MoreQuestionsandAnswersSite_Visit9_1_16.pdf

PDF 43 KB Posted

Attached to
Wetland Restoration - Hendry Co. , Florida - USDA-NRCS
Solicitation number
AG-2B46-S-16-0045
Issued by

About this file

More Questions and Answers from 9/1/16

View the file

Other files

File Type Posted
Bid_Abstract_-_Aspring_WRP.pdf PDF
Aspring_Final_Geotechnical_Report-6Pages59-60.pdf PDF
SF-30Amendment_5.pdf PDF
Aspring_Final_Geotechnical_Report-5Pages_36-58.pdf PDF
Aspring_Final_Geotechnical_Report_Part1.pdf PDF
Aspring_Final_Geotechnical_Report_Part3.pdf PDF
Aspring_Final_Geotechnical_ReportPart7.pdf PDF
Aspring_Final_Geotechnical_Report-4Pages_31-35from.pdf PDF
Aspring_Final_Geotechnical_Report_Part2.pdf PDF
Aspring_Summary_of_Changes.pdf PDF
Questions_from_September_8th_Site_Visit.pdf PDF
Site_Vist_Attendees9_8_16.pdf PDF
SF-30Amendment4.pdf PDF
Revised_pages_from_Aspring_Corrected_Final_Design_Construction_Specifications.pdf PDF
Aspring_Sheet_C520.pdf PDF
SF-30Amendment_3.pdf PDF
Aspring_Bid_Meeting_Minutes_QuestionsandAnswers9_1_16.pdf PDF
Amendment_2.pdf PDF
Site_Showing_Attendees_9-1-16.pdf PDF
Pages34-43AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages24-33AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages44-49AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages15-23AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages7-14AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages1-6_AspringConstruction_PlansRevised8_29_16.pdf PDF
AspringSpecificationsRevised8_29_16.pdf PDF
SF1442Aspring.pdf PDF
DesignPlansPages39-45.pdf PDF
DesignPlansPages46-49.pdf PDF
DesignPlansPages31-38.pdf PDF
Special_Provisions.pdf PDF
DesignPlansPages8-14.pdf PDF
DesignPlansPages23-30.pdf PDF
DesignPlansPages1-7.pdf PDF
IFBConstruction_Aspring_WRP_Restoration.pdf PDF
Design_Construction_PlansPages15-22.pdf PDF
Aspring_Corrected_Final_Design_Construction_Specifications.pdf PDF
FL144Wage_Determination.txt TXT text file
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q & A from Site Visit 9/1/16–

1. Dike will be how far from easement boundary on the west side? The dike will be inside the perimeter ditch

2. Why are the wells shown? We’re not doing anything to the wells. Some are permanent wells and it’s just to show their locations.

3. What do we do about areas for culvert installation? Will farming be going on? Produce will be coming out. Minimize the down time. Harvest trucks coming out every two hours during season.

4. Is there another route? There may be a possibility of rerouting the farm traffic, if needed.

5. Is there a site for staging? The staging areas are shown in the drawings.

6. Can we leave equipment nearby? Yes, in the staging area.

7. Spoil- Will be spoil be ln both sides? If it only shows one side do we go typical? Yes, go by typical.

Push spoil back in ditch.

8. Is there any place cap rock should go? Haul off

9. Can we use the road outside of North boundary? No limit use of it.

10. Does borrow area have to be the shape on the plan? No.

11. Same guidelines on compaction on the dike near SWC4? Yes Dike nearest SWC4 is the toughest area.

12. Exotics treatment only where work being done? Yes, see revised Construction Specifications.

13. Barriers required? Silt fence

14. Turbidity barrier? At the outlets of the site as shown in the drawings.

15. Do concrete trucks come on dike? Yes, only way. SWC4 more stable

16. Are we going to have to keep fences and gates closed all of the time? Entrance gate will have to be closed at the end of the day. Other gates must be left as they were found. NRCS will work with the landowner to move the cattle.

17. Can we get a temporary disconnect of power? Contractor can call Glades Electric to turn off.

18. Can we get a farming/harvest schedule? If a schedule becomes available we will provide it to the Contractor. At this time, there is no schedule.