Special_Provisions.pdf

PDF 34 KB Posted

Attached to
Wetland Restoration - Hendry Co. , Florida - USDA-NRCS
Solicitation number
AG-2B46-S-16-0045
Issued by

About this file

Special Provisions

View the file

Other files

File Type Posted
Bid_Abstract_-_Aspring_WRP.pdf PDF
Aspring_Final_Geotechnical_Report-6Pages59-60.pdf PDF
SF-30Amendment_5.pdf PDF
Aspring_Final_Geotechnical_Report-5Pages_36-58.pdf PDF
Aspring_Final_Geotechnical_Report_Part1.pdf PDF
Aspring_Final_Geotechnical_Report_Part3.pdf PDF
Aspring_Final_Geotechnical_ReportPart7.pdf PDF
Aspring_Final_Geotechnical_Report-4Pages_31-35from.pdf PDF
Aspring_Final_Geotechnical_Report_Part2.pdf PDF
MoreQuestionsandAnswersSite_Visit9_1_16.pdf PDF
Aspring_Summary_of_Changes.pdf PDF
Questions_from_September_8th_Site_Visit.pdf PDF
Site_Vist_Attendees9_8_16.pdf PDF
SF-30Amendment4.pdf PDF
Revised_pages_from_Aspring_Corrected_Final_Design_Construction_Specifications.pdf PDF
Aspring_Sheet_C520.pdf PDF
SF-30Amendment_3.pdf PDF
Aspring_Bid_Meeting_Minutes_QuestionsandAnswers9_1_16.pdf PDF
Amendment_2.pdf PDF
Site_Showing_Attendees_9-1-16.pdf PDF
Pages34-43AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages24-33AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages44-49AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages15-23AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages7-14AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages1-6_AspringConstruction_PlansRevised8_29_16.pdf PDF
AspringSpecificationsRevised8_29_16.pdf PDF
SF1442Aspring.pdf PDF
DesignPlansPages39-45.pdf PDF
DesignPlansPages46-49.pdf PDF
DesignPlansPages31-38.pdf PDF
DesignPlansPages8-14.pdf PDF
DesignPlansPages23-30.pdf PDF
DesignPlansPages1-7.pdf PDF
IFBConstruction_Aspring_WRP_Restoration.pdf PDF
Design_Construction_PlansPages15-22.pdf PDF
Aspring_Corrected_Final_Design_Construction_Specifications.pdf PDF
FL144Wage_Determination.txt TXT text file
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PROVISIONS

AG-2B46-S-16-0045

ASPRING WRP RESTORATION

1. The permits applicable to this project are:

• Standard General Environmental Resource Permit (ERP)

• USACOE Nationwide Permit

• NPDES Stormwater Permit for Construction

• State of Florida Permit Application to Construct, Repair, Modify, or Abandon a Well

• SWPPP (to be obtained by contractor)

• NPDES NOI (to be obtained by contractor)

The Contractor shall complete the schedule of construction and the Stormwater Pollution Prevention Plan (SWPPP) prior to submitting the Notice of Intent (NOI). The Contractor is responsible for submitting the NOI and paying the application fee. The Contractor shall ensure that the SWPPP certification is completed by its workforce and subcontractors. The Contractor shall implement the SWPPP during construction. The Contractor shall submit the Notice of Termination (NOT) when finished.

2. The Contractor shall review the plans and specifications for accuracy and completeness. The Contractor shall also make his own determination of the quantities of work required to complete the construction and make his own assessment of the site and work required prior to bidding. Any discrepancies, errors, or omissions shall be brought to the attention of the Contracting Officer (CO) prior to the bid due date.

3. The Contractor shall call SUNSHINE STATE ONE CALL OF FLORIDA - CALL

BEFORE YOU DIG 1-800-432-4770 two full business days (but not more than five) before digging to find out where buried facilities are located.

File details come from the government source that posted it. Updated .