM11-002 | Karen Mallinen | 2011-01188 | Door Operator on 2nd Floor WAB by Elevator is working | Automated Services and Products | $4,980.85 |
| 3/24/11 | AW-AFM11-003 | Clarice Dixson | 2011-00559 | Insect screen installation of three existing Greenhouses | Ag-Con | $3,799.57 |
| 4/26/11 | AW-AFM11-004 | Clarice Dixson | 2011-01558 | Polish diesel fuel in the (UST) & above ground storage tank | Larry Holmes Polishing Fuel | $4,108.80 |
| 4/27/11 | AW-AFM11-005 (A) | Andrew Breksa | 2011-01344 | Need new circuits connected to back up system in lab 1125 | Alameda Electric | $3,300.07 |
| 4/27/11 | AW-AFM11-005 (B) | Andrew Breksa | 2011-01344 | Need new circuits connected to back up system in lab 1125 | Alameda Electric | $7,394.25 |
| 6/6/11 | AW-AFM11-006 | Clarice Dixson | 2011-01630 | Provide an Emergency (Exit Only) Gate at the SE Area of GH | Just Fencing Inc. | $4,413.75 |
| 6/6/11 | AW-AFM11-007 | Clarice Dixson | 2010-03143 | Provide Light Motion Sensors in WAB Restrooms and Equipment Rooms | Alameda Electric | $12,371.91 |
| 7/6/11 | AW-AFM11-008 | Syed Imam | 2011-02294 | Move Melt-Extruder from IPL 3rd floor to IPL 1st floor room F113 | Alameda Electric | $1,865.63 |
| 7/13/11 | AW-AFM11-009 | Stanley Green | 2011-02465 | Relocate & Store Equipment, Parts, Misc Items from 2nd & 3rd Floor FPL to Underpass Building | $4,392.00 | |
| 8/15/11 | AW-AFM11-010 | David Orong | 2011-02725 | HAZ-CAT Testing for unkown chemicals in USDA-ARS | North State Environmental | $15,799.62 |
| 8/17/11 | AW-AFM11-011 | Sam Gazdik | 2011-02705 | Provide UPS power as primary source to ARS Net equipment racks in room | Wesco | $4,010.11 |
| 8/24/11 | AW-AFM11-012 | Lone Santacera | 2011-02761 | Remove/Replace Stanley/Horton Operator with new Horton Operators | Automated Services and Products, Inc. | 5,885.00 |
| 8/24/11 | AW-AFM11-013 | Irene Wibawa | 2011-02549 | Install 2 Faucets & Run 2 Elect. Line Outlets to the Faucets | Alameda Electric | $6,734.63 |
| 9/8/11 | AW-AFM11-014 | David Hantz | 2011-02810 | Replace ballasts and power cords as necessary on 24 EA light fixtures | Alameda Electric | $4,906.24 |
| 9/12/11 | AW-AFM11-015 | David Orong | 2011-02894 | Repair Underground secondary containment for Underground Storage | Reinholdt Engineering Construction | $5,465.56 |
| 9/19/11 | AW-AFM11-016 | Clarice Dixson | 2011-02927 | Install Vinyl Flooring on 1st Floor | House of Carpets | $10,346.90 |
| 9/19/11 | AW-AFM11-017 | Clarice Dixson | 2011-02927 | Install Vinyl Flooring on 2nd Floor | House of Carpets | $24,719.14 |
| 9/19/11 | AW-AFM11-018 | Clarice Dixson | 2011-02927 | Install Carpet in CD & AO Office Suite | House of Carpets | $8,041.05 |
| 9/19/11 | AW-AFM11-019 | Lone Santacera | 2011-01263 | Replace Rain Gutters in Wellness Center | Conroy Construction | $11,021.00 |
| 9/21/11 | AW-AFM11-020 | Clarice Dixson | 2011-02930 | Provide a Finished Wall (Including Electrical Services) | Skehan Inc. | $4,387.00 |
| 9/22/11 | AW-AFM11-021 | Howard Zhang | 2011-02936 | Install a Hy-Security barrier gate operator | William D. White Co. | $26,371.22 |
| 10/18/11 | AW-AFM11-022 | Rebecca Haussman | 2011-02780 | Need Estimate & Details for Repair of Percival 3-1 3rd Floor PGEC Balcony | $2,063.78 | |
| 11/1/11 | AW-AFM11-023 | Stanley Green | 2011-00005 | Install Energy Efficient Lighting in Main Service Building | $12,518.34 | |
| 11/10/11 | AW-AFM11-026 | Lone Santacera | 2011-00324 | Re-Programming of Fire Alarm Control Panel | $3,284.90 | |
| 12/21/11 | AW-AFM11-027 | Lone Santacera | 2012-00684 | Relocate Pressure Transducers to be the recommended location per Trane BMS | Alameda Electric/ Grainger | $605.06 |
| 1/18/12 | AW-AFM12-01 | Clarice Dixson | 2012-00865 | Provide Concrete Slab for bicycle storage in parking lot | Skehan Construction | $13,706.70 |
| 2/7/12 | AW-AFM12-02 | Clarice Dixson | 2012-01047 | William D. White Co. Inc | $10,815.56 | |
| 2/9/12 | AW-AFM12-03 | Clarice Dixson | 2012-01070 | Install Energy Efficient Lighting in WAB | Omega Pacific Electrical Supply | |
| 2/9/12 | AW-AFM12-04 | Clarice Dixson | 2012-01071 | Install Energy Efficient Lighting in Main Building | Omega Pacific Electrical Supply | |
| 2/28/12 | AW-AFM12-05 | Lone Santacera | Support for Swinerton Power Shutdown | |||
| 3/6/12 | AW-AFM12-06 | Wanless Hatcher | 2012-01325 | Repair/Paint Existing Water Damage 3rd Floor Small Animal Facility | MiPeSo | |
| 3/27/12 | AW-AFM12-07 | Clarice Dixson | 2012-01431 | Dismantel and Reconstruct Bicycle Shed | Skehan Construction | $30,655.50 |
| 3/27/12 | AW-AFM12-09 | Lisa Gorski | 2012-01162 | Build a Chamber of Plexi-Glass on 2nd and 3rd Floor WAB | Tap Plastics Inc. | $1,177.33 |
| 3/28/12 | AW-AFM12-10 | Clarice Dixson | 2012-01416 | Install Cyclone Fence/Gate Adjacent to the Overpass Building | Just Fencing Inc. | $2,410.71 |
| 4/3/12 | AW-AFM12-10 | Clarice Dixson | 2012-01416 | Install Cyclone Fence/Gate Adjacent to the Overpass Building | Just Fencing Inc. | $2,970.32 |
| 3/28/12 | AW-AFM12-11 | Clarice Dixson | 2012-01417 | Install Barbed Wire at West Gate Entrance | Just Fencing Inc. | $2,664.30 |
| 4/3/12 | AW-AFM12-11 | Clarice Dixson | 2012-01417 | Install Barbed Wire at West Gate Entrance | Just Fencing Inc. | $2,099.34 |
| 4/2/12 | AW-AFM12-12 | Stanley Green | 2012-01506 | Install Energy Efficient Lighting - Front of Building | Omega Pacific Electrical Supply | $1,710.93 |
| 4/2/12 | AW-AFM12-13 | Stanley Green | 2012-01507 | Install Energy Efficient Lighting - Underpass Storage Building (Project #3) | Omega Pacific Electrical Supply | $6,957.14 |
| 4/2/12 | AW-AFM12-14 | Stanley Green | 2012-01508 | Install Energy Efficient Lighting - Main Building (Project #1) | Omega Pacific Electrical Supply | $43,685.10 |
| 4/2/12 | AW-AFM12-15 | Stanley Green | 2012-01509 | Install Energy Efficient Lighting - WAB (Project #2) | Omega Pacific Electrical Supply | $8,530.04 |
| 4/2/12 | AW-AFM12-16 | Stanley Green | 2012-01510 | Install Energy Efficient Lighting - Greenhouse (Project #4) | Omega Pacific Electrical Supply | $3,338.40 |
| 4/2/12 | AW-AFM12-17 | Stanley Green | 2012-01511 | Install Energy Efficient Lighting - Wool Building (Project #5) | Omega Pacific Electrical Supply | $1,398.76 |
| 4/16/12 | AW-AFM12-18 | Stanley Green | Parking Lot Lighting Upgrade to LED's | $2,249.56 | ||
| 4/17/12 | AW-AFM12-19 | Paul Allen | 2012-01430 | Install Contractor in Roof Green House Rm 401 & 3 Controlled Outlets | Alameda Electrical Distributors | $1,430.24 |
| 4/19/12 | AW-AFM12-20 | Andrew Breksa | 2012-01516 | Construct Housing to Encase a Roto-Evaporator | Tap Plastics Inc. | $1,948.45 |
| 4/24/12 | AW-AFM12-21 | Tom Moreno | 2012-01421 | Corrective Measures for Water Infiltration WAB 4th Floor | All Seasons Construction | $4,467.25 |
| 5/2/12 | AW-AFM12-22 | Stanley Green | 2012-01506 | Install Energy Efficient Lighting - Front of Building | Omega Pacific Electrical Supply | $1,710.93 |
| 5/2/12 | AW-AFM12-23 | Stanley Green | 2012-01507 | Install Energy Efficient Lighting - Underpass Storage Building (Project #3) | Omega Pacific Electrical Supply | $8,672.99 |
| 5/2/12 | AW-AFM12-24 | Stanley Green | 2012-01508 | Install Energy Efficient Lighting - Main Building (Project #1) | Omega Pacific Electrical Supply | $39,585.40 |
| 5/2/12 | AW-AFM12-25 | Stanley Green | 2012-01509 | Install Energy Efficient Lighting - WAB (Project #2) | Omega Pacific Electrical Supply | $8,310.47 |
| 5/2/12 | AW-AFM12-26 | Stanley Green | 2012-01510 | Install Energy Efficient Lighting - Greenhouse (Project #4) | Omega Pacific Electrical Supply | $5,007.60 |
| 5/2/12 | AW-AFM12-27 | Stanley Green | 2012-01511 | Install Energy Efficient Lighting - Wool Building (Project #5) | Omega Pacific Electrical Supply | $1,398.76 |
| 5/4/12 | AW-AFM12-28 | Clarice Dixson | 2012-01615 | Electrical ARC Flash Protective Equipment | Cementex | $2,996.00 |
| 5/16/12 | AW-AFM12-29 | Anna Bates | 2012-01548 | Improve Walk-In Refrigerator 2nd Floor WAB | American Refrigeration Supplies Inc | $11,155.90 |
| 5/22/12 | AW-AFM12-30 | Tom Moreno | 2012-01543 | Roof Top GH Water Infiltration & Drainage Corrective Measures | All Seasons Construction | $6,257.81 |
| 5/31/12 | AW-AFM12-31 | David Orong | 2010-02548 | Air Balance 14 rooms in the WAB | Pyramid Balancing Associates, Inc. | $145,948.00 |
| 6/5/12 | AW-AFM12-32 | Clarice Dixson | 2011-00324 | Fire Alarm Re-Programming | Simplex Grinnell | $2,386.10 |
| 6/11/12 | AW-AFM12-33 | Clarice Dixson | 2012-02056 | Replace Heat Detector | Simplex Grinnell | $16,269.35 |
| 6/15/12 | AW-AFM12-34 | Artur Klamczynski | 2012-01836 | Install Injection Molding Machine | Leistritz | $4,156.08 |
| 6/18/12 | AW-AFM12-35 | Clarice Dixson | 2011-01558 | Polish diesel fuel in the (UST) & above ground storage tank | Amber Industrial Services | $5,136.00 |
| 7/2/12 | AW-AFM12-36 | Clarice Dixson | 2012-02152 | Move Equipment from IPL to various Locations | MiPeSo | $3,600.00 |
| 7/2/12 | AW-AFM12-37 | Clarice Dixson | 2010-01666 | Overtime for Installing Speakers | $3,879.00 | |
| 7/2/12 | AW-AFM12-38 | Clarice Dixson | 2011-02931 | Overtime for Installing Flat Panels | $4,344.48 | |
| 8/8/12 | AW-AFM12-39 | John Herr | 2012-02700 | Run Conduit with New Outlets in EIW GH #3 | Alameda Electrical Distributors | $746.11 |
| 8/8/12 | AW-AFM12-40 | John Herr | 2012-01017 | Repair Water Damage including Drywalling WAB SAF Building | MiPeSo | $4,483.30 |
| 8/8/12 | AW-AFM12-41 | Clarice Dixson | 2012-01017 | Additional Water Damage Repair in WAB SAF Building | MiPeSo | $3,531.00 |
| 8/8/12 | AW-AFM12-42 | Tom Moreno | 2012-03128 | MB SW Pilot Plant Move | MiPeSo | $5,778.00 |
| 8/13/12 | AW-AFM12-43 | Artur Klamczynski | 2012-01836 | Install Injection Molding Machine | Leistritz | $3,777.10 |
| 8/23/12 | AW-AFM12-44 | Delilah Wood | 2012-03123 | Reconfigure Mailroom to Accommodate New Equipment to Emergency Power | Skehan | $45,609.37 |
| 8/30/12 | AW-AFM12-45 | Stanley Green | 2012-03213 | Replace Compressor on SW Chiller | $12,433.18 | |
| 9/6/12 | AW-AFM12-46 | Clarice Dixson | 2012-03453 | Upgrade Room 0109 Growth Chamber Controls | BioChambers | $42,971.28 |
| 9/11/12 | AW-AFM12-47 | Don Olson | 2012-03463 | Hook Up Electrical Connections for Peeling Unit in the FPL | Grainger | $1,050.58 |
| 9/20/12 | AW-AFM12-48 | Clarice Dixson | 2012-03499 | Purchase Mechanical Scissor Lift | Aichi | $13,642.15 |
| 9/26/12 | AW-AFM12-49 | Clarice Dixson | 2012-03502 | Vinyl Flooring MB 1st Floor Admin Wing | House of Carpets | $20,627.46 |
| 9/27/12 | AW-AFM12-50 | Clarice Dixson | 2012-03503 | Vinyl Flooring MB 2nd Floor Admin Wing | House of Carpets | $48,502.03 |
| 9/27/12 | AW-AFM12-51 | Clarice Dixson | 2012-03541 | Re-Coat Front Steps | Allied Construction Services | $27,381.30 |
| 10/9/12 | AW-AFM12-52 | Stanley Green | 2013-00173 | Support for Power Shutdown | $2,017.08 | |
| 10/9/12 | AW-AFM12-53 | Lone Santacera | 2012-03473 | Replace Damaged Window in Room 0004 | Arrow Glass Company | $3,319.14 |
| 11/20/12 | AW-AFM13-00 | Yuzhu Zhang | 2012-03539 | Remove Section of Bench with Water, Gas, Air & Vacuum Lines Rm 3125 | Grainger | $1,824.22 |
| 11/28/12 | AW-AFM13-01 | Keith Fagerquist | 2013-00286 | Modifications for Orbitrap Instrument | $11,522.13 | |
| 12/7/12 | AW-AFM13-02 | Gwyn Watson | 2013-00765 | Retrofit Boiler for Emission Standards | One Source Enegeering, Inc. | $79,565.20 |
| 1/7/13 | AW-AFM13-03 | Clarice Dixson | 2012-00815 | Remove Carpets and Install Base Boards in Rm 2030 & 2034 | House of Carpets | $9,700.62 |
| 1/15/13 | AW-AFM13-04 | Clarice Dixson | 2013-00803 | Install Gate on SB Roll-Up Door to prevent intruders from entering | MiPeSo | $2,996.00 |
| 1/15/13 | AW-AFM13-05 | Clarice Dixson | 2013-00801 | Install Reflective Window Glazing on the interior of NS of the SB | MiPeSo | $4,504.56 |
| 1/15/13 | AW-AFM13-06 | Clarice Dixson | 2013-00555 | Change Door Hinge Rm 1006 | Skehan Construction | $2,247.00 |
| 1/16/13 | AW-AFM13-07 | Clarice Dixson | 2013-01069 | Partially Repair/Replace (52 yards) Existing Vinyl Flooring in Rm 2200 | House of Carpets | $6,367.57 |
| 1/30/13 | AW-AFM13-08 | Clarice Dixson | 2013-01127 | Upgrade Offices on 2nd Floor Main Building | MiPeSo | $2,568.00 |
| 2/26/13 | AW-AFM13-09 | David Hane | 2012-00043 | Install UPS Into Server Room | Cal West | $5,271.65 |
| 3/13/13 | AW-AFM13-10 | Clarice Dixson | 2013-01658 | Remove and Replace First Aid Room Door | Skehan Construction | $1,377.50 |
| 3/13/13 | AW-AFM13-11 | Clarice Dixson | 2013-01704 | Build Bench by Flagpole | Skehan Construction | $6,794.50 |
| 3/15/13 | AW-AFM13-12 | Clarice Dixson | 2013-01710 | Install Vinyl 1st Floor Hallways | House of Carpets | $19,046.00 |
| 3/15/13 | AW-AFM13-13 | Clarice Dixson | 2013-01711 | Repair/Replace Vinyl in WAB room 202 | House of Carpets | $921.27 |
| 3/20/13 | AW-AFM13-14 | Clarice Dixson | 2013-01169 | Check and Service Existing Fire Doors | $6,367.57 | |
| 3/20/13 | AW-AFM13-15 | Clarice Dixson | 2013-01731 | Repair/Replace Armstrong Medintech in Room 2200 | House of Carpets | $6,367.57 |
| 3/27/13 | AW-AFM13-16 | Keith Fagerquist | 2013-01732 | Install E-Power to support freezers & refrigerators in Rm 3106 | $2,378.77 | |
| 5/1/13 | AW-AFM13-16 | Clarice dixson | 2013-02016 | Replace old A/C UNIT IN RM 3034 | Specialty products | $8,633.71 |
| 5/14/13 | AW-AFM13-17 | Barbara Alee | 2013-02195 | Provide 2 Persons to help Organize Inventory Storage Bins | $1,877.04 | |
| 5/29/13 | AW-AFM13-18 | Clarice Dixson | 2013-02231 | Replace 37 Fire Hoses | Best Equipment Co LLC | $4,968.54 |
| 6/21/13 | AW-AFM13-19 | Andrew Breksa | 2013-02341 | Build Aluminum Stand per Specifications | $1,041.16 | |
| 7/1/13 | AW-AFM13-20 | Clarice Dixson | 2013-00509 | Install Card Key Readers at MB Lobby | Automated Services and Products Inc | $22,500.00 |
| 8/1/13 | AW-AFM13-21 | Clarice Dixson | 2013-02901 | Order Tables and Chairs | Piedmont Party | $1,320.38 |
| 8/14/13 | AW-AFM13-22 | Clarice Dixson | 2013-02931 | Prepare Basement Floor Hallway for Epoxy Floor Coating | Stonhard | $28,579.70 |
| 8/8/13 | AW-AFM13-23 | John Toledo | 2013-02909 | Rees Support | Rees Scientific | $1,932.42 |
| 8/8/13 | AW-AFM13-24 | Jonathan Lindsey | 2013-02922 | Replace Door Gasket Room 1200 | ARS | $30.05 |
| 8/16/13 | AW-AFM13-25 | Lone Santacera | 2013-02954 | Chiller Room Roll Up Door Jacked Up w/ New Security Door | R&S Erection of Richmond, Inc. | $6,188.54 |
ADD. WORK
2-9-09 TO 4-27-11
Sheet2
Sheet3