Bid_Abstract_-_Aspring_WRP.pdf

PDF 157 KB Posted

Attached to
Wetland Restoration - Hendry Co. , Florida - USDA-NRCS
Solicitation number
AG-2B46-S-16-0045
Issued by

About this file

Abstract of Offers

View the file

Other files

File Type Posted
Aspring_Final_Geotechnical_Report-6Pages59-60.pdf PDF
SF-30Amendment_5.pdf PDF
Aspring_Final_Geotechnical_Report-5Pages_36-58.pdf PDF
Aspring_Final_Geotechnical_Report_Part1.pdf PDF
Aspring_Final_Geotechnical_Report_Part3.pdf PDF
Aspring_Final_Geotechnical_ReportPart7.pdf PDF
Aspring_Final_Geotechnical_Report-4Pages_31-35from.pdf PDF
Aspring_Final_Geotechnical_Report_Part2.pdf PDF
MoreQuestionsandAnswersSite_Visit9_1_16.pdf PDF
Aspring_Summary_of_Changes.pdf PDF
Questions_from_September_8th_Site_Visit.pdf PDF
Site_Vist_Attendees9_8_16.pdf PDF
SF-30Amendment4.pdf PDF
Revised_pages_from_Aspring_Corrected_Final_Design_Construction_Specifications.pdf PDF
Aspring_Sheet_C520.pdf PDF
SF-30Amendment_3.pdf PDF
Aspring_Bid_Meeting_Minutes_QuestionsandAnswers9_1_16.pdf PDF
Amendment_2.pdf PDF
Site_Showing_Attendees_9-1-16.pdf PDF
Pages34-43AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages24-33AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages44-49AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages15-23AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages7-14AspringConstruction_PlansRevised8_29_16.pdf PDF
Pages1-6_AspringConstruction_PlansRevised8_29_16.pdf PDF
AspringSpecificationsRevised8_29_16.pdf PDF
SF1442Aspring.pdf PDF
DesignPlansPages39-45.pdf PDF
DesignPlansPages46-49.pdf PDF
DesignPlansPages31-38.pdf PDF
Special_Provisions.pdf PDF
DesignPlansPages8-14.pdf PDF
DesignPlansPages23-30.pdf PDF
DesignPlansPages1-7.pdf PDF
IFBConstruction_Aspring_WRP_Restoration.pdf PDF
Design_Construction_PlansPages15-22.pdf PDF
Aspring_Corrected_Final_Design_Construction_Specifications.pdf PDF
FL144Wage_Determination.txt TXT text file
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

### ABSTRACT OF OFFERS - CONSTRUCTION

SOLICITATION

NUMBER

AG-2B46-S-16-0045

DATE ISSUED

7/27/2016

DATE OPENED

9/20/2016 Page 1 of 3

ISSUING OFFICE: USDA-NRCS

675 U.S. COURTHOUSE, 801 BROADWAY Nancy W. Harris, Contracting Officer 3500 N. 12th St. 715 Hatcher Rd. 1200 NW 78th Ave. #213

NASHVILLE, TN 37203

PROJECT TITLE

ASPRING

WRP

RESTORAT Bid Bond 20% - Yes Bid Bond 20% - Yes Bid Bond 20% - Yes

NUMBER OF AMENDMENTS ISSU 5 GOVERNMENT ESTIMATE

AMENDMENTS

ACKNOWLEDG

E YES

AMENDMENTS

ACKNOWLEDG

E YES

AMENDMENTS

ACKNOWLEDGE YES

Item No. Work or Material QTY Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Clearing & Grubbing 1 LS 63,763.22$ $ 63,763.22 $225,000.00 $225,000.00 $ 201,220.00 $ 201,220.00 201,722.52$ $ 201,722.52

2 Pollution Control 1 LS 69,608.34$ $ 69,608.34 $ 178,000.00 $178,000.00 $ 168,310.00 $ 168,310.00 214,486.45$ $ 214,486.45

Vegetative Measures 1 LS 11,477.25$ $ 11,477.25 $ 50,000.00 $50,000.00 $ 26,500.00 $ 26,500.00 261,879.46$ $ 261,879.46

Construction Surveys 1 LS 24,725.00$ $ 24,725.00 $ 35,000.00 $35,000.00 $ 116,500.00 $ 116,500.00 69,439.39$ $ 69,439.39

Mobilization & Demobilization 1 LS 57,500.00$ $ 57,500.00 $ 66,000.00 $66,000.00 $ 53,000.00 $ 53,000.00 225,188.17$ $ 225,188.17

6 Removal of Water 1 LS 27,025.00$ $ 27,025.00 $ 100,000.00 $100,000.00 $ 123,800.00 $ 123,800.00 94,135.76$ $ 94,135.76

Earthfill, Dike Construction (DK1) 18,000 LF 32.68$ $ 588,240.00 $ 24.50 $441,000.00 $ 26.00 $ 468,000.00 28.03$ $ 504,540.00

Earthfill, Ditch Block (DB1-DB7) 7 EA 946.32$ $ 6,624.24 7,500.00$ $52,500.00 $ 26,000.00 $ 182,000.00 6,095.99$ $ 42,671.93

Structure for Water Control (SWC1) 1 EA 5,211.60$ $ 5,211.60 17,700.00$ $17,700.00 $ 29,000.00 $ 29,000.00 8,461.01$ $ 8,461.01

Structure for Water Control (SWC2) 1 EA 4,988.53$ $ 4,988.53 16,800.00$ $16,800.00 $ 20,500.00 $ 20,500.00 12,683.04$ $ 12,683.04

Structure for Water Control (SWC3) 1 EA 4,838.92$ $ 4,838.92 16,200.00$ $16,200.00 22,000 $ 22,000.00 13395.55 $ 13,395.55

Structure for Water Control (SWC4) 1 EA 834.54$ $ 834.54 80,000.00$ 80,000.00$ 10,000 $ 10,000.00 40,217.54 $ 40,217.54

Alliance Steel Construction, Inc.

Superior, WI 54880

H & R of Belle Glade, Inc

Belle Glade, FL 33430 Miami, FL 33126

Ponchartrain Partners, LLC

I Certify that I have opened, read and recorded on this abstract all offers received in response to this solicitation

Structure for Water Control (SWC5) 1 EA $ 54,170.21 $ 54,170.21 $ 105,000.00 $105,000.00 $ 93,000.00 $93,000.00 $ 145,999.88 $145,999.88

Land Smoothing (LS1-LS14) 1 LS $ 102,323.46 $ 102,323.46 $ 42,000.00 $42,000.00 $ 217,000.00 $217,000.00 $ 108,620.32 $108,620.32

Structural Removal (RES1 - RES9) 9 EA $ 2,733.01 $ 24,597.09 $ 6,000.00 $54,000.00 $ 8,000.00 $72,000.00 $ 5,692.46 $51,232.14

Road Modification (RM1) 1 EA $ 3,617.74 $ 3,617.74 $ 49,000.00 $49,000.00 $ 7,000.00 $7,000.00 $ 29,033.63 $29,033.63

17 Channel (CH1) 1 EA $ 10,701.90 $ 10,701.90 $ 97,000.00 $97,000.00 $ 13,170.00 $13,170.00 $ 12,922.73 $12,922.73

Berm Modification 1 EA $ 9,660.00 $ 9,660.00 $ 180,000.00 $180,000.00 $ 27,000.00 $27,000.00 $ 20,157.07 $20,157.07

TOTAL

ESTIMATE $ 1,069,907.04 TOTAL BID $1,805,200.00 TOTAL BID $ 1,850,000.00 TOTAL BID $ 2,056,786.59

### ABSTRACT OF OFFERS - CONSTRUCTION

SOLICITATION

NUMBER

AG-2B46-S-16-0045

DATE ISSUED

7/27/2016

DATE OPENED

9/20/2016 Page 3

ISSUING OFFICE: USDA-NRCS

675 U.S. COURTHOUSE, 801 BROADWAY 745 NW 2ND STREET 100A HILLCREST DRIVE

NASHVILLE, TN 37203

PROJECT TITLE

ASPRING

WRP

RESTORAT

ION Bid Bond 20% - Yes Bid Bond 20% - Yes

NUMBER OF AMENDMENTS ISSU 5

ACKNOWLEDGE YES

ACKNOWLEDG YES

Item No. Work or Material QTY Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Clearing & Grubbing 1 LS 186,700.00$ $ 186,700.00 $195,000.00 $195,000.00

2 Pollution Control 1 LS 90,330.00$ $ 90,330.00 $116,250.00 $116,250.00

Vegetative Measures 1 LS 298,805.00$ $ 298,805.00 $ 200,000.00 $200,000.00

Construction Surveys 1 LS 32,640.00$ $ 32,640.00 $ 250,000.00 $250,000.00

Mobilization & Demobilization 1 LS 29,835.00$ $ 29,835.00 $ 250,000.00 $250,000.00

6 Removal of Water 1 LS 130,725.00$ $ 130,725.00 $ 453,500.00 $453,500.00

Earthfill, Dike Construction

(DK1) 18,000 LF 39.50$ $ 711,000.00 $ 42.46 $764,280.00

SOUTH BAY, FL 33493 ANDALUSIA, AL 36420

EDENS CONSTRUCTION CO.,

INC.

TRIPLE C CONTRACTING,

LLC

Earthfill, Ditch Block (DB1-DB7) 7 EA 9,400.00$ $ 65,800.00 4,000.00$ $28,000.00

Structure for Water Control

(SWC1) 1 EA 19,240.00$ $ 19,240.00 24,100.00$ $24,100.00

Structure for Water Control

(SWC2) 1 EA 18,555.00$ $ 18,555.00 20,400.00$ $20,400.00

Structure for Water Control

(SWC3) 1 EA 18,100.00$ $ 18,100.00 21,900.00$ $21,900.00

Structure for Water Control

(SWC4) 1 EA 10,160.00$ $ 10,160.00 65,500.00$ $65,500.00

Structure for Water Control

(SWC5) 1 EA $ 207,350.00 $ 207,350.00 $ 139,550.00 $139,550.00

Land Smoothing

(LS1-LS14) 1 LS $ 274,290.00 $ 274,290.00 $ 402,125.00 $402,125.00

Structural Removal (RES1 -

RES9) 9 EA $ 9,520.00 $ 85,680.00 $ 1,566.00 $14,094.00

Road Modification

(RM1) 1 EA $ 10,520.00 $ 10,520.00 $ 9,000.00 $9,000.00

17 Channel (CH1) 1 EA $ 30,200.00 $ 30,200.00 $ 20,000.00 $20,000.00

Berm Modification 1 EA $ 20,720.00 $ 20,720.00 $ 23,800.00 $23,800.00

TOTAL BID $ 2,240,650.00 TOTAL BID $2,997,499.00 TOTAL BID $ - TOTAL BID $ -

Sheet1

2016-09-22T15:34:11-0500
NANCY HARRIS

File details come from the government source that posted it. Updated .