Summary of Changes

View the file

Other files

File Type Posted
Bid_Abstract_-_Aspring_WRP.pdf PDF
Aspring_Final_Geotechnical_Report-6Pages59-60.pdf PDF
SF-30Amendment_5.pdf PDF
Aspring_Final_Geotechnical_Report-5Pages_36-58.pdf PDF
Aspring_Final_Geotechnical_Report_Part1.pdf PDF
Aspring_Final_Geotechnical_Report_Part3.pdf PDF
Aspring_Final_Geotechnical_ReportPart7.pdf PDF
Aspring_Final_Geotechnical_Report-4Pages_31-35from.pdf PDF
Aspring_Final_Geotechnical_Report_Part2.pdf PDF
MoreQuestionsandAnswersSite_Visit9_1_16.pdf PDF
Questions_from_September_8th_Site_Visit.pdf PDF
Site_Vist_Attendees9_8_16.pdf PDF
SF-30Amendment4.pdf PDF
Revised_pages_from_Aspring_Corrected_Final_Design_Construction_Specifications.pdf PDF
Aspring_Sheet_C520.pdf PDF
SF-30Amendment_3.pdf PDF
Aspring_Bid_Meeting_Minutes_QuestionsandAnswers9_1_16.pdf PDF
Amendment_2.pdf PDF
Site_Showing_Attendees_9-1-16.pdf PDF
Pages34-43AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages24-33AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages44-49AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages15-23AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages7-14AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages1-6_AspringConstruction_PlansRevised8_29_16.pdf PDF
AspringSpecificationsRevised8_29_16.pdf PDF
SF1442Aspring.pdf PDF
DesignPlansPages39-45.pdf PDF
DesignPlansPages46-49.pdf PDF
DesignPlansPages31-38.pdf PDF
Special_Provisions.pdf PDF
DesignPlansPages8-14.pdf PDF
DesignPlansPages23-30.pdf PDF
DesignPlansPages1-7.pdf PDF
IFBConstruction_Aspring_WRP_Restoration.pdf PDF
Design_Construction_PlansPages15-22.pdf PDF
Aspring_Corrected_Final_Design_Construction_Specifications.pdf PDF
FL144Wage_Determination.txt TXT text file
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aspring Summary of Changes 9-9-2016

Drawings:

Sheet C520: Borrow Area Detail Note 6 was removed. The borrow areas will be seeded and mulched the same as all other disturbed areas in accordance with Construction Specification 440, Vegetative Measures.

Specifications:

Sheet 7-5: Section 9.a.(5) III. The requirement of two (2) signed and sealed hard copies was changed to four (4).

Sheet 21-4: Section 9.a. Bid Item No. 17, Channel (CH1) was included in this section, since it was omitted from the specifications previously.

Sheet 21-4: Section 9.b. Subsidiary Item, Excavation, Common Borrow: Item 5 was added which states “All rocks larger than 6 inches in diameter must be stockpiled and removed from the site.” Also, Bid Item No. 12, Structure for Water Control (SWC4) and Bid Item No. 17, Channel (CH1) were removed from the list of pay items for this subsidiary item.

Sheet 21-5: Section 9.c. Subsidiary Item, Excavation, Common, Structural: Item 2 was added which states“ All rocks larger than 6 inches in diameter must be stockpiled and removed from the site.” Also, Bid item No. 12, Structure for Water Control (SWC4) was removed from the list of pay items for this subsidiary item.

Sheet 21-5: Section 9.d: Bid Item No. 12, Structure for Water Control (SWC4) and Bid Item No. 17, Channel (CH1) were removed from the list of pay items for this subsidiary item.

Sheet 21-6: Section 9.e. Subsidiary Item, Excavation, Common, Structure Removal: Item 3 was added which states“ All rocks larger than 6 inches in diameter must be stockpiled and removed from the site.”

Sheet 23-6: Section 10.a. Bid Item No. 12 Structure for Water Control (SWC4) was removed since this item is paid for in specification 442. Also, in item 3 the compaction method stating “…compacted by at least three (3) passes over the entire surface by a 10 ton vibrating steel-wheeled roller…” was changed to “…compacted by at least three (3) passes over the entire surface by at least an 8 ton vibrating steel-wheeled roller or crawler-type tractor…”

Sheet 23-7: Section 10.b. Bid Item No. 16, Road Modification: In item 3, the compaction method stating “…compacted by at least three (3) passes over the entire surface by a 10 ton vibrating steel-wheeled roller…” was changed to “…compacted by at least three (3) passes over the entire surface by at least an 8 ton vibrating steel-wheeled roller or crawler-type tractor…”

Sheet 23-8: Section 10.e. Bid Item No. 16, Road Modification: In item 3, the compaction method stating “…compacted by at least three (3) passes over the entire surface by a 10 ton vibrating steel-wheeled roller…” was changed to “…compacted by at least three (3) passes over the entire surface by at least an 8 ton vibrating steel-wheeled roller or crawler-type tractor…”

Sheet 42-5 Section 11.a.(2) the wall thickness requirement was changed to 2.5 inches for SWC1, SWC2 and SWC3.

Sheet 61-4: Section 8.a Item 4 was added and states “Contractor will provide engineer with FDOT certification letter prior to beginning riprap work.”

Sheets 441-1 through 441-4: Construction Specification 441-3 Invasive Exotic Plant Species Treatment.

Extensive changes were made to this specification to direct the efforts of the Contractor to preventing the spread of invasive species on and around the site rather than necessarily treating all invasive species in the construction work area.

Sheet 442-6 Section 7.a. in item 1 the statement “Method of payment shall be per square feet.” Was deleted, since this item is paid as each. In item 3, the compaction method stating “…compacted by at least three (3) passes over the entire surface by a 10 ton vibrating steel-wheeled roller…” was changed to “…compacted by at least three (3) passes over the entire surface by at least an 8 ton vibrating steel-wheeled roller or crawler-type tractor…” In item 6, all the subsidiary items were removed.

File details come from the government source that posted it. Updated .