b. Changes to Solicitation Amend No 1.doc
DOC document 140 KB Posted
- Attached to
- Roofing Repair/Replacement & Minor Facility Construction Federal contract opportunity
- Solicitation number
- AG-04R3-S-09-0004
About this file
b. Changes to the solicitation
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment No. 1; Solicitation # AG-04R3-S-09-0004; Building/Roof/Repair/Construction/Reconstruction; Page 1 of 4
Supplies or Services and Prices/Costs Schedule of Items
Solicitation No.
AG-04R3-S-09-0004
Page
Name of Offeror or Contractor
| ITEM NO. |
| DESCRIPTION |
| QUANTITY |
| PAY UNIT |
| UNIT PRICE |
| TOTAL |
SCHEDULE OF ITEMS
Umatilla National Forest
| ITEM 1 |
| Site 1 |
BASE ITEM
1.1
| Tollgate Recreation Center (Mess Hall) – roof replacement |
| 1 |
| LSQ |
| LS |
| $ |
| $ |
BASE ITEM
1.1a
| Tollgate Recreation Center( Mess Hall) – truss repair |
| 6 |
| CQ |
| EACH |
| $ |
| $ |
OPTION
1.1b
| Tollgate Recreation Center(Mess Hall) – truss replacement |
| 5 |
| CQ |
| EACH |
| $ |
| $ |
| TOTAL ITEM 1 (SITE 1) |
| XXXXXX |
| XXXXX |
| XXXXXX |
| XXXXXX |
| $ |
| ITEM 2 |
| Site 2 |
| 1.2 |
| Ukiah Warehouse – roof replacement |
| 1 |
| LSQ |
| LS |
| XXXXXX |
| $ |
| ITEM 3 |
| Site 3 |
| 1.3 |
| Ukiah Tree Cooler – roof replacement |
| 1 |
| LSQ |
| LS |
| XXXXXX |
| $ |
OPTION ITEMS: to be awarded depending on Funding availability
| ITEM 4 |
| Site 4 |
| 1.4 |
| Godman Sno-shelter – roof replacement (1/2 of |
roof)
| 1 |
| LSQ |
| LS |
| XXXXXX |
| $ |
| ITEM 5 |
| Site 5 |
| 1.5 |
| Long Meadows Guard Station – roof replacement with GFM (metal roofing) |
| 1 |
| LSQ |
| LS |
| XXXXXX |
| $ |
| ITEM 6 |
| Site 6 |
| 1.6 |
| Umatilla NF Radio shop – roof replacement with GFM (shingles) |
| 1 |
| LSQ |
| LS |
| XXXXXX |
| $ |
| TOTAL ALL ITEMS |
| XXXXXXXX |
| XXXXXXX |
| XXXXXXX |
| XXXXXX |
| $ |
OPTION ITEM MAY OR MAY NOT BE EXERCISED AT TIME OF AWARD OF BASE ITEMS.
THE CONTRACTING OFFICER MAY EXERCISE OPTION ITEMS BY WRITTEN NOTICE TO
THE CONTRACTOR. OPTION ITEMS, IF EXERCISED WILL BE REQUESTED WITHIN THE ESTABLISHED PERFORMANCE PERIOD
Work may be perform in the States of Idaho, Oregon and Washington. In the counties of OR Harney; OR Malheur ;WA Adams; WA Asotin; WA Columbia; WA Ferry; WA Garfield; OR Baker; OR Gilliam; OR Grant; OR Morrow; OR Umatilla; OR Union; OR Wallowa; OR Wheeler; WA Walla Walla; ID Idaho.
MINIMUM AND MAXIMUM CONTRACT AMOUNTS (FEB 1988)
During the period specified in FAR clause 52.216-18 ORDERING, the Government shall place orders totaling a minimum of $2,000_, but not in excess of $990,000 _
Supplies or Services and Prices/Costs Schedule of Items
Solicitation No.
AG-04R3-S-09-0004
Page Added
Name of Offeror or Contractor
| ITEM NO. |
| DESCRIPTION |
| QUANTITY |
| PAY UNIT |
| UNIT PRICE |
| TOTAL |
SCHEDULE OF ITEMS
Umatilla National Forest
Note: Provide quote on SAMPLE PROJECTS for evaluation purposes only. SAMPLE PROJECTS serve as a means of evaluating for “price reasonability” in further developing the pool of Contractors for competing of Task Orders.
All items not specified as a SAMPLE PROJECT will be awarded under this solicitation.
| 1.7 |
| *SAMPLE PROJECT 1: Exterior painting of rental cabin(s). Work includes preparing, priming and painting of exterior walls, doors, and window frames |
Information: Average FS small rental cabin: Outside wall dimensions 20 ft x 20 ft; 2 doors, 5 windows (24” x 24”). Estimate 4 – 5 days work including mob and cleanup; nearest full service community 20 miles away. No electricity or potable water available.
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| 1.8 |
| *SAMPLE PROJECT 2: Interior painting of rental cabin(s). Work includes preparing, priming and painting of interior walls, doors, and window frames. |
Information: Average FS small rental cabin with 1 small bedroom and doorway, kitchen with doorway to living room, small bathroom with door: Outside wall dimensions 20 ft x 20 ft; 2 doors, 5 windows (24” x 24”). Estimate 4 – 5 days work including mob and cleanup; nearest full service community 20 miles away. No electricity or potable water available.
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| 1.9a |
| Demolition of 1960-era vehicle hoist: Work includes removal and disposal of all metal hoist items including chain, cylinders, guide rails, and other attachments and controls. Work also includes removal of hydraulic fluid collection reservoir and containment culvert (est. 175 gal capacity). Contractor shall install one air fitting and connecting plumbing (Government Furnished Material) prior to closure of pit. |
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| 1.9b |
| Re-establish Concrete floor: Contractor shall close up pit finishing with a concrete floor surface to match existing shop floor. Fill in access pit (estimated 2 ft wide x 13 long ft x 8 ft deep) with common borrow material and minimum of 8 inches of crushed aggregate on top. Compaction of fill to no visible deflection required. Provide all labor and materials to form up and pour 8 inch concrete slab with rebar reinforcement (a 12” x 12” grid full length of pit) to complete pit closure. |
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| 1.10 |
| *SAMPLE PROJECT3: Building foundation stabilization and reconstruction. Information: Small 20 ft x 20 ft rental cabin with pre-1950 deteriorating concrete foundation. Contractor to provide all work needed to support building during repairs and/or replacement of foundation. Estimate 10 – 20 days work including mob and cleanup; nearest full service community 20 miles away. No electricity or potable water available |
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| TOTAL ALL ITEMS |
| XXXXXXXX |
| XXXXXXX |
| XXXXXXX |
| XXXXXX |
| $ |
* SAMPLE PROJECTS will be used for negotiation and evaluation purposes only.
THE CONTRACTING OFFICER MAY EXERCISE OPTION ITEMS BY WRITTEN NOTICE TO
THE CONTRACTOR. OPTION ITEMS, IF EXERCISED WILL BE REQUESTED WITHIN THE ESTABLISHED PERFORMANCE PERIOD
Work may be perform in the States of Idaho, Oregon and Washington. In the counties of OR Harney; OR Malheur ;WA Adams; WA Asotin; WA Columbia; WA Ferry; WA Garfield; OR Baker; OR Gilliam; OR Grant; OR Morrow; OR Umatilla; OR Union; OR Wallowa; OR Wheeler; WA Walla Walla; ID Idaho.
MINIMUM AND MAXIMUM CONTRACT AMOUNTS (FEB 1988)
During the period specified in FAR clause 52.216-18 ORDERING, the Government shall place orders totaling a minimum of $2,000_, but not in excess of $990,000 _
Sample Projects shown in the schedule are for price evaluation purposes only. The Sample Projects are not representative of the actual quantities being ordered, but serve as a means of evaluating for “price reasonability” in further developing a pool of Contractors for competing Task Orders.
C-2
PROJECT LOCATION
1. Site 7:
· Hoist Removal at Umatilla NF Fleet Shop & Warehouse Compound 1411 SE Byers, Pendleton, OR
· Directions from Pendleton: From I-84 Exit 210 (near Red Lion) proceed north on Hwy 11 to overpass and Court Street intersection with stop lights. Proceed ahead through the stop light; onto Court Place road curves slightly to the right; proceed two block to 12th Street; turn left and proceed ahead one block to Byers; turn right onto Byers; proceed ahead past Washington Elementary School. Umatilla National Forest Warehouse Compound is first left past the school yard. Fleet Shop is first warehouse building on right. Note: Compound is gated and locked weekends and after 4:30 pm on weekdays. Period of performance will be 30 days from the notice to proceed date.
G-4
GOVERNMENT-FURNISHED PROPERTY
| Item No. |
| Property Description |
| Property Value |
| Qty |
| Location |
| Date Available |
| 5.1 |
| Metal roofing material |
( designated for Long Meadow Guard Station task order) $ 1000.00
Umatilla NF Compound at
1411 SE Byers, Pendleton, OR At award
| 6.1 |
| Cedar shingles |
(Radio Shop at Umatilla NF compound) $ 1000.00
Umatilla NF Compound at
1411 SE Byers, Pendleton, OR At award
| 7.1 |
| Air fittings & connecting tubing |
| $100.00 |
Umatilla NF Compound at
1411 SE Byers, Pendleton, OR At award
Section J - List of Documents, Exhibits, and Other Attachments
The following attachments are made a part of this solicitation and any resultant contract.
| Title |
| Pages |
| 1. Title Sheet |
| 1 |
| 2. Project Descriptions, Locations and Drawings: All projects |
| 14 |
| 3. Specifications |
| 27 |
| 4. OREGON DOL Wage Decision No. 1977-0079 (Rev #37) |
| 3 |
| 5. WASHINGTON DOL Wage Decision No. 1977-0209 (Rev. # 37) |
| 4 |
| 6. IDAHO DOL Wage Decision No. 1995-0028 (Rev #21) |
| 5 |
| 7. IDAHO DOL Wage Decision No. ID20070007 (residential) |
| 3 |
| 8. OREGON DOL Wage Decision No.OR080006 (residential) |
| 3 |
| 9. OREGON DOL Wage Decision No.OR080011 (residential) |
| 3 |
| 10. OREGON DOL Wage Decision No.OR2007016 (residential) |
| 3 |
| 11. WASHINGTON DOL Wage Decision No. WA080016 (residential) |
| 3 |
| 12. WASHINGTON DOL Wage Decision No. WA080017 (residential) |
| 3 |
| 13. WASHINGTON DOL Wage Decision No. WA080018 (residential) |
| 3 |
| 14. IDAHO DOL Wage Decision No. ID080001 (building) |
| 5 |
| 15. OREGON DOL Wage Decision No.OR080001 (building) |
| 25 |
| 16. WASHINGTON DOL Wage Decision No. WA080003 (building) |
| 20 |
| 17. SF24 Bid Bond |
| 2 |
| 18. SF25 Performance Bond |
| 2 |
| 19. SF25A Payment Bond |
| 2 |
| 20. SF25B Continuation Sheet for Bonds |
| 2 |