Questions and Answers from 9/8/16 site visit

View the file

Other files

File Type Posted
Bid_Abstract_-_Aspring_WRP.pdf PDF
Aspring_Final_Geotechnical_Report-6Pages59-60.pdf PDF
SF-30Amendment_5.pdf PDF
Aspring_Final_Geotechnical_Report-5Pages_36-58.pdf PDF
Aspring_Final_Geotechnical_Report_Part1.pdf PDF
Aspring_Final_Geotechnical_Report_Part3.pdf PDF
Aspring_Final_Geotechnical_ReportPart7.pdf PDF
Aspring_Final_Geotechnical_Report-4Pages_31-35from.pdf PDF
Aspring_Final_Geotechnical_Report_Part2.pdf PDF
MoreQuestionsandAnswersSite_Visit9_1_16.pdf PDF
Aspring_Summary_of_Changes.pdf PDF
Site_Vist_Attendees9_8_16.pdf PDF
SF-30Amendment4.pdf PDF
Revised_pages_from_Aspring_Corrected_Final_Design_Construction_Specifications.pdf PDF
Aspring_Sheet_C520.pdf PDF
SF-30Amendment_3.pdf PDF
Aspring_Bid_Meeting_Minutes_QuestionsandAnswers9_1_16.pdf PDF
Amendment_2.pdf PDF
Site_Showing_Attendees_9-1-16.pdf PDF
Pages34-43AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages24-33AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages44-49AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages15-23AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages7-14AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages1-6_AspringConstruction_PlansRevised8_29_16.pdf PDF
AspringSpecificationsRevised8_29_16.pdf PDF
SF1442Aspring.pdf PDF
DesignPlansPages39-45.pdf PDF
DesignPlansPages46-49.pdf PDF
DesignPlansPages31-38.pdf PDF
Special_Provisions.pdf PDF
DesignPlansPages8-14.pdf PDF
DesignPlansPages23-30.pdf PDF
DesignPlansPages1-7.pdf PDF
IFBConstruction_Aspring_WRP_Restoration.pdf PDF
Design_Construction_PlansPages15-22.pdf PDF
Aspring_Corrected_Final_Design_Construction_Specifications.pdf PDF
FL144Wage_Determination.txt TXT text file
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions from September 8th Site Visit:

1) Q. What will the contractor do with unsuitable materials?

A. Rocks larger than 6” will be stockpiled and removed from the site. Unsuitable earthfill will be spread onsite at a location approved by the engineer.

2) Q. Will the rocks have to be removed from the land smoothing areas?

A. The rocks in the land smoothing area will be pushed in to the adjacent ditch with other spoil material and will not have to be removed.

3) Q. Will additional material be available for land smoothing?

A. The land smoothing will consist of pushing adjacent spoil back into the ditches. Hauling of additional fill will not be needed in these areas and we anticipate there will not be enough fill to completely fill the ditches. The Contractor will grade them to blend with existing topography.

4) Q. Will the dike on the east side along the existing reservoir be accessible to the contractor?

A. No this is not an available access road for the contractor.

5) Q. What to do with the vegetation after clearing and grubbing for the land smoothing?

A. The vegetative material will be stripped from the land smoothing areas and stockpiled, the areas will be smoothed and the stripped vegetation will be spread on top.

6) Q. Please clarify removal of exotics in the design?

A. The removal of exotics will only be required in the construction area. This has recently been updated in the specifications to focus efforts on eliminating or reducing the spread of invasive plants and does not necessarily require the treatment of all invasive plants in the construction area.