k.DB_Oregon_Wage_Determination_Res2.htm

HTM file 5 KB Posted

Attached to
Roofing Repair/Replacement & Minor Facility Construction Federal contract opportunity
Solicitation number
AG-04R3-S-09-0004
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

k. DB Oregon Wage Determination Residential 2

Text of this file

General Decision Number: OR080011 07/25/2008 OR11

Superseded General Decision Number: OR20070011

State: Oregon

Construction Type: Residential

Counties: Gilliam, Grant, Harney, Lake, Morrow and Wheeler Counties in Oregon.

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 02/08/2008 1 07/25/2008

* SUOR1977-002 07/01/1977

Rates Fringes

CARPENTER........................$ 7.50

CEMENT MASON/CONCRETE FINISHER...$ 7.50

ELECTRICIAN......................$ 8.00

FLOOR LAYER: CARPET (SOFT)

FLOOR............................$ 6.55

Insulation Installer.............$ 7.20

LABORER..........................$ 6.55

PAINTER..........................$ 7.75

PLUMBER..........................$ 9.00

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 7.50

Sheet metal worker...............$ 9.18

TILE SETTER......................$ 6.95

TRUCK DRIVER.....................$ 6.55

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files for this federal contract opportunity

Other files attached to Roofing Repair/Replacement & Minor Facility Construction, newest first.
File Type Posted
d. Amended Specification.pdf PDF
c. Hoist Removal.pdf PDF
a. Amendment_1.rtf RTF text file
b. Changes to Solicitation Amend No 1.doc DOC document
b.Solicitation.rtf RTF text file
v.sf25b_Continuation_Sheet_Bonds.pdf PDF
u.Sf25a_Payment_Bond.pdf PDF
h.Idaho_Wage_Determination95-0228_sca.htm HTM file
n.DB-WA_Wage_Determination_Res2.htm HTM file
s. SF24_Bid_Bond.pdf PDF
f.Oregon_Wage_Determination77-0079_sca.htm HTM file
l.DB_Oregon_Wage_Determination_Res3.htm HTM file
d.ProjectDescriptions_Locations_Drawings.pdf PDF
e.Specifications.pdf PDF
j.DB_Oregon_Wage_Determination_Res1.htm HTM file
o.DB-WA_Wage_Determination_Res3.htm HTM file
p.DB_Idaho_Wage_Determination_Building.htm HTM file
t.sf25_Performance_Bond.pdf PDF
c.TitleSheet.pdf PDF
a.Bidders_Packet.rtf RTF text file
q.DB_Oregon_Wage_Determination_Building.htm HTM file
r.DB-WA_Wage_Determination_Building.htm HTM file
m.DB-WA_Wage_Determination_Res1.htm HTM file
i.DB_Idaho_Wage_Determination_Residential.htm HTM file
g.Washington_Wage_Determination77-0209_sca.htm HTM file
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .