a. Amendment 1
Text of this file
Solicitation No. AG-04R3-S-09-0004 , Amendment No. 1 Page 1 of 2
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CONTRACT ID CODE
PAGE OF PAGES
2 AMENDMENT NO.
1 (ONE)
3. EFFECTIVE DATE
05/15/2009
4. REQUISITION/PUCHASE REQ. NO.
5. PROJECT NO.(IF APPLICABLE)
6. ISSUE BY CODE
7.ADMINISTERED BY (if other than item 6) CODE
Blue Mountain AQM Area 2517 SW Hailey Avenue Pendleton, OR 97801
8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) X 9A.Amend Solicitation No. AG-04R3-S-09-0004
X 9B.Dated 04/17/2009
10A.Mod Contract/Order #
10B.Dated (see Item 13) code facility code
11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION
[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ X ] is extended [ ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..
C. This supplemental agreement is entered into pursuant to authority of:
D Other: (Specify type of modification and authority):
E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) Building/Roof Repair/Construction/Reconstruction
| The date set for receipt of offers is extended to 05/29/2009. The time and location remain the same. |
| Replace the Schedule of Items with the revised Schedule of Items attached. |
| ADD #7. Site 7 to Section C-2 “Project Location”. |
CONTINUED ON NEXT PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A.NAME AND TITLE OF SIGNER (Type or print)
16A.NAME AND TITLE OF CONTRACTING OFFICER
Peggy Patten, Contracting Officer
15B.CONTRACTOR/OFFEROR
By ______________________________ (Signature of person authorized to sign)
15C.DATE SIGNED
16B.UNITED STATES OF AMERICA
By/s/ Peggy Patten_______ (Signature of Contracting Officer)
16C.DATE SIGNED
05/15/2009 Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243
AMENDMENT #1 CONTINUED
| ADD 7.1 TO SECTION G-4 “GOVERNMENT-FURNISHED PROPERTY”. |
| DELETE Section J in it’s entirety and replace with the new attached Section J. |
| ADD the attached 2 new pages to #2 “Project Description, Locations and Drawings: All projects” located in Section J. The 2 new pages are the Hoist Project Description and Drawing. |
| Change the page numbers of #2 in Section J from 12 to 14. |
| DELETE the Specifications (19 pages) in it’s entirety and replace with the new Specifications (27 pages) attached |
| DELETE Paragraph B. Capability from Section M-3 “EVALUATION CRITERIA”. |
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .