Attachment_1_Appendix_3a_-_Workload_Data_for_Additional_Work.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Building Operations and Maintenance Services for the Western Regional Research Center, Albany, California
Solicitation number
AG-32SD-S-14-0002
Issued by

About this file

Attachment 1 Appendix 3a - Workload Data for Additional Work

View the file

Other files

File Type Posted
AG-32SD-S-14-0002A8_SF30.pdf PDF
AG-32SD-S-14-0002A7_SF30.pdf PDF
Attachment_1_-_Performance_Work_Statement _March_2014.pdf PDF
AG-32SD-S-14-0002A6_SF30.pdf PDF
AG-32SD-S-14-0002_B-M_REV_3_7_2014.pdf PDF
AG-32SD-S-14-0002_B-M_REV_2_25_2014.pdf PDF
Attachment_1_-_Performance_Work_Statement _February_2014.pdf PDF
Attachment_1_Appendix_8_-_Government_Furnished_Property_Government_Furnished_Equipment_UPDATED_2_28_2014.pdf PDF
Attachment_1_Appendix_6_-_Preventive_Maintenance_Equipment_List_UPDATED_2_28_2014.xlsx XLSX spreadsheet
AG-32SD-S-14-0002A5_SF30.pdf PDF
Questions_and_Answers_-_Amendment_5.pdf PDF
Attachment_1_Appendix_7_-_PM_Task_Master_List_UPDATED_2_24_2013.pdf PDF
Attachment_1_Appendix_11_-_List_of_Required_Reports_UPDATED_2_28_2014.pdf PDF
Wage_Determination_DB_REVISED_CA29 _1_31_14.pdf PDF
SIGN_IN_SHEET_-_PRE_PROPOSAL_CONFERENCE.pdf PDF
AG-32SD-S-14-0002_B-M_REV_2_19_2014.pdf PDF
Section_B_-_FILLABLE.xlsx XLSX spreadsheet
Wage_Determination_SCA_2005-2052_R14_6_19_13.pdf PDF
Questions_and_Answers_-_Amendment_3.pdf PDF
Minutes_-_PRE_PROPOSAL_CONFERENCE.pdf PDF
AG-32SD-S-14-0002A4_SF30.pdf PDF
AG-32SD-S-14-0002A3_SF30.pdf PDF
AG-32SD-S-14-0002A2_SF30.pdf PDF
AG-32SD-S-14-0002A1_SF30.pdf PDF
Attachment_1_Appendix_4_-_Historical_Subcontracted_Work_UPDATED.docx DOCX document
Attachment_1_Appendix_3b_-_Workload_Data_for_Routine_Work_UPDATED.pdf PDF
Attachment_1_Appendix_3a_-_Workload_Data_for_Additional_Work_UPDATED.xlsx XLSX spreadsheet
Attachment_1_Appendix_7_-_PM_Task_Master_List_UPDATED.docx DOCX document
Attachment_1_Appendix_6_-_Preventive_Maintenance_Equipment_List_UPDATED.xlsx XLSX spreadsheet
Attachment_1_Appendix_9_-_Government_Vehicle_List.docx DOCX document
Attachment_1_Appendix_7_-_PM_Task_Master_List.docx DOCX document
Attachment_1_Appendix_5_-_Facility_Inventory.docx DOCX document
Attachment_1_Appendix_11_-_List_of_Required_Reports.docx DOCX document
Attachment_1_Appendix_6_-_Preventive_Maintenance_Equipment_List.xlsx XLSX spreadsheet
AG-32SD-S-14-0002.pdf PDF
Attachment_2_-_Service_Contract_Act_Wage_Determination_WD_05-2051 _6_19_13.pdf PDF
Attachment_1_Appendix_4_-_Historical_Subcontracted_Work.docx DOCX document
Attachment_1_Appendix_3b_-_Workload_Data_for_Routine_Work.pdf PDF
Attachment_1_Appendix_8_-_Government_Furnished_Property_Government_Furnished_Equipment.docx DOCX document
Attachment_3_-_Davis_Bacon_Wage_Determination_CA29 _1_24_14.pdf PDF
Attachment_1_-_Performance_Work_Statement _October_2013.docx DOCX document
Attachment_1_Appendix_1_-_Glossary.docx DOCX document
Attachment_1_Appendix_12_-_QASP.docx DOCX document
Attachment_1_Appendix_2_-_Site_Layout.pdf PDF
Attachment_1_Appendix_10_-_Equipment_Test_Certification_List.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date of ProposalCost Proposal #CommentsRequestorWO #Scope of WorkCompany NameAmountSTATUS
12/2/09AW-AFM09-003*(Revised II) Stanley took 4/12/2010Mark Carter2008-01637Security upgrades to WAB rooms 320W and 408WOpening Technologies Inc$40,024.60COMPLETE
8/6/09AW-AFM09-012Revised on 8/6/2010Clarice Dixson2008-03303Install 5 magnetic doors/smoke detectors in SW PGECSimplex Grinnell$87,392.18COMPLETE
2/9/09AW-AFM09-018Jerry Mayer2008-03255Upgrade pneumatic controls WAB for EMSAutomated Control Inc.$41,804.90COMPLETE
3/4/09AW-AFM09-021Lone Santacera2009-01565Remove/Replace gutters and drains in Wool Building$7,190.40COMPLETE
8/4/09AW-AFM09-027Adam Salvadalena2005-01569Install communication wire from PG&E to existing communication system$7,773.15COMPLETE
5/28/09AW-AFM09-045Wendell Brown2009-01372Replace inoperable Gyrotech auto operators$6,300.00COMPLETE
5/28/09AW-AFM09-045 (III)Wendell Brown2009-01372Double doors NW 2nd floor leading to labs are not closed$6,300.00COMPLETE
6/2/09AW-AFM09-046 (II)Stanley Green2009-02578Pipe installation in Boiler and Mechanical room$5,831.50COMPLETE
AW-AFM09-047Pete ToledoInstall air filters for WABAir Filter Maintenance, Inc.$4,673.56COMPLETE
6/26/09AW-AFM09-048Lone Santacera2009-02911Replace main water back flow preventerFluid Gauge Company, Inc.$8,792.08COMPLETE
7/1/09AW-AFM09-049David OrongIndustrial Labeling SystemGrainger$3,208.93COMPLETE
7/13/09AW-AFM09-050Lone Santacera2009-03083Replace refractory liner in Boiler room$5,885.00COMPLETE
7/13/09AW-AFM09-052Lone Santacera2009-03085Correct deficiencies on Elevator inspection reportAscent$4,012.50COMPLETE
9/15/09AW-AFM09-053RevisedGelu NistorPurchase Variable Frequency DriveDrivesWarehouse.com$4,586.43COMPLETE
7/13/09AW-AFM09-054Gelu NistorPurchase Photo Electric Switch with Receiver ReflectorAlameda Electric$1,058.36COMPLETE
7/14/09AW-AFM09-055David Orong2009-03088Conduct survey for Asbestos containing materials and leadRGA Environmental$2,022.30COMPLETE
7/20/09AW-AFM09-056Tom Moreno2009-02632Replace all exit lights in facility buildings with new fixtures using LED'sWesco$29,892.49COMPLETE
8/4/09AW-AFM09-056 (II)Gelu Nistor2009-03176Install emergency lighting, women's bathroom 4th floor and Room 311$1,822.37COMPLETE
8/4/09AW-AFM09-057RevisedDavid OrongInstallation/Fabrication of 529 lineal feet of handrailInch's Tooling & Machining$93,025.80
10/9/09AW-AFM09-058Revised on 10/9/2009Clarice Dixson2009-03351Replace Library A/C unitC&E Enterprises$16,591.42COMPLETE
9/23/09AW-AFM09-059RevisedLone Santacera2009-03365Repair Air/Resurface Main Parking Lot$28,667.44COMPLETE
9/3/09AW-AFM09-060Clarice Dixson2009-02899Improve Ventilation in autoclave room W312LAutomated Services and Products$3,317.00COMPLETE
9/3/09AW-AFM09-061Lone Santacera2009-03552Replace NW R.O. water system with Industrial Capacity unitsSiemens$16,529.36COMPLETE
9/3/09AW-AFM09-062Lone Santacera2008-01639Paint wool buildingPembra Bldg. Contractor$30,755.01COMPLETE
9/3/09AW-AFM09-063Lone Santacera2009-03553Repair/Replace NW Attic low pressure steam line insulationPlant Hazardous Services$11,181.55COMPLETE
9/3/09AW-AFM09-064Lone Santacera2009-02623Install false wall in room 3034New High Protection Roofing Co.$2,996.00COMPLETE
9/17/09AW-AFM09-065Revised (II) on 9/17/2009, 9/23/2009Andrew Breksa2009-03547Install Nitrogen Line in room 1127$924.37
9/24/09AW-AFM09-066RevisedGelu Nistor2009-03596Provide underground communications$27,252.18COMPLETE
9/24/09AW-AFM09-067RevisedWendell Brown2009-03595Repair roof leak WABPembra Bldg. Contractor$5,077.15COMPLETE
9/22/09AW-AFM09-068Wendell Brown2009-03627Replace 8 windows in WAB Wellness suitePembra Bldg. Contractor$4,612.77COMPLETE
10/2/09AW-AFM09-069Rebecca HaussmanReplace X-Ray with Kodak 2000 Processor (refurbished)Merry X-Ray$10,165.00COMPLETE
10/5/09AW-AFM09-070gave to Lone from my files 3/18/2011Tom Moreno2010-00018Paint stack on Draft buildingPembra Bldg. Contractor$7,142.25
10/19/09AW-AFM09-073Gwyn Watson2010-00088Replace carpet/Install laminate floor in Gym 1st floor WABPembra Bldg. Contractor$6,933.60COMPLETE
11/6/09AW-AFM09-074gave to Lone from filing cabinet 3/18/2011Lone Santacera2010-00391Repair York Chiller #1 in Service buildingDelta T HVAC Services$5,992.00COMPLETE
11/17/09AW-AFM09-075*Stanley has, 2/19/2010David Orong2010-00453Repairs/Re-Testing 2009 WAB room 408BTSS$7,720.37COMPLETE
12/29/09AW-AFM09-076Clarice Dixson2010-00830Repair/Install Cameras in WAB and Main BuildingIntegra Systems LLC$8,538.60COMPLETE
4/9/10AW-AFM10-066ContinuedGelu Nistor2009-03596Fiber cable installation in Quarantine Green HouseAlameda Electric$15,509.06COMPLETE
1/15/10AW-AFM10-082Michael Pierce2010-01113Install Unistruts for HID Lamps in Roof Top G.H. Room 4$2,733.85COMPLETE
2/16/10AW-AFM10-082Revised on 2/16/2010Michael Pierce2010-01113Install Unistruts for HID Lamps in Roof Top G.H. Room 4McMaster-Carr$3,064.16COMPLETE
2/3/10AW-AFM10-083Stanley Green2010-01352Replace Fitness Center RoofPembra Bldg. Contractor$14,600.15COMPLETE
2/3/10AW-AFM10-084Stanley Green2010-01353Replace Purify Pipe Line in Attic Main BuildingPembra Bldg. Contractor$3,151.15COMPLETE
2/10/10AW-AFM10-087Lone Santacera2010-01392Repair Linoleum at the Laboratory Entry 4th Floor WABPembra Bldg. Contractor$2,616.15COMPLETE
2/10/10AW-AFM10-087Revised on 2/16/2010Lone Santacera2010-01392Repair Linoleum at the Laboratory Entry 4th Floor WABPembra Bldg. Contractor$1,760.15COMPLETE
2/22/10AW-AFM10-088gave to Lone from filing cabinet 3/18/2011Stanley Green2010-01436Replace York cooling system condenser in the CourtyardPembra Bldg. Contractor$28,718.80COMPLETE
4/9/10AW-AFM10-088Revised on 4/14/2010Stanley Green2010-01436Replace York cooling system condenser in the CourtyardC&E Enterprises$21,013.57COMPLETE
3/10/10AW-AFM10-089RevisedDavid Hantz2009-03628Replace pad reservoirs in PGEC G.H. 1-6 both are rusted out and leakingPembra Bldg. Contractor$21,266.25
4/1/10AW-AFM10-089 IIRevised II on 4/1/2010David Hantz2009-03628Replace pad reservoirs in PGEC G.H. 1-6 both are rusted out and leakingPembra Bldg. Contractor$30,912.30
2/23/10AW-AFM10-089**Lone took portion of Original Document 3/2/2010 *Stanley took both original and revised 3/25/2010David Hantz2009-03628Replace pad reservoirs in PGEC G.H. 1-6 both are rusted out and leakingGrainger/ Harrington Industrial Plastics$36,548.88COMPLETE
4/5/10AW-AFM10-090ContinuedClarice Dixson2010-01642Relocate Akima Project Office and Stockroom from Room 0024 to Library$4,051.32COMPLETE
3/9/10AW-AFM10-090*Stanley has portion 3/19/2010Clarice Dixson2010-01642Relocate Akima Project Office and Stockroom from Room 0024 to LibraryPembra Bldg. Contractor$14,505.99COMPLETE
3/9/10AW-AFM10-091Stanley Green2010-00846Replace Leaking Deteriorated Condensate Line between North & South WingPembra Bldg. Contractor$4,756.15COMPLETE
4/1/10AW-AFM10-092Clarice Dixson2010-01642Retrofit overhead lights in current Library areaAlameda Electric$3,129.16COMPLETE
4/23/10AW-AFM10-096Stanley Green2010-02012Carpet replacement in the new Training AreaPembra Bldg. Contractor$2,872.95COMPLETE
5/3/10AW-AFM10-097Stanley Green2010-02056Install A/C Unit in new Computer classroomC&E Enterprises$8,791.12COMPLETE
5/3/10AW-AFM10-098Lone Santacera2010-02057Replacement of Underground 4 Inch Steam Expansion JointPembra Bldg. Contractor$9,239.45COMPLETE
5/11/10AW-AFM10-099Clarice DixsonBuilding of Training CenterPembra Bldg. Contractor$25,966.23COMPLETE
5/18/10AW-AFM10-099Revised on 5/18/2010Clarice DixsonBuilding of Training CenterPembra Bldg. Contractor$18,930.97COMPLETE
5/18/10AW-AFM10-102Clarice DixsonBuilding of Training Center - Roll Up GrillPembra Bldg. Contractor$7,035.25COMPLETE
5/19/10AW-AFM10-103Clarice DixsonBuilding of Computer Training Center - ElectricalAlameda Electric$3,914.43COMPLETE
6/11/10AW-AFM10-105David Orong2010-02548Air Balance 14 rooms in the WABTabco$9,587.20COMPLETE
6/24/10AW-AFM10-106Raymond Carruthers2010-02395Electrical and Equipment rack Installation at Quarantine GreenhouseWesco$20,324.47COMPLETE
7/13/10AW-AFM10-106Continued on 7/13/2010Raymond Carruthers2010-02395Electrical and Equipment rack Installation at Quarantine GreenhouseWesco$5,465.66COMPLETE
8/19/10AW-AFM10-107Lone Santacera2010-03219Underground Water Leak repair (North Wing at West End of building)Pembra Bldg. Contractor$8,554.65COMPLETE
9/2/10AW-AFM10-108gave to Lone from my files 3/18/2011Clarice Dixson2010-01666Install Additional PA Speakers in the Following AreasValcom$13,104.33
9/3/10AW-AFM10-109Ildefonso Arroyo2010-02592Replace (9) remaining Heaters in the PGEC GreenhouseRefrigeration Supplies Distributor$23,278.41
9/14/10AW-AFM10-110gave to Lone from my files 3/18/2011Clarice DixsonBuild Bicycle shedPembra Bldg. Contractor$22,394.03
9/14/10AW-AFM10-111Stanley GreenWool building Elevator pit emergency pump installationPembra Bldg. Contractor$4,421.24
9/30/10AW-AFM10-112Wen-Xian Du2010-03196Install new Heat Pump in room #3127Bay-Valley Heating & Air Conditioning$8,185.88COMPLETE
2/15/11AW-AFM10-112Revised II on 2/15/2011Wen-Xian Du2010-03196Install new Heat Pump in room #3127RSD & Alameda Electrical$3,953.17COMPLETE
2/10/11AW-AFM11-001Lone Santacera2011-01242Repair Emergency GeneratorAmerican Power Corp.$5,330.88COMPLETE
3/10/11AW-AFM10-112Revised II (with labor) on 3/10/2011Wen-Xian Du2011-03196Install new Heat Pump in room #3127RSD & Alameda Electrical$6,446.57COMPLETE
3/14/11AW-AFM11-002Stanley gave original copy to Clarice 5/4/2011Karen Mallinen2011-01188Door Operator on 2nd Floor WAB by Elevator is workingAutomated Services and Products$4,980.85
3/24/11AW-AFM11-003Clarice Dixson2011-00559Insect screen installation of three existing GreenhousesAg-Con$3,799.57
4/26/11AW-AFM11-004Clarice Dixson2011-01558Polish diesel fuel in the (UST) & above ground storage tankLarry Holmes Polishing Fuel$4,108.80
4/27/11AW-AFM11-005 (A)Andrew Breksa2011-01344Need new circuits connected to back up system in lab 1125Alameda Electric$3,300.07
4/27/11AW-AFM11-005 (B)Andrew Breksa2011-01344Need new circuits connected to back up system in lab 1125Alameda Electric$7,394.25

ADD. WORK

2-9-09 TO 4-27-11

Sheet2