UPDATED Appendix 3a - Workload Data for Additional Work

View the file

Other files

File Type Posted
AG-32SD-S-14-0002A8_SF30.pdf PDF
AG-32SD-S-14-0002A7_SF30.pdf PDF
Attachment_1_-_Performance_Work_Statement _March_2014.pdf PDF
AG-32SD-S-14-0002A6_SF30.pdf PDF
AG-32SD-S-14-0002_B-M_REV_3_7_2014.pdf PDF
AG-32SD-S-14-0002_B-M_REV_2_25_2014.pdf PDF
Attachment_1_-_Performance_Work_Statement _February_2014.pdf PDF
Attachment_1_Appendix_8_-_Government_Furnished_Property_Government_Furnished_Equipment_UPDATED_2_28_2014.pdf PDF
Attachment_1_Appendix_6_-_Preventive_Maintenance_Equipment_List_UPDATED_2_28_2014.xlsx XLSX spreadsheet
AG-32SD-S-14-0002A5_SF30.pdf PDF
Questions_and_Answers_-_Amendment_5.pdf PDF
Attachment_1_Appendix_7_-_PM_Task_Master_List_UPDATED_2_24_2013.pdf PDF
Attachment_1_Appendix_11_-_List_of_Required_Reports_UPDATED_2_28_2014.pdf PDF
Wage_Determination_DB_REVISED_CA29 _1_31_14.pdf PDF
SIGN_IN_SHEET_-_PRE_PROPOSAL_CONFERENCE.pdf PDF
AG-32SD-S-14-0002_B-M_REV_2_19_2014.pdf PDF
Section_B_-_FILLABLE.xlsx XLSX spreadsheet
Wage_Determination_SCA_2005-2052_R14_6_19_13.pdf PDF
Questions_and_Answers_-_Amendment_3.pdf PDF
Minutes_-_PRE_PROPOSAL_CONFERENCE.pdf PDF
AG-32SD-S-14-0002A4_SF30.pdf PDF
AG-32SD-S-14-0002A3_SF30.pdf PDF
AG-32SD-S-14-0002A2_SF30.pdf PDF
AG-32SD-S-14-0002A1_SF30.pdf PDF
Attachment_1_Appendix_4_-_Historical_Subcontracted_Work_UPDATED.docx DOCX document
Attachment_1_Appendix_3b_-_Workload_Data_for_Routine_Work_UPDATED.pdf PDF
Attachment_1_Appendix_7_-_PM_Task_Master_List_UPDATED.docx DOCX document
Attachment_1_Appendix_6_-_Preventive_Maintenance_Equipment_List_UPDATED.xlsx XLSX spreadsheet
Attachment_1_Appendix_9_-_Government_Vehicle_List.docx DOCX document
Attachment_1_Appendix_7_-_PM_Task_Master_List.docx DOCX document
Attachment_1_Appendix_5_-_Facility_Inventory.docx DOCX document
Attachment_1_Appendix_11_-_List_of_Required_Reports.docx DOCX document
Attachment_1_Appendix_6_-_Preventive_Maintenance_Equipment_List.xlsx XLSX spreadsheet
AG-32SD-S-14-0002.pdf PDF
Attachment_2_-_Service_Contract_Act_Wage_Determination_WD_05-2051 _6_19_13.pdf PDF
Attachment_1_Appendix_4_-_Historical_Subcontracted_Work.docx DOCX document
Attachment_1_Appendix_3b_-_Workload_Data_for_Routine_Work.pdf PDF
Attachment_1_Appendix_3a_-_Workload_Data_for_Additional_Work.xlsx XLSX spreadsheet
Attachment_1_Appendix_8_-_Government_Furnished_Property_Government_Furnished_Equipment.docx DOCX document
Attachment_3_-_Davis_Bacon_Wage_Determination_CA29 _1_24_14.pdf PDF
Attachment_1_-_Performance_Work_Statement _October_2013.docx DOCX document
Attachment_1_Appendix_1_-_Glossary.docx DOCX document
Attachment_1_Appendix_12_-_QASP.docx DOCX document
Attachment_1_Appendix_2_-_Site_Layout.pdf PDF
Attachment_1_Appendix_10_-_Equipment_Test_Certification_List.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

WORKLOAD DATA FOR ADDITIONAL WORK - UPDATED
DateCost Proposal #RequestorWO #Scope of WorkCompany NameAmount
12/2/09AW-AFM09-003*Mark Carter2008-01637Security upgrades to WAB rooms 320W and 408WOpening Technologies Inc$40,024.60
8/6/09AW-AFM09-012Clarice Dixson2008-03303Install 5 magnetic doors/smoke detectors in SW PGECSimplex Grinnell$87,392.18
2/9/09AW-AFM09-018Jerry Mayer2008-03255Upgrade pneumatic controls WAB for EMSAutomated Control Inc.$41,804.90
3/4/09AW-AFM09-021Lone Santacera2009-01565Remove/Replace gutters and drains in Wool Building$7,190.40
8/4/09AW-AFM09-027Adam Salvadalena2005-01569Install communication wire from PG&E to existing communication system$7,773.15
5/28/09AW-AFM09-045Wendell Brown2009-01372Replace inoperable Gyrotech auto operators$6,300.00
5/28/09AW-AFM09-045 (III)Wendell Brown2009-01372Double doors NW 2nd floor leading to labs are not closed$6,300.00
6/2/09AW-AFM09-046 (II)Stanley Green2009-02578Pipe installation in Boiler and Mechanical room$5,831.50
AW-AFM09-047Pete ToledoInstall air filters for WABAir Filter Maintenance, Inc.$4,673.56
6/26/09AW-AFM09-048Lone Santacera2009-02911Replace main water back flow preventerFluid Gauge Company, Inc.$8,792.08
7/1/09AW-AFM09-049David OrongIndustrial Labeling SystemGrainger$3,208.93
7/13/09AW-AFM09-050Lone Santacera2009-03083Replace refractory liner in Boiler room$5,885.00
7/13/09AW-AFM09-052Lone Santacera2009-03085Correct deficiencies on Elevator inspection reportAscent$4,012.50
9/15/09AW-AFM09-053Gelu NistorPurchase Variable Frequency DriveDrivesWarehouse.com$4,586.43
7/13/09AW-AFM09-054Gelu NistorPurchase Photo Electric Switch with Receiver ReflectorAlameda Electric$1,058.36
7/14/09AW-AFM09-055David Orong2009-03088Conduct survey for Asbestos containing materials and leadRGA Environmental$2,022.30
7/20/09AW-AFM09-056Tom Moreno2009-02632Replace all exit lights in facility buildings with new fixtures using LED'sWesco$29,892.49
8/4/09AW-AFM09-056 (II)Gelu Nistor2009-03176Install emergency lighting, women's bathroom 4th floor and Room 311$1,822.37
10/9/09AW-AFM09-058Clarice Dixson2009-03351Replace Library A/C unitC&E Enterprises$16,591.42
9/23/09AW-AFM09-059Lone Santacera2009-03365Repair Air/Resurface Main Parking Lot$28,667.44
9/3/09AW-AFM09-060Clarice Dixson2009-02899Improve Ventilation in autoclave room W312LAutomated Services and Products$3,317.00
9/3/09AW-AFM09-061Lone Santacera2009-03552Replace NW R.O. water system with Industrial Capacity unitsSiemens$16,529.36
9/3/09AW-AFM09-062Lone Santacera2008-01639Paint wool buildingPembra Bldg. Contractor$30,755.01
9/3/09AW-AFM09-063Lone Santacera2009-03553Repair/Replace NW Attic low pressure steam line insulationPlant Hazardous Services$11,181.55
9/3/09AW-AFM09-064Lone Santacera2009-02623Install false wall in room 3034New High Protection Roofing Co.$2,996.00
9/24/09AW-AFM09-066Gelu Nistor2009-03596Provide underground communications$27,252.18
9/24/09AW-AFM09-067Wendell Brown2009-03595Repair roof leak WABPembra Bldg. Contractor$5,077.15
9/22/09AW-AFM09-068Wendell Brown2009-03627Replace 8 windows in WAB Wellness suitePembra Bldg. Contractor$4,612.77
10/2/09AW-AFM09-069Rebecca HaussmanReplace X-Ray with Kodak 2000 Processor (refurbished)Merry X-Ray$10,165.00
10/19/09AW-AFM09-073Gwyn Watson2010-00088Replace carpet/Install laminate floor in Gym 1st floor WABPembra Bldg. Contractor$6,933.60
11/6/09AW-AFM09-074Lone Santacera2010-00391Repair York Chiller #1 in Service buildingDelta T HVAC Services$5,992.00
11/17/09AW-AFM09-075*David Orong2010-00453Repairs/Re-Testing 2009 WAB room 408BTSS$7,720.37
12/29/09AW-AFM09-076Clarice Dixson2010-00830Repair/Install Cameras in WAB and Main BuildingIntegra Systems LLC$8,538.60
4/9/10AW-AFM10-066Gelu Nistor2009-03596Fiber cable installation in Quarantine Green HouseAlameda Electric$15,509.06
1/15/10AW-AFM10-082Michael Pierce2010-01113Install Unistruts for HID Lamps in Roof Top G.H. Room 4$2,733.85
2/16/10AW-AFM10-082Michael Pierce2010-01113Install Unistruts for HID Lamps in Roof Top G.H. Room 4McMaster-Carr$3,064.16
2/3/10AW-AFM10-083Stanley Green2010-01352Replace Fitness Center RoofPembra Bldg. Contractor$14,600.15
2/3/10AW-AFM10-084Stanley Green2010-01353Replace Purify Pipe Line in Attic Main BuildingPembra Bldg. Contractor$3,151.15
2/10/10AW-AFM10-087Lone Santacera2010-01392Repair Linoleum at the Laboratory Entry 4th Floor WABPembra Bldg. Contractor$2,616.15
2/10/10AW-AFM10-087Lone Santacera2010-01392Repair Linoleum at the Laboratory Entry 4th Floor WABPembra Bldg. Contractor$1,760.15
2/22/10AW-AFM10-088Stanley Green2010-01436Replace York cooling system condenser in the CourtyardPembra Bldg. Contractor$28,718.80
4/9/10AW-AFM10-088Stanley Green2010-01436Replace York cooling system condenser in the CourtyardC&E Enterprises$21,013.57
3/10/10AW-AFM10-089David Hantz2009-03628Replace pad reservoirs in PGEC G.H. 1-6 both are rusted out and leakingPembra Bldg. Contractor$21,266.25
4/1/10AW-AFM10-089 IIDavid Hantz2009-03628Replace pad reservoirs in PGEC G.H. 1-6 both are rusted out and leakingPembra Bldg. Contractor$30,912.30
2/23/10AW-AFM10-089**David Hantz2009-03628Replace pad reservoirs in PGEC G.H. 1-6 both are rusted out and leakingGrainger/ Harrington Industrial Plastics$36,548.88
4/5/10AW-AFM10-090Clarice Dixson2010-01642Relocate Akima Project Office and Stockroom from Room 0024 to Library$4,051.32
3/9/10AW-AFM10-090*Clarice Dixson2010-01642Relocate Akima Project Office and Stockroom from Room 0024 to LibraryPembra Bldg. Contractor$14,505.99
3/9/10AW-AFM10-091Stanley Green2010-00846Replace Leaking Deteriorated Condensate Line between North & South WingPembra Bldg. Contractor$4,756.15
4/1/10AW-AFM10-092Clarice Dixson2010-01642Retrofit overhead lights in current Library areaAlameda Electric$3,129.16
4/23/10AW-AFM10-096Stanley Green2010-02012Carpet replacement in the new Training AreaPembra Bldg. Contractor$2,872.95
5/3/10AW-AFM10-097Stanley Green2010-02056Install A/C Unit in new Computer classroomC&E Enterprises$8,791.12
5/3/10AW-AFM10-098Lone Santacera2010-02057Replacement of Underground 4 Inch Steam Expansion JointPembra Bldg. Contractor$9,239.45
5/11/10AW-AFM10-099Clarice DixsonBuilding of Training CenterPembra Bldg. Contractor$25,966.23
5/18/10AW-AFM10-099Clarice DixsonBuilding of Training CenterPembra Bldg. Contractor$18,930.97
5/18/10AW-AFM10-102Clarice DixsonBuilding of Training Center - Roll Up GrillPembra Bldg. Contractor$7,035.25
5/19/10AW-AFM10-103Clarice DixsonBuilding of Computer Training Center - ElectricalAlameda Electric$3,914.43
6/11/10AW-AFM10-105David Orong2010-02548Air Balance 14 rooms in the WABTabco$9,587.20
6/24/10AW-AFM10-106Raymond Carruthers2010-02395Electrical and Equipment rack Installation at Quarantine GreenhouseWesco$20,324.47
7/13/10AW-AFM10-106Raymond Carruthers2010-02395Electrical and Equipment rack Installation at Quarantine GreenhouseWesco$5,465.66
8/19/10AW-AFM10-107Lone Santacera2010-03219Underground Water Leak repair (North Wing at West End of building)Pembra Bldg. Contractor$8,554.65
9/2/10AW-AFM10-108Clarice Dixson2010-01666Install Additional PA Speakers in the Following AreasValcom$13,104.33
9/3/10AW-AFM10-109Ildefonso Arroyo2010-02592Replace (9) remaining Heaters in the PGEC GreenhouseRefrigeration Supplies Distributor$23,278.41
9/14/10AW-AFM10-110Clarice DixsonBuild Bicycle shedPembra Bldg. Contractor$22,394.03
9/14/10AW-AFM10-111Stanley GreenWool building Elevator pit emergency pump installationPembra Bldg. Contractor$4,421.24
9/30/10AW-AFM10-112Wen-Xian Du2010-03196Install new Heat Pump in room #3127Bay-Valley Heating & Air Conditioning$8,185.88
2/15/11AW-AFM10-112Wen-Xian Du2010-03196Install new Heat Pump in room #3127RSD & Alameda Electrical$3,953.17
2/10/11AW-AFM11-001Lone Santacera2011-01242Repair Emergency GeneratorAmerican Power Corp.$5,330.88
3/10/11AW-AFM10-112Wen-Xian Du2011-03196Install new Heat Pump in room #3127RSD & Alameda Electrical$6,446.57
3/14/11AW-AFM11-002Karen Mallinen2011-01188Door Operator on 2nd Floor WAB by Elevator is workingAutomated Services and Products$4,980.85
3/24/11AW-AFM11-003Clarice Dixson2011-00559Insect screen installation of three existing GreenhousesAg-Con$3,799.57
4/26/11AW-AFM11-004Clarice Dixson2011-01558Polish diesel fuel in the (UST) & above ground storage tankLarry Holmes Polishing Fuel$4,108.80
4/27/11AW-AFM11-005 (A)Andrew Breksa2011-01344Need new circuits connected to back up system in lab 1125Alameda Electric$3,300.07
4/27/11AW-AFM11-005 (B)Andrew Breksa2011-01344Need new circuits connected to back up system in lab 1125Alameda Electric$7,394.25
6/6/11AW-AFM11-006Clarice Dixson2011-01630Provide an Emergency (Exit Only) Gate at the SE Area of GHJust Fencing Inc.$4,413.75
6/6/11AW-AFM11-007Clarice Dixson2010-03143Provide Light Motion Sensors in WAB Restrooms and Equipment RoomsAlameda Electric$12,371.91
7/6/11AW-AFM11-008Syed Imam2011-02294Move Melt-Extruder from IPL 3rd floor to IPL 1st floor room F113Alameda Electric$1,865.63
7/13/11AW-AFM11-009Stanley Green2011-02465Relocate & Store Equipment, Parts, Misc Items from 2nd & 3rd Floor FPL to Underpass Building$4,392.00
8/15/11AW-AFM11-010David Orong2011-02725HAZ-CAT Testing for unkown chemicals in USDA-ARSNorth State Environmental$15,799.62
8/17/11AW-AFM11-011Sam Gazdik2011-02705Provide UPS power as primary source to ARS Net equipment racks in roomWesco$4,010.11
8/24/11AW-AFM11-012Lone Santacera2011-02761Remove/Replace Stanley/Horton Operator with new Horton OperatorsAutomated Services and Products, Inc.5,885.00
8/24/11AW-AFM11-013Irene Wibawa2011-02549Install 2 Faucets & Run 2 Elect. Line Outlets to the FaucetsAlameda Electric$6,734.63
9/8/11AW-AFM11-014David Hantz2011-02810Replace ballasts and power cords as necessary on 24 EA light fixturesAlameda Electric$4,906.24
9/12/11AW-AFM11-015David Orong2011-02894Repair Underground secondary containment for Underground StorageReinholdt Engineering Construction$5,465.56
9/19/11AW-AFM11-016Clarice Dixson2011-02927Install Vinyl Flooring on 1st FloorHouse of Carpets$10,346.90
9/19/11AW-AFM11-017Clarice Dixson2011-02927Install Vinyl Flooring on 2nd FloorHouse of Carpets$24,719.14
9/19/11AW-AFM11-018Clarice Dixson2011-02927Install Carpet in CD & AO Office SuiteHouse of Carpets$8,041.05
9/19/11AW-AFM11-019Lone Santacera2011-01263Replace Rain Gutters in Wellness CenterConroy Construction$11,021.00
9/21/11AW-AFM11-020Clarice Dixson2011-02930Provide a Finished Wall (Including Electrical Services)Skehan Inc.$4,387.00
9/22/11AW-AFM11-021Howard Zhang2011-02936Install a Hy-Security barrier gate operatorWilliam D. White Co.$26,371.22
10/18/11AW-AFM11-022Rebecca Haussman2011-02780Need Estimate & Details for Repair of Percival 3-1 3rd Floor PGEC Balcony$2,063.78
11/1/11AW-AFM11-023Stanley Green2011-00005Install Energy Efficient Lighting in Main Service Building$12,518.34
11/10/11AW-AFM11-026Lone Santacera2011-00324Re-Programming of Fire Alarm Control Panel$3,284.90
12/21/11AW-AFM11-027Lone Santacera2012-00684Relocate Pressure Transducers to be the recommended location per Trane BMSAlameda Electric/ Grainger$605.06
1/18/12AW-AFM12-01Clarice Dixson2012-00865Provide Concrete Slab for bicycle storage in parking lotSkehan Construction$13,706.70
2/7/12AW-AFM12-02Clarice Dixson2012-01047William D. White Co. Inc$10,815.56
2/9/12AW-AFM12-03Clarice Dixson2012-01070Install Energy Efficient Lighting in WABOmega Pacific Electrical Supply
2/9/12AW-AFM12-04Clarice Dixson2012-01071Install Energy Efficient Lighting in Main BuildingOmega Pacific Electrical Supply
2/28/12AW-AFM12-05Lone SantaceraSupport for Swinerton Power Shutdown
3/6/12AW-AFM12-06Wanless Hatcher2012-01325Repair/Paint Existing Water Damage 3rd Floor Small Animal FacilityMiPeSo
3/27/12AW-AFM12-07Clarice Dixson2012-01431Dismantel and Reconstruct Bicycle ShedSkehan Construction$30,655.50
3/27/12AW-AFM12-09Lisa Gorski2012-01162Build a Chamber of Plexi-Glass on 2nd and 3rd Floor WABTap Plastics Inc.$1,177.33
3/28/12AW-AFM12-10Clarice Dixson2012-01416Install Cyclone Fence/Gate Adjacent to the Overpass BuildingJust Fencing Inc.$2,410.71
4/3/12AW-AFM12-10Clarice Dixson2012-01416Install Cyclone Fence/Gate Adjacent to the Overpass BuildingJust Fencing Inc.$2,970.32
3/28/12AW-AFM12-11Clarice Dixson2012-01417Install Barbed Wire at West Gate EntranceJust Fencing Inc.$2,664.30
4/3/12AW-AFM12-11Clarice Dixson2012-01417Install Barbed Wire at West Gate EntranceJust Fencing Inc.$2,099.34
4/2/12AW-AFM12-12Stanley Green2012-01506Install Energy Efficient Lighting - Front of BuildingOmega Pacific Electrical Supply$1,710.93
4/2/12AW-AFM12-13Stanley Green2012-01507Install Energy Efficient Lighting - Underpass Storage Building (Project #3)Omega Pacific Electrical Supply$6,957.14
4/2/12AW-AFM12-14Stanley Green2012-01508Install Energy Efficient Lighting - Main Building (Project #1)Omega Pacific Electrical Supply$43,685.10
4/2/12AW-AFM12-15Stanley Green2012-01509Install Energy Efficient Lighting - WAB (Project #2)Omega Pacific Electrical Supply$8,530.04
4/2/12AW-AFM12-16Stanley Green2012-01510Install Energy Efficient Lighting - Greenhouse (Project #4)Omega Pacific Electrical Supply$3,338.40
4/2/12AW-AFM12-17Stanley Green2012-01511Install Energy Efficient Lighting - Wool Building (Project #5)Omega Pacific Electrical Supply$1,398.76
4/16/12AW-AFM12-18Stanley GreenParking Lot Lighting Upgrade to LED's$2,249.56
4/17/12AW-AFM12-19Paul Allen2012-01430Install Contractor in Roof Green House Rm 401 & 3 Controlled OutletsAlameda Electrical Distributors$1,430.24
4/19/12AW-AFM12-20Andrew Breksa2012-01516Construct Housing to Encase a Roto-EvaporatorTap Plastics Inc.$1,948.45
4/24/12AW-AFM12-21Tom Moreno2012-01421Corrective Measures for Water Infiltration WAB 4th FloorAll Seasons Construction$4,467.25
5/2/12AW-AFM12-22Stanley Green2012-01506Install Energy Efficient Lighting - Front of BuildingOmega Pacific Electrical Supply$1,710.93
5/2/12AW-AFM12-23Stanley Green2012-01507Install Energy Efficient Lighting - Underpass Storage Building (Project #3)Omega Pacific Electrical Supply$8,672.99
5/2/12AW-AFM12-24Stanley Green2012-01508Install Energy Efficient Lighting - Main Building (Project #1)Omega Pacific Electrical Supply$39,585.40
5/2/12AW-AFM12-25Stanley Green2012-01509Install Energy Efficient Lighting - WAB (Project #2)Omega Pacific Electrical Supply$8,310.47
5/2/12AW-AFM12-26Stanley Green2012-01510Install Energy Efficient Lighting - Greenhouse (Project #4)Omega Pacific Electrical Supply$5,007.60
5/2/12AW-AFM12-27Stanley Green2012-01511Install Energy Efficient Lighting - Wool Building (Project #5)Omega Pacific Electrical Supply$1,398.76
5/4/12AW-AFM12-28Clarice Dixson2012-01615Electrical ARC Flash Protective EquipmentCementex$2,996.00
5/16/12AW-AFM12-29Anna Bates2012-01548Improve Walk-In Refrigerator 2nd Floor WABAmerican Refrigeration Supplies Inc$11,155.90
5/22/12AW-AFM12-30Tom Moreno2012-01543Roof Top GH Water Infiltration & Drainage Corrective MeasuresAll Seasons Construction$6,257.81
5/31/12AW-AFM12-31David Orong2010-02548Air Balance 14 rooms in the WABPyramid Balancing Associates, Inc.$145,948.00
6/5/12AW-AFM12-32Clarice Dixson2011-00324Fire Alarm Re-ProgrammingSimplex Grinnell$2,386.10
6/11/12AW-AFM12-33Clarice Dixson2012-02056Replace Heat DetectorSimplex Grinnell$16,269.35
6/15/12AW-AFM12-34Artur Klamczynski2012-01836Install Injection Molding MachineLeistritz$4,156.08
6/18/12AW-AFM12-35Clarice Dixson2011-01558Polish diesel fuel in the (UST) & above ground storage tankAmber Industrial Services$5,136.00
7/2/12AW-AFM12-36Clarice Dixson2012-02152Move Equipment from IPL to various LocationsMiPeSo$3,600.00
7/2/12AW-AFM12-37Clarice Dixson2010-01666Overtime for Installing Speakers$3,879.00
7/2/12AW-AFM12-38Clarice Dixson2011-02931Overtime for Installing Flat Panels$4,344.48
8/8/12AW-AFM12-39John Herr2012-02700Run Conduit with New Outlets in EIW GH #3Alameda Electrical Distributors$746.11
8/8/12AW-AFM12-40John Herr2012-01017Repair Water Damage including Drywalling WAB SAF BuildingMiPeSo$4,483.30
8/8/12AW-AFM12-41Clarice Dixson2012-01017Additional Water Damage Repair in WAB SAF BuildingMiPeSo$3,531.00
8/8/12AW-AFM12-42Tom Moreno2012-03128MB SW Pilot Plant MoveMiPeSo$5,778.00
8/13/12AW-AFM12-43Artur Klamczynski2012-01836Install Injection Molding MachineLeistritz$3,777.10
8/23/12AW-AFM12-44Delilah Wood2012-03123Reconfigure Mailroom to Accommodate New Equipment to Emergency PowerSkehan$45,609.37
8/30/12AW-AFM12-45Stanley Green2012-03213Replace Compressor on SW Chiller$12,433.18
9/6/12AW-AFM12-46Clarice Dixson2012-03453Upgrade Room 0109 Growth Chamber ControlsBioChambers$42,971.28
9/11/12AW-AFM12-47Don Olson2012-03463Hook Up Electrical Connections for Peeling Unit in the FPLGrainger$1,050.58
9/20/12AW-AFM12-48Clarice Dixson2012-03499Purchase Mechanical Scissor LiftAichi$13,642.15
9/26/12AW-AFM12-49Clarice Dixson2012-03502Vinyl Flooring MB 1st Floor Admin WingHouse of Carpets$20,627.46
9/27/12AW-AFM12-50Clarice Dixson2012-03503Vinyl Flooring MB 2nd Floor Admin WingHouse of Carpets$48,502.03
9/27/12AW-AFM12-51Clarice Dixson2012-03541Re-Coat Front StepsAllied Construction Services$27,381.30
10/9/12AW-AFM12-52Stanley Green2013-00173Support for Power Shutdown$2,017.08
10/9/12AW-AFM12-53Lone Santacera2012-03473Replace Damaged Window in Room 0004Arrow Glass Company$3,319.14
11/20/12AW-AFM13-00Yuzhu Zhang2012-03539Remove Section of Bench with Water, Gas, Air & Vacuum Lines Rm 3125Grainger$1,824.22
11/28/12AW-AFM13-01Keith Fagerquist2013-00286Modifications for Orbitrap Instrument$11,522.13
12/7/12AW-AFM13-02Gwyn Watson2013-00765Retrofit Boiler for Emission StandardsOne Source Enegeering, Inc.$79,565.20
1/7/13AW-AFM13-03Clarice Dixson2012-00815Remove Carpets and Install Base Boards in Rm 2030 & 2034House of Carpets$9,700.62
1/15/13AW-AFM13-04Clarice Dixson2013-00803Install Gate on SB Roll-Up Door to prevent intruders from enteringMiPeSo$2,996.00
1/15/13AW-AFM13-05Clarice Dixson2013-00801Install Reflective Window Glazing on the interior of NS of the SBMiPeSo$4,504.56
1/15/13AW-AFM13-06Clarice Dixson2013-00555Change Door Hinge Rm 1006Skehan Construction$2,247.00
1/16/13AW-AFM13-07Clarice Dixson2013-01069Partially Repair/Replace (52 yards) Existing Vinyl Flooring in Rm 2200House of Carpets$6,367.57
1/30/13AW-AFM13-08Clarice Dixson2013-01127Upgrade Offices on 2nd Floor Main BuildingMiPeSo$2,568.00
2/26/13AW-AFM13-09David Hane2012-00043Install UPS Into Server RoomCal West$5,271.65
3/13/13AW-AFM13-10Clarice Dixson2013-01658Remove and Replace First Aid Room DoorSkehan Construction$1,377.50
3/13/13AW-AFM13-11Clarice Dixson2013-01704Build Bench by FlagpoleSkehan Construction$6,794.50
3/15/13AW-AFM13-12Clarice Dixson2013-01710Install Vinyl 1st Floor HallwaysHouse of Carpets$19,046.00
3/15/13AW-AFM13-13Clarice Dixson2013-01711Repair/Replace Vinyl in WAB room 202House of Carpets$921.27
3/20/13AW-AFM13-14Clarice Dixson2013-01169Check and Service Existing Fire Doors$6,367.57
3/20/13AW-AFM13-15Clarice Dixson2013-01731Repair/Replace Armstrong Medintech in Room 2200House of Carpets$6,367.57
3/27/13AW-AFM13-16Keith Fagerquist2013-01732Install E-Power to support freezers & refrigerators in Rm 3106$2,378.77
5/1/13AW-AFM13-16Clarice dixson2013-02016Replace old A/C UNIT IN RM 3034Specialty products$8,633.71
5/14/13AW-AFM13-17Barbara Alee2013-02195Provide 2 Persons to help Organize Inventory Storage Bins$1,877.04
5/29/13AW-AFM13-18Clarice Dixson2013-02231Replace 37 Fire HosesBest Equipment Co LLC$4,968.54
6/21/13AW-AFM13-19Andrew Breksa2013-02341Build Aluminum Stand per Specifications$1,041.16
7/1/13AW-AFM13-20Clarice Dixson2013-00509Install Card Key Readers at MB LobbyAutomated Services and Products Inc$22,500.00
8/1/13AW-AFM13-21Clarice Dixson2013-02901Order Tables and ChairsPiedmont Party$1,320.38
8/14/13AW-AFM13-22Clarice Dixson2013-02931Prepare Basement Floor Hallway for Epoxy Floor CoatingStonhard$28,579.70
8/8/13AW-AFM13-23John Toledo2013-02909Rees SupportRees Scientific$1,932.42
8/8/13AW-AFM13-24Jonathan Lindsey2013-02922Replace Door Gasket Room 1200ARS$30.05
8/16/13AW-AFM13-25Lone Santacera2013-02954Chiller Room Roll Up Door Jacked Up w/ New Security DoorR&S Erection of Richmond, Inc.$6,188.54

ADD. WORK

2-9-09 TO 4-27-11

Sheet2

Sheet3