a. Amendment_1.rtf

RTF text file 78 KB Posted

Attached to
Roofing Repair/Replacement & Minor Facility Construction Federal contract opportunity
Solicitation number
AG-04R3-S-09-0004
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

a. Amendment 1

Text of this file

Solicitation No. AG-04R3-S-09-0004 , Amendment No. 1 Page 1 of 2

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE

PAGE OF PAGES

2 AMENDMENT NO.

1 (ONE)

3. EFFECTIVE DATE

05/15/2009

4. REQUISITION/PUCHASE REQ. NO.

5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

Blue Mountain AQM Area 2517 SW Hailey Avenue Pendleton, OR 97801

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) X 9A.Amend Solicitation No. AG-04R3-S-09-0004

X 9B.Dated 04/17/2009

10A.Mod Contract/Order #

10B.Dated (see Item 13) code facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ X ] is extended [ ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) Building/Roof Repair/Construction/Reconstruction

The date set for receipt of offers is extended to 05/29/2009. The time and location remain the same.
Replace the Schedule of Items with the revised Schedule of Items attached.
ADD #7. Site 7 to Section C-2 “Project Location”.

CONTINUED ON NEXT PAGE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Peggy Patten, Contracting Officer

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED

16B.UNITED STATES OF AMERICA

By/s/ Peggy Patten_______ (Signature of Contracting Officer)

16C.DATE SIGNED

05/15/2009 Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

AMENDMENT #1 CONTINUED

ADD 7.1 TO SECTION G-4 “GOVERNMENT-FURNISHED PROPERTY”.
DELETE Section J in it’s entirety and replace with the new attached Section J.
ADD the attached 2 new pages to #2 “Project Description, Locations and Drawings: All projects” located in Section J. The 2 new pages are the Hoist Project Description and Drawing.
Change the page numbers of #2 in Section J from 12 to 14.
DELETE the Specifications (19 pages) in it’s entirety and replace with the new Specifications (27 pages) attached
DELETE Paragraph B. Capability from Section M-3 “EVALUATION CRITERIA”.

Other files for this federal contract opportunity

Other files attached to Roofing Repair/Replacement & Minor Facility Construction, newest first.
File Type Posted
d. Amended Specification.pdf PDF
c. Hoist Removal.pdf PDF
b. Changes to Solicitation Amend No 1.doc DOC document
n.DB-WA_Wage_Determination_Res2.htm HTM file
s. SF24_Bid_Bond.pdf PDF
f.Oregon_Wage_Determination77-0079_sca.htm HTM file
l.DB_Oregon_Wage_Determination_Res3.htm HTM file
b.Solicitation.rtf RTF text file
k.DB_Oregon_Wage_Determination_Res2.htm HTM file
v.sf25b_Continuation_Sheet_Bonds.pdf PDF
u.Sf25a_Payment_Bond.pdf PDF
h.Idaho_Wage_Determination95-0228_sca.htm HTM file
d.ProjectDescriptions_Locations_Drawings.pdf PDF
e.Specifications.pdf PDF
j.DB_Oregon_Wage_Determination_Res1.htm HTM file
o.DB-WA_Wage_Determination_Res3.htm HTM file
p.DB_Idaho_Wage_Determination_Building.htm HTM file
t.sf25_Performance_Bond.pdf PDF
c.TitleSheet.pdf PDF
a.Bidders_Packet.rtf RTF text file
q.DB_Oregon_Wage_Determination_Building.htm HTM file
r.DB-WA_Wage_Determination_Building.htm HTM file
m.DB-WA_Wage_Determination_Res1.htm HTM file
i.DB_Idaho_Wage_Determination_Residential.htm HTM file
g.Washington_Wage_Determination77-0209_sca.htm HTM file
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .